Opening the dossier…
Opening the dossier…
Contractor dossier
167 projects on file, including joint ventures this contractor is part of.
Total projects
167
Total budget
₱5.6B
Average progress
95.8%
Completion rate
85.0%
Average risk score
46.6
Medium risk on average, out of 100
Flagged as unusual
15
9.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region I | 155 | ₱4.9B | 45.9 | 11 | 95.4% |
| Region III | 8 | ₱600.5M | 57.9 | 0 | 99.9% |
| Cordillera Administrative Region | 4 | ₱117.2M | 51.8 | 4 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 145 | ₱4.6B | 45.8 | 10 | 96.1% |
| Flood Control and Drainage | 12 | ₱551.2M | 48.6 | 1 | 98.9% |
| Buildings and Facilities | 4 | ₱11.1M | 23.4 | 0 | 100.0% |
| GAA 2025 SSP | 3 | ₱322.9M | 95.5 | 3 | 59.6% |
| GAA 2025 OO-2 | 1 | ₱47.3M | 82.0 | 0 | 100.0% |
| OTHER | 1 | ₱40.3M | 72.9 | 1 | 94.2% |
| Water Provision and Storage | 1 | ₱3.3M | 25.9 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25AI0187REHABILITATION OF ROAD, PHASE 1, UMINGAN, PANGASINAN | Region I | Pangasinan 3rd DEO | On-Going | ₱117M | 70% | High risk96 | Flagged0.033 |
| 25AI0188REHABILITATION OF ROAD, PHASE 2, UMINGAN, PANGASINAN | Region I | Pangasinan 3rd DEO | On-Going | ₱117M | 76% | High risk96 | Flagged0.031 |
| 25AG0164SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SOLAR LED STREET LIGHTS ALONG ALAMINOS-BOLINAO ROAD K0325 + 831, ALAMINOS CITY, PANGASINAN | Region I | Pangasinan 1st DEO | On-Going | ₱88.9M | 33% | High risk95 | Flagged0.044 |
| 25AG0022FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF BANK SLOPE PROTECTION ALONG ALAMINOS RIVER, SESELANGEN SECTION (SEGMENT B), BARANGAY SESELANGEN, SUAL, PANGASINAN | Region I | Pangasinan 1st DEO | On-Going | ₱47.3M | 100% | High risk82 | —-0.008 |
| 24CL0057ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - SN MARCELINO-SN ANTONIO-SN NARCISO RD - K0157+046 -K0158+000, K0159+000 - K0160+000, SAN ANTONIO, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱95.5M | 100% | High risk76 | —-0.050 |
| 24CL0102ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-TERTIARY ROADS-SN MARCELINO-SN ANTONIO-SN NARCISO RD-K0162+407.72-K0163+000,K0164+000-K0164+404,K0165+000-K0165+705, K0166+286-K0166+639, SAN ANTONIO & SAN NARCISO, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱96.5M | 99% | High risk75 | —-0.020 |
| 24CL0151ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE - TERTIARY ROADS AMUNGAN-PALAUIG-BANLOG RD - K0213+878 - K0215+551, K0216+532 - K0217+077, K0223+000 - K0223+550, PALAUIG, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱96.5M | 100% | High risk73 | —-0.047 |
| 24CL0042REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - OLONGAPO-BUGALLON RD - K0190 + 017 - K0191 + 000, K0193 + 718 - K0194 + 000, K0196 + 050 - K0197 + 000, BOTOLAN, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱69.9M | 100% | High risk73 | —-0.057 |
| 24AJ0006ROAD WIDENING - SECONDARY ROADS ALONG SN CARLOS - CALASIAO ROAD - K0210+700 - K0211 + 657, CALASIAO, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱40.3M | 94% | High risk73 | Flagged0.006 |
| 24A00437PREVENTIVE MAINTENANCE-TERTIARY ROADS, ASPHALT OVERLAY BINALONAN-ASINGAN -STA. MARIA ROAD, K0193+943-K0196+111,K0196+187-K0196+360,K0196+485-K0196+719,K0198+152-K0199+139 | Region I | Region I | Completed | ₱96.5M | 100% | High risk68 | —-0.043 |
| 16AI0253PREVENTIVE MAINT. BASED ON PAVEMENT MGMT SYSTEM/HIGHWAY DEVT & MGMT-4 (HDM-4) (INTERMITTENT SECTIONS | Region I | Pangasinan 3rd DEO | Completed | ₱18.7M | 100% | High risk66 | —-0.056 |
| 17AI0102IMPVT/WIDENING OF NATL RD ALONG BINALONAN-ASINGAN-STA. MARIA ROAD W/ RROW ACQUISITION, KO 186+850-KO | Region I | Pangasinan 3rd DEO | Completed | ₱43.1M | 100% | High risk65 | —-0.054 |
| 17AJ0036ASSET PRESERVATION OF NATIONAL ROADS, PREVENTIVE MAINTENANCE BASED ON PAVEMENT MANAGEMENT SYSTEM / HDM-4, JUDGE JOSE DE VENECIA SR. AVE., K0.207+000 TO K0.207+073; K0.207+(-)611 TO K0.207+000; K0.207+(-)711 TO K0.207+(-)611, CALASIAO, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱6.6M | 100% | High risk65 | —-0.053 |
| 17AH0112REPAIR/REHAB./IMPRV'T.(ASPHALT OVERLAY)ALONG PANG.-ZAMBALES RD.K0341+(-841)-K0344+000 | Region I | Pangasinan 2nd DEO | Completed | ₱25.8M | 100% | High risk62 | Flagged0.008 |
| 17AH0111REPAIR/REHAB./IMPRV'T.(ASPHALT OVERLAY)ALONG PANG.-ZAMBALES RD.,K0348+000-K0353+636 | Region I | Pangasinan 2nd DEO | Completed | ₱37.2M | 100% | High risk62 | Flagged0.009 |
| 17AH0115REPAIR/REHAB/IMPRV'T. (ASPHALT OVERLAY)ALONG PANG.-TARLAC RD.K0167+100-K0173+110 | Region I | Pangasinan 2nd DEO | Completed | ₱42.3M | 100% | High risk62 | Flagged0.007 |
| 24AG0186SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF EMBANKMENT ALONG LUCAP BOULEVARD, BARANGAY LUCAP, ALAMINOS CITY, PANGASINAN | Region I | Pangasinan 1st DEO | Completed | ₱96.5M | 100% | High risk60 | Flagged0.003 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25AG0164SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SOLAR LED STREET LIGHTS ALONG ALAMINOS-BOLINAO ROAD K0325 + 831, ALAMINOS CITY, PANGASINAN | Region I | Pangasinan 1st DEO | On-Going | ₱88.9M | 33% | High risk95 | Flagged0.044 |
| 25AI0187REHABILITATION OF ROAD, PHASE 1, UMINGAN, PANGASINAN | Region I | Pangasinan 3rd DEO | On-Going | ₱117M | 70% | High risk96 | Flagged0.033 |
| 25AI0188REHABILITATION OF ROAD, PHASE 2, UMINGAN, PANGASINAN | Region I | Pangasinan 3rd DEO | On-Going | ₱117M | 76% | High risk96 | Flagged0.031 |
| 17AH0111REPAIR/REHAB./IMPRV'T.(ASPHALT OVERLAY)ALONG PANG.-ZAMBALES RD.,K0348+000-K0353+636 | Region I | Pangasinan 2nd DEO | Completed | ₱37.2M | 100% | High risk62 | Flagged0.009 |
| 17AH0112REPAIR/REHAB./IMPRV'T.(ASPHALT OVERLAY)ALONG PANG.-ZAMBALES RD.K0341+(-841)-K0344+000 | Region I | Pangasinan 2nd DEO | Completed | ₱25.8M | 100% | High risk62 | Flagged0.008 |
| 17AH0115REPAIR/REHAB/IMPRV'T. (ASPHALT OVERLAY)ALONG PANG.-TARLAC RD.K0167+100-K0173+110 | Region I | Pangasinan 2nd DEO | Completed | ₱42.3M | 100% | High risk62 | Flagged0.007 |
| 24AJ0006ROAD WIDENING - SECONDARY ROADS ALONG SN CARLOS - CALASIAO ROAD - K0210+700 - K0211 + 657, CALASIAO, PANGASINAN | Region I | Pangasinan 4th DEO | On-Going | ₱40.3M | 94% | High risk73 | Flagged0.006 |
| 17PA0119REPAIR/REHABILITATION/IMPROVEMENT OF ABRA-KALINGA ROAD ASPHALT OVERLAY WITH THERMOPLASTIC PAVEMENT MARKINGS, KO416+079 - KO418+697 TO KO424+100 - KO424+386 | Cordillera Administrative Region | Abra DEO | Completed | ₱24M | 100% | Medium risk52 | Flagged0.006 |
| 17PA0121REPAIR/REHABILITATION/IMPROVEMENT OFABRA- ILOCOS NORTE ROAD ASPHALT OVERLAY WITH THERMOPLASTIC PAVEMENT MARKINGS, KO413+000 - KO416+818 | Cordillera Administrative Region | Abra DEO | Completed | ₱35.6M | 100% | Medium risk52 | Flagged0.006 |
| 17PA0118REPAIR/REHABILITATION/IMPROVEMENT OF ABRA-KALINGA ROAD ASPHALT OVERLAY WITH THERMOPLASTIC PAVEMENT MARKINGS, A.) KO424+492 - KO426+343; B.) KO435+551 - KO437+441 | Cordillera Administrative Region | Abra DEO | Completed | ₱23M | 100% | Medium risk52 | Flagged0.004 |
| 17PA0120REPAIR/REHABILITATION/IMPROVEMENT OF ABRA-KALINGA ROAD ASPHALT OVERLAY WITH THERMOPLASTIC PAVEMENT MARKINGS, A.) 429+850 - KO435+456 | Cordillera Administrative Region | Abra DEO | Completed | ₱34.6M | 100% | Medium risk52 | Flagged0.004 |
| 17AH0114REPAIR/REHAB./IMPROV'T.(ASPHALT OVERLAY)ALONG LABRADOR-LINGAYEN RD.,K0366+900-K0368+600 | Region I | Pangasinan 2nd DEO | Completed | ₱11.5M | 100% | Medium risk58 | Flagged0.003 |
| 24AG0186SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF EMBANKMENT ALONG LUCAP BOULEVARD, BARANGAY LUCAP, ALAMINOS CITY, PANGASINAN | Region I | Pangasinan 1st DEO | Completed | ₱96.5M | 100% | High risk60 | Flagged0.003 |
| 17AH0113REPAIR/REHAB./IMPV'T.(ASPHALT OVERLAY)ALONG LINGAYEN CAPITOL LOOP (LS)K0364+(-219)-K0364+836 | Region I | Pangasinan 2nd DEO | Completed | ₱11.7M | 100% | Medium risk58 | Flagged0.002 |
| 17AJ0089CONCRETING OF BRGY. PIAS FMR, MAPANDAN, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱1.9M | 100% | Low risk20 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 23AJ0037PREVENTIVE MAINTENANCE ON SECONDARY ROADS, ASPHALT OVERLAY ALONG STA. BARBARA - MANGALDAN RD., K0202+577 - K0203+000 | Region I | Pangasinan 4th DEO | Completed | ₱8.3M | 100% | Medium risk43 | —-0.086 |
| 127 | 22AJ0039PREVENTIVE MAINTENANCE-SECONDARY ROADS-ASPHALT OVERLAY ALONG CARMEN JCT-BAYAMBANG-MANAT RD - K0204+400-K0204+923 | Region I | Pangasinan 4th DEO | Completed | ₱8.3M | 100% | Medium risk43 | —-0.086 |
| 128 | 24AD0003PREVENTIVE MAINTENANCE PRIMARY ROADS MANILA NORTH RD - K0357 + 681 - K0358 + 272 | Region I | Ilocos Sur 2nd DEO | Completed | ₱11.7M | 100% | Medium risk43 | —-0.086 |
| 129 | 21AE0001PREVENTIVE MAINTENANCE - SAN FERNANDO PORT ROAD, K0268+717 - K0269+789 | Region I | La Union 1st DEO | Completed | ₱18.1M | 100% | Medium risk43 | —-0.084 |
| 130 | 22AJ0041PREVENTIVE MAINTENANCE-SECONDARY ROADS-ASPHALT OVERLAY ALONG CAMILING-WAWA-BAYAMBANG-MALASIQUI-STA. BARBARA RD - K0172+(-200) - K0172+(-013), K0176+000-K0176+394 | Region I | Pangasinan 4th DEO | Completed | ₱6.5M | 100% | Medium risk43 | —-0.087 |
| 131 | 20AE0005PREVENTIVE MAINTENANCE - SAN FERNANDO - BAGULIN ROAD - K0284+000 - K0285+000 | Region I | La Union 1st DEO | Completed | ₱9.8M | 100% | Medium risk43 | —-0.084 |
| 132 | 25AG0076BASIC INFRASTRUCTURE PROGRAM (BIP)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD, PHASE II,SITIO PATING-CALAPNET,BARANGAY MACABOBONI, AGNO,PANGASINAN | Region I | Pangasinan 1st DEO | Completed | ₱19.4M | 100% | Medium risk43 | —-0.083 |
| 133 | 23AG0087BASIC INFRASTRUCTURE PROGRAM - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - ROAD CONCRETING OF SITIO PATING-CALAPNET, BRGY. MACABOBONI, AGNO, PANGASINAN | Region I | Pangasinan 1st DEO | Completed | ₱19.8M | 100% | Medium risk43 | —-0.083 |
| 134 | 18AJ0015PREVENTIVE MAINTENANCE ALONG CAMILING-WAWA-BAYAMBANG-MALASIQUI-STA. BARBARA ROAD, K0.188+306 - K0.189+206, MALASIQUI, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱6.3M | 100% | Medium risk43 | —-0.087 |
| 135 | 17AJ0048CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT) AT BARANGAY AMBAYAT II, BAYAMBANG, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱2.9M | 100% | Medium risk43 | —-0.057 |
| 136 | 23AD0001PREVENTIVE MAINTENANCE - SECONDARY ROADS - ILOCOS SUR-ABRA RD - K0380 + 495 - K0381 + 488 | Region I | Ilocos Sur 2nd DEO | Completed | ₱7.9M | 100% | Medium risk43 | —-0.082 |
| 137 | 23AE0004PREVENTIVE MAINTENANCE- TERTIARY ROADS- SN FERNANDO-BAGULIN RD - K0276+000 - K0276+965 | Region I | La Union 1st DEO | Completed | ₱9.8M | 100% | Medium risk43 | —-0.086 |
| 138 | 24AE0065PREVENTIVE MAINTENANCE - TERTIARY ROADS - SN FERNANDO- BAGULIN RD - K0277+524-K0277+1024 | Region I | La Union 1st DEO | Completed | ₱9.8M | 100% | Medium risk43 | —-0.089 |
| 139 | 23AE0003PREVENTIVE MAINTENANCE - TERTIARY ROADS - SN FERNANDO- BAGULIN RD - K0270+000 - K0271+000 | Region I | La Union 1st DEO | Completed | ₱9.7M | 100% | Medium risk43 | —-0.086 |
| 140 | 20AE0006PREVENTIVE MAINTENANCE - BACNOTAN - LUNA - BALAOAN ROAD - K0284+(-774) - K0284+741 | Region I | La Union 1st DEO | Completed | ₱10.8M | 100% | Medium risk43 | —-0.088 |
| 141 | 23AG0006ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PANGASINAN-ZAMBALES RD - K0323 + 300 - K0324 + 935 AT ALAMINOS CITY, PANGASINAN | Region I | Pangasinan 1st DEO | Completed | ₱15.6M | 100% | Medium risk43 | —-0.082 |
| 142 | 25AG0031CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP) ACCESS ROAD LEADING TO LUCAP BOULEVARD AND MANGROVE PARK, BRGY.BUED,ALAMINOS CITY, PANG | Region I | Pangasinan 1st DEO | Completed | ₱9.6M | 100% | Medium risk42 | —-0.085 |
| 143 | 24AG0027CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - ACCESS ROAD LEADING TO LUCAP BOULEVARD AND MANGROVE PARK, BRGY. BUED, ALAMINOS CITY, PANGASINAN | Region I | Pangasinan 1st DEO | Completed | ₱9.8M | 100% | Medium risk42 | —-0.084 |
| 144 | 18AE0020PREVENTIVE MAINTENANCE ALONG SAN FERNANDO - BAGULIN ROAD K0272+420 TO K0272+828 AND K0279+1000 TO K0280+700 | Region I | La Union 1st DEO | Completed | ₱9.1M | 100% | Medium risk42 | —-0.088 |
| 145 | 23AD0002PREVENTIVE MAINTENANCE - SECONDARY ROADS - TAGUDIN-CERVANTES RD - K0321 + (-353) - K0321 + 571 | Region I | Ilocos Sur 2nd DEO | Completed | ₱7.1M | 100% | Medium risk42 | —-0.085 |
| 146 | 18AJ0107CONCRETING OF BRGY. LIBAS FMR, BRGY. LIBAS, SAN CARLOS CITY, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱4.9M | 100% | Medium risk41 | —-0.037 |
| 147 | 24CL0043REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS OLONGAPO-BUGALLON RD K0203+013 - K0203+566, K0204+000 - K0205+164, K0206+494 - K0207+000, IBA, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱61.1M | 100% | Medium risk40 | —-0.092 |
| 148 | 24CL0044REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS-OLONGAPO-BUGALLON RD K0209 + 000 - K0210 + 936, IBA, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱61.3M | 100% | Medium risk40 | —-0.092 |
| 149 | 19CL0022PREVENTIVE MAINTENANCE OF SECONDARY ROADS ALONG OLONGAPO-BUGALLON ROAD, K0 160+522 - K0 161+000, K0 161+750 - K0 162+000, K0 250 + 090 -K0 250+720, K0 250+834 - K0 251+667 | Region III | Zambales 1st DEO | Completed | ₱23.1M | 100% | Medium risk35 | —-0.093 |
| 150 | 18AJ0054CONSTRUCTION (COMPLETION OF MULTI-PURPOSE BUILDING AT NANCAPIAN, MALASIQUI, PANGASINAN | Region I | Pangasinan 4th DEO | Completed | ₱3M | 100% | Low risk29 | —-0.088 |