Contractor dossier
186 projects on file, including joint ventures this contractor is part of.
Total projects
186
Total budget
₱5.6B
Average progress
89.5%
Completion rate
78.0%
Average risk score
43.4
Medium risk on average, out of 100
Flagged as unusual
11
5.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 131 | ₱3.9B | 40.9 | 9 | 88.5% |
| National Capital Region | 46 | ₱1.4B | 48.2 | 0 | 92.0% |
| Region IV-A | 7 | ₱207.6M | 48.2 | 0 | 100.0% |
| Region II | 1 | ₱57.6M | 94.8 | 1 | 31.8% |
| Region I | 1 | ₱11.7M | 61.8 | 1 | 92.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 67 | ₱1.5B | 41.5 | 2 | 84.2% |
| Buildings and Facilities | 61 | ₱1.4B | 39.7 | 2 | 94.5% |
| Flood Control and Drainage | 44 | ₱2.2B | 47.9 | 4 | 91.1% |
| Bridges | 5 | ₱36.2M | 33.8 | 0 | 100.0% |
| OTHER | 4 | ₱260.1M | 61.3 | 0 | 100.0% |
| GAA 2025 SSP | 3 | ₱171.6M | 94.7 | 3 | 44.3% |
| Water Provision and Storage | 2 | ₱11M | 31.7 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CA0020CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG COLO RIVER, BACONG SECTION, | Region III | Bataan 1st DEO | On-Going | ₱94.5M | 92% | High risk96 | Flagged0.009 |
| 25B00012CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER 11239 - PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG MANILA NORTH RD - K0614+000 - K0615+000, K0617+198 - K0617+771, K0622+000 - K0623+182 | Region II | Region II | On-Going | ₱57.6M | 32% | High risk95 | Flagged0.034 |
| 25CH0073CONSTRUCTION OF PEDESTRIAN OVERPASS, MANCATIAN, PORAC, PAMPANGA | Region III | Pampanga 2nd DEO | On-Going | ₱19.6M | 9% | High risk93 | Flagged0.027 |
| 24CL0039FLOOD CONTROL WORKS ALONG TAMBAK-BANCAL RIVER (PHASE I), SITIO TAMBAK, BARANGAY PALANGINAN, IBA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱96M | 99% | High risk81 | —-0.014 |
| 25CL0119CONSTRUCTION OF RIVERBANK SLOPE PROTECTION STRUCTURE ALONG BANCAL-SAN ISIDRO-MAMBOG RIVER, PHASE 2, BOTOLAN, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.2M | 52% | High risk81 | —-0.004 |
| 25CA0076BASIC INFRASTRUCTURE PROGRAM - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (GYMNASIUM), SAMAL, BATAAN | Region III | Bataan 1st DEO | On-Going | ₱145.5M | 3% | High risk80 | Flagged0.017 |
| 24C00003FLOOD MANAGEMENT PROGRAM-CONST./MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS-CONST. OF SLOPE PROTECTION STRUCTURES ALONG DILA-DILA CREEK, DINALUPIHAN CENTRAL BUSINESS DIST. SAPANG PUTOL (TRIBUTARY TO COLO CREEK), DINALUPIHAN, BATAAN | Region III | Region III | On-Going | ₱142.5M | 80% | High risk80 | —-0.002 |
| 24CL0040FLOOD CONTROL WORKS ALONG TAMBAK-BANCAL RIVER (PHASE II), SITIO TAMBAK, BARANGAY PALANGINAN, IBA, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱96.5M | 100% | High risk80 | —-0.043 |
| 25CL0239CONSTRUCTION OF ROAD, BOTOLAN-IBA- PALAUIG BY-PASS ROAD, PHASE 2, IBA-PALAUIG, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.1M | 0% | High risk76 | —-0.002 |
| 24CL0177CONSTRUCTION OF ROAD, DAANG KALIKASAN TO DAMPAY - BINABALIAN SECTION, PHASE 1, CANDELARIA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.4M | 0% | High risk75 | Flagged0.007 |
| 24CL0181CONSTRUCTION OF ROAD, DAANG KALIKASAN TO DAMPAY - BINABALIAN SECTION, PHASE 2, CANDELARIA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.4M | 0% | High risk74 | Flagged0.007 |
| 24CB0135CONSTRUCTION OF DETOUR ROAD ALONG NAGWALING, PILAR, BATAAN | Region III | Bataan 2nd DEO | On-Going | ₱141.7M | 85% | High risk74 | Flagged0.031 |
| 24CL0210CONSTRUCTION OF CONCRETE SLOPE PROTECTION STRUCTURE ALONG GABOR RIVER, PHASE 2, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱47.6M | 0% | High risk73 | Flagged0.050 |
| 24CL0211CONSTRUCTION OF CONCRETE SLOPE PROTECTION STRUCTURE ALONG GABOR RIVER, PHASE 3, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱47.6M | 0% | High risk73 | Flagged0.050 |
| 25CL0133CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MARANGLA RIVER UPSTREAM (LEFT SIDE), BARANGAY SAN AGUSTIN, IBA, ZAMBALES, PHASE 2 | Region III | Zambales 1st DEO | On-Going | ₱47.6M | 92% | High risk73 | —-0.027 |
| 24CB0136CONSTRUCTION OF FLOOD CONTROL DIKE AT PANTINGAN RIVER (PHASE I), PILAR, BATAAN | Region III | Bataan 2nd DEO | On-Going | ₱105.8M | 85% | High risk72 | Flagged0.028 |
| 25CA0040BASIC INFRASTRUCTURE PROGRAM - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITIATION OF ROAD, SITIO PUGAD LAWIN, BARANGAY SAN JUAN, SAMAL, BATAAN | Region III | Bataan 1st DEO | On-Going | ₱4.8M | 0% | High risk72 | —-0.012 |
| 25CO0047ASSET PRESERVATION PROGRAM - CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS - BAGAC-POBLACION RD - BAGAC, BATAAN | Region III | Bataan 3rd DEO | On-Going | ₱19.2M | 4% | High risk70 | —-0.011 |
| 24C00157ASSET PRESERVATION PROGRAM - CONST/UPGRADING/REHABLITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS - ROMAN EXPRESSWAY - MARIVELES, BATAAN | Region III | Region III | On-Going | ₱16.5M | 46% | High risk70 | —-0.018 |
| 21CA0086CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS) CONCRETING OF BRGY. IMELDA- BRGY. LALAWIGAN ROAD LEADIN | Region III | Bataan 1st DEO | Completed | ₱39.2M | 100% | High risk70 | —-0.064 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24CL0210CONSTRUCTION OF CONCRETE SLOPE PROTECTION STRUCTURE ALONG GABOR RIVER, PHASE 2, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱47.6M | 0% | High risk73 | Flagged0.050 |
| 24CL0211CONSTRUCTION OF CONCRETE SLOPE PROTECTION STRUCTURE ALONG GABOR RIVER, PHASE 3, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱47.6M | 0% | High risk73 | Flagged0.050 |
| 25B00012CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER 11239 - PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG MANILA NORTH RD - K0614+000 - K0615+000, K0617+198 - K0617+771, K0622+000 - K0623+182 | Region II | Region II | On-Going | ₱57.6M | 32% | High risk95 | Flagged0.034 |
| 24CB0135CONSTRUCTION OF DETOUR ROAD ALONG NAGWALING, PILAR, BATAAN | Region III | Bataan 2nd DEO | On-Going | ₱141.7M | 85% | High risk74 | Flagged0.031 |
| 24CB0136CONSTRUCTION OF FLOOD CONTROL DIKE AT PANTINGAN RIVER (PHASE I), PILAR, BATAAN | Region III | Bataan 2nd DEO | On-Going | ₱105.8M | 85% | High risk72 | Flagged0.028 |
| 25CH0073CONSTRUCTION OF PEDESTRIAN OVERPASS, MANCATIAN, PORAC, PAMPANGA | Region III | Pampanga 2nd DEO | On-Going | ₱19.6M | 9% | High risk93 | Flagged0.027 |
| 25CA0076BASIC INFRASTRUCTURE PROGRAM - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (GYMNASIUM), SAMAL, BATAAN | Region III | Bataan 1st DEO | On-Going | ₱145.5M | 3% | High risk80 | Flagged0.017 |
| 25CA0020CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG COLO RIVER, BACONG SECTION, | Region III | Bataan 1st DEO | On-Going | ₱94.5M | 92% | High risk96 | Flagged0.009 |
| 24CL0181CONSTRUCTION OF ROAD, DAANG KALIKASAN TO DAMPAY - BINABALIAN SECTION, PHASE 2, CANDELARIA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.4M | 0% | High risk74 | Flagged0.007 |
| 24CL0177CONSTRUCTION OF ROAD, DAANG KALIKASAN TO DAMPAY - BINABALIAN SECTION, PHASE 1, CANDELARIA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.4M | 0% | High risk75 | Flagged0.007 |
| 24AA0418CONSTRUCTION OF 2 STOREY 4 CLASSROOM SCHOOL BUILDING IN PASALENG NATIONAL HIGH SCHOOL, BARANGAY PASALENG, PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱11.7M | 92% | High risk62 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 21CA0037BRIDGE PROGRAM- RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, GATAO BR. (B01569LZ) ALONG GOV. JJ LINAO ROAD, MORONG, BATAAN | Region III | Bataan 1st DEO | Completed | ₱6.9M | 100% | Medium risk37 | —-0.058 |
| 127 | 19CA0010BRIDGE PROGRAM-RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES- PAGSAKIAN BRIDGE 1(B01575LZ) ALONG GOV. J.J. LINAO ROAD, MORONG, BATAAN | Region III | Bataan 1st DEO | Completed | ₱8.8M | 100% | Medium risk37 | —-0.059 |
| 128 | 22CA0014BASIC INFRASTRUCTURE PROGRAM (BIP)-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES - CONSTRUCTION OF DRAINAGE CANAL, BARANGAY LALAWIGAN, SAMAL, BATAAN | Region III | Bataan 1st DEO | Completed | ₱9.9M | 100% | Medium risk36 | —-0.090 |
| 129 | 21CA0022ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - ROMAN EXPRESSWAY - K0105+758-K0106+121, ORANI, BATAAN | Region III | Bataan 1st DEO | Completed | ₱16.6M | 100% | Medium risk36 | —-0.100 |
| 130 | 18CH0119IMPROVEMENT/CONCRETING OF ROAD LEADING TO NABUCLOD ECO PARK (PABANLAG SECTION), FLORIDABLANCA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱28.9M | 100% | Medium risk35 | —-0.102 |
| 131 | 21CA0066CONVERGENCE AND SPECIAL SUPPORT PROGRAM CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM (TRIP) -ANGELES-PORAC-FLORIDABLANCA-DINALUPIHAN-JOSE ABAD SANTOS AVENUE DIVERSION ROAD | Region III | Bataan 1st DEO | Completed | ₱14.7M | 100% | Medium risk35 | —-0.102 |
| 132 | 24CA0018ASSET PRESERVATION PROGRAM -REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - ROMAN EXPRESSWAY - K0101+ (-050) - K0101+043, HERMOSA, BATAAN | Region III | Bataan 1st DEO | Completed | ₱9.8M | 100% | Medium risk34 | —-0.102 |
| 133 | 19CA0024ASSET PRESERVATION PROGRAM-REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS-ROMAN EXPRESSWAY K0107+000- K0107+349ORANI, BATAAN | Region III | Bataan 1st DEO | Completed | ₱7.6M | 100% | Medium risk34 | —-0.099 |
| 134 | 20CA0004LOCAL INFRASTRUCTURE PROGRAM- BUILDING AND OTHER STRUCTURES MULTI-PURPOSE/FACILITIES -CONSTRUCTION OF MULTI-PURPOSE BUILDING, STA. ISABEL, DINALUPIHAN, BATAAN | Region III | Bataan 1st DEO | Completed | ₱6.9M | 100% | Medium risk33 | —-0.104 |
| 135 | 22CA0032CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION/REHABILITATION OF FLOOD CONTROL PROJECT ALONG COLO RIVER, STA.0+495.50 - STA 0+846.62, LAYAC SECTION PHASE 2AGPDINALUPIHAN, BATAAN | Region III | Bataan 1st DEO | Completed | ₱49M | 100% | Medium risk33 | —-0.088 |
| 136 | 19CA0098CONSTRUCTION OF TWO (2) STOREY-TEN (10) CLASSROOMS SCHOOL BUILDING, TOMAS PINPIN MEMORIAL ELEMENTARY SCHOOL, ABUCAY, BATAAN | Region III | Bataan 1st DEO | Completed | ₱27.5M | 100% | Medium risk33 | —-0.046 |
| 137 | 19CA0068LOCAL INFRASTRUCTURE PROGRAM BUILDINGS AND OTHER STRUCTURES MULTI-PURPOSE/FACILITIES CONSTRUCTION OF MULTI-PURPOSE BUILDING BARANGAY LAYAC, DINALUPIHAN, BATAAN | Region III | Bataan 1st DEO | Completed | ₱5.9M | 100% | Medium risk33 | —-0.104 |
| 138 | 24CA0007FLOOD MANAGEMENT PROGRAM -CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG COLO RIVER (PHASE 3AGP), PALIHAN SECTION, HERMOSA, BATAAN | Region III | Bataan 1st DEO | Completed | ₱49M | 100% | Medium risk33 | —-0.086 |
| 139 | 22CA0040CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION/REHABILITATION OF FLOOD CONTROL PROJECT ALONG COLO RIVER, STA. (-) 0+739.50-STA. (-) 1+111.41, PALIHAN SECTION PHASE 2AGPHERMOSA, BATAAN | Region III | Bataan 1st DEO | Completed | ₱49M | 100% | Medium risk33 | —-0.086 |
| 140 | 22CA0038CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM- CONSTRUCTION/REHABILITATION OF FLOOD CONTROL PROJECT ALONG COLO RIVER, STA.(-)0+159-00 STA.0+495.50, LAYAC SECTION PHASE 1AGPDINALUPIHAN, BATAAN | Region III | Bataan 1st DEO | Completed | ₱49M | 100% | Medium risk33 | —-0.089 |
| 141 | 22CA0031CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONSTRUCTION/REHABILITATION OF FLOOD CONTROL PROJECT ALONG COLO RIVER, STA.0+441.43- STA (-) .0+596.40, PALIHAN SECTION PHASE 1AGPHERMOSA, BATAAN | Region III | Bataan 1st DEO | Completed | ₱49M | 100% | Medium risk33 | —-0.089 |
| 142 | 21CA0058LOCAL INFRASTRUCTURE PROGRAM- BUILDING AND OTHER STRUCTURES - MULTI-PURPOSE/FACILITIES- CONSTRUCTION OF MULTI-PURPOSE BUILDING KATAASAN, DINALUPIHAN, BATAAN | Region III | Bataan 1st DEO | Completed | ₱5.9M | 100% | Medium risk33 | —-0.104 |
| 143 | 18CA0101CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOM UNDER THE DEPEDS CY 2018 - BASIC EDUCATIONAL FACILITIES FUND- TWO (2) STOREY-EIGHT (8) CLASSROOM SCHOOL BUILDING, KABUKIRAN ELEMENTARY SCHOOL, ABUCAY, BATAAN | Region III | Bataan 1st DEO | Completed | ₱23.5M | 100% | Medium risk33 | —-0.047 |
| 144 | 20CA0002LOCAL INFRASTRUCTURE PROGRAM - BUILDING AND OTHER STRUCTURES MULTI-PURPOSE/FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, COLODINALUPIHAN, BATAAN | Region III | Bataan 1st DEO | Completed | ₱5.9M | 100% | Medium risk33 | —-0.102 |
| 145 | 22CA0006BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, MAGSAYSAY E.S. DINALUPIHAN, BATAAN | Region III | Bataan 1st DEO | Completed | ₱4.9M | 100% | Medium risk32 | —-0.103 |
| 146 | 21CA0006LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTI-PURPOSE/FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, PITA,DINALUPIHAN, BATAAN | Region III | Bataan 1st DEO | Completed | ₱5.9M | 100% | Medium risk32 | —-0.100 |
| 147 | 19CA0105CONSTRUCTION OF TWO (2) STOREY-FOUR (4) CLASSROOMS SCHOOL BUILDING, BANGKAL ELEMENTARY SCHOOL, ABUCAY, BATAAN | Region III | Bataan 1st DEO | Completed | ₱15.6M | 100% | Medium risk32 | —-0.048 |
| 148 | 21CA0008LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTI-PURPOSE/FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, SAN SIMON, DINALUPIHAN, BATAAN | Region III | Bataan 1st DEO | Completed | ₱5.9M | 100% | Medium risk32 | —-0.104 |
| 149 | 19CA0103CONSTRUCTION OF TWO (2) STOREY-FOUR (4) CLASSROOMS SCHOOL BUILDING, F.C. DEL ROSARIO ELEMENTARY SCHOOL, SAMAL, BATAAN | Region III | Bataan 1st DEO | Completed | ₱15.4M | 100% | Medium risk32 | —-0.048 |
| 150 | 18CH0129CONCRETING OF ROAD, BRGY. MAWACAT, FLORIDABLANCA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱11.1M | 100% | Medium risk32 | —-0.102 |