Opening the dossier…
Opening the dossier…
Contractor dossier
186 projects on file, including joint ventures this contractor is part of.
Total projects
186
Total budget
₱5.6B
Average progress
89.5%
Completion rate
78.0%
Average risk score
43.4
Medium risk on average, out of 100
Flagged as unusual
11
5.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 131 | ₱3.9B | 40.9 | 9 | 88.5% |
| National Capital Region | 46 | ₱1.4B | 48.2 | 0 | 92.0% |
| Region IV-A | 7 | ₱207.6M | 48.2 | 0 | 100.0% |
| Region II | 1 | ₱57.6M | 94.8 | 1 | 31.8% |
| Region I | 1 | ₱11.7M | 61.8 | 1 | 92.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 67 | ₱1.5B | 41.5 | 2 | 84.2% |
| Buildings and Facilities | 61 | ₱1.4B | 39.7 | 2 | 94.5% |
| Flood Control and Drainage | 44 | ₱2.2B | 47.9 | 4 | 91.1% |
| Bridges | 5 | ₱36.2M | 33.8 | 0 | 100.0% |
| OTHER | 4 | ₱260.1M | 61.3 | 0 | 100.0% |
| GAA 2025 SSP | 3 | ₱171.6M | 94.7 | 3 | 44.3% |
| Water Provision and Storage | 2 | ₱11M | 31.7 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CA0020CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG COLO RIVER, BACONG SECTION, | Region III | Bataan 1st DEO | On-Going | ₱94.5M | 92% | High risk96 | Flagged0.009 |
| 25B00012CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER 11239 - PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG MANILA NORTH RD - K0614+000 - K0615+000, K0617+198 - K0617+771, K0622+000 - K0623+182 | Region II | Region II | On-Going | ₱57.6M | 32% | High risk95 | Flagged0.034 |
| 25CH0073CONSTRUCTION OF PEDESTRIAN OVERPASS, MANCATIAN, PORAC, PAMPANGA | Region III | Pampanga 2nd DEO | On-Going | ₱19.6M | 9% | High risk93 | Flagged0.027 |
| 24CL0039FLOOD CONTROL WORKS ALONG TAMBAK-BANCAL RIVER (PHASE I), SITIO TAMBAK, BARANGAY PALANGINAN, IBA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱96M | 99% | High risk81 | —-0.014 |
| 25CL0119CONSTRUCTION OF RIVERBANK SLOPE PROTECTION STRUCTURE ALONG BANCAL-SAN ISIDRO-MAMBOG RIVER, PHASE 2, BOTOLAN, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.2M | 52% | High risk81 | —-0.004 |
| 25CA0076BASIC INFRASTRUCTURE PROGRAM - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (GYMNASIUM), SAMAL, BATAAN | Region III | Bataan 1st DEO | On-Going | ₱145.5M | 3% | High risk80 | Flagged0.017 |
| 24C00003FLOOD MANAGEMENT PROGRAM-CONST./MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS-CONST. OF SLOPE PROTECTION STRUCTURES ALONG DILA-DILA CREEK, DINALUPIHAN CENTRAL BUSINESS DIST. SAPANG PUTOL (TRIBUTARY TO COLO CREEK), DINALUPIHAN, BATAAN | Region III | Region III | On-Going | ₱142.5M | 80% | High risk80 | —-0.002 |
| 24CL0040FLOOD CONTROL WORKS ALONG TAMBAK-BANCAL RIVER (PHASE II), SITIO TAMBAK, BARANGAY PALANGINAN, IBA, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱96.5M | 100% | High risk80 | —-0.043 |
| 25CL0239CONSTRUCTION OF ROAD, BOTOLAN-IBA- PALAUIG BY-PASS ROAD, PHASE 2, IBA-PALAUIG, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.1M | 0% | High risk76 | —-0.002 |
| 24CL0177CONSTRUCTION OF ROAD, DAANG KALIKASAN TO DAMPAY - BINABALIAN SECTION, PHASE 1, CANDELARIA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.4M | 0% | High risk75 | Flagged0.007 |
| 24CL0181CONSTRUCTION OF ROAD, DAANG KALIKASAN TO DAMPAY - BINABALIAN SECTION, PHASE 2, CANDELARIA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.4M | 0% | High risk74 | Flagged0.007 |
| 24CB0135CONSTRUCTION OF DETOUR ROAD ALONG NAGWALING, PILAR, BATAAN | Region III | Bataan 2nd DEO | On-Going | ₱141.7M | 85% | High risk74 | Flagged0.031 |
| 24CL0210CONSTRUCTION OF CONCRETE SLOPE PROTECTION STRUCTURE ALONG GABOR RIVER, PHASE 2, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱47.6M | 0% | High risk73 | Flagged0.050 |
| 24CL0211CONSTRUCTION OF CONCRETE SLOPE PROTECTION STRUCTURE ALONG GABOR RIVER, PHASE 3, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱47.6M | 0% | High risk73 | Flagged0.050 |
| 25CL0133CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MARANGLA RIVER UPSTREAM (LEFT SIDE), BARANGAY SAN AGUSTIN, IBA, ZAMBALES, PHASE 2 | Region III | Zambales 1st DEO | On-Going | ₱47.6M | 92% | High risk73 | —-0.027 |
| 24CB0136CONSTRUCTION OF FLOOD CONTROL DIKE AT PANTINGAN RIVER (PHASE I), PILAR, BATAAN | Region III | Bataan 2nd DEO | On-Going | ₱105.8M | 85% | High risk72 | Flagged0.028 |
| 25CA0040BASIC INFRASTRUCTURE PROGRAM - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITIATION OF ROAD, SITIO PUGAD LAWIN, BARANGAY SAN JUAN, SAMAL, BATAAN | Region III | Bataan 1st DEO | On-Going | ₱4.8M | 0% | High risk72 | —-0.012 |
| 25CO0047ASSET PRESERVATION PROGRAM - CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS - BAGAC-POBLACION RD - BAGAC, BATAAN | Region III | Bataan 3rd DEO | On-Going | ₱19.2M | 4% | High risk70 | —-0.011 |
| 24C00157ASSET PRESERVATION PROGRAM - CONST/UPGRADING/REHABLITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS - ROMAN EXPRESSWAY - MARIVELES, BATAAN | Region III | Region III | On-Going | ₱16.5M | 46% | High risk70 | —-0.018 |
| 21CA0086CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS) CONCRETING OF BRGY. IMELDA- BRGY. LALAWIGAN ROAD LEADIN | Region III | Bataan 1st DEO | Completed | ₱39.2M | 100% | High risk70 | —-0.064 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24CL0210CONSTRUCTION OF CONCRETE SLOPE PROTECTION STRUCTURE ALONG GABOR RIVER, PHASE 2, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱47.6M | 0% | High risk73 | Flagged0.050 |
| 24CL0211CONSTRUCTION OF CONCRETE SLOPE PROTECTION STRUCTURE ALONG GABOR RIVER, PHASE 3, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱47.6M | 0% | High risk73 | Flagged0.050 |
| 25B00012CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER 11239 - PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG MANILA NORTH RD - K0614+000 - K0615+000, K0617+198 - K0617+771, K0622+000 - K0623+182 | Region II | Region II | On-Going | ₱57.6M | 32% | High risk95 | Flagged0.034 |
| 24CB0135CONSTRUCTION OF DETOUR ROAD ALONG NAGWALING, PILAR, BATAAN | Region III | Bataan 2nd DEO | On-Going | ₱141.7M | 85% | High risk74 | Flagged0.031 |
| 24CB0136CONSTRUCTION OF FLOOD CONTROL DIKE AT PANTINGAN RIVER (PHASE I), PILAR, BATAAN | Region III | Bataan 2nd DEO | On-Going | ₱105.8M | 85% | High risk72 | Flagged0.028 |
| 25CH0073CONSTRUCTION OF PEDESTRIAN OVERPASS, MANCATIAN, PORAC, PAMPANGA | Region III | Pampanga 2nd DEO | On-Going | ₱19.6M | 9% | High risk93 | Flagged0.027 |
| 25CA0076BASIC INFRASTRUCTURE PROGRAM - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (GYMNASIUM), SAMAL, BATAAN | Region III | Bataan 1st DEO | On-Going | ₱145.5M | 3% | High risk80 | Flagged0.017 |
| 25CA0020CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG COLO RIVER, BACONG SECTION, | Region III | Bataan 1st DEO | On-Going | ₱94.5M | 92% | High risk96 | Flagged0.009 |
| 24CL0181CONSTRUCTION OF ROAD, DAANG KALIKASAN TO DAMPAY - BINABALIAN SECTION, PHASE 2, CANDELARIA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.4M | 0% | High risk74 | Flagged0.007 |
| 24CL0177CONSTRUCTION OF ROAD, DAANG KALIKASAN TO DAMPAY - BINABALIAN SECTION, PHASE 1, CANDELARIA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.4M | 0% | High risk75 | Flagged0.007 |
| 24AA0418CONSTRUCTION OF 2 STOREY 4 CLASSROOM SCHOOL BUILDING IN PASALENG NATIONAL HIGH SCHOOL, BARANGAY PASALENG, PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱11.7M | 92% | High risk62 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 18OH0070CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-14 | National Capital Region | South Manila DEO | Completed | ₱9.3M | 100% | Medium risk46 | —-0.100 |
| 77 | 20OH0079OO2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MGM'T. PROGRAM-CONST/MAINT OF FLOOD MITIGA | National Capital Region | South Manila DEO | Completed | ₱19.1M | 100% | Medium risk46 | —-0.089 |
| 78 | 24OH0072CONVERGENCE AND SPECIAL SUPPORT PROGRAM/SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A 11239-INSTALLATION OF ROADWAY LIGHTING STRUCTURES ALONG A. LUNA ST. (FROM TAFT AVENUE TO GIL PUYAT AVENUE), PASAY CITY | National Capital Region | South Manila DEO | On-Going | ₱9.6M | 98% | Medium risk46 | —-0.061 |
| 79 | 23OH0055CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SPECIAL ROAD FUND-MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A 11239-SOLAR STREET LIGHTNING ALONG F.B. HARRISON ST. (FROM ARNAIZ AVE. TO EDSA AVE.) PASAY CITY | National Capital Region | South Manila DEO | Completed | ₱6.2M | 100% | Medium risk46 | —-0.098 |
| 80 | 18OH0094CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS,14 | National Capital Region | South Manila DEO | Completed | ₱9.3M | 100% | Medium risk46 | —-0.100 |
| 81 | 23C00302CONVERGENCE & SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-AUGMENTATION CONST. OF MULTI-PURPOSE BUILDING, MORONG DISTRICT HOSPITAL, BATAAN, MORONG, BATAAN | Region III | Region III | Completed | ₱49.5M | 100% | Medium risk45 | —-0.091 |
| 82 | 25CA0044ASSET PRESERVATION PROGRAM -REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS -MABATANG-VICINAL RD - (S01426LZ) CHAINAGE 676-CHAINAGE 2093, ABUCAY, BATAAN | Region III | Bataan 1st DEO | On-Going | ₱35.5M | 45% | Medium risk44 | —-0.055 |
| 83 | 23C00205ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - BAGAC-MARIVELES RD - BAGAC, BATAAN | Region III | Region III | On-Going | ₱26.1M | 100% | Medium risk44 | —-0.057 |
| 84 | 23CB0038CONSTRUCTION OF MULTI-PURPOSE FACILITY, CAPITOL COMPOUND, BALANGA CITY, BATAAN | Region III | Bataan 2nd DEO | Completed | ₱33.4M | 100% | Medium risk44 | —-0.098 |
| 85 | 25CA0030ASSET PRESERVATION PROGRAM -REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - JCT LAYAC-BALANGA-MARIVELES PORT RD - K0117+679 -K0118+638, ABUCAY, BATAAN | Region III | Bataan 1st DEO | On-Going | ₱32.2M | 82% | Medium risk44 | —-0.066 |
| 86 | 25CA0004ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - MABATANG VICINAL RD - K0118 + 000 - K0118 + 800, K0120 + 000 - K0120 + 1064, ABUCAY, BATAAN | Region III | Bataan 1st DEO | Completed | ₱29.5M | 100% | Medium risk43 | —-0.101 |
| 87 | 23OD0246REHABILITATION/ IMPROVEMENT OF MUTI-PURPOSE BUILDING, BRGY. 178, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱4.8M | 100% | Medium risk43 | —-0.050 |
| 88 | 25CA0045CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONST. OF ROAD, IMELDA-LALAWIGAN ROAD | Region III | Bataan 1st DEO | On-Going | ₱28.8M | 30% | Medium risk43 | —-0.050 |
| 89 | 23CA0005NETWORK DEVELOPMENT PROGRAM- ROAD WIDENING - SECONDARY ROADS ROMAN EXPRESSWAY- KO115+409 - KO115+933, ABUCAY, BATAAN | Region III | Bataan 1st DEO | Completed | ₱19.6M | 100% | Medium risk43 | —-0.101 |
| 90 | 24CA0059ASSET PRESERVATION PROGRAM -REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS -TERTIARY ROADS -CALAGUIMAN VICINAL RD - KO117+515 - KO118+759, SAMAL, BATAAN | Region III | Bataan 1st DEO | Completed | ₱27.3M | 100% | Medium risk42 | —-0.101 |
| 91 | 19CA0077LOCAL INFRASTRUCTURE PROGRAM LOCAL ROADS AND BRIDGES LOCAL ROADS CONSTRUCTION OF ROAD, BARANGAY SALIAN , ABUCAY, BATAAN | Region III | Bataan 1st DEO | Completed | ₱14.8M | 100% | Medium risk41 | —-0.101 |
| 92 | 21CA0070CONVERGENCE AND SPECIAL SUPPORT PROGRAM -CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - (TRIP) - MULAWIN-TALA ROAD LEADING TO MT. NATIB, BATAAN NATIONAL PARK, ORANI, BATAAN | Region III | Bataan 1st DEO | Completed | ₱14.7M | 100% | Medium risk41 | —-0.101 |
| 93 | 24C00155BASIC INFRASTUCTURE PROGRAM - BIP - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, BRGY IPAG, MARIVELES, BATAAN | Region III | Region III | On-Going | ₱5.8M | 33% | Medium risk41 | —-0.029 |
| 94 | 21CA0065CONVERGENCE AND SPECIAL SUPPORT PROGRAM- CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM (TRIP) - STA. ISABEL- SAN RAMON DIVERSION ROADDINALUPIHAN, BATAAN | Region III | Bataan 1st DEO | Completed | ₱48.4M | 100% | Medium risk40 | —-0.091 |
| 95 | 23C00260CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES, AND ECONOMIC ZONES (ROLL-IT) - BRGY. TUBO-TUBO ROAD LEADING TO AGRO-TOURISM AREA, DINALUPIHAN, BATAAN | Region III | Region III | On-Going | ₱48.3M | 29% | Medium risk40 | —-0.039 |
| 96 | 21CA0007LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONSTRUCTION OF ROAD, BAYAN, ORANI, BATAAN | Region III | Bataan 1st DEO | Completed | ₱9.9M | 100% | Medium risk40 | —-0.102 |
| 97 | 25CA0035ASSET PRESERVATION PROGRAM -REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE -TERTIARY ROADS - CALAGUIMAN VICINAL RD - K0125+108 -K0125+208, SAMAL, BATAAN | Region III | Bataan 1st DEO | On-Going | ₱7.8M | 47% | Medium risk40 | —-0.055 |
| 98 | 18CA0014ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-TERTIARY ROADS, MABATANG VICINAL ROAD (S01288LZ) K0118+(-557)-K0118+(-020.30), K0120+763- K0120+900, MABATANG, ABUCAY, BATAAN | Region III | Bataan 1st DEO | Completed | ₱7.5M | 100% | Medium risk40 | —-0.102 |
| 99 | 22CA0005BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, PARAISO E.S. ORANI, BATAAN | Region III | Bataan 1st DEO | Completed | ₱5.9M | 100% | Medium risk40 | —-0.105 |
| 100 | 25CH0005ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - LUBAO BYPASS RD - (S04416LZ) CHAINAGE 308 - CHAINAGE 2659, LUBAO, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱72.1M | 100% | Medium risk40 | —-0.095 |