413 projects on file, including joint ventures this contractor is part of.
Total projects
413
Total budget
₱12.5B
Average progress
93.4%
Completion rate
71.2%
Average risk score
51.3
Medium risk on average, out of 100
Flagged as unusual
61
14.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 407 | ₱12.4B | 51.6 | 61 | 93.3% |
| Negros Island Region | 3 | ₱126M | 48.1 | 0 | 100.0% |
| Region IV-B | 3 | ₱5.8M | 19.7 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 162 | ₱6.5B | 50.6 | 6 | 96.5% |
| Buildings and Facilities | 91 | ₱855.2M | 33.7 | 0 | 98.4% |
| Flood Control and Drainage | 85 | ₱3.2B | 48.4 | 0 | 98.1% |
| OTHER | 30 | ₱997.8M | 83.1 | 26 | 76.3% |
| GAA 2025 SSP | 23 | ₱401.5M | 93.8 | 23 | 68.6% |
| Bridges | 11 | ₱91.9M | 38.8 | 0 | 91.6% |
| Water Provision and Storage | 5 | ₱42.7M | 44.0 | 1 | 92.6% |
| GAA 2025 OO-1 | 3 | ₱201.9M | 94.2 | 3 | 51.3% |
| GAA 2025 OO-2 | 2 | ₱153.8M | 91.9 | 2 | 30.1% |
| Bridges, Roads | 1 | ₱96.5M | 61.6 | 0 | 98.1% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25I00119SIPAG - COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES - CONSTRUCTION OF COASTAL ROAD, BARANGAY PEPELITAN - BARANGAY SABANG NORTH, BORONGAN CITY | Region VIII | Region VIII | On-Going | ₱96.4M | 56% | High risk96 | Flagged0.028 |
| 25I00121SIPAG - INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) - CONSTRUCTION OF ROAD, PHASE 2, BARANGAY NATO - BARANGAY BONGDO, TAFT, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱48.2M | 77% | High risk96 | Flagged0.013 |
| 25IB0053CONSTRUCTION OF MULTI-PURPOSE BUILDING, TAFT MUNICIPAL HALL PHASE 2, BARANGAY POBLACION, TAFT, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱48.9M | 35% | High risk96 | Flagged0.025 |
| 25IB0050CONSTRUCTION OF MULTI-PURPOSE BUILDING, CAN-AVID MUNICIPAL HALL PHASE 2 BARANGAY POBLACION, CAN-AVID, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱48.9M | 42% | High risk96 | Flagged0.025 |
| 25IN0018CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF DAS-AY FLOOD CONTROL STRUCTURE (SEGMENT 2), HIN | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱53.1M | 90% | High risk96 | Flagged0.010 |
| 25IB0060CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), BARANGAY SAN LUIS, TAFT, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱9.8M | 44% | High risk95 | Flagged0.024 |
| 25IB0038CONSTRUCTION OF EVACUATION CENTER BARANGAY BATI-AWAN, TAFT, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱4.8M | 40% | High risk95 | Flagged0.025 |
| 25IB0144CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY BUGAS, BORONGAN CITY, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱4.9M | 86% | High risk95 | Flagged0.013 |
| 25IN0057SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY SAGBOK ROAD, HINUNDAYAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱4.8M | 85% | High risk95 | Flagged0.014 |
| 25IN0024CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY OSAO ROAD, SA | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱4.8M | 84% | High risk95 | Flagged0.013 |
| 25IN0022CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY TOPTOP ROAD, | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱4.8M | 100% | High risk95 | Flagged0.005 |
| 25IB0104ROAD WIDENING SECONDARY ROADS, WRIGHT - TAFT - BORONGAN RD (SM00172SM)K0875+667 - K0876+511, K0877+525 - K0878+256, K0878+800 - K0879+389 | Region VIII | Eastern Samar DEO | On-Going | ₱104.8M | 22% | High risk95 | Flagged0.024 |
| 25IN0021CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY BIASONG ROAD, | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱4.8M | 21% | High risk95 | Flagged0.029 |
| 25IL0027SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF STA. SOFIA BR., PADRE BURGOS, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | On-Going | ₱24.5M | 97% | High risk95 | Flagged0.007 |
| 25IN0020CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY LUMBOG ROAD, | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱4.8M | 100% | High risk95 | Flagged0.005 |
| 25IL0035CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, MAMBAJAO, MAASIN CITY, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | On-Going | ₱4.9M | 100% | High risk94 | Flagged0.004 |
| 25IN0027CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY MAHAYAHAY ROA | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱5.6M | 84% | High risk94 | Flagged0.012 |
| 25IL0053CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONCRETING OF ROADS, SITIO SAN VICENTE CANSIRONG - BAUGO, MAASIN C | Region VIII | Southern Leyte 1st DEO | On-Going | ₱5.9M | 34% | High risk94 | Flagged0.025 |
| 25I00156ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - MAHARLIKA HIGHWAY - K1010+885 - K1011+080, K1011+520 - K1011+595 | Region VIII | Region VIII | On-Going | ₱49.8M | 72% | High risk94 | Flagged0.002 |
| 25I00149ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS MAHARLIKA HIGHWAY - K1010+630 - K1010+885 | Region VIII | Region VIII | On-Going | ₱47.2M | 60% | High risk93 | Flagged0.006 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24IL0107FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SHORELINE PROTECTION STRUCTURE ALONG ASUNCION - BENIT SECTION, MALITBOG, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | On-Going | ₱120.5M | 72% | High risk92 | Flagged0.068 |
| 23IM0124CONSTRUCTION OF 1-UNIT 3STY15CL, SCHOOL BUILDING, LEYTE NATIONAL HIGH SCHOOL, TACLOBAN CITY, LEYTE | Region VIII | Tacloban City DEO | On-Going | ₱40M | 81% | High risk90 | Flagged0.059 |
| 25IB0134CONCRETING OF BRGY. ABEJAO TO BRGY. SEGUINON FMR, BRGY. ABEJAO AND BRGY. SEGUINON, SALCEDO, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱5M | 90% | High risk88 | Flagged0.045 |
| 24I00283CONSTRUCTION OF 1 UNIT 1-STOREY 2-CLASSROOM SCHOOL BUILDING IN MAGAUPAS ELEMENTARY SCHOOL, BRGY. MAGAUPAS, LILOAN, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱6.6M | 100% | High risk88 | Flagged0.043 |
| 24I00377CONSTRUCTION OF 1 UNIT 1-STOREY 2-CLASSROOM SCHOOL BUILDING IN PANDAN - SAN MIGUEL ELEMENTARY SCHOOL, BRGY. SAN MIGUEL, SOGOD, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱6.6M | 100% | High risk89 | Flagged0.040 |
| 25IB0132CONCRETING OF NATIONAL HIGHWAY TO SITIO AMAMPAGAO FMR, LAWAAN, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱5M | 100% | High risk89 | Flagged0.040 |
| 25IB0128CONCRETING OF BRGY. POLANGI FMR, BRGY. POLANGI, TAFT, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱5M | 100% | High risk89 | Flagged0.038 |
| 25IN0062CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS - CONSTRUCTION (COMPLETION) OF PUBLIC WATER SUPPLY SYSTEM (LEVEL II), BARANGAY MABICAY, SOGOD, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱1.9M | 0% | High risk88 | Flagged0.035 |
| 25IN0065CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY PONG-OY, SAN JUAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱3M | 14% | High risk90 | Flagged0.034 |
| 25IN0021CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY BIASONG ROAD, | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱4.8M | 21% | High risk95 | Flagged0.029 |
| 25I00119SIPAG - COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES - CONSTRUCTION OF COASTAL ROAD, BARANGAY PEPELITAN - BARANGAY SABANG NORTH, BORONGAN CITY | Region VIII | Region VIII | On-Going | ₱96.4M | 56% | High risk96 | Flagged0.028 |
| 24I00222CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY POBLACION | Region VIII | Region VIII | On-Going | ₱4.8M | 7% | High risk80 | Flagged0.026 |
| 24I00220SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD BRGY. HOMONHON - CASUGURAN - HABAG, GUIUAN, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱96.4M | 37% | High risk84 | Flagged0.025 |
| 25IB0038CONSTRUCTION OF EVACUATION CENTER BARANGAY BATI-AWAN, TAFT, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱4.8M | 40% | High risk95 | Flagged0.025 |
| 25IL0053CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONCRETING OF ROADS, SITIO SAN VICENTE CANSIRONG - BAUGO, MAASIN C | Region VIII | Southern Leyte 1st DEO | On-Going | ₱5.9M | 34% | High risk94 | Flagged0.025 |
| 25IB0053CONSTRUCTION OF MULTI-PURPOSE BUILDING, TAFT MUNICIPAL HALL PHASE 2, BARANGAY POBLACION, TAFT, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱48.9M | 35% | High risk96 | Flagged0.025 |
| 25IB0050CONSTRUCTION OF MULTI-PURPOSE BUILDING, CAN-AVID MUNICIPAL HALL PHASE 2 BARANGAY POBLACION, CAN-AVID, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱48.9M | 42% | High risk96 | Flagged0.025 |
| 25IB0060CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), BARANGAY SAN LUIS, TAFT, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱9.8M | 44% | High risk95 | Flagged0.024 |
| 25IB0104ROAD WIDENING SECONDARY ROADS, WRIGHT - TAFT - BORONGAN RD (SM00172SM)K0875+667 - K0876+511, K0877+525 - K0878+256, K0878+800 - K0879+389 | Region VIII | Eastern Samar DEO | On-Going | ₱104.8M | 22% | High risk95 | Flagged0.024 |
| 23I00127SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC/FACILITIES - CONSTRUCTION OF CONCRETE ROAD - IMPROVEMENT/UPGRADING OF ACCESS ROAD AND CONSTRUCTION OF MULTI-PURPOSE BUILDING IN BRGY. 06, GUIUAN, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱48.1M | 61% | High risk82 | Flagged0.023 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 351 | 19IB0255RECONSTRUCTION OF CABAY RIVER FLOOD CONTROL, BRGY. CABAY BALANGKAYAN, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱9.4M | 100% | Medium risk43 | —-0.027 |
| 352 | 23IL0073CONSTRUCTION OF 1STY2CL, PINASCOHAN MGS, MAASIN, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱5M | 100% | Medium risk42 | —-0.053 |
| 353 | 23IL0072CONSTRUCTION OF 1STY3CL, IBARRA NATIONAL HIGH SCHOOL, MAASIN, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱10M | 100% | Medium risk42 | —-0.052 |
| 354 | 24IL0092CONCRETING OF BRGY. LARAY FMR - BRGY. LARAY, MACROHON, SOUTHERN LEYTE, BRGY. LARAY, MACROHON, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱5M | 100% | Medium risk42 | —-0.042 |
| 355 | 18IB0147CONSTRUCTION OF 1-STOREY WORKSHOP BUILDING (STANDARD TECHNICAL VOCATIONAL BUILDING) AT JIPAPAD NATIONAL HIGH SCHOOL, JIPAPAD, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱4.8M | 100% | Medium risk42 | —-0.049 |
| 356 | 18IB0168CONCRETING OF BRGY. NAPARAAN - BRGY. ABEJAO FMR, BRGY. NAPARAAN AND BRGY. ABEJAO, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱4.8M | 100% | Medium risk41 | —-0.039 |
| 357 | 17IJ0225REHABILITATION OF STAFF HOUSE SAN JORGE, SAN JORGE, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱5.8M | 100% | Medium risk41 | —-0.029 |
| 358 | 17IJ0165CONSTRUCTION OF THREE (3) STOREY - SIX (6) CLASSROOM SCHOOL BUILDING, SAN POLICARPO NATIONAL HIGH SCHOOL, CALBAYOG CITY, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱13.9M | 100% | Medium risk40 | —-0.028 |
| 359 | 17IB0166(1) COMPLETION OF 1-UNIT, 2-STOREY, 4- CL. RM. SCHOOL BUILDING AT ORAS NATIONAL HIGH SCHOOL; (2) COMPLETION OF 2-UNITS, 2-STOREY, 10-CL. RM. SCHOOL BUILDING AT DOLORES NATIONAL HIGH SCHOOL; (3) COMPLETION OF 1-UNIT, 1-STOREY, 2- CL. RM. SCHOOL BUILDING AT | Region VIII | Eastern Samar DEO | Completed | ₱6.3M | 100% | Medium risk38 | —-0.021 |
| 360 | 16IB0293REPAIR OF ESSU SOCIAL HALL EASTERN SAMAR STATE UNIVERSITY, CAN-AVID CAMPUS, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱7.1M | 100% | Medium risk38 | —-0.023 |
| 361 | 16IB0329REPAIR/REHABILITATION OF TEN (10) MARKET BUILDINGS, DOLORES EASTERN SAMAR. | Region VIII | Eastern Samar DEO | Completed | ₱12.2M | 100% | Medium risk38 | —-0.023 |
| 362 | 16IB0324REPAIR/REHABILITATION OF DOLORES BUS/TRANSPORT TERMINAL, DOLORES, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱7.5M | 100% | Medium risk37 | —-0.022 |
| 363 | 24I00130CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BRGY. GAKAT, LIBAGON, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱3.9M | 100% | Low risk30 | —-0.056 |
| 364 | 23I00048BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY MAC, SOGOD, SOUTHERN LEYTE | Region VIII | Region VIII | Completed | ₱2M | 100% | Low risk30 | —-0.095 |
| 365 | 24IL0040CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM - MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES, COMPLETION OF MULTI-PURPOSE BUILDING, SAMPUNGON, BONTOC, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱3.5M | 100% | Low risk28 | —-0.097 |
| 366 | 24IL0054CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM - MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES, COMPLETION OF MULTI-PURPOSE BUILDING, CANDATAG, MALITBOG, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱4M | 100% | Low risk26 | —-0.095 |
| 367 | 19IB0243CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTION SYSTEM FY -2019 1. DPWH -ESDEO COMPOUND, BORONGAN CITY, EASTERN SAMAR; (2)SAN ISIDRO ELEMENTARY SCHOOL, SULAT, EASTERN SAMAR; (3) CAGBONGA ELEM. SCHOOL, BORONGAN CITY, | Region VIII | Eastern Samar DEO | Completed | ₱3.8M | 100% | Low risk25 | —-0.060 |
| 368 | 24I00120ASSET PRESERVATION - CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS - JCT HIMAY-ANGAN - SILAGO - ABUYOG RD - K1100+507 - K1100+907 | Region VIII | Region VIII | On-Going | ₱4.1M | 91% | Low risk25 | —-0.049 |
| 369 | 17IB0025REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES AT TABO BRIDGE (B00524SM), ALONG JCT. TAFT - ORAS - SAN POLICARPO - ARTECHE ROAD, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱3.9M | 100% | Low risk25 | —-0.030 |
| 370 | 17IB0026REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES AT STO. NIÑO BRIDGE (B00501SM), ALONG JCT. BUENAVISTA - LAWAAN - MARABUT ROAD, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱3.4M | 100% | Low risk24 | —-0.032 |
| 371 | 18IB0080REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES AT TALISAY BRIDGE (B00518SM), ALONG JCT. TAFT - ORAS - SAN POLICARPO - ARTECHE ROAD | Region VIII | Eastern Samar DEO | Completed | ₱2.8M | 100% | Low risk24 | —-0.055 |
| 372 | 18IB0118CONSTRUCTION OF MULTI-PURPOSE BUILDING, DACUL, TAFT, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱2M | 100% | Low risk24 | —-0.094 |
| 373 | 20IB0049CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. TABOC (PHASE 1), LLORENTE, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱2M | 100% | Low risk23 | —-0.093 |
| 374 | 18IB0095CONSTRUCTION OF MULTI-PURPOSE BUILDING GARDEN, ARTECHE, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱2.8M | 100% | Low risk23 | —-0.093 |
| 375 | 20IB0089CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. CABONG, CITY OF BORONGAN, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱2.5M | 100% | Low risk23 | —-0.094 |