186 projects on file, including joint ventures this contractor is part of.
Total projects
186
Total budget
₱5.6B
Average progress
89.5%
Completion rate
78.0%
Average risk score
43.4
Medium risk on average, out of 100
Flagged as unusual
11
5.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 131 | ₱3.9B | 40.9 | 9 | 88.5% |
| National Capital Region | 46 | ₱1.4B | 48.2 | 0 | 92.0% |
| Region IV-A | 7 | ₱207.6M | 48.2 | 0 | 100.0% |
| Region II | 1 | ₱57.6M | 94.8 | 1 | 31.8% |
| Region I | 1 | ₱11.7M | 61.8 | 1 | 92.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 67 | ₱1.5B | 41.5 | 2 | 84.2% |
| Buildings and Facilities | 61 | ₱1.4B | 39.7 | 2 | 94.5% |
| Flood Control and Drainage | 44 | ₱2.2B | 47.9 | 4 | 91.1% |
| Bridges | 5 | ₱36.2M | 33.8 | 0 | 100.0% |
| OTHER | 4 | ₱260.1M | 61.3 | 0 | 100.0% |
| GAA 2025 SSP | 3 | ₱171.6M | 94.7 | 3 | 44.3% |
| Water Provision and Storage | 2 | ₱11M | 31.7 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CA0020CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG COLO RIVER, BACONG SECTION, | Region III | Bataan 1st DEO | On-Going | ₱94.5M | 92% | High risk96 | Flagged0.009 |
| 25B00012CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER 11239 - PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG MANILA NORTH RD - K0614+000 - K0615+000, K0617+198 - K0617+771, K0622+000 - K0623+182 | Region II | Region II | On-Going | ₱57.6M | 32% | High risk95 | Flagged0.034 |
| 25CH0073CONSTRUCTION OF PEDESTRIAN OVERPASS, MANCATIAN, PORAC, PAMPANGA | Region III | Pampanga 2nd DEO | On-Going | ₱19.6M | 9% | High risk93 | Flagged0.027 |
| 24CL0039FLOOD CONTROL WORKS ALONG TAMBAK-BANCAL RIVER (PHASE I), SITIO TAMBAK, BARANGAY PALANGINAN, IBA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱96M | 99% | High risk81 | —-0.014 |
| 25CL0119CONSTRUCTION OF RIVERBANK SLOPE PROTECTION STRUCTURE ALONG BANCAL-SAN ISIDRO-MAMBOG RIVER, PHASE 2, BOTOLAN, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.2M | 52% | High risk81 | —-0.004 |
| 25CA0076BASIC INFRASTRUCTURE PROGRAM - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (GYMNASIUM), SAMAL, BATAAN | Region III | Bataan 1st DEO | On-Going | ₱145.5M | 3% | High risk80 | Flagged0.017 |
| 24C00003FLOOD MANAGEMENT PROGRAM-CONST./MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS-CONST. OF SLOPE PROTECTION STRUCTURES ALONG DILA-DILA CREEK, DINALUPIHAN CENTRAL BUSINESS DIST. SAPANG PUTOL (TRIBUTARY TO COLO CREEK), DINALUPIHAN, BATAAN | Region III | Region III | On-Going | ₱142.5M | 80% | High risk80 | —-0.002 |
| 24CL0040FLOOD CONTROL WORKS ALONG TAMBAK-BANCAL RIVER (PHASE II), SITIO TAMBAK, BARANGAY PALANGINAN, IBA, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱96.5M | 100% | High risk80 | —-0.043 |
| 25CL0239CONSTRUCTION OF ROAD, BOTOLAN-IBA- PALAUIG BY-PASS ROAD, PHASE 2, IBA-PALAUIG, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.1M | 0% | High risk76 | —-0.002 |
| 24CL0177CONSTRUCTION OF ROAD, DAANG KALIKASAN TO DAMPAY - BINABALIAN SECTION, PHASE 1, CANDELARIA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.4M | 0% | High risk75 | Flagged0.007 |
| 24CL0181CONSTRUCTION OF ROAD, DAANG KALIKASAN TO DAMPAY - BINABALIAN SECTION, PHASE 2, CANDELARIA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.4M | 0% | High risk74 | Flagged0.007 |
| 24CB0135CONSTRUCTION OF DETOUR ROAD ALONG NAGWALING, PILAR, BATAAN | Region III | Bataan 2nd DEO | On-Going | ₱141.7M | 85% | High risk74 | Flagged0.031 |
| 24CL0210CONSTRUCTION OF CONCRETE SLOPE PROTECTION STRUCTURE ALONG GABOR RIVER, PHASE 2, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱47.6M | 0% | High risk73 | Flagged0.050 |
| 24CL0211CONSTRUCTION OF CONCRETE SLOPE PROTECTION STRUCTURE ALONG GABOR RIVER, PHASE 3, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱47.6M | 0% | High risk73 | Flagged0.050 |
| 25CL0133CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MARANGLA RIVER UPSTREAM (LEFT SIDE), BARANGAY SAN AGUSTIN, IBA, ZAMBALES, PHASE 2 | Region III | Zambales 1st DEO | On-Going | ₱47.6M | 92% | High risk73 | —-0.027 |
| 24CB0136CONSTRUCTION OF FLOOD CONTROL DIKE AT PANTINGAN RIVER (PHASE I), PILAR, BATAAN | Region III | Bataan 2nd DEO | On-Going | ₱105.8M | 85% | High risk72 | Flagged0.028 |
| 25CA0040BASIC INFRASTRUCTURE PROGRAM - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - REHABILITIATION OF ROAD, SITIO PUGAD LAWIN, BARANGAY SAN JUAN, SAMAL, BATAAN | Region III | Bataan 1st DEO | On-Going | ₱4.8M | 0% | High risk72 | —-0.012 |
| 25CO0047ASSET PRESERVATION PROGRAM - CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - TERTIARY ROADS - BAGAC-POBLACION RD - BAGAC, BATAAN | Region III | Bataan 3rd DEO | On-Going | ₱19.2M | 4% | High risk70 | —-0.011 |
| 24C00157ASSET PRESERVATION PROGRAM - CONST/UPGRADING/REHABLITATION OF DRAINAGE ALONG NATIONAL ROADS - SECONDARY ROADS - ROMAN EXPRESSWAY - MARIVELES, BATAAN | Region III | Region III | On-Going | ₱16.5M | 46% | High risk70 | —-0.018 |
| 21CA0086CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES IN SUPPORT OF NATIONAL SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM - TIKAS) CONCRETING OF BRGY. IMELDA- BRGY. LALAWIGAN ROAD LEADIN | Region III | Bataan 1st DEO | Completed | ₱39.2M | 100% | High risk70 | —-0.064 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24CL0210CONSTRUCTION OF CONCRETE SLOPE PROTECTION STRUCTURE ALONG GABOR RIVER, PHASE 2, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱47.6M | 0% | High risk73 | Flagged0.050 |
| 24CL0211CONSTRUCTION OF CONCRETE SLOPE PROTECTION STRUCTURE ALONG GABOR RIVER, PHASE 3, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱47.6M | 0% | High risk73 | Flagged0.050 |
| 25B00012CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER 11239 - PREVENTIVE MAINTENANCE - PRIMARY ROADS ALONG MANILA NORTH RD - K0614+000 - K0615+000, K0617+198 - K0617+771, K0622+000 - K0623+182 | Region II | Region II | On-Going | ₱57.6M | 32% | High risk95 | Flagged0.034 |
| 24CB0135CONSTRUCTION OF DETOUR ROAD ALONG NAGWALING, PILAR, BATAAN | Region III | Bataan 2nd DEO | On-Going | ₱141.7M | 85% | High risk74 | Flagged0.031 |
| 24CB0136CONSTRUCTION OF FLOOD CONTROL DIKE AT PANTINGAN RIVER (PHASE I), PILAR, BATAAN | Region III | Bataan 2nd DEO | On-Going | ₱105.8M | 85% | High risk72 | Flagged0.028 |
| 25CH0073CONSTRUCTION OF PEDESTRIAN OVERPASS, MANCATIAN, PORAC, PAMPANGA | Region III | Pampanga 2nd DEO | On-Going | ₱19.6M | 9% | High risk93 | Flagged0.027 |
| 25CA0076BASIC INFRASTRUCTURE PROGRAM - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (GYMNASIUM), SAMAL, BATAAN | Region III | Bataan 1st DEO | On-Going | ₱145.5M | 3% | High risk80 | Flagged0.017 |
| 25CA0020CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG COLO RIVER, BACONG SECTION, | Region III | Bataan 1st DEO | On-Going | ₱94.5M | 92% | High risk96 | Flagged0.009 |
| 24CL0181CONSTRUCTION OF ROAD, DAANG KALIKASAN TO DAMPAY - BINABALIAN SECTION, PHASE 2, CANDELARIA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.4M | 0% | High risk74 | Flagged0.007 |
| 24CL0177CONSTRUCTION OF ROAD, DAANG KALIKASAN TO DAMPAY - BINABALIAN SECTION, PHASE 1, CANDELARIA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.4M | 0% | High risk75 | Flagged0.007 |
| 24AA0418CONSTRUCTION OF 2 STOREY 4 CLASSROOM SCHOOL BUILDING IN PASALENG NATIONAL HIGH SCHOOL, BARANGAY PASALENG, PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱11.7M | 92% | High risk62 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 151 | 18CH0144CONCRETING OF ROAD, BRGY. NABUCLOD, SITIO CAMACHILE, FLORIDABLANCA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱9.3M | 100% | Medium risk31 | —-0.103 |
| 152 | 21CH0107CONCRETING/IMPROVEMENT OF ROAD LEADING TO MAIN GATE ENTRANCE, FLORIDABLANCA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱6.4M | 100% | Medium risk31 | —-0.103 |
| 153 | 19CA0107CONCRETING OF SABATAN ROAD, BARANGAY SABANG FMR, BARANGAY SABANG, MORONG, BATAAN | Region III | Bataan 1st DEO | Completed | ₱4.8M | 100% | Medium risk30 | —-0.039 |
| 154 | 23CA0013FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONSTRUCTION OF FLOOD CONTROL ALONG COLO RIVER, BAMBAN SECTION PHASE III-1C, HERMOSA, BATAAN | Region III | Bataan 1st DEO | Completed | ₱29M | 100% | Medium risk30 | —-0.089 |
| 155 | 23CA0014FLOOD MANAGEMENT PROGRAM -CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF FLOOD CONTROL PROJECT ALONG COLO RIVER BACONG SECTION PHASE IV-AGP1HERMOSA, BATAAN | Region III | Bataan 1st DEO | Completed | ₱29.4M | 100% | Medium risk30 | —-0.089 |
| 156 | 20CA0064CONCRETING OF CATULIRAN, BRGY. MABATANG FMR, BRGY. MABATANG, ABUCAY, BATAAN | Region III | Bataan 1st DEO | Completed | ₱9.7M | 100% | Medium risk30 | —-0.043 |
| 157 | 19CA0087FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION/REHABILITATION OF FLOOD CONTROL PROJECT ALONG COLO RIVER, LUACAN SECTION, PHASE B, DINALUPIHAN, BATAAN | Region III | Bataan 1st DEO | Completed | ₱19.6M | 100% | Medium risk30 | —-0.090 |
| 158 | 20CA0014FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL PROJECTS IN MALIGAYA RIVERDINALUPIHAN, BATAAN | Region III | Bataan 1st DEO | Completed | ₱22.2M | 100% | Medium risk30 | —-0.089 |
| 159 | 20CA0034LOCAL INFRASTRUCTURE PROGRAM FLOOD CONTROL AND DRAINAGE FLOOD CONTROL STRUCTURES/FACILITIES CONSTRUCTION/IMPROVEMENT OF DALAO RIVER,DINALUPIHAN, BATAAN | Region III | Bataan 1st DEO | Completed | ₱19.8M | 100% | Medium risk30 | —-0.090 |
| 160 | 20CA0061CONCRETING OF BRGY. SIBUL TO BUTATERO, BRGY. PAG-ASA FMR, BRGY. SIBUL AND BRGY. PAG-ASAORANI, BATAAN | Region III | Bataan 1st DEO | Completed | ₱11.6M | 100% | Medium risk30 | —-0.041 |
| 161 | 23CH0005FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS - CONSTRUCTION OF CARMENCITA ROAD DIKE, FLORIDABLANCA, PAMPANGA | Region III | Pampanga 2nd DEO | Completed | ₱29.4M | 100% | Low risk30 | —-0.090 |
| 162 | 23CA0053CONCRETING OF SITIO LAKBANGAN, BRGY. IMELDA FMR, BRGY. IMELDA, SAMAL, BATAAN | Region III | Bataan 1st DEO | Completed | ₱12.2M | 100% | Low risk29 | —-0.044 |
| 163 | 19CA0113CONSTRUCTION OF TWO (2) UNITS, TWO (2) STOREY-FOUR (4) CLASSROOMS SCHOOL BUILDING, DINALUPIHAN ELEMENTARY SCHOOL, DINALUPIHAN, BATAAN | Region III | Bataan 1st DEO | Completed | ₱27.7M | 100% | Low risk29 | —-0.043 |
| 164 | 18CA0084CONSTRUCTION OF FOUR (4) STOREY-EIGHT (8) CLASSROOMS SCHOOL BUILDING, J.C. PAYUMO JR. MEMORIAL HIGH SCHOOL, DINALUPIHAN, BATAAN | Region III | Bataan 1st DEO | Completed | ₱17.9M | 100% | Low risk28 | —-0.046 |
| 165 | 19CA0106CONSTRUCTION OF TWO (2) STOREY-SIX (6) CLASSROOMS SCHOOL BUILDING, BALSIK NATIONAL HIGH SCHOOL, HERMOSA, BATAAN | Region III | Bataan 1st DEO | Completed | ₱19.4M | 100% | Low risk28 | —-0.041 |
| 166 | 20CA0057CONSTRUCTION OF TWO (2) STOREY-FOUR (4) CLASSROOM SCHOOL BUILDING, BAYAN-BAYANAN ELEMENTARY SCHOOL, DINALUPIHAN, BATAAN | Region III | Bataan 1st DEO | Completed | ₱15.6M | 100% | Low risk28 | —-0.049 |
| 167 | 21CA0093CONSTRUCTION/COMPLETION OF FOUR (4) STOREY -TWENTY (20) CLASSROOMS SCHOOL BUILDING, JOSE C. PAYUMO JR. MEMORIAL HIGH SCHOOLDINALUPIHAN, BATAAN | Region III | Bataan 1st DEO | Completed | ₱7.1M | 100% | Low risk26 | —-0.050 |
| 168 | 17OE0183CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS-RAIN WATER COLLECTORS SYSTEM-CONSTRUCTION OF 5 UNITS RAINWATER COLLECTION SYSTEM (RWCS), MANILA | National Capital Region | North Manila DEO | Completed | ₱1.2M | 100% | Low risk25 | —-0.040 |
| 169 | 22OB0320IMPROVEMENT/ EXTENSION OF SPD FIRING RANGE AND CONSTRUCTION OF COVERED PARKING, SOUTHERN POLICE DISTRICT | National Capital Region | Metro Manila 1st DEO | Completed | ₱3.2M | 100% | Low risk25 | —-0.102 |
| 170 | 17CA0016REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES MABICAL BRIDGE (B01557LZ) ALONG JUNCTION LAYAC-BALANGA-MARIVELES PORT ROAD, SAMAL, BATAAN | Region III | Bataan 1st DEO | Completed | ₱1.8M | 100% | Low risk21 | —-0.035 |
| 171 | 19CA0043LOCAL INFRASTRUCTURE PROGRAM-FLOOD CONTROL AND DRAINAGE-FLOOD CONTROL STRUCTURE/FACILITIES-CONSTRUCTION (EXTENSION) OF DIKE, PUROK 2, BARANGAY SABANG, MORONG, BATAAN | Region III | Bataan 1st DEO | Completed | ₱3M | 100% | Low risk17 | —-0.085 |
| 172 | 19CA0094LOCAL INFRASTRUCTURE PROGRAM-LOCAL ROADS AND BRIDGES-LOCAL ROADS-CONCRETING/IMPROVEMENT OF THE SCHOOL PAVEMENT AT ORANI NATIONAL HIGH SCHOOL IN SITIO KAWAYAN, BARANGAY TUGATOGORANI, BATAAN | Region III | Bataan 1st DEO | Completed | ₱3M | 100% | Low risk17 | —-0.102 |
| 173 | 19CA0019ASSET PRESERVATION-PREVENTIVE MAINTENANCE-PRIMARY ROADS-PREVENTIVE MAINTENANCE OF ROAD-ASPHALT OVERLAY-ALONG JOSE ABAD SANTOS AVENUE (JASA) (S01254LZ), K0104+814 - K0105+075 DINALUPIHAN, BATAAN | Region III | Bataan 1st DEO | Completed | ₱4.6M | 100% | Low risk15 | —-0.098 |
| 174 | 19CA0092LOCAL INFRASTRUCTURE PROGRAM-LOCAL ROADS AND BRIDGES-LOCAL ROADS-IMPROVEMENT OF MT. STA. RITA ROAD, BARANGAY TIPO, HERMOSA, BATAAN | Region III | Bataan 1st DEO | Completed | ₱3M | 100% | Low risk15 | —-0.098 |
| 175 | 19CA0053LOCAL INFRASTRUCTURE PROGRAM FLOOD CONTROL AND DRAINAGE DRAINAGE/PROTECTION WORKS CONSTRUCTION OF MAIN DRAINAGE CANAL ALONG ROMAN SUPER HIGHWAY BARANGAY PALIHAN HERMOSA, BATAAN | Region III | Bataan 1st DEO | Completed | ₱3M | 100% | Low risk15 | —-0.087 |