Contractor dossier
63 projects on file, including joint ventures this contractor is part of.
Total projects
63
Total budget
₱1.3B
Average progress
99.3%
Completion rate
95.2%
Average risk score
21.8
Low risk on average, out of 100
Flagged as unusual
3
4.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region XII | 63 | ₱1.3B | 21.8 | 3 | 99.3% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 33 | ₱200.9M | 8.8 | 0 | 100.0% |
| Roads | 18 | ₱519.2M | 28.3 | 0 | 100.0% |
| Flood Control and Drainage | 7 | ₱253.5M | 24.8 | 0 | 100.0% |
| OTHER | 2 | ₱218.6M | 73.4 | 1 | 100.0% |
| GAA 2025 SSP | 1 | ₱22.4M | 93.2 | 1 | 73.0% |
| GAA 2025 OO-1 | 1 | ₱45M | 90.8 | 1 | 80.4% |
| GAA 2025 OO-2 | 1 | ₱34.2M | 71.7 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25MF0020CONSTRUCTION OF PEDESTRIAN OVERPASS AT KIDAPAWAN-ALLAH JUNCTION RD - K1677 + 625 | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱22.4M | 73% | High risk93 | Flagged0.024 |
| 25ME0063ROAD WIDENING ALONG SARANGANI - DAVAO DEL SUR COASTAL RD - K1703+066 - K1705+121, GLAN, SARANGANI PROVINCE | Region XII | Sarangani DEO | On-Going | ₱45M | 80% | High risk91 | Flagged0.015 |
| 24M00179OFF-CARRIAGEWAY IMPROVEMENT: CONSTRUCTION OF TRAFFIC ISLAND - COTABATO-MARBEL RD - COTABATO-MARBEL RD - K1723 + 470 - K1728 + 126, BANGA, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱73.8M | 100% | High risk77 | Flagged0.001 |
| 25MG0075CONSTRUCTION OF PROTECTION ALONG B'LOK CREEK, BRGY. ZONE 1, KORONADAL CITY, SOUTH COTABATO | Region XII | South Cotabato 2nd DEO | Completed | ₱34.2M | 100% | High risk72 | —-0.046 |
| 17M00007ROAD UPGRADING (UNPAVED TO PAVED) ALONG SNA-LEBAK-KALAMANSIG ROAD, K1857+700 - K1859+000 (CHAINAGE 10698 - CHAINAGE 12000), K1859+973 - K1862+230 (CHAINAGE 12973 - CHAINAGE 15231), TINALON SECTION, SNA, SULTAN KUDARAT | Region XII | Region XII | Completed | ₱144.7M | 100% | High risk70 | —-0.008 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25MF0020CONSTRUCTION OF PEDESTRIAN OVERPASS AT KIDAPAWAN-ALLAH JUNCTION RD - K1677 + 625 | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱22.4M | 73% | High risk93 | Flagged0.024 |
| 25ME0063ROAD WIDENING ALONG SARANGANI - DAVAO DEL SUR COASTAL RD - K1703+066 - K1705+121, GLAN, SARANGANI PROVINCE | Region XII | Sarangani DEO | On-Going | ₱45M | 80% | High risk91 | Flagged0.015 |
| 24M00179OFF-CARRIAGEWAY IMPROVEMENT: CONSTRUCTION OF TRAFFIC ISLAND - COTABATO-MARBEL RD - COTABATO-MARBEL RD - K1723 + 470 - K1728 + 126, BANGA, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱73.8M | 100% | High risk77 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25MF0020CONSTRUCTION OF PEDESTRIAN OVERPASS AT KIDAPAWAN-ALLAH JUNCTION RD - K1677 + 625 | Region XII | Sultan Kudarat 1st DEO | On-Going | ₱22.4M | 73% | High risk93 | Flagged0.024 |
| 2 | 25ME0063ROAD WIDENING ALONG SARANGANI - DAVAO DEL SUR COASTAL RD - K1703+066 - K1705+121, GLAN, SARANGANI PROVINCE | Region XII | Sarangani DEO | On-Going | ₱45M | 80% | High risk91 | Flagged0.015 |
| 3 | 24M00179OFF-CARRIAGEWAY IMPROVEMENT: CONSTRUCTION OF TRAFFIC ISLAND - COTABATO-MARBEL RD - COTABATO-MARBEL RD - K1723 + 470 - K1728 + 126, BANGA, SOUTH COTABATO | Region XII | Region XII | On-Going | ₱73.8M | 100% | High risk77 | Flagged0.001 |
| 4 | 25MG0075CONSTRUCTION OF PROTECTION ALONG B'LOK CREEK, BRGY. ZONE 1, KORONADAL CITY, SOUTH COTABATO | Region XII | South Cotabato 2nd DEO | Completed | ₱34.2M | 100% | High risk72 | —-0.046 |
| 5 | 17M00007ROAD UPGRADING (UNPAVED TO PAVED) ALONG SNA-LEBAK-KALAMANSIG ROAD, K1857+700 - K1859+000 (CHAINAGE 10698 - CHAINAGE 12000), K1859+973 - K1862+230 (CHAINAGE 12973 - CHAINAGE 15231), TINALON SECTION, SNA, SULTAN KUDARAT | Region XII | Region XII | Completed | ₱144.7M | 100% | High risk70 | —-0.008 |
| 6 | 17MG0093MFO 1-NATIONAL ROAD NETWORK SERVICES:ASSET PRESERVATION OF NATIONAL ROADS-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPE, SLOPE COLLAPSE, AND LANDSLIDE-SECONDARY MIDSAYAP-MARBEL RD-K1784+748-K1784+931 MODIFIED TO: MFO 1-NATIONAL ROAD NETWORK S | Region XII | South Cotabato 2nd DEO | Completed | ₱9.6M | 100% | Medium risk43 | —-0.055 |
| 7 | 19MG0080ROAD WIDENING ON SPECIFIC LOCATION ALONG MIDSAYAP-MARBEL RD (S00275MN) K1774+645 TO K1776+423, K1776+439 TO K1778+263 | Region XII | South Cotabato 2nd DEO | Completed | ₱87.9M | 100% | Medium risk36 | —-0.078 |
| 8 | 23M00142CONSTRUCTION OF MISSING LINKS/NEW ROADS - SURALLAH-TBOLI-SAN JOSE ROAD (GEN. SANTOS CITY), PACKAGE 2, STA. 4+280.00 - STA. 7+800.00, SURALLAH, SOUTH COTABATO | Region XII | Region XII | Completed | ₱76.2M | 100% | Medium risk35 | —-0.082 |
| 9 | 18MF0043CONST. OF CONCRETE RD.-NJR POB. PRES. QUIRINO CONNECTING TO BRGY. BAGUMBAYAN IN SUPPORT OF PALM OIL, MUSCUVADO/SUGARCANE, VEGETABLES, RICE AND CORN, STA. 0+000 - STA. 1+310 - STA. 1+754 - STA. 3+444, PRES. QUIRINO, SULTAN KUDARAT. | Region XII | Sultan Kudarat 1st DEO | Completed | ₱55M | 100% | Medium risk32 | —-0.086 |
| 10 | 22MG0027ROAD WIDENING-MIDSAYAP-MARBEL RD-K1779+988-K1781+393 | Region XII | South Cotabato 2nd DEO | Completed | ₱52.1M | 100% | Medium risk31 | —-0.087 |
| 11 | 21MF0022CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BANGA RIVER (BARAS SECTION), TACURONG, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | Completed | ₱47.9M | 100% | Low risk28 | —-0.076 |
| 12 | 22MF0019JCT. BRGY. BARAS TO BRGY. NEW PASSI LEADING TO MONTE VICENTEAU RESORT, BRGY. NEW PASSI, TACURONG, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | Completed | ₱20.6M | 100% | Low risk27 | —-0.089 |
| 13 | 20MG0072ROAD WIDENING-ALONG MIDSAYAP-MARBEL RD-(S00275MN) K1778+256-K1779-412 | Region XII | South Cotabato 2nd DEO | Completed | ₱27.6M | 100% | Low risk27 | —-0.088 |
| 14 | 21MG0104ROAD WIDENING-MIDSAYAP-MARBEL RD-K1772+825-K1774+074.50 | Region XII | South Cotabato 2nd DEO | Completed | ₱29.4M | 100% | Low risk27 | —-0.088 |
| 15 | 20MH0081REHABILITATION OF MALIGAYA - ROAD SIDE, BARANGAY SAGASA, ESPERANZA, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱12.8M | 100% | Low risk27 | —-0.089 |
| 16 | 20MF0011ROAD WIDENING-DULAWAN-MARBEL ROAD, STA.K1764+506-STA.K1765+786, TACURONG CITY, SULTAN KUDARAT | Region XII | Sultan Kudarat 1st DEO | Completed | ₱27M | 100% | Low risk27 | —-0.089 |
| 17 | 20MH0075CONCRETING OF ROAD CONNECTING PUROK NARRA, BRGY. NUMO, ESPERANZA, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱13M | 100% | Low risk27 | —-0.088 |
| 18 | 19MH0010REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS: RECONSTRUCTION TO CONCRETE PAVEMENT: ISULAN JCT.-NINOY AQUINO ROAD, K1794+377 - K1794+678; K1810+523 - K1811+035 BAGUMBAYAN, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱30.2M | 100% | Low risk27 | —-0.087 |
| 19 | 20MH0074CONCRETING OF PUROK KAWAYAN ROAD, BRGY. POBLACION, BAGUMBAYAN, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱14.9M | 100% | Low risk27 | —-0.089 |
| 20 | 19MH0005PREVENTIVE MAINTENANCE OF ROAD: CONCRETE REBLOCKINF: ISULAN JCT.-NINOY AQUINO ROAD K1785+(-755) - K1785+000; K1798+603 - K1799+550; K1800+645 - K1801+843; K1805+502 - K1806+279; K1811+252 - K1811+432; K1830+279 - K1830+350; K1830+470 -K1830+720 BAGUMBAYAN | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱18.5M | 100% | Low risk26 | —-0.088 |
| 21 | 18MG0063ROAD WIDENING-MIDSAYAP-MARBEL RD K1786+478-K1787+574.5 | Region XII | South Cotabato 2nd DEO | Completed | ₱27.6M | 100% | Low risk26 | —-0.088 |
| 22 | 19ME0082CONCRETING OF TAMARAW DRIVE POB. ALABEL; ALABEL, SARANGANI PROVINCE | Region XII | Sarangani DEO | Completed | ₱4.9M | 100% | Low risk25 | —-0.083 |
| 23 | 23MH0021CONSTRUCTION OF RIVER BANK PROTECTION/FLOOD CONTROL (DOWNSTREAM SIDE) BARANGAY BIWANG, BAGUMBAYAN, SULTAN KUDARAT | Region XII | Sultan Kudarat 2nd DEO | Completed | ₱44.7M | 100% | Low risk25 | —-0.077 |
| 24 | 18MG0073CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS:CONSTRUCTION OF RIVER BANK PROTECTION ALONG BANGA RIVER, B.S. AQUINO SECTION, NORALA, SOUTH COTABATO | Region XII | South Cotabato 2nd DEO | Completed | ₱14M | 100% | Low risk25 | —-0.074 |
| 25 | 22MG0035CONSTRUCTION OF RIVER BANK PROTECTION ALONG ALA RIVER, BRGY. NEW PANAY, STO. NIÑO, SOUTH COTABATO | Region XII | South Cotabato 2nd DEO | Completed | ₱44.1M | 100% | Low risk24 | —-0.075 |