Contractor dossier
162 projects on file, including joint ventures this contractor is part of.
Total projects
162
Total budget
₱14B
Average progress
95.6%
Completion rate
84.0%
Average risk score
53.9
Medium risk on average, out of 100
Flagged as unusual
4
2.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 78 | ₱2.9B | 51.9 | 0 | 98.6% |
| Region IV-A | 55 | ₱3.2B | 53.4 | 2 | 91.0% |
| Region III | 13 | ₱1.8B | 62.2 | 1 | 97.2% |
| Region IV-B | 8 | ₱1.1B | 57.6 | 1 | 91.2% |
| Region X | 5 | ₱783M | 60.0 | 0 | 100.0% |
| Region XI | 3 | ₱4.1B | 61.9 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 80 | ₱4.6B | 50.7 | 1 | 98.8% |
| Roads | 47 | ₱2.8B | 52.6 | 2 | 90.5% |
| Bridges | 11 | ₱4.8B | 55.3 | 0 | 98.9% |
| Buildings and Facilities | 11 | ₱819.9M | 52.5 | 0 | 89.7% |
| GAA 2025 SSP | 7 | ₱140.5M | 88.3 | 0 | 99.9% |
| OTHER | 4 | ₱458.2M | 67.7 | 1 | 100.0% |
| Bridges, Roads | 2 | ₱374.4M | 68.5 | 0 | 81.7% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25OD0311CONSTRUCTION OF ROADS AND DRAINAGE SYSTEMS WITH BRIDGE REPLACEMENT ALONG BARANGAY 172, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱29M | 99% | High risk91 | —-0.001 |
| 25OD0293CONSTRUCTION OF ROADS AND DRAINAGE SYSTEMS ALONG NORTH DIVERSION ROAD (NDR), CALOOCAN CITY (PHASE 2) | National Capital Region | Metro Manila 3rd DEO | Completed | ₱19.3M | 100% | High risk89 | —-0.032 |
| 25OD0226CONSTRUCTION OF ROADS AND DRAINAGE SYSTEMS ALONG BARANGAYS 82, 83, 84 AND 85, MORNING BREEZE, CALOOCAN CITY (PHASE 3) | National Capital Region | Metro Manila 3rd DEO | Completed | ₱23.7M | 100% | High risk88 | —-0.030 |
| 25OD0297CONSTRUCTION OF ROAD AND DRAINAGE SYSTEM ALONG BARANGAY 172 (PHASE 2), CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱18.2M | 100% | High risk88 | —-0.031 |
| 25OD0269CONSTRUCTION OF ROAD AND DRAINAGE SYSTEMS ALONG MALOLOS AVENUE, BAGONG BARRIO, CALOOCAN CITY (PHASE 3) | National Capital Region | Metro Manila 3rd DEO | Completed | ₱18.8M | 100% | High risk88 | —-0.032 |
| 25OD0011CONSTRUCTION OF ROAD AND DRAINAGE SYSTEM ALONG URDUJA, BARANGAY 172 (PHASE 2), CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱22M | 100% | High risk88 | —-0.031 |
| 25OD0263CONSTRUCTION OF ROADS AND DRAINAGE SYSTEMS ALONG BARANGAY 172, CALOOCAN CITY (PHASE 3) | National Capital Region | Metro Manila 3rd DEO | On-Going | ₱9.5M | 100% | High risk86 | —-0.002 |
| 25C00003FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF AGUANG FLOOD CONTROL STRUCTURE-PHASE 3-BALER, AURORA, PROVINCE OF AURORA | Region III | Region III | On-Going | ₱189.2M | 78% | High risk78 | —-0.002 |
| 24C00181FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF DIPACULAO RIVER CONTROL STRUCTURE (PHASE 2), DIPACULAO, AURORA, PROVINCE OF AURORA | Region III | Region III | Completed | ₱193M | 100% | High risk77 | —-0.027 |
| 24C00002FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF AGUANG FLOOD CONTROL STRUCTURE, BALER AURORA (PHASE II), PROVINCE OF AURORA | Region III | Region III | Completed | ₱146.7M | 100% | High risk77 | —-0.036 |
| 23DO0017ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - TERTIARY ROADS - MARIKINA-INFANTA RD - K0069+200 - K0072+069 TANAY, RIZAL, 2ND LD | Region IV-A | Rizal 2nd DEO | Completed | ₱96.5M | 100% | High risk76 | —-0.021 |
| 16C00074CONSTRUCTION & MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS, REPLACEMENT OF PERMANENT WEAK BRIDGES-GENERAL ALEJO SANTOS BRIDGE (BO0013LZ) ALONG BALIWAG-BUSTOS ROAD, PROVINCE OF BULACAN | Region III | Region III | Completed | ₱282.7M | 100% | High risk72 | Flagged0.013 |
| 23DO0090ORGANIZATIONAL OUTCOME 2 - PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG NANGKA RIVER (STA. 0+38 | Region IV-A | Rizal 2nd DEO | Completed | ₱69.5M | 100% | High risk72 | —-0.030 |
| 20DO0033ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - MANILA EAST RD. - K0043+000 - K0044+000, K0046+400 - K0047+305 CARDONA AND MORONG, RIZAL | Region IV-A | Rizal 2nd DEO | Completed | ₱63.7M | 100% | High risk70 | —-0.055 |
| 17E00001IMPROVEMENT/WIDENING OF MARINDUQUE CIRCUM. ROAD, SECT. 1: KO070+420 KO072+380 (STA. 70+420-STA. 72+480); SECT. 2: KO092+000-KO092+977 (STA. 92+000-STA. 92+977): SECT. 3: KO098+060-KO098+980 (STA. 98+060-STA. 98+980), MARINDUQUE | Region IV-B | Region IV-B | Completed | ₱144.7M | 100% | High risk69 | —-0.017 |
| 23D00142CONSTRUCTION OF BINANGONAN - ANGONO - TAYTAY DIVERSION ROAD, RIZAL PACKAGE 2 | Region IV-A | Region IV-A | On-Going | ₱187.2M | 79% | High risk69 | —-0.017 |
| 17CD0158CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG STA. MARIA RIVER (PHASE 1), STA. MARIA, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱46.3M | 100% | High risk68 | —-0.062 |
| 23D00143CONSTRUCTION OF BINANGONAN - ANGONO - TAYTAY DIVERSION ROAD, RIZAL PACKAGE 1 | Region IV-A | Region IV-A | On-Going | ₱187.2M | 84% | High risk68 | —-0.019 |
| 23E00007SUSTAINABLE INFRASTRCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF GASAN SHORE PROTECTION/BOULEVARD, GASAN, MARINDUQUE | Region IV-B | Region IV-B | On-Going | ₱185.9M | 42% | High risk66 | Flagged0.013 |
| 24D00190BINANGONAN-ANGONO-TAYTAY-DIVERSION ROAD (COASTAL ROAD) PACKAGE 2 | Region IV-A | Region IV-A | On-Going | ₱140M | 90% | High risk65 | —-0.047 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24DN0136CONCRETING OF CITY NURSERY ROAD AT BRGY. SAN JOSE FMR ANTIPOLO CITY, RIZAL | Region IV-A | Rizal 1st DEO | On-Going | ₱37.6M | 3% | Medium risk50 | Flagged0.023 |
| 24DN0135CONCRETING OF PUROK BACONG TO PUROK TAYABASAN, BRGY. SAN JOSE FMR, BRGY. SAN JOSE ANTIPOLO CITY, RIZAL | Region IV-A | Rizal 1st DEO | On-Going | ₱10.5M | 0% | Medium risk43 | Flagged0.019 |
| 16C00074CONSTRUCTION & MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS, REPLACEMENT OF PERMANENT WEAK BRIDGES-GENERAL ALEJO SANTOS BRIDGE (BO0013LZ) ALONG BALIWAG-BUSTOS ROAD, PROVINCE OF BULACAN | Region III | Region III | Completed | ₱282.7M | 100% | High risk72 | Flagged0.013 |
| 23E00007SUSTAINABLE INFRASTRCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- CONST. OF GASAN SHORE PROTECTION/BOULEVARD, GASAN, MARINDUQUE | Region IV-B | Region IV-B | On-Going | ₱185.9M | 42% | High risk66 | Flagged0.013 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 19DQ0009ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS - DASMARINAS-CARMONA RD - K0038 + 700 - K0039 + 413 | Region IV-A | Region IV-A | Completed | ₱37.6M | 100% | Medium risk48 | —-0.103 |
| 102 | 18DQ0013ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - SALAWAG-PALIPARAN RD (S06036LZ) - K0028 + (-077) - K0029 + 440 | Region IV-A | Region IV-A | Completed | ₱32.5M | 100% | Medium risk48 | —-0.103 |
| 103 | 18DQ0040LOCAL PROGRAM - CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENTOF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - LOCAL ROADS ANDBRIDGES - LOCAL BRIDGES - WIDENING OF SAN LUIS BRIDGE AND FATIMABRIDGE INCLUDING APPROACHES ALONG FRANCISCO BARZAGA ROA | Region IV-A | Region IV-A | Terminated | ₱13M | 100% | Medium risk47 | —-0.012 |
| 104 | 24DN0112CONSTRUCTION OF BARANGAY SAPANG - BARANGAY MALAKABAN INTERCONNECTING ROAD BINANGONAN, RIZAL (FIRST DISTRICT) | Region IV-A | Rizal 1st DEO | On-Going | ₱38.4M | 78% | Medium risk47 | —-0.062 |
| 105 | 19DN0105CONCRETING OF ROAD LEADING TO ANTIPOLO CITY GOVERNMENT CENTER, SITIO CABADING, SAN JOSE, ANTIPOLO CITY (SECOND DISTRICT) | Region IV-A | Rizal 1st DEO | Completed | ₱28.6M | 100% | Medium risk47 | —-0.106 |
| 106 | 21DO0022LOCAL PROGRAM-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - LOCAL ROADS ANF BRIDGES - LOCAL ROADS - REHABILITATION/IMPROVEMENT OF ROAD INCLUDING DRAINAGE IMPPROVEMENT AND SLOPE PROTECTION WORKS ALONG.. | Region IV-A | Rizal 2nd DEO | Completed | ₱46.2M | 100% | Medium risk47 | —-0.104 |
| 107 | 20DO0015ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLODD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG PURAY RIVER, RODRIGUEZ, | Region IV-A | Rizal 2nd DEO | Completed | ₱33.3M | 100% | Medium risk47 | —-0.088 |
| 108 | 21EA0138REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS, DR. DAMIAN REYES RD (BOAC SIDE) - K0010+276 - K0011+014 | Region IV-B | Marinduque DEO | Completed | ₱65.9M | 100% | Medium risk47 | —-0.075 |
| 109 | 22DO0014CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - SUSTANABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES- REHABILITATION OF BANK PROTECTION STRUCTURE AT BRGY. BALITE, RODRIGUEZ | Region IV-A | Rizal 2nd DEO | Completed | ₱19.6M | 100% | Medium risk47 | —-0.089 |
| 110 | 19DN0208INSTALLATION OF STREETLIGHTS AT HAMAKA PARK TO LICO'S PARK, BARANGAY SAN ROQUE, ANTIPOLO CITY, RIZAL | Region IV-A | Rizal 1st DEO | Completed | ₱4.8M | 100% | Medium risk47 | —-0.106 |
| 111 | 22DO0021ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - RODRIGUEZ - SN JOSE RD - K0031 + 448 - K0032 + 345 | Region IV-A | Rizal 2nd DEO | Completed | ₱24.5M | 100% | Medium risk47 | —-0.104 |
| 112 | 18DO0046ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG UPPER MONTALBAN RIVER AND PURA | Region IV-A | Rizal 2nd DEO | Completed | ₱19.8M | 100% | Medium risk47 | —-0.089 |
| 113 | 20DO0039ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG MORONG RIVER, BRGY. SAN | Region IV-A | Rizal 2nd DEO | Completed | ₱29.7M | 100% | Medium risk47 | —-0.087 |
| 114 | 18DQ0003ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF REVETMENT ALONG SAMPALOC RIVER, PHASE LLL, WEST SIDE, BR | Region IV-A | Region IV-A | Completed | ₱24.4M | 100% | Medium risk47 | —-0.061 |
| 115 | 18DQ0004ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINSTMAJOR FLOODS - FLOOD MANAGEMENT PROGRAM -CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES ANDDRAINAGE SYSTEMS: CONSTRUCTION OF REVETMENT ALONG SAMPALOC RIVER,PHASE LLL, EAST SIDE | Region IV-A | Region IV-A | Completed | ₱24.4M | 100% | Medium risk47 | —-0.068 |
| 116 | 23DN0087CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - CONSTRUCTION OF FOOTBRIDGE IN FRONT OF ANTIPOLO INSTITUTE OF TECHNOLOGY, ANTIPOLO CITY (SECOND DISTRICT) | Region IV-A | Rizal 1st DEO | On-Going | ₱25.6M | 88% | Medium risk46 | —-0.056 |
| 117 | 20DO0065LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM- LOCAL ROADS AND BRIDGES- LOCAL ROADS- REHAB/IMPVT OF ROAD INCLUDING DRAINAGE IMPROVEMENT AND SLOPE PROTECTION WORKS ALONG SITIO HARANGAN, BRGY. MACABUD AND BRGY. SAN ISIDRO, MONTALBAN RIZAL | Region IV-A | Rizal 2nd DEO | Completed | ₱19.4M | 100% | Medium risk46 | —-0.106 |
| 118 | 20DO0064LOCAL PROGRAM-LOCAL INFRASTRUCTURE PROGRAM- LOCAL ROADS AND BRIDGES-LOCAL ROADS-REHAB/ IMPRVT OF ROAD INCLUDING DRAINAGE IMPRVT AND SLOPE PROTECTION WORKS ALONG SITIO PINTOR LEADING TO RIZAL PROVINCIAL SANITARY LANDFILL, BRGY. SAN ISIDR0 RODRIGUEZ RIZAL | Region IV-A | Rizal 2nd DEO | Completed | ₱19.5M | 100% | Medium risk46 | —-0.106 |
| 119 | 17OB0404CONSTRUCTION OF MULTI-LEVEL MULTI-PURPOSE BUILDING, BRGY. NORTH SIGNAL, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱19M | 100% | Medium risk46 | —-0.062 |
| 120 | 23DO0012ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - MANILA EAST RD K0067+498 - K0068+364 | Region IV-A | Rizal 2nd DEO | Completed | ₱23.5M | 100% | Medium risk46 | —-0.103 |
| 121 | 22DO0024ORGANAZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-TERTIARY ROADS-PILILLA JCT.-JALAJALA RD. K0062+600 - K0062+800, K0066+533 - K0068+067 | Region IV-A | Rizal 2nd DEO | Completed | ₱19.6M | 100% | Medium risk46 | —-0.104 |
| 122 | 24OD0135CONSTRUCTION OF ROAD AND DRAINAGE SYSTEM ALONG BRGY. 168, CELIA RD. (PHASE 2), CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱19.2M | 100% | Medium risk46 | —-0.098 |
| 123 | 17OB0370CONSTRUCTION OF TWO STOREY MULTI PURPOSE BUILDING, WITH PARK FACILITIES AT NORTH SIGNAL VILLAGE (SENIOR CITIZENS CENTER) NORTH SIGNAL TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱9.5M | 100% | Medium risk46 | —-0.073 |
| 124 | 24OD0185CONSTRUCTION OF ROAD AND DRAINAGE SYSTEM ALONG PITONG BAHAY RD., BRGY. 177 (PHASE 2), CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱14.4M | 100% | Medium risk46 | —-0.098 |
| 125 | 24OD0097CONSTRUCTION OF ROAD AND DRAINAGE SYSTEM ALONG SARANAY RD., BRGY. 171 (PHASE 3), CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱19.2M | 100% | Medium risk46 | —-0.098 |