Contractor dossier
186 projects on file, including joint ventures this contractor is part of.
Total projects
186
Total budget
₱5.6B
Average progress
89.5%
Completion rate
78.0%
Average risk score
43.4
Medium risk on average, out of 100
Flagged as unusual
11
5.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 131 | ₱3.9B | 40.9 | 9 | 88.5% |
| National Capital Region | 46 | ₱1.4B | 48.2 | 0 | 92.0% |
| Region IV-A | 7 | ₱207.6M | 48.2 | 0 | 100.0% |
| Region II | 1 | ₱57.6M | 94.8 | 1 | 31.8% |
| Region I | 1 | ₱11.7M | 61.8 | 1 | 92.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 67 | ₱1.5B | 41.5 | 2 | 84.2% |
| Buildings and Facilities | 61 | ₱1.4B | 39.7 | 2 | 94.5% |
| Flood Control and Drainage | 44 | ₱2.2B | 47.9 | 4 | 91.1% |
| Bridges | 5 | ₱36.2M | 33.8 | 0 | 100.0% |
| OTHER | 4 | ₱260.1M | 61.3 | 0 | 100.0% |
| GAA 2025 SSP | 3 | ₱171.6M | 94.7 | 3 | 44.3% |
| Water Provision and Storage | 2 | ₱11M | 31.7 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CA0020CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG COLO RIVER, BACONG SECTION, | Region III | Bataan 1st DEO | On-Going | ₱94.5M | 92% | High risk96 | Flagged0.009 |
| 25B00012CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER 11239 - PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG MANILA NORTH RD - K0614+000 - K0615+000, K0617+198 - K0617+771, K0622+000 - K0623+182 | Region II | Region II | On-Going | ₱57.6M | 32% | High risk95 | Flagged0.034 |
| 25CH0073CONSTRUCTION OF PEDESTRIAN OVERPASS, MANCATIAN, PORAC, PAMPANGA | Region III | Pampanga 2nd DEO | On-Going | ₱19.6M | 9% | High risk93 | Flagged0.027 |
| 24CL0039FLOOD CONTROL WORKS ALONG TAMBAK-BANCAL RIVER (PHASE I), SITIO TAMBAK, BARANGAY PALANGINAN, IBA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱96M | 99% | High risk81 | —-0.014 |
| 25CL0119CONSTRUCTION OF RIVERBANK SLOPE PROTECTION STRUCTURE ALONG BANCAL-SAN ISIDRO-MAMBOG RIVER, PHASE 2, BOTOLAN, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.2M | 52% | High risk81 | —-0.004 |
| 25CA0076BASIC INFRASTRUCTURE PROGRAM - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (GYMNASIUM), SAMAL, BATAAN | Region III | Bataan 1st DEO | On-Going | ₱145.5M | 3% | High risk80 | Flagged0.017 |
| 24C00003FLOOD MANAGEMENT PROGRAM-CONST./MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS-CONST. OF SLOPE PROTECTION STRUCTURES ALONG DILA-DILA CREEK, DINALUPIHAN CENTRAL BUSINESS DIST. SAPANG PUTOL (TRIBUTARY TO COLO CREEK), DINALUPIHAN, BATAAN | Region III | Region III | On-Going | ₱142.5M | 80% | High risk80 | —-0.002 |
| 24CL0040FLOOD CONTROL WORKS ALONG TAMBAK-BANCAL RIVER (PHASE II), SITIO TAMBAK, BARANGAY PALANGINAN, IBA, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱96.5M | 100% | High risk80 | —-0.043 |
| 25CL0239CONSTRUCTION OF ROAD, BOTOLAN-IBA- PALAUIG BY-PASS ROAD, PHASE 2, IBA-PALAUIG, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.1M | 0% | High risk76 | —-0.002 |
| 24CL0177CONSTRUCTION OF ROAD, DAANG KALIKASAN TO DAMPAY - BINABALIAN SECTION, PHASE 1, CANDELARIA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.4M | 0% | High risk75 | Flagged0.007 |
| 24CL0181CONSTRUCTION OF ROAD, DAANG KALIKASAN TO DAMPAY - BINABALIAN SECTION, PHASE 2, CANDELARIA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.4M | 0% | High risk74 | Flagged0.007 |
| 24CB0135CONSTRUCTION OF DETOUR ROAD ALONG NAGWALING, PILAR, BATAAN | Region III | Bataan 2nd DEO | On-Going | ₱141.7M | 85% | High risk74 | Flagged0.031 |
| 24CL0210CONSTRUCTION OF CONCRETE SLOPE PROTECTION STRUCTURE ALONG GABOR RIVER, PHASE 2, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱47.6M | 0% | High risk73 | Flagged0.050 |
| 24CL0211CONSTRUCTION OF CONCRETE SLOPE PROTECTION STRUCTURE ALONG GABOR RIVER, PHASE 3, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱47.6M | 0% | High risk73 | Flagged0.050 |
| 25CL0133CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MARANGLA RIVER UPSTREAM (LEFT SIDE), BARANGAY SAN AGUSTIN, IBA, ZAMBALES, PHASE 2 | Region III | Zambales 1st DEO | On-Going | ₱47.6M | 92% | High risk73 | —-0.027 |
| 24CB0136CONSTRUCTION OF FLOOD CONTROL DIKE AT PANTINGAN RIVER (PHASE I), PILAR, BATAAN | Region III | Bataan 2nd DEO | On-Going | ₱105.8M | 85% | High risk72 | Flagged0.028 |
| 25CA0040BASIC INFRASTRUCTURE PROGRAM - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITIATION OF ROAD, SITIO PUGAD LAWIN, BARANGAY SAN JUAN, SAMAL, BATAAN | Region III | Bataan 1st DEO | On-Going | ₱4.8M | 0% | High risk72 | —-0.012 |
| 25CO0047ASSET PRESERVATION PROGRAM - CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS - BAGAC-POBLACION RD - BAGAC, BATAAN | Region III | Bataan 3rd DEO | On-Going | ₱19.2M | 4% | High risk70 | —-0.011 |
| 24C00157ASSET PRESERVATION PROGRAM - CONST/UPGRADING/REHABLITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS - ROMAN EXPRESSWAY - MARIVELES, BATAAN | Region III | Region III | On-Going | ₱16.5M | 46% | High risk70 | —-0.018 |
| 21CA0086CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS) CONCRETING OF BRGY. IMELDA- BRGY. LALAWIGAN ROAD LEADIN | Region III | Bataan 1st DEO | Completed | ₱39.2M | 100% | High risk70 | —-0.064 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24CL0210CONSTRUCTION OF CONCRETE SLOPE PROTECTION STRUCTURE ALONG GABOR RIVER, PHASE 2, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱47.6M | 0% | High risk73 | Flagged0.050 |
| 24CL0211CONSTRUCTION OF CONCRETE SLOPE PROTECTION STRUCTURE ALONG GABOR RIVER, PHASE 3, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱47.6M | 0% | High risk73 | Flagged0.050 |
| 25B00012CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER 11239 - PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG MANILA NORTH RD - K0614+000 - K0615+000, K0617+198 - K0617+771, K0622+000 - K0623+182 | Region II | Region II | On-Going | ₱57.6M | 32% | High risk95 | Flagged0.034 |
| 24CB0135CONSTRUCTION OF DETOUR ROAD ALONG NAGWALING, PILAR, BATAAN | Region III | Bataan 2nd DEO | On-Going | ₱141.7M | 85% | High risk74 | Flagged0.031 |
| 24CB0136CONSTRUCTION OF FLOOD CONTROL DIKE AT PANTINGAN RIVER (PHASE I), PILAR, BATAAN | Region III | Bataan 2nd DEO | On-Going | ₱105.8M | 85% | High risk72 | Flagged0.028 |
| 25CH0073CONSTRUCTION OF PEDESTRIAN OVERPASS, MANCATIAN, PORAC, PAMPANGA | Region III | Pampanga 2nd DEO | On-Going | ₱19.6M | 9% | High risk93 | Flagged0.027 |
| 25CA0076BASIC INFRASTRUCTURE PROGRAM - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (GYMNASIUM), SAMAL, BATAAN | Region III | Bataan 1st DEO | On-Going | ₱145.5M | 3% | High risk80 | Flagged0.017 |
| 25CA0020CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG COLO RIVER, BACONG SECTION, | Region III | Bataan 1st DEO | On-Going | ₱94.5M | 92% | High risk96 | Flagged0.009 |
| 24CL0181CONSTRUCTION OF ROAD, DAANG KALIKASAN TO DAMPAY - BINABALIAN SECTION, PHASE 2, CANDELARIA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.4M | 0% | High risk74 | Flagged0.007 |
| 24CL0177CONSTRUCTION OF ROAD, DAANG KALIKASAN TO DAMPAY - BINABALIAN SECTION, PHASE 1, CANDELARIA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.4M | 0% | High risk75 | Flagged0.007 |
| 24AA0418CONSTRUCTION OF 2 STOREY 4 CLASSROOM SCHOOL BUILDING IN PASALENG NATIONAL HIGH SCHOOL, BARANGAY PASALENG, PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱11.7M | 92% | High risk62 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 24AA0418CONSTRUCTION OF 2 STOREY 4 CLASSROOM SCHOOL BUILDING IN PASALENG NATIONAL HIGH SCHOOL, BARANGAY PASALENG, PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱11.7M | 92% | High risk62 | Flagged0.004 |
| 27 | 23CA0048CONCRETING OF SITIO CATULIRAN, BRGY. MABATANG FMR, BRGY. MABATANG, ABUCAY, BATAAN | Region III | Bataan 1st DEO | Completed | ₱13.4M | 100% | High risk61 | —-0.010 |
| 28 | 20O00037CONSTRUCTION OF SLOPE PROTECTION AND LINEAR PARKS ALONG TAGUIG RIVER, BRGY. USUSAN, TAGUIG CITY | National Capital Region | National Capital Region | Completed | ₱193M | 100% | High risk61 | —-0.020 |
| 29 | 24CL0013CONSTRUCTION OF FLOOD CONTROL, TAMBAK RIVER 1-A, PALANGINAN, IBA, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱96.3M | 100% | High risk61 | —-0.073 |
| 30 | 25CA0011FLOOD MANAGEMENT PROGRAM -CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF FLOOD CONTROL STRUCTURE COLO RIVER, MAITE SECTION PHASE 6, HERMOSA, BATAAN | Region III | Bataan 1st DEO | On-Going | ₱94.3M | 95% | High risk61 | —-0.045 |
| 31 | 25OD0325CONSTRUCTION OF MULTI-PURPOSE BUILDING (3S CENTER BUILDING) AT BARANGAY ISLA, VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱85.9M | 16% | Medium risk59 | —-0.027 |
| 32 | 24CA0037FLOOD MANAGEMENT PROGRAM -CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PULO-KABALUTAN RIVER, ORANI, BATAAN | Region III | Bataan 1st DEO | Completed | ₱96.5M | 100% | Medium risk58 | —-0.077 |
| 33 | 22OB0145CONSTRUCTION OF MULTI-PURPOSE BUILDING WITH SITE DEVELOPMENT AT BARANGAY LOWER BICUTAN, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱49.5M | 100% | Medium risk56 | —-0.084 |
| 34 | 22O00088CONSTRUCTION OF FEMALE BARRACKS, CRSAFP, CAMP GENERAL EMILIO AGUINALDO, QUEZON CITY | National Capital Region | National Capital Region | Completed | ₱54.1M | 100% | Medium risk55 | —-0.086 |
| 35 | 22OB0045CONSTRUCTION OF MULTI-PURPOSE BUILDING AT SANCTUARY CENTER (IACAT), BRGY. ADDITION HILLS, MANDALUYONG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱47.8M | 100% | Medium risk55 | —-0.090 |
| 36 | 22OB0175CONSTRUCTION OF CYBER BATTALION AND NETWORK ENTERPRISE TECHNOLOGY BATTALION ADMIN BUILDING WITH PARKING AND OUTSIDE DEVELOPMENT, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱47.5M | 100% | Medium risk55 | —-0.097 |
| 37 | 22OB0161IMPROVEMENT/CONSTRUCTION OF SLOPE PROTECTION ALONG MARICABAN CREEK, TAGUIG CITY, PHASE II | National Capital Region | Metro Manila 1st DEO | Completed | ₱91.6M | 100% | Medium risk55 | —-0.071 |
| 38 | 25OD0107REHABILITATION OF ROAD AND DRAINAGE ALONG MULAWINAN ST., BARANGAY LAWANG BATO, VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱66.4M | 20% | Medium risk55 | —-0.039 |
| 39 | 24CH0153CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. POBLACION, PORAC, PAMPANGA | Region III | Pampanga 2nd DEO | On-Going | ₱96.9M | 52% | Medium risk52 | —-0.035 |
| 40 | 22OB0174CONSTRUCTION OF AGH HEADQUARTERS WITH PARKING, FORT BONIFACIO, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱42.8M | 100% | Medium risk52 | —-0.082 |
| 41 | 22OB0135CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BRGY. HAGONOY, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱42.8M | 100% | Medium risk52 | —-0.083 |
| 42 | 22OB0178CONSTRUCTION OF MULTI-PURPOSE BUILDING HQS, AIR, LEGASPI COMPOUND, FORT BONIFACIO, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱38M | 100% | Medium risk52 | —-0.095 |
| 43 | 18OE0087ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS-OLD STA. MESA ST.-K0006+-924.00-K000+6-723.80, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱6.2M | 100% | Medium risk50 | —-0.045 |
| 44 | 23DI0081CONSTRUCTION OF RIVER PROTECTION STRUCTURE NEAR CALAMBA CITY HALL, CALAMBA CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱48.2M | 100% | Medium risk50 | —-0.037 |
| 45 | 23DI0022CONSTRUCTION OF REVETMENT ALONG SAN CRISTOBAL RIVER, BARANGAY LOOC, CALAMBA CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱47.8M | 100% | Medium risk50 | —-0.088 |
| 46 | 23DI0032CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY 5, CALAMBA CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱8.8M | 100% | Medium risk50 | —-0.106 |
| 47 | 24OB0206CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY HAGONOY, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱28.2M | 100% | Medium risk49 | —-0.100 |
| 48 | 24OF0227CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT MA. CLARA ST., QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱48.8M | 88% | Medium risk49 | —-0.046 |
| 49 | 23C00224ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - BAGAC-MARIVELES RD - BAGAC, BATAAN | Region III | Region III | On-Going | ₱48.3M | 82% | Medium risk49 | —-0.050 |
| 50 | 20OB0448RETROFITTING OF GOVERNMENT BUILDINGS IN PREPARATION FOR THE BIG ONE VICENTE P. EUSEBIO BUILDING II, DR. SIXTO ANTONIO ELEMENTARY SCHOOL, PASIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱23.4M | 100% | Medium risk49 | —-0.101 |