Contractor dossier
167 projects on file, including joint ventures this contractor is part of.
Total projects
167
Total budget
₱5.6B
Average progress
95.8%
Completion rate
85.0%
Average risk score
46.6
Medium risk on average, out of 100
Flagged as unusual
15
9.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region I | 155 | ₱4.9B | 45.9 | 11 | 95.4% |
| Region III | 8 | ₱600.5M | 57.9 | 0 | 99.9% |
| Cordillera Administrative Region | 4 | ₱117.2M | 51.8 | 4 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 145 | ₱4.6B | 45.8 | 10 | 96.1% |
| Flood Control and Drainage | 12 | ₱551.2M | 48.6 | 1 | 98.9% |
| Buildings and Facilities | 4 | ₱11.1M | 23.4 | 0 | 100.0% |
| GAA 2025 SSP | 3 | ₱322.9M | 95.5 | 3 | 59.6% |
| GAA 2025 OO-2 | 1 | ₱47.3M | 82.0 | 0 | 100.0% |
| OTHER | 1 | ₱40.3M | 72.9 | 1 | 94.2% |
| Water Provision and Storage | 1 | ₱3.3M | 25.9 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25AI0187REHABILITATION OF ROAD, PHASE 1, UMINGAN, PANGASINAN | Region I | Pangasinan 3rd DEO | On-Going | ₱117M | 70% | High risk96 | Flagged0.033 |
| 25AI0188REHABILITATION OF ROAD, PHASE 2, UMINGAN, PANGASINAN | Region I | Pangasinan 3rd DEO | On-Going | ₱117M | 76% | High risk96 | Flagged0.031 |
| 25AG0164SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SOLAR LED STREET LIGHTS ALONG ALAMINOS-BOLINAO ROAD K0325 + 831, ALAMINOS CITY, PANGASINAN | Region I | Pangasinan 1st DEO | On-Going | ₱88.9M | 33% | High risk95 | Flagged0.044 |
| 25AG0022FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF BANK SLOPE PROTECTION ALONG ALAMINOS RIVER, SESELANGEN SECTION (SEGMENT B), BARANGAY SESELANGEN, SUAL, PANGASINAN | Region I | Pangasinan 1st DEO | On-Going | ₱47.3M | 100% | High risk82 | —-0.008 |
| 24CL0057ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - SN MARCELINO-SN ANTONIO-SN NARCISO RD - K0157+046 -K0158+000, K0159+000 - K0160+000, SAN ANTONIO, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱95.5M | 100% | High risk76 | —-0.050 |
| 24CL0102ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-TERTIARY ROADS-SN MARCELINO-SN ANTONIO-SN NARCISO RD-K0162+407.72-K0163+000,K0164+000-K0164+404,K0165+000-K0165+705, K0166+286-K0166+639, SAN ANTONIO & SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱96.5M | 99% | High risk75 | —-0.020 |
| 24CL0151ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE - TERTIARY ROADS AMUNGAN-PALAUIG-BANLOG RD - K0213+878 - K0215+551, K0216+532 - K0217+077, K0223+000 - K0223+550, PALAUIG, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱96.5M | 100% | High risk73 | —-0.047 |
| 24CL0042REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - OLONGAPO-BUGALLON RD - K0190 + 017 - K0191 + 000, K0193 + 718 - K0194 + 000, K0196 + 050 - K0197 + 000, BOTOLAN, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱69.9M | 100% | High risk73 | —-0.057 |
| 24AJ0006ROAD WIDENING - SECONDARY ROADS ALONG SN CARLOS - CALASIAO ROAD - K0210+700 - K0211 + 657, CALASIAO, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱40.3M | 94% | High risk73 | Flagged0.006 |
| 24A00437PREVENTIVE MAINTENANCE-TERTIARY ROADS, ASPHALT OVERLAY BINALONAN-ASINGAN -STA. MARIA ROAD, K0193+943-K0196+111,K0196+187-K0196+360,K0196+485-K0196+719,K0198+152-K0199+139 | Region I | Region I | Completed | ₱96.5M | 100% | High risk68 | —-0.043 |
| 16AI0253PREVENTIVE MAINT. BASED ON PAVEMENT MGMT SYSTEM/HIGHWAY DEVT & MGMT-4 (HDM-4) (INTERMITTENT SECTIONS | Region I | Pangasinan 3rd DEO | Completed | ₱18.7M | 100% | High risk66 | —-0.056 |
| 17AI0102IMPVT/WIDENING OF NATL RD ALONG BINALONAN-ASINGAN-STA. MARIA ROAD W/ RROW ACQUISITION, KO 186+850-KO | Region I | Pangasinan 3rd DEO | Completed | ₱43.1M | 100% | High risk65 | —-0.054 |
| 17AJ0036ASSET PRESERVATION OF NATIONAL ROADS, PREVENTIVE MAINTENANCE BASED ON PAVEMENT MANAGEMENT SYSTEM / HDM-4, JUDGE JOSE DE VENECIA SR. AVE., K0.207+000 TO K0.207+073; K0.207+(-)611 TO K0.207+000; K0.207+(-)711 TO K0.207+(-)611, CALASIAO, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱6.6M | 100% | High risk65 | —-0.053 |
| 17AH0112REPAIR/REHAB./IMPRV'T.(ASPHALT OVERLAY)ALONG PANG.-ZAMBALES RD.K0341+(-841)-K0344+000 | Region I | Pangasinan 2nd DEO | Completed | ₱25.8M | 100% | High risk62 | Flagged0.008 |
| 17AH0111REPAIR/REHAB./IMPRV'T.(ASPHALT OVERLAY)ALONG PANG.-ZAMBALES RD.,K0348+000-K0353+636 | Region I | Pangasinan 2nd DEO | Completed | ₱37.2M | 100% | High risk62 | Flagged0.009 |
| 17AH0115REPAIR/REHAB/IMPRV'T. (ASPHALT OVERLAY)ALONG PANG.-TARLAC RD.K0167+100-K0173+110 | Region I | Pangasinan 2nd DEO | Completed | ₱42.3M | 100% | High risk62 | Flagged0.007 |
| 24AG0186SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF EMBANKMENT ALONG LUCAP BOULEVARD, BARANGAY LUCAP, ALAMINOS CITY, PANGASINAN | Region I | Pangasinan 1st DEO | Completed | ₱96.5M | 100% | High risk60 | Flagged0.003 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25AG0164SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SOLAR LED STREET LIGHTS ALONG ALAMINOS-BOLINAO ROAD K0325 + 831, ALAMINOS CITY, PANGASINAN | Region I | Pangasinan 1st DEO | On-Going | ₱88.9M | 33% | High risk95 | Flagged0.044 |
| 25AI0187REHABILITATION OF ROAD, PHASE 1, UMINGAN, PANGASINAN | Region I | Pangasinan 3rd DEO | On-Going | ₱117M | 70% | High risk96 | Flagged0.033 |
| 25AI0188REHABILITATION OF ROAD, PHASE 2, UMINGAN, PANGASINAN | Region I | Pangasinan 3rd DEO | On-Going | ₱117M | 76% | High risk96 | Flagged0.031 |
| 17AH0111REPAIR/REHAB./IMPRV'T.(ASPHALT OVERLAY)ALONG PANG.-ZAMBALES RD.,K0348+000-K0353+636 | Region I | Pangasinan 2nd DEO | Completed | ₱37.2M | 100% | High risk62 | Flagged0.009 |
| 17AH0112REPAIR/REHAB./IMPRV'T.(ASPHALT OVERLAY)ALONG PANG.-ZAMBALES RD.K0341+(-841)-K0344+000 | Region I | Pangasinan 2nd DEO | Completed | ₱25.8M | 100% | High risk62 | Flagged0.008 |
| 17AH0115REPAIR/REHAB/IMPRV'T. (ASPHALT OVERLAY)ALONG PANG.-TARLAC RD.K0167+100-K0173+110 | Region I | Pangasinan 2nd DEO | Completed | ₱42.3M | 100% | High risk62 | Flagged0.007 |
| 24AJ0006ROAD WIDENING - SECONDARY ROADS ALONG SN CARLOS - CALASIAO ROAD - K0210+700 - K0211 + 657, CALASIAO, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱40.3M | 94% | High risk73 | Flagged0.006 |
| 17PA0119REPAIR/REHABILITATION/IMPROVEMENT OF ABRA-KALINGA ROAD ASPHALT OVERLAY WITH THERMOPLASTIC PAVEMENT MARKINGS, KO416+079 - KO418+697 TO KO424+100 - KO424+386 | Cordillera Administrative Region | Abra DEO | Completed | ₱24M | 100% | Medium risk52 | Flagged0.006 |
| 17PA0121REPAIR/REHABILITATION/IMPROVEMENT OFABRA- ILOCOS NORTE ROAD ASPHALT OVERLAY WITH THERMOPLASTIC PAVEMENT MARKINGS, KO413+000 - KO416+818 | Cordillera Administrative Region | Abra DEO | Completed | ₱35.6M | 100% | Medium risk52 | Flagged0.006 |
| 17PA0118REPAIR/REHABILITATION/IMPROVEMENT OF ABRA-KALINGA ROAD ASPHALT OVERLAY WITH THERMOPLASTIC PAVEMENT MARKINGS, A.) KO424+492 - KO426+343; B.) KO435+551 - KO437+441 | Cordillera Administrative Region | Abra DEO | Completed | ₱23M | 100% | Medium risk52 | Flagged0.004 |
| 17PA0120REPAIR/REHABILITATION/IMPROVEMENT OF ABRA-KALINGA ROAD ASPHALT OVERLAY WITH THERMOPLASTIC PAVEMENT MARKINGS, A.) 429+850 - KO435+456 | Cordillera Administrative Region | Abra DEO | Completed | ₱34.6M | 100% | Medium risk52 | Flagged0.004 |
| 17AH0114REPAIR/REHAB./IMPROV'T.(ASPHALT OVERLAY)ALONG LABRADOR-LINGAYEN RD.,K0366+900-K0368+600 | Region I | Pangasinan 2nd DEO | Completed | ₱11.5M | 100% | Medium risk58 | Flagged0.003 |
| 24AG0186SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF EMBANKMENT ALONG LUCAP BOULEVARD, BARANGAY LUCAP, ALAMINOS CITY, PANGASINAN | Region I | Pangasinan 1st DEO | Completed | ₱96.5M | 100% | High risk60 | Flagged0.003 |
| 17AH0113REPAIR/REHAB./IMPV'T.(ASPHALT OVERLAY)ALONG LINGAYEN CAPITOL LOOP (LS)K0364+(-219)-K0364+836 | Region I | Pangasinan 2nd DEO | Completed | ₱11.7M | 100% | Medium risk58 | Flagged0.002 |
| 17AJ0089CONCRETING OF BRGY. PIAS FMR, MAPANDAN, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱1.9M | 100% | Low risk20 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25AI0187REHABILITATION OF ROAD, PHASE 1, UMINGAN, PANGASINAN | Region I | Pangasinan 3rd DEO | On-Going | ₱117M | 70% | High risk96 | Flagged0.033 |
| 2 | 25AI0188REHABILITATION OF ROAD, PHASE 2, UMINGAN, PANGASINAN | Region I | Pangasinan 3rd DEO | On-Going | ₱117M | 76% | High risk96 | Flagged0.031 |
| 3 | 25AG0164SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SOLAR LED STREET LIGHTS ALONG ALAMINOS-BOLINAO ROAD K0325 + 831, ALAMINOS CITY, PANGASINAN | Region I | Pangasinan 1st DEO | On-Going | ₱88.9M | 33% | High risk95 | Flagged0.044 |
| 4 | 25AG0022FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF BANK SLOPE PROTECTION ALONG ALAMINOS RIVER, SESELANGEN SECTION (SEGMENT B), BARANGAY SESELANGEN, SUAL, PANGASINAN | Region I | Pangasinan 1st DEO | On-Going | ₱47.3M | 100% | High risk82 | —-0.008 |
| 5 | 24CL0057ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - SN MARCELINO-SN ANTONIO-SN NARCISO RD - K0157+046 -K0158+000, K0159+000 - K0160+000, SAN ANTONIO, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱95.5M | 100% | High risk76 | —-0.050 |
| 6 | 24CL0102ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-TERTIARY ROADS-SN MARCELINO-SN ANTONIO-SN NARCISO RD-K0162+407.72-K0163+000,K0164+000-K0164+404,K0165+000-K0165+705, K0166+286-K0166+639, SAN ANTONIO & SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱96.5M | 99% | High risk75 | —-0.020 |
| 7 | 24CL0151ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE - TERTIARY ROADS AMUNGAN-PALAUIG-BANLOG RD - K0213+878 - K0215+551, K0216+532 - K0217+077, K0223+000 - K0223+550, PALAUIG, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱96.5M | 100% | High risk73 | —-0.047 |
| 8 | 24CL0042REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - OLONGAPO-BUGALLON RD - K0190 + 017 - K0191 + 000, K0193 + 718 - K0194 + 000, K0196 + 050 - K0197 + 000, BOTOLAN, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱69.9M | 100% | High risk73 | —-0.057 |
| 9 | 24AJ0006ROAD WIDENING - SECONDARY ROADS ALONG SN CARLOS - CALASIAO ROAD - K0210+700 - K0211 + 657, CALASIAO, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱40.3M | 94% | High risk73 | Flagged0.006 |
| 10 | 24A00437PREVENTIVE MAINTENANCE-TERTIARY ROADS, ASPHALT OVERLAY BINALONAN-ASINGAN -STA. MARIA ROAD, K0193+943-K0196+111,K0196+187-K0196+360,K0196+485-K0196+719,K0198+152-K0199+139 | Region I | Region I | Completed | ₱96.5M | 100% | High risk68 | —-0.043 |
| 11 | 16AI0253PREVENTIVE MAINT. BASED ON PAVEMENT MGMT SYSTEM/HIGHWAY DEVT & MGMT-4 (HDM-4) (INTERMITTENT SECTIONS | Region I | Pangasinan 3rd DEO | Completed | ₱18.7M | 100% | High risk66 | —-0.056 |
| 12 | 17AI0102IMPVT/WIDENING OF NATL RD ALONG BINALONAN-ASINGAN-STA. MARIA ROAD W/ RROW ACQUISITION, KO 186+850-KO | Region I | Pangasinan 3rd DEO | Completed | ₱43.1M | 100% | High risk65 | —-0.054 |
| 13 | 17AJ0036ASSET PRESERVATION OF NATIONAL ROADS, PREVENTIVE MAINTENANCE BASED ON PAVEMENT MANAGEMENT SYSTEM / HDM-4, JUDGE JOSE DE VENECIA SR. AVE., K0.207+000 TO K0.207+073; K0.207+(-)611 TO K0.207+000; K0.207+(-)711 TO K0.207+(-)611, CALASIAO, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱6.6M | 100% | High risk65 | —-0.053 |
| 14 | 17AH0112REPAIR/REHAB./IMPRV'T.(ASPHALT OVERLAY)ALONG PANG.-ZAMBALES RD.K0341+(-841)-K0344+000 | Region I | Pangasinan 2nd DEO | Completed | ₱25.8M | 100% | High risk62 | Flagged0.008 |
| 15 | 17AH0111REPAIR/REHAB./IMPRV'T.(ASPHALT OVERLAY)ALONG PANG.-ZAMBALES RD.,K0348+000-K0353+636 | Region I | Pangasinan 2nd DEO | Completed | ₱37.2M | 100% | High risk62 | Flagged0.009 |
| 16 | 17AH0115REPAIR/REHAB/IMPRV'T. (ASPHALT OVERLAY)ALONG PANG.-TARLAC RD.K0167+100-K0173+110 | Region I | Pangasinan 2nd DEO | Completed | ₱42.3M | 100% | High risk62 | Flagged0.007 |
| 17 | 24AG0186SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF EMBANKMENT ALONG LUCAP BOULEVARD, BARANGAY LUCAP, ALAMINOS CITY, PANGASINAN | Region I | Pangasinan 1st DEO | Completed | ₱96.5M | 100% | High risk60 | Flagged0.003 |
| 18 | 24AG0021SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BRGY. LUCAP, ALAMINOS CITY, PANGASINAN (PACKAGE II) | Region I | Pangasinan 1st DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.050 |
| 19 | 24AG0141SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS(SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BALINGCAGUING RIVER (POBLACION SECTION),STA.026+990-STA.027+420 | Region I | Pangasinan 1st DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.050 |
| 20 | 17AH0114REPAIR/REHAB./IMPROV'T.(ASPHALT OVERLAY)ALONG LABRADOR-LINGAYEN RD.,K0366+900-K0368+600 | Region I | Pangasinan 2nd DEO | Completed | ₱11.5M | 100% | Medium risk58 | Flagged0.003 |
| 21 | 17AH0113REPAIR/REHAB./IMPV'T.(ASPHALT OVERLAY)ALONG LINGAYEN CAPITOL LOOP (LS)K0364+(-219)-K0364+836 | Region I | Pangasinan 2nd DEO | Completed | ₱11.7M | 100% | Medium risk58 | Flagged0.002 |
| 22 | 24AI0177PREVENTIVE MAINTENANCE - PRIMARY ROADS - BAKIT-BAKIT JCT.- UMINGAN RD - K0184+000 - K0188+600 | Region I | Pangasinan 3rd DEO | Completed | ₱96.3M | 100% | Medium risk57 | —-0.080 |
| 23 | 24AI0184PREVENTIVE MAINTENANCE - TERTIARY ROADS - SN NICOLAS - NATIVIDAD - SN QUINTIN - UMINGAN - GUIMBA RD - K0204+940 - K0207+685 | Region I | Pangasinan 3rd DEO | Completed | ₱96.3M | 100% | Medium risk57 | —-0.078 |
| 24 | 24A00431PREVENTIVE MAINTENANCE- PRIMARY ROADS, BAKIT-BAKIT-JCT-UMINGAN ROAD,K0177+000-K0178+000,K0181+000-K0182+000,K0189+000-K0190+109 | Region I | Region I | Completed | ₱96.5M | 100% | Medium risk56 | —-0.079 |
| 25 | 25AJ0027PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG URDANETA JCT - DAGUPAN RD - K0195 + 000 - K0196 + 440, K0201 + 870 - K0202 + 314 | Region I | Pangasinan 4th DEO | On-Going | ₱106.5M | 100% | Medium risk56 | —-0.047 |