Contractor dossier
97 projects on file, including joint ventures this contractor is part of.
Total projects
97
Total budget
₱8.1B
Average progress
89.3%
Completion rate
68.0%
Below 70%
Average risk score
57.6
Medium risk on average, out of 100
Flagged as unusual
14
14.4% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XI | 80 | ₱6.2B | 56.3 | 8 | 91.2% |
| Region XII | 17 | ₱1.9B | 63.9 | 6 | 80.4% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 65 | ₱4.5B | 50.6 | 1 | 95.1% |
| Bridges | 8 | ₱924.3M | 55.2 | 1 | 98.3% |
| GAA 2025 OO-1 | 7 | ₱930.7M | 94.3 | 6 | 41.9% |
| Bridges, Roads | 7 | ₱890.4M | 62.9 | 0 | 92.6% |
| Flood Control and Drainage | 4 | ₱485.4M | 57.6 | 1 | 76.3% |
| GAA 2025 SSP | 3 | ₱196.6M | 94.1 | 2 | 71.1% |
| OTHER | 3 | ₱207.7M | 81.3 | 3 | 76.8% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25LK0022CONSTRUCTION OF ROAD, BARANGAY SALAPAWAN TO SITIO KINSE-KINSE, PAQUIBATO DISTRICT, DAVAO CITY | Region XI | Davao City 3rd DEO | On-Going | ₱66.9M | 69% | High risk95 | Flagged0.021 |
| 25MI0029BUKIDNON-COTABATO RD - K1629 + 413 - K1629 + 530 | Region XII | Cotabato 3rd DEO | On-Going | ₱74.3M | 100% | High risk95 | —-0.000 |
| 25MI0030BUKIDNON-COTABATO RD - K1630 + 100 - K1630 + 300 | Region XII | Cotabato 3rd DEO | On-Going | ₱79.3M | 36% | High risk95 | Flagged0.025 |
| 25MI0056BUKIDNON-COTABATO RD - K1612+656 - K1613+000 | Region XII | Cotabato 3rd DEO | On-Going | ₱127.8M | 9% | High risk94 | Flagged0.041 |
| 25M00051PREVENTIVE MAINTENANCE - MAHARLIKA HIGHWAY( COTABATO-MARBEL RD) - K1740 + 789 - K1741 + 279, K1742 + 333 - K1743 + 233, SURALLAH, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱187.1M | 92% | High risk94 | Flagged0.027 |
| 25LD0194PREVENTIVE MAINTENANCE OF ROAD;: ASPHALT OVERLAY- DAVAO- COTABATO ROAD (JCT. DIGOS-COTABATO SECTION)-K1580+625-K1581+434, K1582+118-K1582+670, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱94.5M | 49% | High risk94 | Flagged0.022 |
| 25MC0043CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TINANAN RIVER , PACKAGE 1, BARANGAY MALIBATUAN, ARAKAN, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱93.6M | 45% | High risk94 | Flagged0.037 |
| 25L00072REHABILITATION/MAJOR REPAIR OF BRIDGE - LASANG BRIDGE (B00019MN) ALONG MAHARLIKA HIGHWAY (MN), DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱66.1M | 2% | High risk94 | Flagged0.033 |
| 25L00119REPLACEMENT OF BRIDGE - GOV. MIRANDA BR. (B00016MN) ALONG MAHARLIKA HIGHWAY, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱301.5M | 6% | High risk94 | Flagged0.062 |
| 25MI0016INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (GUARDRAILS, PAVEMENT MARKINGS, ROAD SIGNS) ALONG BUKIDNON-COTABATO RD - K1642+(-177) - K1643+334, K1642+(-334) - K1642+(-177), K1642+(-468) - K1643+(-334), K1642+(-660) - K1642+(-468), K1643+334 - K1655+ | Region XII | Cotabato 3rd DEO | Completed | ₱36.2M | 100% | High risk93 | —-0.020 |
| 24L00348PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - MAHARLIKA HIGHWAY - (S01364MN) K1480+695 - K1481+640, K1482+740 - K1482+961, (S00062MN) K1482+333 - K1482+752, (S00063MN) K1480+(-956) - K1480+(-695), DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱93.6M | 61% | High risk91 | Flagged0.078 |
| 24MC0012CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - PACO-ROXAS-ARAKAN VALLEY-JCT DAVAO-BUKIDNON RD - K1684 + 475 - K1684 + 617, ARAKAN, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱96.5M | 80% | High risk80 | Flagged0.018 |
| 23L00092DAANG MAHARLIKA (MN) K1476+580 - K1476+988, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱17.6M | 90% | High risk73 | Flagged0.018 |
| 18L00164JCT. DAVAO-COTABATO ROAD (BANGKAL SECT.)-CATALUNAN GRANDE RD-JCT. DAVAO-BUKIDNON RD (MINTAL SECT.),I | Region XI | Region XI | Completed | ₱169.8M | 100% | High risk69 | —-0.024 |
| 20L00040CONSTRUCTION OF CONCRETE BRIDGE-JCT. CABANTIAN ROAD (ACACIA SECTION)-JCT. MANDUG-CALLAWA ROAD (MANDUG SECTION), DAVAO CITY | Region XI | Region XI | Completed | ₱194.7M | 100% | High risk68 | —-0.024 |
| 21L00154CONSTRUCTION OF CONCRETE ROAD - MATANAO - KIBLAWAN - PADADA ROAD, DAVAO DEL SUR | Region XI | Region XI | Completed | ₱204.8M | 100% | High risk67 | —-0.025 |
| 23L00081CONSTRUCTION OF CONCRETE BRIDGE - MATANAO - KIBLAWAN - PADADA ROAD, PACKAGE J, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱92.7M | 95% | High risk66 | —-0.017 |
| 22L00084CONSTRUCTION OF DIGOS RIVER FLOOD CONTROL PROJECT, BRGY. RUPARAN (SECTION 6), DIGOS CITY, DAVAO DEL SUR | Region XI | Region XI | Completed | ₱173.6M | 100% | High risk65 | —-0.037 |
| 18L00022CONC. OF MATANAO-KIBLAWAN-PADADA RD PACKAGE A, INCLUDING RROW, DAVAO DEL SUR | Region XI | Region XI | Completed | ₱281.5M | 100% | High risk65 | —-0.049 |
| 18L00025CONCRETING OF MATANAO-KIBLAWAN-PADADA ROAD PACKAGE B, INCLUDING RROW, DAVAO DEL SUR | Region XI | Region XI | Completed | ₱219.1M | 100% | High risk65 | —-0.052 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24L00348PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - MAHARLIKA HIGHWAY - (S01364MN) K1480+695 - K1481+640, K1482+740 - K1482+961, (S00062MN) K1482+333 - K1482+752, (S00063MN) K1480+(-956) - K1480+(-695), DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱93.6M | 61% | High risk91 | Flagged0.078 |
| 25L00119REPLACEMENT OF BRIDGE - GOV. MIRANDA BR. (B00016MN) ALONG MAHARLIKA HIGHWAY, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱301.5M | 6% | High risk94 | Flagged0.062 |
| 25MI0056BUKIDNON-COTABATO RD - K1612+656 - K1613+000 | Region XII | Cotabato 3rd DEO | On-Going | ₱127.8M | 9% | High risk94 | Flagged0.041 |
| 25MC0043CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TINANAN RIVER , PACKAGE 1, BARANGAY MALIBATUAN, ARAKAN, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱93.6M | 45% | High risk94 | Flagged0.037 |
| 25L00072REHABILITATION/MAJOR REPAIR OF BRIDGE - LASANG BRIDGE (B00019MN) ALONG MAHARLIKA HIGHWAY (MN), DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱66.1M | 2% | High risk94 | Flagged0.033 |
| 25M00051PREVENTIVE MAINTENANCE - MAHARLIKA HIGHWAY( COTABATO-MARBEL RD) - K1740 + 789 - K1741 + 279, K1742 + 333 - K1743 + 233, SURALLAH, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱187.1M | 92% | High risk94 | Flagged0.027 |
| 25MI0030BUKIDNON-COTABATO RD - K1630 + 100 - K1630 + 300 | Region XII | Cotabato 3rd DEO | On-Going | ₱79.3M | 36% | High risk95 | Flagged0.025 |
| 25LD0194PREVENTIVE MAINTENANCE OF ROAD;: ASPHALT OVERLAY- DAVAO- COTABATO ROAD (JCT. DIGOS-COTABATO SECTION)-K1580+625-K1581+434, K1582+118-K1582+670, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱94.5M | 49% | High risk94 | Flagged0.022 |
| 25LK0022CONSTRUCTION OF ROAD, BARANGAY SALAPAWAN TO SITIO KINSE-KINSE, PAQUIBATO DISTRICT, DAVAO CITY | Region XI | Davao City 3rd DEO | On-Going | ₱66.9M | 69% | High risk95 | Flagged0.021 |
| 23L00092DAANG MAHARLIKA (MN) K1476+580 - K1476+988, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱17.6M | 90% | High risk73 | Flagged0.018 |
| 24MC0012CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - PACO-ROXAS-ARAKAN VALLEY-JCT DAVAO-BUKIDNON RD - K1684 + 475 - K1684 + 617, ARAKAN, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱96.5M | 80% | High risk80 | Flagged0.018 |
| 25M00007CONSTRUCTION OF PULANGI RIVERBANK PROTECTION (DOWNSTREAM OF CARMEN BR., RIGHT BANK), PHASE III, STA. 0+652.5 - STA. 01+286.5, BARANGAY UGALINGAN, CARMEN, COTABATO | Region XII | Region XII | On-Going | ₱167M | 5% | Medium risk57 | Flagged0.013 |
| 18L00093WIDENING (2 INTO 4 LANES) OF MANIKI BRIDGE (B00182MN) & APPROACHES ALONG TAGUM-PANABO CIRC. RD INCL | Region XI | Region XI | Completed | ₱332.8M | 100% | High risk64 | Flagged0.012 |
| 25LA0079CONSTRUCTION OF ROAD, BARANGAY MAINIT-PANARAON, MACO, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱48M | 4% | Medium risk49 | Flagged0.011 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25LK0022CONSTRUCTION OF ROAD, BARANGAY SALAPAWAN TO SITIO KINSE-KINSE, PAQUIBATO DISTRICT, DAVAO CITY | Region XI | Davao City 3rd DEO | On-Going | ₱66.9M | 69% | High risk95 | Flagged0.021 |
| 2 | 25MI0029BUKIDNON-COTABATO RD - K1629 + 413 - K1629 + 530 | Region XII | Cotabato 3rd DEO | On-Going | ₱74.3M | 100% | High risk95 | —-0.000 |
| 3 | 25MI0030BUKIDNON-COTABATO RD - K1630 + 100 - K1630 + 300 | Region XII | Cotabato 3rd DEO | On-Going | ₱79.3M | 36% | High risk95 | Flagged0.025 |
| 4 | 25MI0056BUKIDNON-COTABATO RD - K1612+656 - K1613+000 | Region XII | Cotabato 3rd DEO | On-Going | ₱127.8M | 9% | High risk94 | Flagged0.041 |
| 5 | 25M00051PREVENTIVE MAINTENANCE - MAHARLIKA HIGHWAY( COTABATO-MARBEL RD) - K1740 + 789 - K1741 + 279, K1742 + 333 - K1743 + 233, SURALLAH, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱187.1M | 92% | High risk94 | Flagged0.027 |
| 6 | 25LD0194PREVENTIVE MAINTENANCE OF ROAD;: ASPHALT OVERLAY- DAVAO- COTABATO ROAD (JCT. DIGOS-COTABATO SECTION)-K1580+625-K1581+434, K1582+118-K1582+670, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱94.5M | 49% | High risk94 | Flagged0.022 |
| 7 | 25MC0043CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TINANAN RIVER , PACKAGE 1, BARANGAY MALIBATUAN, ARAKAN, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱93.6M | 45% | High risk94 | Flagged0.037 |
| 8 | 25L00072REHABILITATION/MAJOR REPAIR OF BRIDGE - LASANG BRIDGE (B00019MN) ALONG MAHARLIKA HIGHWAY (MN), DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱66.1M | 2% | High risk94 | Flagged0.033 |
| 9 | 25L00119REPLACEMENT OF BRIDGE - GOV. MIRANDA BR. (B00016MN) ALONG MAHARLIKA HIGHWAY, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱301.5M | 6% | High risk94 | Flagged0.062 |
| 10 | 25MI0016INSTALLATION/APPLICATION OF ROAD SAFETY FACILITIES (GUARDRAILS, PAVEMENT MARKINGS, ROAD SIGNS) ALONG BUKIDNON-COTABATO RD - K1642+(-177) - K1643+334, K1642+(-334) - K1642+(-177), K1642+(-468) - K1643+(-334), K1642+(-660) - K1642+(-468), K1643+334 - K1655+ | Region XII | Cotabato 3rd DEO | Completed | ₱36.2M | 100% | High risk93 | —-0.020 |
| 11 | 24L00348PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - MAHARLIKA HIGHWAY - (S01364MN) K1480+695 - K1481+640, K1482+740 - K1482+961, (S00062MN) K1482+333 - K1482+752, (S00063MN) K1480+(-956) - K1480+(-695), DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱93.6M | 61% | High risk91 | Flagged0.078 |
| 12 | 24MC0012CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - PACO-ROXAS-ARAKAN VALLEY-JCT DAVAO-BUKIDNON RD - K1684 + 475 - K1684 + 617, ARAKAN, COTABATO | Region XII | Cotabato 2nd DEO | On-Going | ₱96.5M | 80% | High risk80 | Flagged0.018 |
| 13 | 23L00092DAANG MAHARLIKA (MN) K1476+580 - K1476+988, DAVAO DEL NORTE | Region XI | Region XI | On-Going | ₱17.6M | 90% | High risk73 | Flagged0.018 |
| 14 | 18L00164JCT. DAVAO-COTABATO ROAD (BANGKAL SECT.)-CATALUNAN GRANDE RD-JCT. DAVAO-BUKIDNON RD (MINTAL SECT.),I | Region XI | Region XI | Completed | ₱169.8M | 100% | High risk69 | —-0.024 |
| 15 | 20L00040CONSTRUCTION OF CONCRETE BRIDGE-JCT. CABANTIAN ROAD (ACACIA SECTION)-JCT. MANDUG-CALLAWA ROAD (MANDUG SECTION), DAVAO CITY | Region XI | Region XI | Completed | ₱194.7M | 100% | High risk68 | —-0.024 |
| 16 | 21L00154CONSTRUCTION OF CONCRETE ROAD - MATANAO - KIBLAWAN - PADADA ROAD, DAVAO DEL SUR | Region XI | Region XI | Completed | ₱204.8M | 100% | High risk67 | —-0.025 |
| 17 | 23L00081CONSTRUCTION OF CONCRETE BRIDGE - MATANAO - KIBLAWAN - PADADA ROAD, PACKAGE J, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱92.7M | 95% | High risk66 | —-0.017 |
| 18 | 22L00084CONSTRUCTION OF DIGOS RIVER FLOOD CONTROL PROJECT, BRGY. RUPARAN (SECTION 6), DIGOS CITY, DAVAO DEL SUR | Region XI | Region XI | Completed | ₱173.6M | 100% | High risk65 | —-0.037 |
| 19 | 18L00022CONC. OF MATANAO-KIBLAWAN-PADADA RD PACKAGE A, INCLUDING RROW, DAVAO DEL SUR | Region XI | Region XI | Completed | ₱281.5M | 100% | High risk65 | —-0.049 |
| 20 | 18L00025CONCRETING OF MATANAO-KIBLAWAN-PADADA ROAD PACKAGE B, INCLUDING RROW, DAVAO DEL SUR | Region XI | Region XI | Completed | ₱219.1M | 100% | High risk65 | —-0.052 |
| 21 | 20L00085CONSTRUCTION OF CONCRETE ROAD-MATANAO-KIBLAWAN-PADADA ROAD, PACKAGE C, DAVAO DEL SUR | Region XI | Region XI | Completed | ₱137.7M | 100% | High risk65 | —-0.062 |
| 22 | 19L00029CONSTRUCTION OF CONCRETE ROAD-ALTERNATE ROAD FROM REGION XI TO REGION X, PACKAGE 3A, DAVAO CITY | Region XI | Region XI | Completed | ₱133.6M | 100% | High risk65 | —-0.058 |
| 23 | 18L00093WIDENING (2 INTO 4 LANES) OF MANIKI BRIDGE (B00182MN) & APPROACHES ALONG TAGUM-PANABO CIRC. RD INCL | Region XI | Region XI | Completed | ₱332.8M | 100% | High risk64 | Flagged0.012 |
| 24 | 18L00013WIDENING (2 INTO 4 LANES) OF DAVAO-BUKIDNON RD INCL. SLOPE PROTECTION & ROW (BRGY. BAGANIHAN & BRGY. | Region XI | Region XI | Completed | ₱184.3M | 100% | High risk64 | —-0.054 |
| 25 | 22LD0068CONSTRUCTION OF PUROK 6 OSMENA-PARAMI ROAD WITH PSCG BRIDGE, SULOP, DAVAO DEL SUR | Region XI | Davao del Sur DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.055 |