Contractor dossier
413 projects on file, including joint ventures this contractor is part of.
Total projects
413
Total budget
₱12.5B
Average progress
93.4%
Completion rate
71.2%
Average risk score
51.3
Medium risk on average, out of 100
Flagged as unusual
61
14.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 407 | ₱12.4B | 51.6 | 61 | 93.3% |
| Negros Island Region | 3 | ₱126M | 48.1 | 0 | 100.0% |
| Region IV-B | 3 | ₱5.8M | 19.7 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 162 | ₱6.5B | 50.6 | 6 | 96.5% |
| Buildings and Facilities | 91 | ₱855.2M | 33.7 | 0 | 98.4% |
| Flood Control and Drainage | 85 | ₱3.2B | 48.4 | 0 | 98.1% |
| OTHER | 30 | ₱997.8M | 83.1 | 26 | 76.3% |
| GAA 2025 SSP | 23 | ₱401.5M | 93.8 | 23 | 68.6% |
| Bridges | 11 | ₱91.9M | 38.8 | 0 | 91.6% |
| Water Provision and Storage | 5 | ₱42.7M | 44.0 | 1 | 92.6% |
| GAA 2025 OO-1 | 3 | ₱201.9M | 94.2 | 3 | 51.3% |
| GAA 2025 OO-2 | 2 | ₱153.8M | 91.9 | 2 | 30.1% |
| Bridges, Roads | 1 | ₱96.5M | 61.6 | 0 | 98.1% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25I00119SIPAG - COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES - CONSTRUCTION OF COASTAL ROAD, BARANGAY PEPELITAN - BARANGAY SABANG NORTH, BORONGAN CITY | Region VIII | Region VIII | On-Going | ₱96.4M | 56% | High risk96 | Flagged0.028 |
| 25I00121SIPAG - INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) - CONSTRUCTION OF ROAD, PHASE 2, BARANGAY NATO - BARANGAY BONGDO, TAFT, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱48.2M | 77% | High risk96 | Flagged0.013 |
| 25IB0053CONSTRUCTION OF MULTI-PURPOSE BUILDING, TAFT MUNICIPAL HALL PHASE 2, BARANGAY POBLACION, TAFT, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱48.9M | 35% | High risk96 | Flagged0.025 |
| 25IB0050CONSTRUCTION OF MULTI-PURPOSE BUILDING, CAN-AVID MUNICIPAL HALL PHASE 2 BARANGAY POBLACION, CAN-AVID, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱48.9M | 42% | High risk96 | Flagged0.025 |
| 25IN0018CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF DAS-AY FLOOD CONTROL STRUCTURE (SEGMENT 2), HIN | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱53.1M | 90% | High risk96 | Flagged0.010 |
| 25IB0060CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), BARANGAY SAN LUIS, TAFT, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱9.8M | 44% | High risk95 | Flagged0.024 |
| 25IB0038CONSTRUCTION OF EVACUATION CENTER BARANGAY BATI-AWAN, TAFT, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱4.8M | 40% | High risk95 | Flagged0.025 |
| 25IB0144CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY BUGAS, BORONGAN CITY, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱4.9M | 86% | High risk95 | Flagged0.013 |
| 25IN0057SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY SAGBOK ROAD, HINUNDAYAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱4.8M | 85% | High risk95 | Flagged0.014 |
| 25IN0024CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY OSAO ROAD, SA | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱4.8M | 84% | High risk95 | Flagged0.013 |
| 25IN0022CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY TOPTOP ROAD, | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱4.8M | 100% | High risk95 | Flagged0.005 |
| 25IB0104ROAD WIDENING SECONDARY ROADS, WRIGHT - TAFT - BORONGAN RD (SM00172SM)K0875+667 - K0876+511, K0877+525 - K0878+256, K0878+800 - K0879+389 | Region VIII | Eastern Samar DEO | On-Going | ₱104.8M | 22% | High risk95 | Flagged0.024 |
| 25IN0021CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY BIASONG ROAD, | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱4.8M | 21% | High risk95 | Flagged0.029 |
| 25IL0027SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF STA. SOFIA BR., PADRE BURGOS, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | On-Going | ₱24.5M | 97% | High risk95 | Flagged0.007 |
| 25IN0020CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY LUMBOG ROAD, | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱4.8M | 100% | High risk95 | Flagged0.005 |
| 25IL0035CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, MAMBAJAO, MAASIN CITY, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | On-Going | ₱4.9M | 100% | High risk94 | Flagged0.004 |
| 25IN0027CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY MAHAYAHAY ROA | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱5.6M | 84% | High risk94 | Flagged0.012 |
| 25IL0053CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONCRETING OF ROADS, SITIO SAN VICENTE CANSIRONG - BAUGO, MAASIN C | Region VIII | Southern Leyte 1st DEO | On-Going | ₱5.9M | 34% | High risk94 | Flagged0.025 |
| 25I00156ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - MAHARLIKA HIGHWAY - K1010+885 - K1011+080, K1011+520 - K1011+595 | Region VIII | Region VIII | On-Going | ₱49.8M | 72% | High risk94 | Flagged0.002 |
| 25I00149ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS MAHARLIKA HIGHWAY - K1010+630 - K1010+885 | Region VIII | Region VIII | On-Going | ₱47.2M | 60% | High risk93 | Flagged0.006 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24IL0107FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SHORELINE PROTECTION STRUCTURE ALONG ASUNCION - BENIT SECTION, MALITBOG, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | On-Going | ₱120.5M | 72% | High risk92 | Flagged0.068 |
| 23IM0124CONSTRUCTION OF 1-UNIT 3STY15CL, SCHOOL BUILDING, LEYTE NATIONAL HIGH SCHOOL, TACLOBAN CITY, LEYTE | Region VIII | Tacloban City DEO | On-Going | ₱40M | 81% | High risk90 | Flagged0.059 |
| 25IB0134CONCRETING OF BRGY. ABEJAO TO BRGY. SEGUINON FMR, BRGY. ABEJAO AND BRGY. SEGUINON, SALCEDO, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱5M | 90% | High risk88 | Flagged0.045 |
| 24I00283CONSTRUCTION OF 1 UNIT 1-STOREY 2-CLASSROOM SCHOOL BUILDING IN MAGAUPAS ELEMENTARY SCHOOL, BRGY. MAGAUPAS, LILOAN, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱6.6M | 100% | High risk88 | Flagged0.043 |
| 24I00377CONSTRUCTION OF 1 UNIT 1-STOREY 2-CLASSROOM SCHOOL BUILDING IN PANDAN - SAN MIGUEL ELEMENTARY SCHOOL, BRGY. SAN MIGUEL, SOGOD, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱6.6M | 100% | High risk89 | Flagged0.040 |
| 25IB0132CONCRETING OF NATIONAL HIGHWAY TO SITIO AMAMPAGAO FMR, LAWAAN, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱5M | 100% | High risk89 | Flagged0.040 |
| 25IB0128CONCRETING OF BRGY. POLANGI FMR, BRGY. POLANGI, TAFT, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱5M | 100% | High risk89 | Flagged0.038 |
| 25IN0062CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS - CONSTRUCTION (COMPLETION) OF PUBLIC WATER SUPPLY SYSTEM (LEVEL II), BARANGAY MABICAY, SOGOD, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱1.9M | 0% | High risk88 | Flagged0.035 |
| 25IN0065CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY PONG-OY, SAN JUAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱3M | 14% | High risk90 | Flagged0.034 |
| 25IN0021CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY BIASONG ROAD, | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱4.8M | 21% | High risk95 | Flagged0.029 |
| 25I00119SIPAG - COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES - CONSTRUCTION OF COASTAL ROAD, BARANGAY PEPELITAN - BARANGAY SABANG NORTH, BORONGAN CITY | Region VIII | Region VIII | On-Going | ₱96.4M | 56% | High risk96 | Flagged0.028 |
| 24I00222CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY POBLACION | Region VIII | Region VIII | On-Going | ₱4.8M | 7% | High risk80 | Flagged0.026 |
| 24I00220SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD BRGY. HOMONHON - CASUGURAN - HABAG, GUIUAN, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱96.4M | 37% | High risk84 | Flagged0.025 |
| 25IB0038CONSTRUCTION OF EVACUATION CENTER BARANGAY BATI-AWAN, TAFT, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱4.8M | 40% | High risk95 | Flagged0.025 |
| 25IL0053CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONCRETING OF ROADS, SITIO SAN VICENTE CANSIRONG - BAUGO, MAASIN C | Region VIII | Southern Leyte 1st DEO | On-Going | ₱5.9M | 34% | High risk94 | Flagged0.025 |
| 25IB0053CONSTRUCTION OF MULTI-PURPOSE BUILDING, TAFT MUNICIPAL HALL PHASE 2, BARANGAY POBLACION, TAFT, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱48.9M | 35% | High risk96 | Flagged0.025 |
| 25IB0050CONSTRUCTION OF MULTI-PURPOSE BUILDING, CAN-AVID MUNICIPAL HALL PHASE 2 BARANGAY POBLACION, CAN-AVID, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱48.9M | 42% | High risk96 | Flagged0.025 |
| 25IB0060CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), BARANGAY SAN LUIS, TAFT, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱9.8M | 44% | High risk95 | Flagged0.024 |
| 25IB0104ROAD WIDENING SECONDARY ROADS, WRIGHT - TAFT - BORONGAN RD (SM00172SM)K0875+667 - K0876+511, K0877+525 - K0878+256, K0878+800 - K0879+389 | Region VIII | Eastern Samar DEO | On-Going | ₱104.8M | 22% | High risk95 | Flagged0.024 |
| 23I00127SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC/FACILITIES - CONSTRUCTION OF CONCRETE ROAD - IMPROVEMENT/UPGRADING OF ACCESS ROAD AND CONSTRUCTION OF MULTI-PURPOSE BUILDING IN BRGY. 06, GUIUAN, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱48.1M | 61% | High risk82 | Flagged0.023 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 276 | 25IL0056CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - ACCESS ROADS AND / OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BRIDGE, BOGO, MAASIN CITY, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | On-Going | ₱5.9M | 67% | Medium risk47 | —-0.017 |
| 277 | 23IK0058CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ANTIAO RIVER, BRGY. SAN ANDRES, CATBALOGAN CITY, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱29.4M | 100% | Medium risk47 | —-0.029 |
| 278 | 21IB0015IMPROVEMENT OF NATIONAL ROADS ALONG JCT. TAFT - ORAS - SAN POLICARPO - ARTECHE ROAD, EASTERN SAMAR, INSTALLATION OF SOLAR STUDS (K0932+000 - K0949+000, S00167SM) | Region VIII | Eastern Samar DEO | Completed | ₱19.5M | 100% | Medium risk47 | —-0.091 |
| 279 | 22IJ0088CSSP: REHABILITATION OF SEAWALL, BARANGAY MAGSAYSAY, ALMAGRO, WESTERN SAMAR | Region VIII | Samar 1st DEO | Completed | ₱19.7M | 100% | Medium risk47 | —-0.083 |
| 280 | 24IL0056CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF CABADIANGAN-BASAK MAASIN CITY ROAD, CABADIANGA | Region VIII | Southern Leyte 1st DEO | Completed | ₱4.9M | 100% | Medium risk47 | —-0.092 |
| 281 | 19IJ0075002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION / MAINTENANCE OF FLOOD CONTROL MITIGATION STRUCTURES AND DRAINAGE SYSTEM. CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG GANDARA RIVER (UPSTREAM), BRGY. CONCEPCION, GANDARA, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱43.5M | 100% | Medium risk47 | —-0.082 |
| 282 | 19IJ0023(RE-ADVERTISE) 002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS -CONSTRUCTIOMAINTENANCE OF FLOOD CONTROL MITIGATIONSTRUCTURES AND DRAINAGESYSTEMS.CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG HINAGBUNGAN RIVER (UPSTREAM) BRGY.CONCEPCION,GANDARA | Region VIII | Samar 1st DEO | Completed | ₱39.5M | 100% | Medium risk47 | —-0.083 |
| 283 | 25IL0052CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONCRETING OF ROADS, SITIO LOBLOBON STO. NIÑO - PANSAAN, MAASIN CI | Region VIII | Southern Leyte 1st DEO | On-Going | ₱5.9M | 100% | Medium risk47 | —-0.062 |
| 284 | 23IL0004BASIC INFRASTRUCTURE PROGRAM - ACCESS ROAD AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES, CONSTRUCTION OF ROAD, BARANGAY CAGNITUAN, MAASIN CITY, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱5M | 100% | Medium risk47 | —-0.093 |
| 285 | 18IJ0065REHABILITATION/IMPROVEMENT OF FLOOD CONTROL STRUCTURE ALONG CAGLANIPAO SUR, CALBAYOG CITY, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱17.7M | 100% | Medium risk47 | —-0.083 |
| 286 | 18IB0153CONSTRUCTION OF 3-STOREY, 6- CLASSROOM SCHOOL BUILDING AT ARTECHE NATIONAL HIGH SCHOOL, ARTECHE, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱14.4M | 100% | Medium risk47 | —-0.047 |
| 287 | 18IJ0203CONSTRUCTION OF TWO (2) STOREY SIX (6) CLASSROOM SCHOOL BUILDING, SAN POLICARPO NATIONAL HIGH SCHOOL, CALBAYOG CITY, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱18.4M | 100% | Medium risk46 | —-0.052 |
| 288 | 18IJ0056REHABILITATION/IMPROVEMENT OF FLOOD CONTROL STRUCTURE ALONG TANGAO RIVER, BRGY. SAN JOAQUIN, CALBAYOG CITY, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱27M | 100% | Medium risk46 | —-0.082 |
| 289 | 20IJ0039002: CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PEÑA RIVER, (UPSTREAM), BRGY. PEÑA, CALBAYOG CITY, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱26.9M | 100% | Medium risk46 | —-0.082 |
| 290 | 20IB0035CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG CAN-OBING RIVER, BRGY. CAN-ABONG, BORONGAN CITY, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱39.2M | 100% | Medium risk46 | —-0.076 |
| 291 | 20IB0036CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SURIBAO RIVER, BRGY. MALOBAGO, MAYDOLONG, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱14.7M | 100% | Medium risk46 | —-0.077 |
| 292 | 20IB0013CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG SURIBAO RIVER, BRGY. BANUYO, BORONGAN CITY, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱14.7M | 100% | Medium risk46 | —-0.078 |
| 293 | 20IJ0019002: CONSRTUCTION OF FLOOD CONTROL STRUCTURE, JIBATANG RIVER DOWNSTREAM, BRGY. LONOY, CALBAYOG CITY, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱45M | 100% | Medium risk46 | —-0.082 |
| 294 | 20IJ0012002: CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG JIBATANG RIVER (UPSTREAM), BRGY. NABANG, CALBAYOG CITY, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱30.8M | 100% | Medium risk46 | —-0.080 |
| 295 | 18IJ0010CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG STRUCTURE ALONG JIBATANG RIVER (UPSTREAM), BRGY. CAPACUHAN, CALBAYOG CITY, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱29.9M | 100% | Medium risk46 | —-0.082 |
| 296 | 20IJ0070REHABILITATION OF DRAINAGE STRUCTURE, K0789+000, BRGY. TARABUCAN, CALBAYOG CITY, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱46.1M | 100% | Medium risk46 | —-0.082 |
| 297 | 19IJ0048CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG JIBATANG RIVER (UPSTREAM), BRGY. TARABUCAN, CALBAYOG CITY, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱41.3M | 100% | Medium risk46 | —-0.082 |
| 298 | 18IB0079CONSTRUCTION OF BALANGIGA FLOOD CONTROL STRUCTURE, BALANGIGA, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱33.3M | 100% | Medium risk46 | —-0.079 |
| 299 | 20IB0105CONSTRUCTION OF FLOOD CONTROL STRUCTURE PROJECT, BRGY. LIBAS, SAN JULIAN, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱9.8M | 100% | Medium risk46 | —-0.076 |
| 300 | 20IB0016CONSTRUCTION OF FLOOD CONTROL STRUCTURES AT BRGY.CABONG, BORONGAN CITY, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱10.4M | 100% | Medium risk46 | —-0.077 |