Contractor dossier
413 projects on file, including joint ventures this contractor is part of.
Total projects
413
Total budget
₱12.5B
Average progress
93.4%
Completion rate
71.2%
Average risk score
51.3
Medium risk on average, out of 100
Flagged as unusual
61
14.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VIII | 407 | ₱12.4B | 51.6 | 61 | 93.3% |
| Negros Island Region | 3 | ₱126M | 48.1 | 0 | 100.0% |
| Region IV-B | 3 | ₱5.8M | 19.7 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 162 | ₱6.5B | 50.6 | 6 | 96.5% |
| Buildings and Facilities | 91 | ₱855.2M | 33.7 | 0 | 98.4% |
| Flood Control and Drainage | 85 | ₱3.2B | 48.4 | 0 | 98.1% |
| OTHER | 30 | ₱997.8M | 83.1 | 26 | 76.3% |
| GAA 2025 SSP | 23 | ₱401.5M | 93.8 | 23 | 68.6% |
| Bridges | 11 | ₱91.9M | 38.8 | 0 | 91.6% |
| Water Provision and Storage | 5 | ₱42.7M | 44.0 | 1 | 92.6% |
| GAA 2025 OO-1 | 3 | ₱201.9M | 94.2 | 3 | 51.3% |
| GAA 2025 OO-2 | 2 | ₱153.8M | 91.9 | 2 | 30.1% |
| Bridges, Roads | 1 | ₱96.5M | 61.6 | 0 | 98.1% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25I00119SIPAG - COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES - CONSTRUCTION OF COASTAL ROAD, BARANGAY PEPELITAN - BARANGAY SABANG NORTH, BORONGAN CITY | Region VIII | Region VIII | On-Going | ₱96.4M | 56% | High risk96 | Flagged0.028 |
| 25I00121SIPAG - INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) - CONSTRUCTION OF ROAD, PHASE 2, BARANGAY NATO - BARANGAY BONGDO, TAFT, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱48.2M | 77% | High risk96 | Flagged0.013 |
| 25IB0053CONSTRUCTION OF MULTI-PURPOSE BUILDING, TAFT MUNICIPAL HALL PHASE 2, BARANGAY POBLACION, TAFT, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱48.9M | 35% | High risk96 | Flagged0.025 |
| 25IB0050CONSTRUCTION OF MULTI-PURPOSE BUILDING, CAN-AVID MUNICIPAL HALL PHASE 2 BARANGAY POBLACION, CAN-AVID, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱48.9M | 42% | High risk96 | Flagged0.025 |
| 25IN0018CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF DAS-AY FLOOD CONTROL STRUCTURE (SEGMENT 2), HIN | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱53.1M | 90% | High risk96 | Flagged0.010 |
| 25IB0060CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), BARANGAY SAN LUIS, TAFT, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱9.8M | 44% | High risk95 | Flagged0.024 |
| 25IB0038CONSTRUCTION OF EVACUATION CENTER BARANGAY BATI-AWAN, TAFT, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱4.8M | 40% | High risk95 | Flagged0.025 |
| 25IB0144CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY BUGAS, BORONGAN CITY, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱4.9M | 86% | High risk95 | Flagged0.013 |
| 25IN0057SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY SAGBOK ROAD, HINUNDAYAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱4.8M | 85% | High risk95 | Flagged0.014 |
| 25IN0024CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY OSAO ROAD, SA | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱4.8M | 84% | High risk95 | Flagged0.013 |
| 25IN0022CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY TOPTOP ROAD, | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱4.8M | 100% | High risk95 | Flagged0.005 |
| 25IB0104ROAD WIDENING SECONDARY ROADS, WRIGHT - TAFT - BORONGAN RD (SM00172SM)K0875+667 - K0876+511, K0877+525 - K0878+256, K0878+800 - K0879+389 | Region VIII | Eastern Samar DEO | On-Going | ₱104.8M | 22% | High risk95 | Flagged0.024 |
| 25IN0021CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY BIASONG ROAD, | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱4.8M | 21% | High risk95 | Flagged0.029 |
| 25IL0027SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF STA. SOFIA BR., PADRE BURGOS, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | On-Going | ₱24.5M | 97% | High risk95 | Flagged0.007 |
| 25IN0020CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY LUMBOG ROAD, | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱4.8M | 100% | High risk95 | Flagged0.005 |
| 25IL0035CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, MAMBAJAO, MAASIN CITY, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | On-Going | ₱4.9M | 100% | High risk94 | Flagged0.004 |
| 25IN0027CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY MAHAYAHAY ROA | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱5.6M | 84% | High risk94 | Flagged0.012 |
| 25IL0053CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONCRETING OF ROADS, SITIO SAN VICENTE CANSIRONG - BAUGO, MAASIN C | Region VIII | Southern Leyte 1st DEO | On-Going | ₱5.9M | 34% | High risk94 | Flagged0.025 |
| 25I00156ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - MAHARLIKA HIGHWAY - K1010+885 - K1011+080, K1011+520 - K1011+595 | Region VIII | Region VIII | On-Going | ₱49.8M | 72% | High risk94 | Flagged0.002 |
| 25I00149ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS MAHARLIKA HIGHWAY - K1010+630 - K1010+885 | Region VIII | Region VIII | On-Going | ₱47.2M | 60% | High risk93 | Flagged0.006 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24IL0107FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SHORELINE PROTECTION STRUCTURE ALONG ASUNCION - BENIT SECTION, MALITBOG, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | On-Going | ₱120.5M | 72% | High risk92 | Flagged0.068 |
| 23IM0124CONSTRUCTION OF 1-UNIT 3STY15CL, SCHOOL BUILDING, LEYTE NATIONAL HIGH SCHOOL, TACLOBAN CITY, LEYTE | Region VIII | Tacloban City DEO | On-Going | ₱40M | 81% | High risk90 | Flagged0.059 |
| 25IB0134CONCRETING OF BRGY. ABEJAO TO BRGY. SEGUINON FMR, BRGY. ABEJAO AND BRGY. SEGUINON, SALCEDO, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱5M | 90% | High risk88 | Flagged0.045 |
| 24I00283CONSTRUCTION OF 1 UNIT 1-STOREY 2-CLASSROOM SCHOOL BUILDING IN MAGAUPAS ELEMENTARY SCHOOL, BRGY. MAGAUPAS, LILOAN, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱6.6M | 100% | High risk88 | Flagged0.043 |
| 24I00377CONSTRUCTION OF 1 UNIT 1-STOREY 2-CLASSROOM SCHOOL BUILDING IN PANDAN - SAN MIGUEL ELEMENTARY SCHOOL, BRGY. SAN MIGUEL, SOGOD, SOUTHERN LEYTE | Region VIII | Region VIII | On-Going | ₱6.6M | 100% | High risk89 | Flagged0.040 |
| 25IB0132CONCRETING OF NATIONAL HIGHWAY TO SITIO AMAMPAGAO FMR, LAWAAN, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱5M | 100% | High risk89 | Flagged0.040 |
| 25IB0128CONCRETING OF BRGY. POLANGI FMR, BRGY. POLANGI, TAFT, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱5M | 100% | High risk89 | Flagged0.038 |
| 25IN0062CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS - CONSTRUCTION (COMPLETION) OF PUBLIC WATER SUPPLY SYSTEM (LEVEL II), BARANGAY MABICAY, SOGOD, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱1.9M | 0% | High risk88 | Flagged0.035 |
| 25IN0065CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY PONG-OY, SAN JUAN, SOUTHERN LEYTE | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱3M | 14% | High risk90 | Flagged0.034 |
| 25IN0021CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BARANGAY BIASONG ROAD, | Region VIII | Southern Leyte 2nd DEO | On-Going | ₱4.8M | 21% | High risk95 | Flagged0.029 |
| 25I00119SIPAG - COASTAL ROADS TO AUGMENT RESILIENCY OF COASTAL COMMUNITIES - CONSTRUCTION OF COASTAL ROAD, BARANGAY PEPELITAN - BARANGAY SABANG NORTH, BORONGAN CITY | Region VIII | Region VIII | On-Going | ₱96.4M | 56% | High risk96 | Flagged0.028 |
| 24I00222CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY POBLACION | Region VIII | Region VIII | On-Going | ₱4.8M | 7% | High risk80 | Flagged0.026 |
| 24I00220SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD BRGY. HOMONHON - CASUGURAN - HABAG, GUIUAN, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱96.4M | 37% | High risk84 | Flagged0.025 |
| 25IB0038CONSTRUCTION OF EVACUATION CENTER BARANGAY BATI-AWAN, TAFT, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱4.8M | 40% | High risk95 | Flagged0.025 |
| 25IL0053CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONCRETING OF ROADS, SITIO SAN VICENTE CANSIRONG - BAUGO, MAASIN C | Region VIII | Southern Leyte 1st DEO | On-Going | ₱5.9M | 34% | High risk94 | Flagged0.025 |
| 25IB0053CONSTRUCTION OF MULTI-PURPOSE BUILDING, TAFT MUNICIPAL HALL PHASE 2, BARANGAY POBLACION, TAFT, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱48.9M | 35% | High risk96 | Flagged0.025 |
| 25IB0050CONSTRUCTION OF MULTI-PURPOSE BUILDING, CAN-AVID MUNICIPAL HALL PHASE 2 BARANGAY POBLACION, CAN-AVID, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱48.9M | 42% | High risk96 | Flagged0.025 |
| 25IB0060CONSTRUCTION OF MULTI-PURPOSE BUILDING (EVACUATION CENTER), BARANGAY SAN LUIS, TAFT, EASTERN SAMAR | Region VIII | Eastern Samar DEO | On-Going | ₱9.8M | 44% | High risk95 | Flagged0.024 |
| 25IB0104ROAD WIDENING SECONDARY ROADS, WRIGHT - TAFT - BORONGAN RD (SM00172SM)K0875+667 - K0876+511, K0877+525 - K0878+256, K0878+800 - K0879+389 | Region VIII | Eastern Samar DEO | On-Going | ₱104.8M | 22% | High risk95 | Flagged0.024 |
| 23I00127SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC/FACILITIES - CONSTRUCTION OF CONCRETE ROAD - IMPROVEMENT/UPGRADING OF ACCESS ROAD AND CONSTRUCTION OF MULTI-PURPOSE BUILDING IN BRGY. 06, GUIUAN, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱48.1M | 61% | High risk82 | Flagged0.023 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 176 | 19IB0246REHABILITATION/RECONSTRUCTION OF CIRCUMFERENTIAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG BRGY. ALANG-ALANG, GEN. MACARTHUR, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱33.8M | 100% | Medium risk49 | —-0.037 |
| 177 | 19IB0232CONCRETING OF BRGY. CAMADA - CABALAGNAN - CANYOPAY FMR, BRGY. CAMADA, CABALAGNAN AND CANYOPAY | Region VIII | Eastern Samar DEO | Completed | ₱17.9M | 100% | Medium risk49 | —-0.041 |
| 178 | 19IJ0079002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOOD-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEM. CPNSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG GANDARA RIVER,BRGY.TAMBONGAN,GANDARA,SAMAR | Region VIII | Samar 1st DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.082 |
| 179 | 18IB0101REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPES COLLAPSE AND LANDSLIDE - SECONDARY ROADS, BORONGAN - GUIUAN ROAD K0931+771 - K0931+861, K0935+643 - K0935+751 | Region VIII | Eastern Samar DEO | Completed | ₱18.6M | 100% | Medium risk49 | —-0.094 |
| 180 | 19IB0067CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO GANAP CAVE, BORONGAN, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱19.6M | 100% | Medium risk49 | —-0.094 |
| 181 | 23IB0017PREVENTIVE MAINTAINANCE SECONDARY ROADS, JCT BUENAVISTA-LAWAAN-MARABUT RD - K0955+591 - K0958+989, K0962+000 - K0965+000 | Region VIII | Eastern Samar DEO | Completed | ₱46.1M | 100% | Medium risk49 | —-0.094 |
| 182 | 25IC0086CONSTRUCTION OF ROAD, BARANGAY SAN ROQUE TO BARANGAY SALVACION (POB.) TO BARANGAY CALAASAN, ALANGALANG, LEYTE | Region VIII | Leyte 1st DEO | On-Going | ₱29.4M | 73% | Medium risk49 | —-0.053 |
| 183 | 24ID0041NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-TERTIARY ROADS,JARO-DAGAMI-BURAUEN-LA PAZ RD. -K0984+560-K0985+376,BURAUEN,LEYTE | Region VIII | Leyte 2nd DEO | Completed | ₱31.3M | 100% | Medium risk49 | —-0.095 |
| 184 | 22IJ0078OO2: CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG GANDARA RIVER, BRGY. BANGAHON,GANDARA, SAMAR, (PHASE III) | Region VIII | Samar 1st DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.082 |
| 185 | 19IB0087PREVENTIVE MAINTENANCE - SECONDARY ROADS ALONG JCT. TAFT - SAN POLICARPO - ARTECHE ROADS, K0891+(-725) - K0892+334.5, K0892+438 - K0893+292.5, K0893+410.5 - K 0893+719 | Region VIII | Eastern Samar DEO | Completed | ₱24.5M | 100% | Medium risk49 | —-0.094 |
| 186 | 20IE0090CONSTRUCTION OF CAIGUIT TO CABUNGAAN DIVERSION ROADVILLABA, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱42.8M | 100% | Medium risk49 | —-0.095 |
| 187 | 24IB0041REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG DOLORES RIVER, BARANGAY MAGSAYSAY, DOLORES, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱49.5M | 100% | Medium risk49 | —-0.079 |
| 188 | 22IJ0045CSSP:CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SINIDMAN RIVER(UPSTREAM) PHASE II, BRGY. SINIDMAN OCCIDENTAL, CALBAYOG CITY, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱48.6M | 100% | Medium risk49 | —-0.081 |
| 189 | 25I00120SIPAG - INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) - CONSTRUCTION OF ROAD, BARANGAY PADANG - BARANGAY CANCILEDES, HERNANI, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱33.7M | 76% | Medium risk49 | —-0.050 |
| 190 | 18IJ0130CONSTRUCTION OF BARANGAY NABULO - BANAAO ROAD, PHASE II, STA. MARGARITA, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱45M | 100% | Medium risk49 | —-0.094 |
| 191 | 20IE0036CONSTRUCTION OF STO. ROSARIO-VILLABA DIVERSION ROAD, LEADING TO HIBULANGAN SMALL RESERVOIR IRRIGATIONVILLABA, LEYTE | Region VIII | Leyte 3rd DEO | Completed | ₱37.2M | 100% | Medium risk49 | —-0.095 |
| 192 | 20IB0102CONSTRUCTION OF BRGY. DACUL FLOOD CONTROL, TAFT, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱49.5M | 100% | Medium risk49 | —-0.079 |
| 193 | 20IJ0072001: REHABILITATION/RECONSTRUCTION OF ROAD WITH SLIP, SLOPE COLLAPSE ALONG CALBAYOG - CATARMAN ROAD, BRGY. CAPACUHAN, CALBAYOG CITY, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱47.4M | 100% | Medium risk49 | —-0.079 |
| 194 | 22IL0107CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SUBANG-DAKU FLOOD CONTROL (SUBA - KANANGKAAN SECTION), SOGOD, SOUTHERN LEYTE | Region VIII | Southern Leyte 1st DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.074 |
| 195 | 24I00145SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF SEAWALL, POBLACION, BALANGKAYAN, EASTERN SAMAR | Region VIII | Region VIII | On-Going | ₱48.1M | 91% | Medium risk49 | —-0.029 |
| 196 | 22ID0028NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS - PALO - CARIGARA - ORMOC RD - K0941+442 - K0943+481 | Region VIII | Leyte 2nd DEO | Completed | ₱39.2M | 100% | Medium risk49 | —-0.096 |
| 197 | 21IB0031CONSTRUCTION OF FLOOD CONTROL ALONG BORONGAN RIVER, BORONGAN CITY, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.074 |
| 198 | 21IB0014CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BORONGAN RIVER, BRGY. SUROK, BORONGAN CITY, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.074 |
| 199 | 23IB0103CONSTRUCTION OF ROAD, BARANGAY BULUSAO-SITIO SUNDUAN, LAWAAN, EASTERN SAMAR | Region VIII | Eastern Samar DEO | Completed | ₱16.7M | 100% | Medium risk49 | —-0.094 |
| 200 | 22IJ0012ACCESS ROAD TO BRGY. TINAPLACAN LEADING TO BANGON FALLS, BRGY. TINAPLACAN,SAMAR | Region VIII | Samar 1st DEO | Completed | ₱37.5M | 100% | Medium risk49 | —-0.094 |