Contractor dossier
162 projects on file, including joint ventures this contractor is part of.
Total projects
162
Total budget
₱14B
Average progress
95.6%
Completion rate
84.0%
Average risk score
53.9
Medium risk on average, out of 100
Flagged as unusual
4
2.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 78 | ₱2.9B | 51.9 | 0 | 98.6% |
| Region IV-A | 55 | ₱3.2B | 53.4 | 2 | 91.0% |
| Region III | 13 | ₱1.8B | 62.2 | 1 | 97.2% |
| Region IV-B | 8 | ₱1.1B | 57.6 | 1 | 91.2% |
| Region X | 5 | ₱783M | 60.0 | 0 | 100.0% |
| Region XI | 3 | ₱4.1B | 61.9 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 80 | ₱4.6B | 50.7 | 1 | 98.8% |
| Roads | 47 | ₱2.8B | 52.6 | 2 | 90.5% |
| Bridges | 11 | ₱4.8B | 55.3 | 0 | 98.9% |
| Buildings and Facilities | 11 | ₱819.9M | 52.5 | 0 | 89.7% |
| GAA 2025 SSP | 7 | ₱140.5M | 88.3 | 0 | 99.9% |
| OTHER | 4 | ₱458.2M | 67.7 | 1 | 100.0% |
| Bridges, Roads | 2 | ₱374.4M | 68.5 | 0 | 81.7% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25OD0311CONSTRUCTION OF ROADS AND DRAINAGE SYSTEMS WITH BRIDGE REPLACEMENT ALONG BARANGAY 172, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱29M | 99% | High risk91 | —-0.001 |
| 25OD0293CONSTRUCTION OF ROADS AND DRAINAGE SYSTEMS ALONG NORTH DIVERSION ROAD (NDR), CALOOCAN CITY (PHASE 2) | National Capital Region | Metro Manila 3rd DEO | Completed | ₱19.3M | 100% | High risk89 | —-0.032 |
| 25OD0226CONSTRUCTION OF ROADS AND DRAINAGE SYSTEMS ALONG BARANGAYS 82, 83, 84 AND 85, MORNING BREEZE, CALOOCAN CITY (PHASE 3) | National Capital Region | Metro Manila 3rd DEO | Completed | ₱23.7M | 100% | High risk88 | —-0.030 |
| 25OD0297CONSTRUCTION OF ROAD AND DRAINAGE SYSTEM ALONG BARANGAY 172 (PHASE 2), CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱18.2M | 100% | High risk88 | —-0.031 |
| 25OD0269CONSTRUCTION OF ROAD AND DRAINAGE SYSTEMS ALONG MALOLOS AVENUE, BAGONG BARRIO, CALOOCAN CITY (PHASE 3) | National Capital Region | Metro Manila 3rd DEO | Completed | ₱18.8M | 100% | High risk88 | —-0.032 |
| 25OD0011CONSTRUCTION OF ROAD AND DRAINAGE SYSTEM ALONG URDUJA, BARANGAY 172 (PHASE 2), CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱22M | 100% | High risk88 | —-0.031 |
| 25OD0263CONSTRUCTION OF ROADS AND DRAINAGE SYSTEMS ALONG BARANGAY 172, CALOOCAN CITY (PHASE 3) | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱9.5M | 100% | High risk86 | —-0.002 |
| 25C00003FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF AGUANG FLOOD CONTROL STRUCTURE-PHASE 3-BALER, AURORA, PROVINCE OF AURORA | Region III | Region III | On-Going | ₱189.2M | 78% | High risk78 | —-0.002 |
| 24C00181FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF DIPACULAO RIVER CONTROL STRUCTURE (PHASE 2), DIPACULAO, AURORA, PROVINCE OF AURORA | Region III | Region III | Completed | ₱193M | 100% | High risk77 | —-0.027 |
| 24C00002FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF AGUANG FLOOD CONTROL STRUCTURE, BALER AURORA (PHASE II), PROVINCE OF AURORA | Region III | Region III | Completed | ₱146.7M | 100% | High risk77 | —-0.036 |
| 23DO0017ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - TERTIARY ROADS - MARIKINA-INFANTA RD - K0069+200 - K0072+069 TANAY, RIZAL, 2ND LD | Region IV-A | Rizal 2nd DEO | Completed | ₱96.5M | 100% | High risk76 | —-0.021 |
| 16C00074CONSTRUCTION & MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS, REPLACEMENT OF PERMANENT WEAK BRIDGES-GENERAL ALEJO SANTOS BRIDGE (BO0013LZ) ALONG BALIWAG-BUSTOS ROAD, PROVINCE OF BULACAN | Region III | Region III | Completed | ₱282.7M | 100% | High risk72 | Flagged0.013 |
| 23DO0090ORGANIZATIONAL OUTCOME 2 - PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG NANGKA RIVER (STA. 0+38 | Region IV-A | Rizal 2nd DEO | Completed | ₱69.5M | 100% | High risk72 | —-0.030 |
| 20DO0033ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - MANILA EAST RD. - K0043+000 - K0044+000, K0046+400 - K0047+305 CARDONA AND MORONG, RIZAL | Region IV-A | Rizal 2nd DEO | Completed | ₱63.7M | 100% | High risk70 | —-0.055 |
| 17E00001IMPROVEMENT/WIDENING OF MARINDUQUE CIRCUM. ROAD, SECT. 1: KO070+420 KO072+380 (STA. 70+420-STA. 72+480); SECT. 2: KO092+000-KO092+977 (STA. 92+000-STA. 92+977): SECT. 3: KO098+060-KO098+980 (STA. 98+060-STA. 98+980), MARINDUQUE | Region IV-B | Region IV-B | Completed | ₱144.7M | 100% | High risk69 | —-0.017 |
| 23D00142CONSTRUCTION OF BINANGONAN - ANGONO - TAYTAY DIVERSION ROAD, RIZAL PACKAGE 2 | Region IV-A | Region IV-A | On-Going | ₱187.2M | 79% | High risk69 | —-0.017 |
| 17CD0158CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG STA. MARIA RIVER (PHASE 1), STA. MARIA, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱46.3M | 100% | High risk68 | —-0.062 |
| 23D00143CONSTRUCTION OF BINANGONAN - ANGONO - TAYTAY DIVERSION ROAD, RIZAL PACKAGE 1 | Region IV-A | Region IV-A | On-Going | ₱187.2M | 84% | High risk68 | —-0.019 |
| 23E00007SUSTAINABLE INFRASTRCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF GASAN SHORE PROTECTION/BOULEVARD, GASAN, MARINDUQUE | Region IV-B | Region IV-B | On-Going | ₱185.9M | 42% | High risk66 | Flagged0.013 |
| 24D00190BINANGONAN-ANGONO-TAYTAY-DIVERSION ROAD (COASTAL ROAD) PACKAGE 2 | Region IV-A | Region IV-A | On-Going | ₱140M | 90% | High risk65 | —-0.047 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24DN0136CONCRETING OF CITY NURSERY ROAD AT BRGY. SAN JOSE FMR ANTIPOLO CITY, RIZAL | Region IV-A | Rizal 1st DEO | On-Going | ₱37.6M | 3% | Medium risk50 | Flagged0.023 |
| 24DN0135CONCRETING OF PUROK BACONG TO PUROK TAYABASAN, BRGY. SAN JOSE FMR, BRGY. SAN JOSE ANTIPOLO CITY, RIZAL | Region IV-A | Rizal 1st DEO | On-Going | ₱10.5M | 0% | Medium risk43 | Flagged0.019 |
| 16C00074CONSTRUCTION & MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS, REPLACEMENT OF PERMANENT WEAK BRIDGES-GENERAL ALEJO SANTOS BRIDGE (BO0013LZ) ALONG BALIWAG-BUSTOS ROAD, PROVINCE OF BULACAN | Region III | Region III | Completed | ₱282.7M | 100% | High risk72 | Flagged0.013 |
| 23E00007SUSTAINABLE INFRASTRCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF GASAN SHORE PROTECTION/BOULEVARD, GASAN, MARINDUQUE | Region IV-B | Region IV-B | On-Going | ₱185.9M | 42% | High risk66 | Flagged0.013 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 22L00004CONSTRUCTION OF CONCRETE BRIDGE - DAVAO CITY COASTAL BYPASS ROAD (BAGO APLAYA - TIMES BEACH - ROXAS AVENUE - STA. ANA WHARF - R. CASTILLO), PACKAGE 1, DAVAO CITY | Region XI | Region XI | Completed | ₱2B | 100% | High risk64 | —-0.005 |
| 27 | 24D00207BINANGONAN-ANGONO-TAYTAY-DIVERSION ROAD (COASTAL ROAD) PACKAGE 3 | Region IV-A | Region IV-A | On-Going | ₱137.4M | 62% | High risk64 | —-0.038 |
| 28 | 24D00189BINANGONAN-ANGONO-TAYTAY-DIVERSION ROAD (COASTAL ROAD) PACKAGE 1 | Region IV-A | Region IV-A | On-Going | ₱137.1M | 90% | High risk64 | —-0.048 |
| 29 | 25DO0012ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - MORONG BYPASS ROAD, RIZAL | Region IV-A | Rizal 2nd DEO | On-Going | ₱92.2M | 85% | High risk63 | —-0.065 |
| 30 | 25DO0042NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE/FACILITIES - CONSTRUCTION OF DPWH OFFICE BUILDING OF RIZAL 2ND DEO, BARAS, RIZAL | Region IV-A | Rizal 2nd DEO | On-Going | ₱96.4M | 88% | High risk63 | —-0.050 |
| 31 | 24D00208BINANGONAN-ANGONO-TAYTAY-DIVERSION ROAD (COASTAL ROAD) PACKAGE 4 | Region IV-A | Region IV-A | On-Going | ₱131.7M | 61% | High risk63 | —-0.042 |
| 32 | 20K00369CLUSTER BUK-01 CONSTRUCTION OF VARIOUS FLOOD CONTROL PROJECTS IN BUKIDNON, 1. CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MALAYBALAY-GINGOOG ROAD (MALUSIKOB BR.) MALAYBALAY CITY, BUKIDNON = PHP65,000,000.00, 2. CONSTRUCTION OF FLOOD CONTROL STRUCT... | Region X | Region X | Completed | ₱185.7M | 100% | High risk63 | —-0.044 |
| 33 | 22E00055REPLACEMENT OF WEAK BRIDGES - BINAYAAN BRIDGE (B00037SY) ALONG SIBUYAN CIRCUMFERENTIAL ROAD, STA. 27+718.40 - STA. 28+226.50, ROMBLON | Region IV-B | Region IV-B | Completed | ₱221.9M | 100% | High risk63 | —-0.011 |
| 34 | 19KA0138CLUSTER 2 1.) CONSTRUCTION OF BRIDGE - MALAYBALAY-GINGOOG ROAD (BUSDI BR.), MALAYBALAY CITY 2.) CONSTRUCTION OF BRIDGE - MALAYBALAY-GINGOOG ROAD (MATILOM BR.), IMPASUG-ONG, BUKIDNON 3.) CONSTRUCTION OF BRIDGE - MALAYBALAY-GINGOOG ROAD | Region X | Bukidnon 1st DEO | Completed | ₱260.1M | 100% | High risk62 | —-0.012 |
| 35 | 21E00042ROAD WIDENING OF MARINDUQUE CIRCUMFERENTIAL ROAD, KO016+000.00-KO018+351.00, MARINDUQUE | Region IV-B | Region IV-B | Completed | ₱228.4M | 100% | High risk62 | —-0.054 |
| 36 | 25DO0076ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-JCT BATASAN-SN MATEO-RODRIGUEZ BYPASS LINK ROAD, RIZAL | Region IV-A | Rizal 2nd DEO | On-Going | ₱124.4M | 44% | High risk61 | —-0.046 |
| 37 | 20K00370CLUSTER BUK1-02 CONSTRUCTION OF VARIOUS FLOOD CONTROL PROJECTS IN BUKIDNON, 1. CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MALAYBALAY-GINGOOG ROAD (KULAMAN BR.) MALAYBALAY CITY, BUKIDNON = PHP70,000,000.00, 2. CONSTRUCTION OF FLOOD CONTROL ... | Region X | Region X | Completed | ₱127.2M | 100% | High risk61 | —-0.057 |
| 38 | 21DO0008CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - REPAIR/REHABILITATION OF MANILA EAST ROAD K0056+000 TO K0064+000 PILILLA, RIZAL | Region IV-A | Rizal 2nd DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.096 |
| 39 | 24DO0072ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-JCT BATASAN-SAN MATEO-RODRIGUEZ BYPASS LINK ROAD, RIZAL | Region IV-A | Rizal 2nd DEO | On-Going | ₱96.5M | 65% | High risk60 | —-0.048 |
| 40 | 23DO0003ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - SN MATEO - RODRIGUEZ RD - K0021+(-418) - K0022+025, K0021+(-463) - K0021+(-418), K0022+025 - K0023+000 | Region IV-A | Rizal 2nd DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.095 |
| 41 | 21DO0007CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHANGE (MVUC) AS PER R.A. 11239 - REPAIR/REHABILITATION OF SAN MATEO RODRIGUEZ ROAD, RODRIGUEZ RIZAL K0027+500 - K0034+078 | Region IV-A | Rizal 2nd DEO | Completed | ₱96.5M | 100% | High risk60 | —-0.095 |
| 42 | 23E00001NETWORK DEVELOPMENT PROGRAM- CONSTRUCTION OF BY-PASS AND DIVERSION ROADS- BOAC-MOGPOG BY-PASS ROAD, MARINDUQUE | Region IV-B | Region IV-B | On-Going | ₱102.6M | 88% | Medium risk58 | —-0.005 |
| 43 | 20L00132CONSTRUCTION OF 4 STOREY W/ BASEMENT PARKING AND ROOF DECK DPWH REGIONAL OFFICE XI, ADMINISTRATIVE, MANPOWER DEVELOPMENT AND FINANCIAL MANAGEMENT BUILDING, R. MAGSAYSAY COR. CHAVEZ STS., DAVAO CITY | Region XI | Region XI | Completed | ₱341.5M | 100% | Medium risk58 | —-0.041 |
| 44 | 20E00002CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, BOAC-MOGPOG BYPASS ROAD, MARINDUQUE | Region IV-B | Region IV-B | Completed | ₱106.1M | 100% | Medium risk57 | —-0.030 |
| 45 | 21CB0051SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - CONSTRUCTION/REHABILITATION OF ROAD SLIPS, SLOPE COLLAPSE AND LANDSLIDE - BAGAC - MARIVELES ROAD KO177+020-KO177+140, BATAAN 2ND DISTRICT | Region III | Bataan 2nd DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.088 |
| 46 | 21CB0053SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - PREVENTIVE MAINTENANCE ALONG GOV JJ LINAO ROAD (SO4822LZ) KO141+600-KO143+147, KO143+345-KO146+000, KO148+365-KO148+820, BATAAN 2ND DISTRICT | Region III | Bataan 2nd DEO | Completed | ₱96.5M | 100% | Medium risk57 | —-0.088 |
| 47 | 25CJ0010CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BAYATING RIVER (SEGMENT 5), CAMILING, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 86% | Medium risk57 | —-0.039 |
| 48 | 23C00101FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF AGUANG FLOOD CONTROL STRUCTURE, BALER, PROVINCE OF AURORA | Region III | Region III | Completed | ₱193M | 100% | Medium risk56 | —-0.057 |
| 49 | 23C00100FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF ABITONAN FLOOD CONTROL STRUCTURE, DIPACULAO, AURORA, PROVINCE OF AURORA | Region III | Region III | Completed | ₱193M | 100% | Medium risk56 | —-0.057 |
| 50 | 21CB0052SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - PREVENTIVE MAINTENANCE ALONG ROMAN EXPRESSWAY (SO1313LZ) KO119+000-KO119+200, KO119+800-KO119+923, KO120+000-KO120+665, KO121+871-KO122+067, KO122+113-KO122+531, KO125+466-KO126+18 | Region III | Bataan 2nd DEO | Completed | ₱96.5M | 100% | Medium risk55 | —-0.089 |