Contractor dossier
268 projects on file, including joint ventures this contractor is part of.
Total projects
268
Total budget
₱12.4B
Average progress
96.8%
Completion rate
91.8%
Average risk score
45.2
Medium risk on average, out of 100
Flagged as unusual
6
2.2% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 203 | ₱9.7B | 43.8 | 4 | 96.4% |
| National Capital Region | 37 | ₱1.5B | 47.5 | 0 | 100.0% |
| Region IV-B | 7 | ₱290.5M | 45.1 | 1 | 96.6% |
| Region IV-A | 5 | ₱226.8M | 55.3 | 0 | 83.1% |
| Region I | 3 | ₱175.7M | 62.9 | 0 | 100.0% |
| Region II | 3 | ₱104.5M | 57.3 | 0 | 100.0% |
| Negros Island Region | 3 | ₱116.8M | 54.3 | 0 | 97.7% |
| Central Office | 2 | ₱146.9M | 61.4 | 0 | 100.0% |
| Region VII | 2 | ₱68.2M | 44.9 | 0 | 100.0% |
| Region VI | 1 | ₱16.4M | 51.5 | 1 | 100.0% |
| Region VIII | 1 | ₱17.4M | 49.2 | 0 | 72.3% |
| Cordillera Administrative Region | 1 | ₱32.3M | 45.7 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 107 | ₱5.5B | 43.0 | 1 | 98.2% |
| Roads | 74 | ₱3.4B | 46.5 | 0 | 99.1% |
| Bridges | 47 | ₱1.9B | 43.3 | 1 | 94.0% |
| Buildings and Facilities | 25 | ₱828.3M | 43.8 | 1 | 100.0% |
| OTHER | 8 | ₱397M | 58.5 | 1 | 88.9% |
| GAA 2025 SSP | 2 | ₱76.2M | 94.2 | 1 | 53.4% |
| GAA 2025 OO-2 | 2 | ₱160.7M | 89.4 | 1 | 69.8% |
| Bridges, Roads | 2 | ₱145.7M | 49.0 | 0 | 57.6% |
| Water Provision and Storage | 1 | ₱1.7M | 14.7 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CB0102CONSTRUCTION OF BRIDGE, BARANGAY CUPANG, BALANGA CITY, BATAAN | Region III | Bataan 2nd DEO | On-Going | ₱56.9M | 17% | High risk95 | Flagged0.027 |
| 25CC0509CONSTRUCTION OF MULTI-PURPOSE BUILDING (GUIGUINTO OVAL SPORTS COMPLEX) POBLACION, GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱19.3M | 90% | High risk94 | —-0.003 |
| 25C00310FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, UMAGOL RIVER, UPSTREAM, SEGMENT VR-2, BAGAC, BATAAN | Region III | Bataan 3rd DEO | On-Going | ₱118.2M | 63% | High risk93 | —-0.001 |
| 25EF0107CONST. OF LUBGOB RIVER FLOOD CONTROL STRUCTURE, QUEZON, PALAWAN | Region IV-B | Palawan 2nd DEO | On-Going | ₱42.4M | 76% | High risk86 | Flagged0.005 |
| 24C00048FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAGAC RIVER (VALDEZ BRIDGE), BAGAC, BATAAN (PHASE II) | Region III | Region III | On-Going | ₱94.3M | 93% | High risk81 | —-0.012 |
| 25CC0170CONSTRUCTION OF CONCRETE SLOPE PROTECTION STRUCTURE, PUROK 6, BARANGAY SANTA CRUZ, GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱92.6M | 32% | High risk81 | —-0.005 |
| 24CC0164CONSTRUCTION OF RIVER CONTROL STRUCTURE AT BARANGAY POBLACION PUROK 1, GUIGUINTO, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱77.2M | 100% | High risk76 | —-0.060 |
| 24CC0294CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE AT BARANGAY CAMBAOG-TALAMPAS (PUROK 3), BUSTOS, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱77.2M | 100% | High risk76 | —-0.061 |
| 17CL0117CONSTRUCTION OF ONE (1) EVACUATION CENTER AT BOTOLAN, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱33.9M | 100% | High risk73 | —-0.062 |
| 24C00161FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG COLO TRIBUTARY (PINULOT SECTION) TO COLO RIVER, PHASE 2-P, BRGY PINULOT, DINALUPIHAN, BATAAN | Region III | Region III | On-Going | ₱47.3M | 54% | High risk73 | —-0.008 |
| 17CB0090REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4) EPZA BY-PASS (BARASO COUNTRY RD) - KO158+-140-KO158+340, KO160+300-KO160+540, KO161 | Region III | Bataan 2nd DEO | Completed | ₱68.1M | 100% | High risk72 | —-0.058 |
| 20CB0011CONSTRUCTION OF FLOOD CONTROL STRUCTURES, TALISAY RIVER, CATMON SECTION PILAR, BATAAN | Region III | Bataan 2nd DEO | Completed | ₱47.8M | 100% | High risk72 | —-0.057 |
| 24CC0436CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY STO. NINO, PANDI, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱4.9M | 100% | High risk72 | —-0.076 |
| 17CA0069CONSTRUCTION OF LAYAC DIVERSION CHANNEL,DINALUPIHAN, BATAAN | Central Office | Flood Control Management Cluster | Completed | ₱62.4M | 100% | High risk72 | —-0.055 |
| 18CL0010CONSTRUCTION OF SLOPE PROTECTION/ FLOOD CONTROL @ TAMBAK RIVER LEFT SIDE (UPSTREAM), BARANGAY PALANGINAN, IBA, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱92.6M | 100% | High risk71 | —-0.025 |
| 22CL0010CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, ACCESS ROAD LEADING TO PRAWN FRY HATCHERIES AND RESORTS AND SURFING AREA, CABANGAN, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱64.5M | 11% | High risk71 | Flagged0.039 |
| 22CL0044CONSTRUCTION OF STA. CRUZ COASTAL ROAD, SANTA CRUZ, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱96.5M | 100% | High risk71 | —-0.019 |
| 19C00077REHABILITATION OF DISASTER-RELATED INFRASTRUCTURE AND OTHER FACILITIES-RECONSTRUCTION OF SLOPE PROTECTION AT BALAYBAY RESETTLEMENT ELEMENTARY SCHOOL, CASTILLEJOS, ZAMBALES | Region III | Region III | On-Going | ₱93.5M | 32% | High risk71 | Flagged0.060 |
| 17CB0024NETWORK DEVELOPMENT IMPROVEMENT/WIDENING OF NATIONAL ROADS ROMAN EXPRESSWAY KO133+292-KO133+600, KO140+813-KO141+437 KO141+472-KO142+094 ORION LIMAY, BATAAN | Region III | Bataan 2nd DEO | Completed | ₱37.5M | 100% | High risk70 | —-0.064 |
| 20A00185LOCAL INFRASTRUCTURE PROGRAM - CONSTRUCTION OF MISSING LINK/NEW ROADS, ADAMS (ILOCOS NORTE) - CALANASAN (APAYAO) ROAD | Region I | Region I | Completed | ₱99M | 100% | High risk70 | —-0.067 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 19C00077REHABILITATION OF DISASTER-RELATED INFRASTRUCTURE AND OTHER FACILITIES-RECONSTRUCTION OF SLOPE PROTECTION AT BALAYBAY RESETTLEMENT ELEMENTARY SCHOOL, CASTILLEJOS, ZAMBALES | Region III | Region III | On-Going | ₱93.5M | 32% | High risk71 | Flagged0.060 |
| 22CL0010CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, ACCESS ROAD LEADING TO PRAWN FRY HATCHERIES AND RESORTS AND SURFING AREA, CABANGAN, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱64.5M | 11% | High risk71 | Flagged0.039 |
| 25CB0102CONSTRUCTION OF BRIDGE, BARANGAY CUPANG, BALANGA CITY, BATAAN | Region III | Bataan 2nd DEO | On-Going | ₱56.9M | 17% | High risk95 | Flagged0.027 |
| 24C00160BRIDGE PROGRAM - REPLACEMENT OF PERMANENT WEAK BRIDGES - AMO BR. (B01613LZ) ALONG JCT. LAYAC-BALANGA-MARIVELES PORT ROAD (PHASE 1) | Region III | Region III | On-Going | ₱40.2M | 0% | High risk64 | Flagged0.016 |
| 16GB0254CONSTRUCTION OF 3 STOREY NINE(9) CLASSROOM SCHOOL BUILDING AT BARBAZA, NHS, BARBAZA, ANTIQUE | Region VI | Antique DEO | Completed | ₱16.4M | 100% | Medium risk51 | Flagged0.012 |
| 25EF0107CONST. OF LUBGOB RIVER FLOOD CONTROL STRUCTURE, QUEZON, PALAWAN | Region IV-B | Palawan 2nd DEO | On-Going | ₱42.4M | 76% | High risk86 | Flagged0.005 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 25CB0103WIDENING OF PERMANENT BRIDGES - CULVO BR. (B00065LZ) ALONG GOV JJ LINAO RD, BATAAN 2ND DISTRICT | Region III | Bataan 2nd DEO | On-Going | ₱61.6M | 13% | Medium risk46 | —-0.008 |
| 102 | 19OI0106CONSTRUCTION OF SLOPE PROTECTION STRUCTURES ALONG TUNASAN RIVER (VILLA CAROLINA I), BRGY. TUNASAN, MUNTINLUPA CITY | National Capital Region | Las Piñas-Muntinlupa DEO | Completed | ₱37.2M | 100% | Medium risk46 | —-0.085 |
| 103 | 20OI0006CONST. OF FLOOD CONTROL STRUCTURES, DANCALAN CREEK, LAS PINAS CITY | National Capital Region | Las Piñas-Muntinlupa DEO | Completed | ₱28.5M | 100% | Medium risk46 | —-0.086 |
| 104 | 18OI0187CONST. OF FOUR (4) STOREY, TWELVE (12) CLASSROOM S/B AT BULI ELEM. SCHOOL, MUNTINLUPA CITY | National Capital Region | Las Piñas-Muntinlupa DEO | Completed | ₱33.6M | 100% | Medium risk46 | —-0.044 |
| 105 | 18OI0123CONSTRUCTION OF SLOPE PROTECTION AND OTHER IMPROVEMENT OF LAS PINAS RIVER & OTHER TRIBUTARIES, LAS P | National Capital Region | Las Piñas-Muntinlupa DEO | Completed | ₱36.1M | 100% | Medium risk46 | —-0.083 |
| 106 | 24EF0001CONSTRUCTION OF BATANG-BATANG RIVER FLOOD CONTROL STRUCTURE, NARRA, PALAWAN | Region IV-B | Palawan 2nd DEO | Completed | ₱53M | 100% | Medium risk46 | —-0.053 |
| 107 | 21CB0047REHABILITATION OF BATAAN PEOPLE'S CENTER, BALANGA CITY, BATAAN | Region III | Bataan 2nd DEO | Completed | ₱48M | 100% | Medium risk46 | —-0.093 |
| 108 | 22CB0041WIDENING OF PERMANENT BRIDGES - PANDAM BR. (BO1602LZ) ALONG ROMAN EXPRESSWAY, ORION, BATAAN | Region III | Bataan 2nd DEO | Completed | ₱85.9M | 100% | Medium risk46 | —-0.048 |
| 109 | 21CB0077REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROAD-JCT. LAYAC-BALANGA-MARIVELES PORT ROAD-KO160+032-KO160+340, KO160+422-KO161+000, BATAAN 2ND DISTRICT | Region III | Bataan 2nd DEO | Completed | ₱34.4M | 100% | Medium risk46 | —-0.101 |
| 110 | 24CA0085CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES -CONSTRUCTION OF ROAD AT 1 BATAAN COMMAND | Region III | Bataan 1st DEO | On-Going | ₱48.2M | 100% | Medium risk46 | —-0.067 |
| 111 | 18PD0078BRIDGE PROGRAM-RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, BGH FLYOVER (B00568LZ) BAGUIO GENERAL HOSPITAL FLYOVER | Cordillera Administrative Region | Baguio City DEO | Completed | ₱32.3M | 100% | Medium risk46 | —-0.044 |
| 112 | 19OD0236CONSTRUCTION OF ROADS/ ALLEY & DRAINAGE ALONG BRGY. 74, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱9.4M | 100% | Medium risk46 | —-0.090 |
| 113 | 22CA0041CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD SITIO TAMA, B | Region III | Bataan 1st DEO | Completed | ₱49M | 100% | Medium risk46 | —-0.097 |
| 114 | 18OH0022PROPOSED DRAINAGE IMPROVEMENT ALONG TAFT AVENUE (NB) ESTRADA TO P. QUIRINO AVENUE,MALATE, MANILA | National Capital Region | South Manila DEO | Completed | ₱18.6M | 100% | Medium risk46 | —-0.090 |
| 115 | 19OD0035CONSTRUCTION/ REHABILITATION OF ROADS AND DRAINAGE ALONG P. JACINTO ROAD CONNECTING TO GENERAL LUIS ROAD, BRGY. 165, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱9.4M | 100% | Medium risk46 | —-0.101 |
| 116 | 24CA0087BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES, ORANI BR. 2 (B01699LZ) ALONG ROMAN EXPRESSWAY, ORANI, BATAAN | Region III | Bataan 1st DEO | On-Going | ₱85.9M | 19% | Medium risk45 | —-0.006 |
| 117 | 18RF0009ASSET PRESERVATION PROGRAMS- REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT MANAGEMENT-4 (HDM-4)- TERTIARY ALONG MABINAY- AYUNGON ROAD, AYUNGON, NEGROS ORIENTAL 1ST LD | Negros Island Region | Negros Oriental 1st DEO | Completed | ₱40.8M | 100% | Medium risk45 | —-0.088 |
| 118 | 23CB0022WIDENING OF PERMANENT BRIDGES - DIVERSION BR. (BO1579LZ) ALONG JCT LAYAC-BALANGA-MARIVELES PORT RD, BATAAN 2ND DISTRICT | Region III | Bataan 2nd DEO | On-Going | ₱56.1M | 91% | Medium risk45 | —-0.018 |
| 119 | 18HG0133CONSTRUCTION OF 4-STOREY 16-CL SCHOOL BUILDING AT SAN SEBASTIAN NHS, SAMBOAN, CEBU | Region VII | Cebu 2nd DEO | Completed | ₱36.7M | 100% | Medium risk45 | —-0.043 |
| 120 | 23EF0005CONSTRUCTION OF BATANG-BATANG RIVER FLOOD CONTROL STRUCTURE, STA. 0+200 - STA.0+900 L/S DOWNSTREAM | Region IV-B | Palawan 2nd DEO | Completed | ₱50.7M | 100% | Medium risk45 | —-0.051 |
| 121 | 18HG0134CONSTRUCTION OF 4-STOREY 12-CL SCHOOL BUILDING AT SAMBOAN NHS, SAMBOAN, CEBU | Region VII | Cebu 2nd DEO | Completed | ₱31.5M | 100% | Medium risk45 | —-0.044 |
| 122 | 20CB0020WIDENING OF PERMANENT BRIDGE, CATANING BR. 2 (BO1598LZ) ALONG ROMAN EXPRESSWAY, BALANGA CITY, BATAAN | Region III | Bataan 2nd DEO | Completed | ₱63.2M | 100% | Medium risk45 | —-0.059 |
| 123 | 23CB0019WIDENING OF PERMANENT BRIDGES - MAMALA BR. (BO1603LZ) ALONG ROMAN EXPRESSWAY, BATAAN 2ND DISTRICT | Region III | Bataan 2nd DEO | Completed | ₱59.8M | 100% | Medium risk45 | —-0.056 |
| 124 | 21CB0026ROAD WIDENING - SECONDARY ROAD - GOV JJ LINAO ROAD - KO135+500 - KO136+456, BATAAN 2ND DISTRICT | Region III | Bataan 2nd DEO | Completed | ₱42.7M | 100% | Medium risk45 | —-0.099 |
| 125 | 23CC0154NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - GOV. HALILI BYPASS ROAD - NLEX (PHASE 2), BULACAN, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | On-Going | ₱76.3M | 90% | Medium risk44 | —-0.052 |