Total projects
413
Total budget
₱12.5B
Average progress
93.4%
Completion rate
71.2%
Average risk score
51.3
Medium risk on average, out of 100
Flagged as unusual
61
14.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 407 | ₱12.4B | 51.6 | 61 | 93.3% |
| Negros Island Region | 3 | ₱126M | 48.1 | 0 | 100.0% |
| Region IV-B | 3 | ₱5.8M | 19.7 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 162 | ₱6.5B | 50.6 | 6 | 96.5% |
| Buildings and Facilities | 91 | ₱855.2M | 33.7 | 0 | 98.4% |
| Flood Control and Drainage | 85 | ₱3.2B | 48.4 | 0 | 98.1% |
| OTHER | 30 | ₱997.8M | 83.1 | 26 | 76.3% |
| GAA 2025 SSP | 23 | ₱401.5M | 93.8 | 23 | 68.6% |
| Bridges | 11 | ₱91.9M | 38.8 | 0 | 91.6% |
| Water Provision and Storage | 5 | ₱42.7M | 44.0 | 1 | 92.6% |
| GAA 2025 OO-1 | 3 | ₱201.9M | 94.2 | 3 | 51.3% |
| GAA 2025 OO-2 | 2 | ₱153.8M | 91.9 | 2 | 30.1% |
| Bridges, Roads | 1 | ₱96.5M | 61.6 | 0 | 98.1% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25I00119SIPAG - COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES - CONSTRUCTION OF COASTAL ROAD, BARANGAY PEPELITAN - BARANGAY SABANG NORTH, BORONGAN CITY | Region VIII | Region VIII | On-Going | ₱96.4M | 56% | High risk96 | Flagged0.028 |
| 25I00121SIPAG - INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) - CONSTRUCTION OF ROAD, PHASE 2, BARANGAY NATO - BARANGAY BONGDO, TAFT, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱48.2M | 77% | High risk96 | Flagged0.013 |
| 25IB0053CONSTRUCTION OF MULTI-PURPOSE BUILDING, TAFT MUNICIPAL HALL PHASE 2, BARANGAY POBLACION, TAFT, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱48.9M | 35% | High risk96 | Flagged0.025 |
| 25IB0050CONSTRUCTION OF MULTI-PURPOSE BUILDING, CAN-AVID MUNICIPAL HALL PHASE 2 BARANGAY POBLACION, CAN-AVID, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱48.9M | 42% | High risk96 | Flagged0.025 |
| 25IN0018CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF DAS-AY FLOOD CONTROL STRUCTURE (SEGMENT 2), HIN | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱53.1M | 90% | High risk96 | Flagged0.010 |
| 25IB0060CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), BARANGAY SAN LUIS, TAFT, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱9.8M | 44% | High risk95 | Flagged0.024 |
| 25IB0038CONSTRUCTION OF EVACUATION CENTER BARANGAY BATI-AWAN, TAFT, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱4.8M | 40% | High risk95 | Flagged0.025 |
| 25IB0144CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY BUGAS, BORONGAN CITY, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱4.9M | 86% | High risk95 | Flagged0.013 |
| 25IN0057SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY SAGBOK ROAD, HINUNDAYAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱4.8M | 85% | High risk95 | Flagged0.014 |
| 25IN0024CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY OSAO ROAD, SA | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱4.8M | 84% | High risk95 | Flagged0.013 |
| 25IN0022CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY TOPTOP ROAD, | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱4.8M | 100% | High risk95 | Flagged0.005 |
| 25IB0104ROAD WIDENING SECONDARY ROADS, WRIGHT - TAFT - BORONGAN RD (SM00172SM)K0875+667 - K0876+511, K0877+525 - K0878+256, K0878+800 - K0879+389 | Region VIII | Eastern Samar DEO | On-Going | ₱104.8M | 22% | High risk95 | Flagged0.024 |
| 25IN0021CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY BIASONG ROAD, | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱4.8M | 21% | High risk95 | Flagged0.029 |
| 25IL0027SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF STA. SOFIA BR., PADRE BURGOS, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | On-Going | ₱24.5M | 97% | High risk95 | Flagged0.007 |
| 25IN0020CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY LUMBOG ROAD, | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱4.8M | 100% | High risk95 | Flagged0.005 |
| 25IL0035CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, MAMBAJAO, MAASIN CITY, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | On-Going | ₱4.9M | 100% | High risk94 | Flagged0.004 |
| 25IN0027CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY MAHAYAHAY ROA | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱5.6M | 84% | High risk94 | Flagged0.012 |
| 25IL0053CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONCRETING OF ROADS, SITIO SAN VICENTE CANSIRONG - BAUGO, MAASIN C | Region VIII | Southern Leyte 1st DEO | On-Going | ₱5.9M | 34% | High risk94 | Flagged0.025 |
| 25I00156ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - MAHARLIKA HIGHWAY - K1010+885 - K1011+080, K1011+520 - K1011+595 | Region VIII | Region VIII | On-Going | ₱49.8M | 72% | High risk94 | Flagged0.002 |
| 25I00149ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS MAHARLIKA HIGHWAY - K1010+630 - K1010+885 | Region VIII | Region VIII | On-Going | ₱47.2M | 60% | High risk93 | Flagged0.006 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24IL0107FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SHORELINE PROTECTION STRUCTURE ALONG ASUNCION - BENIT SECTION, MALITBOG, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | On-Going | ₱120.5M | 72% | High risk92 | Flagged0.068 |
| 23IM0124CONSTRUCTION OF 1-UNIT 3STY15CL, SCHOOL BUILDING, LEYTE NATIONAL HIGH SCHOOL, TACLOBAN CITY, LEYTE | Region VIII | Tacloban City DEO | On-Going | ₱40M | 81% | High risk90 | Flagged0.059 |
| 25IB0134CONCRETING OF BRGY. ABEJAO TO BRGY. SEGUINON FMR, BRGY. ABEJAO AND BRGY. SEGUINON, SALCEDO, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱5M | 90% | High risk88 | Flagged0.045 |
| 24I00283CONSTRUCTION OF 1 UNIT 1-STOREY 2-CLASSROOM SCHOOL BUILDING IN MAGAUPAS ELEMENTARY SCHOOL, BRGY. MAGAUPAS, LILOAN, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱6.6M | 100% | High risk88 | Flagged0.043 |
| 24I00377CONSTRUCTION OF 1 UNIT 1-STOREY 2-CLASSROOM SCHOOL BUILDING IN PANDAN - SAN MIGUEL ELEMENTARY SCHOOL, BRGY. SAN MIGUEL, SOGOD, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱6.6M | 100% | High risk89 | Flagged0.040 |
| 25IB0132CONCRETING OF NATIONAL HIGHWAY TO SITIO AMAMPAGAO FMR, LAWAAN, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱5M | 100% | High risk89 | Flagged0.040 |
| 25IB0128CONCRETING OF BRGY. POLANGI FMR, BRGY. POLANGI, TAFT, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱5M | 100% | High risk89 | Flagged0.038 |
| 25IN0062CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS - CONSTRUCTION (COMPLETION) OF PUBLIC WATER SUPPLY SYSTEM (LEVEL II), BARANGAY MABICAY, SOGOD, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱1.9M | 0% | High risk88 | Flagged0.035 |
| 25IN0065CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY PONG-OY, SAN JUAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱3M | 14% | High risk90 | Flagged0.034 |
| 25IN0021CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY BIASONG ROAD, | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱4.8M | 21% | High risk95 | Flagged0.029 |
| 25I00119SIPAG - COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES - CONSTRUCTION OF COASTAL ROAD, BARANGAY PEPELITAN - BARANGAY SABANG NORTH, BORONGAN CITY | Region VIII | Region VIII | On-Going | ₱96.4M | 56% | High risk96 | Flagged0.028 |
| 24I00222CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY POBLACION | Region VIII | Region VIII | On-Going | ₱4.8M | 7% | High risk80 | Flagged0.026 |
| 24I00220SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD BRGY. HOMONHON - CASUGURAN - HABAG, GUIUAN, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱96.4M | 37% | High risk84 | Flagged0.025 |
| 25IB0038CONSTRUCTION OF EVACUATION CENTER BARANGAY BATI-AWAN, TAFT, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱4.8M | 40% | High risk95 | Flagged0.025 |
| 25IL0053CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONCRETING OF ROADS, SITIO SAN VICENTE CANSIRONG - BAUGO, MAASIN C | Region VIII | Southern Leyte 1st DEO | On-Going | ₱5.9M | 34% | High risk94 | Flagged0.025 |
| 25IB0053CONSTRUCTION OF MULTI-PURPOSE BUILDING, TAFT MUNICIPAL HALL PHASE 2, BARANGAY POBLACION, TAFT, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱48.9M | 35% | High risk96 | Flagged0.025 |
| 25IB0050CONSTRUCTION OF MULTI-PURPOSE BUILDING, CAN-AVID MUNICIPAL HALL PHASE 2 BARANGAY POBLACION, CAN-AVID, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱48.9M | 42% | High risk96 | Flagged0.025 |
| 25IB0060CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), BARANGAY SAN LUIS, TAFT, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱9.8M | 44% | High risk95 | Flagged0.024 |
| 25IB0104ROAD WIDENING SECONDARY ROADS, WRIGHT - TAFT - BORONGAN RD (SM00172SM)K0875+667 - K0876+511, K0877+525 - K0878+256, K0878+800 - K0879+389 | Region VIII | Eastern Samar DEO | On-Going | ₱104.8M | 22% | High risk95 | Flagged0.024 |
| 23I00127SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC/FACILITIES - CONSTRUCTION OF CONCRETE ROAD - IMPROVEMENT/UPGRADING OF ACCESS ROAD AND CONSTRUCTION OF MULTI-PURPOSE BUILDING IN BRGY. 06, GUIUAN, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱48.1M | 61% | High risk82 | Flagged0.023 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 326 | 20IB0042CONSTRUCTION OF BRGY. PUNTA MARIA FLOOD CONTROL, BORONGAN CITY, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱19.4M | 100% | Medium risk46 | —-0.075 |
| 327 | 23ID0088CONSTRUCTION OF 1STY2CL SCHOOL BUILDING CAMANSI PRIMARY SCHOOL,MAYORGA,LEYTE | Region VIII | Leyte 2nd DEO | Completed | ₱5.6M | 100% | Medium risk46 | —-0.054 |
| 328 | 23ID0086CONSTRUCTION OF 1STY2CL SCHOOL BUILDING CANBAÑEZ PRIMARY, LA PAZ,LEYTE | Region VIII | Leyte 2nd DEO | Completed | ₱5.6M | 100% | Medium risk46 | —-0.054 |
| 329 | 20IB0017CONSTRUCTION OF FLOOD CONTROL AT BRGY. 02 AND 03, JIPAPAD, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱16.9M | 100% | Medium risk46 | —-0.077 |
| 330 | 24IB0055CONSTRUCTION OF SEAWALL, BARANGAY POBLACION, GENERAL MAC ARTHUR, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱19.8M | 100% | Medium risk46 | —-0.077 |
| 331 | 20IB0029CONSTRUCTION OF FLOOD CONTROL ALONG CADACAN RIVER PROTECTING NATIONAL ROAD AND BRIDGES, BRGY. CADACAN, GEN. MACARTHUR, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱19.6M | 100% | Medium risk46 | —-0.078 |
| 332 | 20IB0014REHABILITATION OF BRGY. 3, 9, 10, 12 FLOOD CONTROL STRUCTURES, SALCEDO, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱19.6M | 100% | Medium risk45 | —-0.076 |
| 333 | 23IB0063CONSTRUCTION OF FLOOD CONTROL AT BRGY. DAMPIGAN, DOLORES, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱14.8M | 100% | Medium risk45 | —-0.077 |
| 334 | 20IB0012CONSTRUCTION OF BUENAVISTA FLOOD CONTROL PROJECT, BUENAVISTA, QUINAPONDAN, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱19.6M | 100% | Medium risk45 | —-0.078 |
| 335 | 20IB0008CONSTRUCTION OF ARTECHE FLOOD CONTROL, ARTECHE, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱19.6M | 100% | Medium risk45 | —-0.079 |
| 336 | 20IB0072CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ORAS RIVER, ORAS, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱9.8M | 100% | Medium risk45 | —-0.077 |
| 337 | 18IB0042REHABILITATION/IMPROVEMENT OF FLOOD CONTROL STRUCTURES ALONG ORAS RIVER, ORAS, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱21.8M | 100% | Medium risk45 | —-0.077 |
| 338 | 25IN0019CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF MA. ASUNCION TO HIMOS- | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱4.8M | 75% | Medium risk45 | —-0.052 |
| 339 | 25IN0023CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY UNION ROAD, H | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱4.8M | 100% | Medium risk45 | —-0.061 |
| 340 | 17IB0080REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES AT BOBLARAN BRIDGE (B00634SM), ALONG JCT. TAFT - ORAS - SAN POLICARPO - ARTECHE ROAD, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱9.8M | 100% | Medium risk45 | —-0.031 |
| 341 | 19IB0060CONSTRUCTION OF SEAWALL, BRGY. ALUGAN, SAN POLICARPO, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱19.6M | 100% | Medium risk45 | —-0.078 |
| 342 | 25IB0127CONCRETING OF BRGY. LAPGAP TO BRGY. MALOBAGO FMR, BRGY, LAPGAP AND BRGY. MALOBAGO, MAYDOLONG, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱5M | 100% | Medium risk45 | —-0.011 |
| 343 | 25IN0025CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY PATONG ROAD, | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱4.8M | 100% | Medium risk45 | —-0.061 |
| 344 | 25IB0133CONCRETING OF SITIO INNULANGUHAN, BRGY. ROXAS TO BRGY. MAGSAYSAY FMR, BRGY. ROXAS AND BRGY. MAGSAYSAY, GENERAL MACARTHUR, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱5M | 9% | Medium risk45 | Flagged0.020 |
| 345 | 24IL0088CONSTRUCTION OF 1 UNIT 1-STOREY 2-CLASSROOM SCHOOL BUILDING IN DIVISORIA ELEMENTARY SCHOOL, BARANGAY DIVISORIA, BONTOC, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱5M | 100% | Medium risk45 | —-0.054 |
| 346 | 22HJ0018CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES - BRGY. VILLEGAS ROAD CONNECTING GUIHULNGAN TO BALOC TO ISABELA ROAD IN SUPPORT OF BANANA, MANGO AND BAMBOO PROCESSORS OF GUIHULNGAN CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 1st DEO | Completed | ₱11.3M | 100% | Medium risk45 | —-0.090 |
| 347 | 24IL0089CONSTRUCTION OF 1 UNIT 1-STOREY 2-CLASSROOM SCHOOL BUILDING IN PAKU ELEMENTARY SCHOOL, BARANGAY PAKU, BONTOC, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱5M | 100% | Medium risk44 | —-0.054 |
| 348 | 20IJ0046LOCAL PROGRAM: CONSTRUCTION OF MULTI-PURPOSE BUILDING,BRGY. MATOBATO,CALBAYOG CITY,SAMAR | Region VIII | Samar 1st DEO | Completed | ₱4.8M | 100% | Medium risk44 | —-0.097 |
| 349 | 18IB0171CONCRETING OF BRGY. MALAINTOS - BRGY. STO. NIÑO AND DENIGPI-AN FMR, DOLORES, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱5M | 100% | Medium risk44 | —-0.037 |
| 350 | 25IB0130CONCRETING OF BRGY. 02 TO SITIO BALUD FMR, BRGY. 02, SAN POLICARPO, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱5M | 100% | Medium risk44 | —-0.008 |