Contractor dossier
343 projects on file, including joint ventures this contractor is part of.
Total projects
343
Total budget
₱29.6B
Average progress
98.5%
Completion rate
97.4%
Average risk score
55.0
Medium risk on average, out of 100
Flagged as unusual
10
2.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Cordillera Administrative Region | 235 | ₱19.9B | 55.1 | 3 | 99.8% |
| Region IV-A | 34 | ₱3.2B | 63.3 | 0 | 100.0% |
| Region II | 23 | ₱883.6M | 50.9 | 5 | 88.3% |
| Region I | 19 | ₱2.7B | 57.3 | 2 | 89.5% |
| Region XIII | 10 | ₱851M | 46.1 | 0 | 100.0% |
| Region IV-B | 8 | ₱885M | 53.9 | 0 | 100.0% |
| Region XI | 7 | ₱909.8M | 62.0 | 0 | 100.0% |
| Region VII | 4 | ₱22.7M | 23.6 | 0 | 100.0% |
| Region XII | 3 | ₱242.8M | 35.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 225 | ₱22.4B | 55.8 | 2 | 99.4% |
| Bridges | 59 | ₱3.9B | 55.6 | 5 | 97.0% |
| Buildings and Facilities | 26 | ₱429M | 38.3 | 1 | 96.2% |
| Flood Control and Drainage | 24 | ₱2.2B | 56.3 | 0 | 100.0% |
| OTHER | 9 | ₱578.2M | 76.9 | 2 | 88.9% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24A00673ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS, AGOO-BAGUIO CITY ROAD - K0244 + 605 - K0247 + 435 (PACKAGE 05) | Region I | Region I | On-Going | ₱81.2M | 0% | High risk87 | Flagged0.083 |
| 25BK0088CONCRETING OF GAMIS - TRES REYES FMR, BRGY. GAMIS - TRES REYES, SAGUDAY, QUIRINO | Region II | Quirino DEO | Completed | ₱14.7M | 100% | High risk85 | Flagged0.013 |
| 21DK0060REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS, WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDES, FAMY-REAL-INFANTA-DINAHICAN PORT ROAD, K0112+790-K0112+850, REAL, QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱96.5M | 100% | High risk76 | —-0.029 |
| 21DK0059REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS, WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDES, FAMY-REAL-INFANTA-DINAHICAN PORT ROAD, K0112+730-K0112+790, REAL, QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱96.5M | 100% | High risk76 | —-0.029 |
| 21DK0058REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS, WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDES, FAMY-REAL-INFANTA-DINAHICAN PORT ROAD, K0112+670-K0112+730, REAL, QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱96.5M | 100% | High risk76 | —-0.029 |
| 20DK0085RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDES ALONG MARIKINA-INFANTA ROAD (PACKAGE B) INFANTA, QUEZON, K0116+642-K0116+950 | Region IV-A | Quezon 1st DEO | Completed | ₱47.9M | 100% | High risk73 | —-0.037 |
| 20DK0084RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDES ALONG MARIKINA-INFANTA ROAD (PACKAGE A) INFANTA, QUEZON, K0116+102-K0116+293 | Region IV-A | Quezon 1st DEO | Completed | ₱47.5M | 100% | High risk73 | —-0.038 |
| 20DK0086RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSEAND LANDSLIDES ALONG MARIKINA-INFANTA ROAD (PACKAGE C) INFANTA, QUEZON, K0117+308-K0177+680 | Region IV-A | Quezon 1st DEO | Completed | ₱48.8M | 100% | High risk72 | —-0.038 |
| 20DK0087RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDES ALONG MARIKINA-INFANTA ROAD (PACKAGE D) INFANTA, QUEZON, K0118+230-K0118+500 | Region IV-A | Quezon 1st DEO | Completed | ₱48.6M | 100% | High risk72 | —-0.037 |
| 24A00674ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS, AGOO-BAGUIO CITY ROAD - K0247 + 435 - K0250 + 265 (PACKAGE 06) | Region I | Region I | On-Going | ₱79.6M | 0% | High risk69 | Flagged0.062 |
| 23E00163SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONST. OF DIKE ALONG DULANGAN RIVER, SITIO BAYANAN, NAUJAN, OR. MINDORO | Region IV-B | Region IV-B | Completed | ₱241.2M | 100% | High risk68 | —-0.039 |
| 21D00007PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG CALUMPANG RIVER, BATANGAS | Region IV-A | Region IV-A | Completed | ₱143.9M | 100% | High risk68 | —-0.057 |
| 20P00043ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - REPLACEMENT OF PERMANENT WEAK BRIDGES SOOT BRIDGE (B00989LZ) ALONG ABRA - ILOCOS NORTE ROAD | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱530.8M | 100% | High risk67 | Flagged0.026 |
| 21D00008PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAMCONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG CALUMPANG RIVER, BATANGAS (PHASE II) | Region IV-A | Region IV-A | Completed | ₱144.7M | 100% | High risk67 | —-0.055 |
| 23PA0106SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION (COMPLETION) OF DOLORES BRIDGE, CARDONA AND POBLACION, DOLORES, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱124.6M | 100% | High risk66 | —-0.031 |
| 18PA0095DREDGING / RECHANNELING OF ALONG POBLACION-MALABBAGA, LAPAZ, ABRA, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱95.2M | 100% | High risk66 | —-0.052 |
| 21L00142ROCKFALL NETTING INCLUDING IMPROVEMENT OF CRITICAL INTERSECTION AT JCT. SHRINE HILLS ALONG DAVAO CITY DIVERSION ROAD, MATINA CROSSING, DAVAO CITY | Region XI | Region XI | Completed | ₱333.7M | 100% | High risk66 | —-0.047 |
| 18PA0096DREDGING / RECHANNELING OF ALONG SAN GREGORIO-CANAN, LAPAZ, ABRA, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱95.4M | 100% | High risk65 | —-0.052 |
| 17B00024BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP)-DESIGN AND BUILD BRIDGES FOR LUZON, LA CONWAP BRIDGE AND APPROACHES PHASE 2 INCLUDING RIGHT OF WAY ACQUISITION ALONG JCT. ABBAG-GUINGIN BOUNDARY ROAD, QUIRINO | Region II | Region II | On-Going | ₱56.6M | 31% | High risk65 | Flagged0.048 |
| 17B00031BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP) 1 DESIGN AND BUILD BRIDGES FOR LUZON, NGILINAN BRIDGE AND APPROACHES PHASE 2 INCLUDING RIGHT-OF-WAY ACQUISITION ALONG NRJ VILLA SUR-SAN PEDRO CABUAN-YSMAEL DISIMUNGAL, QURINO LONE DISTRICT, QUIRINO | Region II | Region II | Completed | ₱81.9M | 100% | High risk65 | Flagged0.001 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24A00673ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS, AGOO-BAGUIO CITY ROAD - K0244 + 605 - K0247 + 435 (PACKAGE 05) | Region I | Region I | On-Going | ₱81.2M | 0% | High risk87 | Flagged0.083 |
| 24A00674ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS, AGOO-BAGUIO CITY ROAD - K0247 + 435 - K0250 + 265 (PACKAGE 06) | Region I | Region I | On-Going | ₱79.6M | 0% | High risk69 | Flagged0.062 |
| 17B00024BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP)-DESIGN AND BUILD BRIDGES FOR LUZON, LA CONWAP BRIDGE AND APPROACHES PHASE 2 INCLUDING RIGHT OF WAY ACQUISITION ALONG JCT. ABBAG-GUINGIN BOUNDARY ROAD, QUIRINO | Region II | Region II | On-Going | ₱56.6M | 31% | High risk65 | Flagged0.048 |
| 20P00043ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - REPLACEMENT OF PERMANENT WEAK BRIDGES SOOT BRIDGE (B00989LZ) ALONG ABRA - ILOCOS NORTE ROAD | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱530.8M | 100% | High risk67 | Flagged0.026 |
| 24B00159DOH - FY 2024 HEALTH CARE FACILITIES ENHANCEMENT PROGRAM (HFEP): LGU HOSPITALS: LGU HOSPITALS - QUIRINO PROVINCIAL MEDICAL CENTER | Region II | Region II | On-Going | ₱9.8M | 0% | Medium risk43 | Flagged0.020 |
| 25BK0062BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - DECURABAN BR.1 (B03242LZ) ALONG CORDON - AURORA BDRY RD (JCT. DUMABATO - AURORA BDRY), NAGTIPUNAN, QUIRINO | Region II | Quirino DEO | On-Going | ₱30.3M | 0% | Medium risk59 | Flagged0.016 |
| 25BK0088CONCRETING OF GAMIS - TRES REYES FMR, BRGY. GAMIS - TRES REYES, SAGUDAY, QUIRINO | Region II | Quirino DEO | Completed | ₱14.7M | 100% | High risk85 | Flagged0.013 |
| 22P00014ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF MISSING LINKS/NEW ROADS BAGUIO - LA TRINIDAD - ITOGON - SABLAN TUBA AND TUBLAY, KAMOG JCT. - CALOT - PAPPA - BAGONG - BALLUAY - TUEL JCT | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱287.4M | 61% | Medium risk57 | Flagged0.012 |
| 17B00031BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP) 1 DESIGN AND BUILD BRIDGES FOR LUZON, NGILINAN BRIDGE AND APPROACHES PHASE 2 INCLUDING RIGHT-OF-WAY ACQUISITION ALONG NRJ VILLA SUR-SAN PEDRO CABUAN-YSMAEL DISIMUNGAL, QURINO LONE DISTRICT, QUIRINO | Region II | Region II | Completed | ₱81.9M | 100% | High risk65 | Flagged0.001 |
| 22PA0167SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF MADEGNAC BRIDGE PHASE II-A, ALAOA, TINEG, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱46.5M | 99% | Medium risk51 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 251 | 16B00061BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP) 1 DESIGN AND BUILD BRIDGES FOR LUZON, DISINABA BRIDGE AND APPROACHES PHASE II INCLUDES RIGHT-OF-WAY ACQUISITION ALONG CORDON-AURORA BOUNDARY ROAD (ISABELA BOUNDARY JUNCTION DUMABATO), QUIRINO LONE DISTRICT | Region II | Region II | Completed | ₱11.6M | 100% | Medium risk52 | —-0.027 |
| 252 | 20E00059CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VIILP - CALAPAN NORTH ROAD (S00008MR) K0036+180.00 - K0036+302.20, CALAPAN, MINDORO ORIENTAL | Region IV-B | Region IV-B | Completed | ₱92.1M | 100% | Medium risk52 | —-0.080 |
| 253 | 20E00057CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VIILP - CALAPAN NORTH ROAD (S00008MR) K0022+500 - K0022+700; K0022+820 - K0022+857.50, CALAPAN, MINDORO ORIENTAL | Region IV-B | Region IV-B | Completed | ₱92.1M | 100% | Medium risk52 | —-0.080 |
| 254 | 20PA0090REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-TERTIARY ROADS ABRA-ILOCOS NORTE ROAD, K0448+140-K0448+260, NAGAPARAN, DANGLAS, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱49M | 100% | Medium risk52 | —-0.077 |
| 255 | 20PA0101REPLACEMENT OF PERMANENT WEAK BRIDGES, ALINAYA BRIDGE (B02224LZ) ALONG ABRA-ILOCOS SUR ROAD | Cordillera Administrative Region | Abra DEO | Completed | ₱35.8M | 100% | Medium risk52 | —-0.044 |
| 256 | 18PA0110RECHANNELING/DREDGING OF UDANGAN RIVER, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱48M | 100% | Medium risk52 | —-0.062 |
| 257 | 18PA0174CONSTRUCTION OF LAMAO BRIDGE, BUCLOC, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱46.7M | 100% | Medium risk52 | —-0.046 |
| 258 | 20MC0043CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - ALONG PACO-ROXAS-ARAKAN VALLEY - JCT DAVAO-BUKIDNON RD (S00701MN) K1640+100 TO K1640+341, PRES. ROXAS, NORTH COTABATO | Region XII | Cotabato 2nd DEO | Completed | ₱159M | 100% | Medium risk52 | —-0.066 |
| 259 | 22PA0239SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ABANG BRIDGE PHASE 2, ABANG, BUCAY, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱29.4M | 100% | Medium risk51 | —-0.047 |
| 260 | 22PA0167SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF MADEGNAC BRIDGE PHASE II-A, ALAOA, TINEG, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱46.5M | 99% | Medium risk51 | Flagged0.000 |
| 261 | 18PA0097DREDGING / RECHANNELING OF BULI RIVER, LAPAZ, ABRA, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱47.6M | 100% | Medium risk51 | —-0.062 |
| 262 | 21PA0153CONSTRUCTION OF MADEGNAK BRIDGE, TINEG, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱24.7M | 100% | Medium risk51 | —-0.040 |
| 263 | 19PA0120REPAIR/REHABILITATION/IMPROVEMENT OF LA PAZ ROAD LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱39.6M | 100% | Medium risk51 | —-0.077 |
| 264 | 20PA0111REHABILITATION AND ASPHALT OVERLAY OF LA PAZ ROAD, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱44.1M | 100% | Medium risk51 | —-0.077 |
| 265 | 19PA0096REPAIR/REHABILITATION/IMPROVEMENT OF ANGAD ROAD, ANGAD, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱9.9M | 100% | Medium risk51 | —-0.078 |
| 266 | 19PA0115ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM BRIDGE PROGRAM: REPLACEMENT OF PERMANENT WEAK BRIDGES, SADEG BRIDGE (B04732LZ), ALONG ABRA-CERVANTES ROAD | Cordillera Administrative Region | Abra DEO | Completed | ₱21.6M | 100% | Medium risk51 | —-0.046 |
| 267 | 19PA0117ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM BRIDGE PROGRAM: REPLACEMENT OF PERMANENT WEAK BRIDGES, BIWENG BRIDGE (B04733LZ), ALONG ABRA-CERVANTES ROAD | Cordillera Administrative Region | Abra DEO | Completed | ₱15.7M | 100% | Medium risk51 | —-0.045 |
| 268 | 19PA0101CONSTRUCTION OF TINEG RIVER FLOOD CONTROL (POB. DOLORES SIDE) STA. 0+500-STA. 2+550, STA. 3+100-STA. 4+248, DOLORES, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.063 |
| 269 | 19PA0006REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - PRIMARY ROADS, ABRA-KALINGA ROAD, KO451+200-KO451+270, LICUAN-BAAY, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱28M | 100% | Medium risk51 | —-0.082 |
| 270 | 19PA0108REPAIR/REHABILITATION/IMPROVEMENT OF LAMAO BRIDGE PHASE 2, BUCLOC, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱24.7M | 100% | Medium risk50 | —-0.048 |
| 271 | 19PA0007REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - PRIMARY ROADS, ABRA-KALINGA ROAD, KO437+265-K0437+295; KO437+619-K0437+660, LAGANGILANG, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱21.7M | 100% | Medium risk50 | —-0.077 |
| 272 | 19PA0095REPAIR/REHABILITATION/IMPROVEMENT OF SAN ANTONIO ROAD, BANGUED, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱24.7M | 100% | Medium risk50 | —-0.079 |
| 273 | 18PA0014REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, ABRA-KALINGA ROAD, KO437+450 - KO437+550, LAGANGILANG, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱18.8M | 100% | Medium risk50 | —-0.082 |
| 274 | 19PA0071CONSTRUCTION OF BANGLOLAO FLOOD CONTROL PROJECT STA. 62+400-STA.62+758.8 | Cordillera Administrative Region | Abra DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.065 |
| 275 | 21PA0224CONSTRUCTION OF SAN JUAN SUR FLOOD CONTROL, BARANGAY SAN JUAN SUR, MANABO, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.064 |