Contractor dossier
413 projects on file, including joint ventures this contractor is part of.
Total projects
413
Total budget
₱12.5B
Average progress
93.4%
Completion rate
71.2%
Average risk score
51.3
Medium risk on average, out of 100
Flagged as unusual
61
14.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 407 | ₱12.4B | 51.6 | 61 | 93.3% |
| Negros Island Region | 3 | ₱126M | 48.1 | 0 | 100.0% |
| Region IV-B | 3 | ₱5.8M | 19.7 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 162 | ₱6.5B | 50.6 | 6 | 96.5% |
| Buildings and Facilities | 91 | ₱855.2M | 33.7 | 0 | 98.4% |
| Flood Control and Drainage | 85 | ₱3.2B | 48.4 | 0 | 98.1% |
| OTHER | 30 | ₱997.8M | 83.1 | 26 | 76.3% |
| GAA 2025 SSP | 23 | ₱401.5M | 93.8 | 23 | 68.6% |
| Bridges | 11 | ₱91.9M | 38.8 | 0 | 91.6% |
| Water Provision and Storage | 5 | ₱42.7M | 44.0 | 1 | 92.6% |
| GAA 2025 OO-1 | 3 | ₱201.9M | 94.2 | 3 | 51.3% |
| GAA 2025 OO-2 | 2 | ₱153.8M | 91.9 | 2 | 30.1% |
| Bridges, Roads | 1 | ₱96.5M | 61.6 | 0 | 98.1% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25I00119SIPAG - COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES - CONSTRUCTION OF COASTAL ROAD, BARANGAY PEPELITAN - BARANGAY SABANG NORTH, BORONGAN CITY | Region VIII | Region VIII | On-Going | ₱96.4M | 56% | High risk96 | Flagged0.028 |
| 25I00121SIPAG - INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) - CONSTRUCTION OF ROAD, PHASE 2, BARANGAY NATO - BARANGAY BONGDO, TAFT, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱48.2M | 77% | High risk96 | Flagged0.013 |
| 25IB0053CONSTRUCTION OF MULTI-PURPOSE BUILDING, TAFT MUNICIPAL HALL PHASE 2, BARANGAY POBLACION, TAFT, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱48.9M | 35% | High risk96 | Flagged0.025 |
| 25IB0050CONSTRUCTION OF MULTI-PURPOSE BUILDING, CAN-AVID MUNICIPAL HALL PHASE 2 BARANGAY POBLACION, CAN-AVID, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱48.9M | 42% | High risk96 | Flagged0.025 |
| 25IN0018CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF DAS-AY FLOOD CONTROL STRUCTURE (SEGMENT 2), HIN | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱53.1M | 90% | High risk96 | Flagged0.010 |
| 25IB0060CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), BARANGAY SAN LUIS, TAFT, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱9.8M | 44% | High risk95 | Flagged0.024 |
| 25IB0038CONSTRUCTION OF EVACUATION CENTER BARANGAY BATI-AWAN, TAFT, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱4.8M | 40% | High risk95 | Flagged0.025 |
| 25IB0144CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY BUGAS, BORONGAN CITY, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱4.9M | 86% | High risk95 | Flagged0.013 |
| 25IN0057SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY SAGBOK ROAD, HINUNDAYAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱4.8M | 85% | High risk95 | Flagged0.014 |
| 25IN0024CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY OSAO ROAD, SA | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱4.8M | 84% | High risk95 | Flagged0.013 |
| 25IN0022CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY TOPTOP ROAD, | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱4.8M | 100% | High risk95 | Flagged0.005 |
| 25IB0104ROAD WIDENING SECONDARY ROADS, WRIGHT - TAFT - BORONGAN RD (SM00172SM)K0875+667 - K0876+511, K0877+525 - K0878+256, K0878+800 - K0879+389 | Region VIII | Eastern Samar DEO | On-Going | ₱104.8M | 22% | High risk95 | Flagged0.024 |
| 25IN0021CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY BIASONG ROAD, | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱4.8M | 21% | High risk95 | Flagged0.029 |
| 25IL0027SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF STA. SOFIA BR., PADRE BURGOS, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | On-Going | ₱24.5M | 97% | High risk95 | Flagged0.007 |
| 25IN0020CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY LUMBOG ROAD, | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱4.8M | 100% | High risk95 | Flagged0.005 |
| 25IL0035CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, MAMBAJAO, MAASIN CITY, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | On-Going | ₱4.9M | 100% | High risk94 | Flagged0.004 |
| 25IN0027CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY MAHAYAHAY ROA | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱5.6M | 84% | High risk94 | Flagged0.012 |
| 25IL0053CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONCRETING OF ROADS, SITIO SAN VICENTE CANSIRONG - BAUGO, MAASIN C | Region VIII | Southern Leyte 1st DEO | On-Going | ₱5.9M | 34% | High risk94 | Flagged0.025 |
| 25I00156ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - MAHARLIKA HIGHWAY - K1010+885 - K1011+080, K1011+520 - K1011+595 | Region VIII | Region VIII | On-Going | ₱49.8M | 72% | High risk94 | Flagged0.002 |
| 25I00149ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS MAHARLIKA HIGHWAY - K1010+630 - K1010+885 | Region VIII | Region VIII | On-Going | ₱47.2M | 60% | High risk93 | Flagged0.006 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24IL0107FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SHORELINE PROTECTION STRUCTURE ALONG ASUNCION - BENIT SECTION, MALITBOG, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | On-Going | ₱120.5M | 72% | High risk92 | Flagged0.068 |
| 23IM0124CONSTRUCTION OF 1-UNIT 3STY15CL, SCHOOL BUILDING, LEYTE NATIONAL HIGH SCHOOL, TACLOBAN CITY, LEYTE | Region VIII | Tacloban City DEO | On-Going | ₱40M | 81% | High risk90 | Flagged0.059 |
| 25IB0134CONCRETING OF BRGY. ABEJAO TO BRGY. SEGUINON FMR, BRGY. ABEJAO AND BRGY. SEGUINON, SALCEDO, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱5M | 90% | High risk88 | Flagged0.045 |
| 24I00283CONSTRUCTION OF 1 UNIT 1-STOREY 2-CLASSROOM SCHOOL BUILDING IN MAGAUPAS ELEMENTARY SCHOOL, BRGY. MAGAUPAS, LILOAN, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱6.6M | 100% | High risk88 | Flagged0.043 |
| 24I00377CONSTRUCTION OF 1 UNIT 1-STOREY 2-CLASSROOM SCHOOL BUILDING IN PANDAN - SAN MIGUEL ELEMENTARY SCHOOL, BRGY. SAN MIGUEL, SOGOD, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱6.6M | 100% | High risk89 | Flagged0.040 |
| 25IB0132CONCRETING OF NATIONAL HIGHWAY TO SITIO AMAMPAGAO FMR, LAWAAN, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱5M | 100% | High risk89 | Flagged0.040 |
| 25IB0128CONCRETING OF BRGY. POLANGI FMR, BRGY. POLANGI, TAFT, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱5M | 100% | High risk89 | Flagged0.038 |
| 25IN0062CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS - CONSTRUCTION (COMPLETION) OF PUBLIC WATER SUPPLY SYSTEM (LEVEL II), BARANGAY MABICAY, SOGOD, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱1.9M | 0% | High risk88 | Flagged0.035 |
| 25IN0065CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY PONG-OY, SAN JUAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱3M | 14% | High risk90 | Flagged0.034 |
| 25IN0021CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY BIASONG ROAD, | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱4.8M | 21% | High risk95 | Flagged0.029 |
| 25I00119SIPAG - COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES - CONSTRUCTION OF COASTAL ROAD, BARANGAY PEPELITAN - BARANGAY SABANG NORTH, BORONGAN CITY | Region VIII | Region VIII | On-Going | ₱96.4M | 56% | High risk96 | Flagged0.028 |
| 24I00222CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY POBLACION | Region VIII | Region VIII | On-Going | ₱4.8M | 7% | High risk80 | Flagged0.026 |
| 24I00220SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD BRGY. HOMONHON - CASUGURAN - HABAG, GUIUAN, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱96.4M | 37% | High risk84 | Flagged0.025 |
| 25IB0038CONSTRUCTION OF EVACUATION CENTER BARANGAY BATI-AWAN, TAFT, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱4.8M | 40% | High risk95 | Flagged0.025 |
| 25IL0053CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONCRETING OF ROADS, SITIO SAN VICENTE CANSIRONG - BAUGO, MAASIN C | Region VIII | Southern Leyte 1st DEO | On-Going | ₱5.9M | 34% | High risk94 | Flagged0.025 |
| 25IB0053CONSTRUCTION OF MULTI-PURPOSE BUILDING, TAFT MUNICIPAL HALL PHASE 2, BARANGAY POBLACION, TAFT, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱48.9M | 35% | High risk96 | Flagged0.025 |
| 25IB0050CONSTRUCTION OF MULTI-PURPOSE BUILDING, CAN-AVID MUNICIPAL HALL PHASE 2 BARANGAY POBLACION, CAN-AVID, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱48.9M | 42% | High risk96 | Flagged0.025 |
| 25IB0060CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), BARANGAY SAN LUIS, TAFT, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱9.8M | 44% | High risk95 | Flagged0.024 |
| 25IB0104ROAD WIDENING SECONDARY ROADS, WRIGHT - TAFT - BORONGAN RD (SM00172SM)K0875+667 - K0876+511, K0877+525 - K0878+256, K0878+800 - K0879+389 | Region VIII | Eastern Samar DEO | On-Going | ₱104.8M | 22% | High risk95 | Flagged0.024 |
| 23I00127SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC/FACILITIES - CONSTRUCTION OF CONCRETE ROAD - IMPROVEMENT/UPGRADING OF ACCESS ROAD AND CONSTRUCTION OF MULTI-PURPOSE BUILDING IN BRGY. 06, GUIUAN, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱48.1M | 61% | High risk82 | Flagged0.023 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 22IK0056PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG DAANG MAHARLIKA (SM) (SN ISIDRO - SN JUANICO BR), K0867+170 - 868+000; K0868+000 - K0868+900; K0871+521 - K0871+630; K0871+950 - 872+100; K0872+960 - K0874+150; K0874+700 - K0874+903, STA. RITA, SAMAR | Region VIII | Samar 2nd DEO | On-Going | ₱49M | 100% | Medium risk54 | —-0.034 |
| 127 | 20IJ0071001: DAANG MAHARLIKA (SM) (SN ISIDRO-SN JUANICO BR.) K0785+624 -K0785+924, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱48.6M | 100% | Medium risk54 | —-0.095 |
| 128 | 18IK0119CONSTRUCTION OF UPDATED STANDARD 1-UNIT, 4-STOREY, TWENTY (20) CLASSROOM SCHOOL BUILDING, SILANGA NATIONAL HIGH SCHOOL, BRGY. SILANGA, CATBALOGAN CITY, SAMAR | Region VIII | Samar 2nd DEO | Completed | ₱42.7M | 100% | Medium risk53 | —-0.037 |
| 129 | 21IJ0120CONCRETING OF BRGY. TALAHID - COSTA RICA ROAD, ALMAGRO, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱48.8M | 100% | Medium risk53 | —-0.097 |
| 130 | 23IB0185CONSTRUCTION OF ADMIN BUILDING, EASTERN SAMAR STATE UNIVERSITY BALANGIGA CAMPUS, BALANGIGA, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱39.6M | 99% | Medium risk53 | —-0.007 |
| 131 | 23I00195JCT BUENAVISTA - BORONGAN CITY ROAD, EASTERN SAMAR - K1013+000 - K1014+573, EASTERN SAMAR LD | Region VIII | Region VIII | On-Going | ₱48.1M | 90% | Medium risk53 | —-0.043 |
| 132 | 20IB0125CONSTRUCTION OF LABORATORY BUILDING, EASTERN SAMAR STATE UNIVERSITY, BORONGAN, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱18.6M | 100% | Medium risk53 | —-0.094 |
| 133 | 19IB0015CONSTRUCTION OF MULTI-PURPOSE BUILDING, DPWH EASTERN SAMAR DISTRICT ENGINEERING OFFICE BRGY. BATO, BORONGAN CITY, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱16.6M | 100% | Medium risk53 | —-0.094 |
| 134 | 25IN0017CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF SAN FRANCISCO SHORELINE PROTECTION (SEGMENT 2), | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱77.2M | 39% | Medium risk53 | —-0.019 |
| 135 | 19IE0062ASSET PRESERVATION-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-TERTIARY ROADS, STO. ROSARIO-VILLABA RD., K1013+859-K1013+986, K1014+050-K1014+060VILLABA, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱47.5M | 100% | Medium risk53 | —-0.095 |
| 136 | 24IE0055ROAD CONCRETING, BRGY. JALAS TO BRGY. BUGA BUGA VILLABA, LEYTE | Region VIII | Leyte 3rd DEO | On-Going | ₱48.6M | 95% | Medium risk53 | —-0.052 |
| 137 | 23IL0010FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SHORELINE PROTECTION STRUCTURE - NEWLY CONVERTED NATIONAL ROAD - ALONG LIMASAWA CIRCUMFERENTIAL ROAD, LIMASAWA, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱84.4M | 100% | Medium risk53 | —-0.071 |
| 138 | 25IN0016CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF PANALIAN FLOOD CONTROL (SEGMENT 2), SILAGO, SOU | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱72.3M | 52% | Medium risk52 | —-0.021 |
| 139 | 24I00361ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - LILOAN - S RICARDO RD - K1082+400 - K1082+450 | Region VIII | Region VIII | On-Going | ₱48.2M | 41% | Medium risk52 | —-0.041 |
| 140 | 24I00359ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - LILOAN - S RICARDO RD - K1081+470 - K1081+530, PINTUYAN, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱48.2M | 100% | Medium risk52 | —-0.059 |
| 141 | 21IB0092CONSTRUCTION OF MISSING LINKS/NEW ROADS ALONG ARTECHE, BRGY. CATUMSAN - JIPAPAD - LAS NAVAS - CATUBIG ROAD, JIPAPAD, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱49M | 100% | Medium risk52 | —-0.089 |
| 142 | 20IE0095REHABILITATION/IMPROVEMENT OF SLOPE FAILURE FOR ROCKFALL PROTECTION SYSTEM ALONG CALUBIAN-SAN ISIDRO-TABANGO-VILLABA-PALOMPON ROAD LEYTE, K1054+000 - K1054+400VILLABA, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱47.4M | 100% | Medium risk52 | —-0.095 |
| 143 | 18IJ0021WIDENING/IMPROVEMENT ALONG CALBAYOG-CATARMAN ROAD, K0803+151 - K0805+000, CALBAYOG CITY, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱49.5M | 100% | Medium risk52 | —-0.087 |
| 144 | 22IJ0064OO1: REHABILITATION/RECONSTRUCTION OF ROAD WITH SLIPS,SLOPE COLLAPSE AND LANDSLIDE - PRIMARY ROADS DAANG MAHARLIKA (SM) (SN ISIDRO - SN JUANICO BR.) KO721+700 - KO722+200 | Region VIII | Samar 1st DEO | Completed | ₱47.6M | 100% | Medium risk52 | —-0.094 |
| 145 | 23IB0077CONSTRUCTION OF MULTI-PURPOSE BUILDING (AMPHITHEATER), EASTERN SAMAR STATE UNIVERSITY, GUIUAN CAMPUS, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱29.4M | 100% | Medium risk52 | —-0.089 |
| 146 | 24ID0124CONSTRUCTION(COMPLETION) OF MULTI-PURPOSE BUILDING (DULAG HEALTH AND WELLNESS CENTER), DULAG,LEYTE | Region VIII | Leyte 2nd DEO | On-Going | ₱14.7M | 100% | Medium risk52 | —-0.057 |
| 147 | 21IB0032REHABILITATION/IMPROVEMENT OF FLOOD CONTROL STRUCTURES ALONG ORAS RIVER PROTECTING BARANGAY ROAD, BARANGAY ALANG-ALANG, ORAS, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱57.9M | 100% | Medium risk52 | —-0.077 |
| 148 | 23HJ0041OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-TERTIARY ROADS-GUIHULNGAN-BALOC-ISABELA RD- K0148+950-K0149+162, GUIHULNGAN CITY, NEGROS ORIENTA | Negros Island Region | Negros Oriental 1st DEO | Completed | ₱65.6M | 100% | Medium risk52 | —-0.087 |
| 149 | 24IL0015FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SHORELINE PROTECTION STRUCTURE ALONG LIMASAWA CIRCUMFERENTIAL ROAD, LIMASAWA, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | On-Going | ₱61.7M | 100% | Medium risk52 | —-0.032 |
| 150 | 21IJ0123CONSTRUCTION OF ROAD, BRGY.MABUHAY - BRGY. SALVACION , STA. MARGARITA, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱46.9M | 100% | Medium risk52 | —-0.095 |