Contractor dossier
343 projects on file, including joint ventures this contractor is part of.
Total projects
343
Total budget
₱29.6B
Average progress
98.5%
Completion rate
97.4%
Average risk score
55.0
Medium risk on average, out of 100
Flagged as unusual
10
2.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Cordillera Administrative Region | 235 | ₱19.9B | 55.1 | 3 | 99.8% |
| Region IV-A | 34 | ₱3.2B | 63.3 | 0 | 100.0% |
| Region II | 23 | ₱883.6M | 50.9 | 5 | 88.3% |
| Region I | 19 | ₱2.7B | 57.3 | 2 | 89.5% |
| Region XIII | 10 | ₱851M | 46.1 | 0 | 100.0% |
| Region IV-B | 8 | ₱885M | 53.9 | 0 | 100.0% |
| Region XI | 7 | ₱909.8M | 62.0 | 0 | 100.0% |
| Region VII | 4 | ₱22.7M | 23.6 | 0 | 100.0% |
| Region XII | 3 | ₱242.8M | 35.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 225 | ₱22.4B | 55.8 | 2 | 99.4% |
| Bridges | 59 | ₱3.9B | 55.6 | 5 | 97.0% |
| Buildings and Facilities | 26 | ₱429M | 38.3 | 1 | 96.2% |
| Flood Control and Drainage | 24 | ₱2.2B | 56.3 | 0 | 100.0% |
| OTHER | 9 | ₱578.2M | 76.9 | 2 | 88.9% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24A00673ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS, AGOO-BAGUIO CITY ROAD - K0244 + 605 - K0247 + 435 (PACKAGE 05) | Region I | Region I | On-Going | ₱81.2M | 0% | High risk87 | Flagged0.083 |
| 25BK0088CONCRETING OF GAMIS - TRES REYES FMR, BRGY. GAMIS - TRES REYES, SAGUDAY, QUIRINO | Region II | Quirino DEO | Completed | ₱14.7M | 100% | High risk85 | Flagged0.013 |
| 21DK0060REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS, WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDES, FAMY-REAL-INFANTA-DINAHICAN PORT ROAD, K0112+790-K0112+850, REAL, QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱96.5M | 100% | High risk76 | —-0.029 |
| 21DK0059REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS, WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDES, FAMY-REAL-INFANTA-DINAHICAN PORT ROAD, K0112+730-K0112+790, REAL, QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱96.5M | 100% | High risk76 | —-0.029 |
| 21DK0058REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS, WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDES, FAMY-REAL-INFANTA-DINAHICAN PORT ROAD, K0112+670-K0112+730, REAL, QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱96.5M | 100% | High risk76 | —-0.029 |
| 20DK0085RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDES ALONG MARIKINA-INFANTA ROAD (PACKAGE B) INFANTA, QUEZON, K0116+642-K0116+950 | Region IV-A | Quezon 1st DEO | Completed | ₱47.9M | 100% | High risk73 | —-0.037 |
| 20DK0084RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDES ALONG MARIKINA-INFANTA ROAD (PACKAGE A) INFANTA, QUEZON, K0116+102-K0116+293 | Region IV-A | Quezon 1st DEO | Completed | ₱47.5M | 100% | High risk73 | —-0.038 |
| 20DK0086RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSEAND LANDSLIDES ALONG MARIKINA-INFANTA ROAD (PACKAGE C) INFANTA, QUEZON, K0117+308-K0177+680 | Region IV-A | Quezon 1st DEO | Completed | ₱48.8M | 100% | High risk72 | —-0.038 |
| 20DK0087RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDES ALONG MARIKINA-INFANTA ROAD (PACKAGE D) INFANTA, QUEZON, K0118+230-K0118+500 | Region IV-A | Quezon 1st DEO | Completed | ₱48.6M | 100% | High risk72 | —-0.037 |
| 24A00674ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS, AGOO-BAGUIO CITY ROAD - K0247 + 435 - K0250 + 265 (PACKAGE 06) | Region I | Region I | On-Going | ₱79.6M | 0% | High risk69 | Flagged0.062 |
| 23E00163SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONST. OF DIKE ALONG DULANGAN RIVER, SITIO BAYANAN, NAUJAN, OR. MINDORO | Region IV-B | Region IV-B | Completed | ₱241.2M | 100% | High risk68 | —-0.039 |
| 21D00007PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG CALUMPANG RIVER, BATANGAS | Region IV-A | Region IV-A | Completed | ₱143.9M | 100% | High risk68 | —-0.057 |
| 20P00043ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - REPLACEMENT OF PERMANENT WEAK BRIDGES SOOT BRIDGE (B00989LZ) ALONG ABRA - ILOCOS NORTE ROAD | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱530.8M | 100% | High risk67 | Flagged0.026 |
| 21D00008PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAMCONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG CALUMPANG RIVER, BATANGAS (PHASE II) | Region IV-A | Region IV-A | Completed | ₱144.7M | 100% | High risk67 | —-0.055 |
| 23PA0106SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION (COMPLETION) OF DOLORES BRIDGE, CARDONA AND POBLACION, DOLORES, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱124.6M | 100% | High risk66 | —-0.031 |
| 18PA0095DREDGING / RECHANNELING OF ALONG POBLACION-MALABBAGA, LAPAZ, ABRA, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱95.2M | 100% | High risk66 | —-0.052 |
| 21L00142ROCKFALL NETTING INCLUDING IMPROVEMENT OF CRITICAL INTERSECTION AT JCT. SHRINE HILLS ALONG DAVAO CITY DIVERSION ROAD, MATINA CROSSING, DAVAO CITY | Region XI | Region XI | Completed | ₱333.7M | 100% | High risk66 | —-0.047 |
| 18PA0096DREDGING / RECHANNELING OF ALONG SAN GREGORIO-CANAN, LAPAZ, ABRA, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱95.4M | 100% | High risk65 | —-0.052 |
| 17B00024BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP)-DESIGN AND BUILD BRIDGES FOR LUZON, LA CONWAP BRIDGE AND APPROACHES PHASE 2 INCLUDING RIGHT OF WAY ACQUISITION ALONG JCT. ABBAG-GUINGIN BOUNDARY ROAD, QUIRINO | Region II | Region II | On-Going | ₱56.6M | 31% | High risk65 | Flagged0.048 |
| 17B00031BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP) 1 DESIGN AND BUILD BRIDGES FOR LUZON, NGILINAN BRIDGE AND APPROACHES PHASE 2 INCLUDING RIGHT-OF-WAY ACQUISITION ALONG NRJ VILLA SUR-SAN PEDRO CABUAN-YSMAEL DISIMUNGAL, QURINO LONE DISTRICT, QUIRINO | Region II | Region II | Completed | ₱81.9M | 100% | High risk65 | Flagged0.001 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24A00673ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS, AGOO-BAGUIO CITY ROAD - K0244 + 605 - K0247 + 435 (PACKAGE 05) | Region I | Region I | On-Going | ₱81.2M | 0% | High risk87 | Flagged0.083 |
| 24A00674ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS, AGOO-BAGUIO CITY ROAD - K0247 + 435 - K0250 + 265 (PACKAGE 06) | Region I | Region I | On-Going | ₱79.6M | 0% | High risk69 | Flagged0.062 |
| 17B00024BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP)-DESIGN AND BUILD BRIDGES FOR LUZON, LA CONWAP BRIDGE AND APPROACHES PHASE 2 INCLUDING RIGHT OF WAY ACQUISITION ALONG JCT. ABBAG-GUINGIN BOUNDARY ROAD, QUIRINO | Region II | Region II | On-Going | ₱56.6M | 31% | High risk65 | Flagged0.048 |
| 20P00043ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - REPLACEMENT OF PERMANENT WEAK BRIDGES SOOT BRIDGE (B00989LZ) ALONG ABRA - ILOCOS NORTE ROAD | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱530.8M | 100% | High risk67 | Flagged0.026 |
| 24B00159DOH - FY 2024 HEALTH CARE FACILITIES ENHANCEMENT PROGRAM (HFEP): LGU HOSPITALS: LGU HOSPITALS - QUIRINO PROVINCIAL MEDICAL CENTER | Region II | Region II | On-Going | ₱9.8M | 0% | Medium risk43 | Flagged0.020 |
| 25BK0062BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - DECURABAN BR.1 (B03242LZ) ALONG CORDON - AURORA BDRY RD (JCT. DUMABATO - AURORA BDRY), NAGTIPUNAN, QUIRINO | Region II | Quirino DEO | On-Going | ₱30.3M | 0% | Medium risk59 | Flagged0.016 |
| 25BK0088CONCRETING OF GAMIS - TRES REYES FMR, BRGY. GAMIS - TRES REYES, SAGUDAY, QUIRINO | Region II | Quirino DEO | Completed | ₱14.7M | 100% | High risk85 | Flagged0.013 |
| 22P00014ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF MISSING LINKS/NEW ROADS BAGUIO - LA TRINIDAD - ITOGON - SABLAN TUBA AND TUBLAY, KAMOG JCT. - CALOT - PAPPA - BAGONG - BALLUAY - TUEL JCT | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱287.4M | 61% | Medium risk57 | Flagged0.012 |
| 17B00031BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP) 1 DESIGN AND BUILD BRIDGES FOR LUZON, NGILINAN BRIDGE AND APPROACHES PHASE 2 INCLUDING RIGHT-OF-WAY ACQUISITION ALONG NRJ VILLA SUR-SAN PEDRO CABUAN-YSMAEL DISIMUNGAL, QURINO LONE DISTRICT, QUIRINO | Region II | Region II | Completed | ₱81.9M | 100% | High risk65 | Flagged0.001 |
| 22PA0167SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF MADEGNAC BRIDGE PHASE II-A, ALAOA, TINEG, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱46.5M | 99% | Medium risk51 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 276 | 19PA0100CONSTRUCTION OF TINEG RIVER FLOOD CONTROL (CARDONA SIDE) STA. 0+000-STA.0+800, STA.1+000-STA.5+220, DOLORES, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.064 |
| 277 | 21PA0081REHABILITATION/IMPROVEMENT OF LAGANGILANG ACCESS ROAD, ABRA-KALINGA ROAD JUNCTION - PAGPAGATPAT, AGUET - PAGPAGATPAT, LAGANGILANG, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱19.2M | 100% | Medium risk50 | —-0.081 |
| 278 | 18PA0176CONSTRUCTION OF LUTONG BRIDGE, SALLAPADAN, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱27.8M | 100% | Medium risk50 | —-0.047 |
| 279 | 21PA0076ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE-SECONDARY ROADS, ABRA-KALINGA ROAD (K0419+484-K0421+600) | Cordillera Administrative Region | Abra DEO | Completed | ₱19.6M | 100% | Medium risk50 | —-0.079 |
| 280 | 20E00062CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VIILP - CALAPAN NORTH ROAD (S00008MR), K0043+625.00 - K0043+800.40 | Region IV-B | Region IV-B | Completed | ₱90.2M | 100% | Medium risk50 | —-0.081 |
| 281 | 18PA0015REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, ABRA-KALINGA ROAD, KO439+300 - KO439+350, LAGANGILANG, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱14.1M | 100% | Medium risk50 | —-0.080 |
| 282 | 19PA0051REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE-TERTIARY ROADS, ABRA-ILOCOS NORTE ROAD K0430+650-K0430+905; K0431+113; K0431+348; K0431+362+K0431+484, NAGAPARAN, DANGLAS, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱33.1M | 100% | Medium risk50 | —-0.078 |
| 283 | 19PA0016REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS, ABRA-ILOCOS NORTE ROAD, K0429+927-K0429+990, NAGAPARAN, DANGLAS, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱30.5M | 100% | Medium risk50 | —-0.078 |
| 284 | 22PA0355REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS -TERTIARY ROADS, ABRA-ILOCOS NORTE ROAD, K0446+200-K0446+350 | Cordillera Administrative Region | Abra DEO | Completed | ₱30.6M | 100% | Medium risk50 | —-0.079 |
| 285 | 22PA0361REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS -TERTIARY ROADS, ABRA-ILOCOS NORTE ROAD, K0449+550-K0449+700 | Cordillera Administrative Region | Abra DEO | Completed | ₱30.7M | 100% | Medium risk50 | —-0.079 |
| 286 | 22PA0360REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS -TERTIARY ROADS, ABRA-ILOCOS NORTE ROAD, K0447+820-K0447+963 | Cordillera Administrative Region | Abra DEO | Completed | ₱29.2M | 100% | Medium risk50 | —-0.079 |
| 287 | 22PA0252SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BOLINEY BRIDGE, PHASE 2, POBLACION, BOLINEY, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱29.4M | 100% | Medium risk50 | —-0.045 |
| 288 | 20PA0091REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-TERTIARY ROADS ABRA-ILOCOS NORTE ROAD, K0431+500-K0431+700, NAGAPARAN, DANGLAS, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱44.1M | 100% | Medium risk50 | —-0.072 |
| 289 | 20PA0092REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE-TERTIARY ROADS ABRA-ILOCOS NORTE ROAD, K0433+010-K0433+400, NAGAPARAN, DANGLAS, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱44.1M | 100% | Medium risk50 | —-0.077 |
| 290 | 22PA0356REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS -TERTIARY ROADS, ABRA-ILOCOS NORTE ROAD, K0446+515-K0446+700 | Cordillera Administrative Region | Abra DEO | Completed | ₱37.5M | 100% | Medium risk50 | —-0.077 |
| 291 | 23PA0188CONSTRUCTION OF HANGING BRIDGE, BARANGAYS POBLACION AND PALANG, SAN QUINTIN, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱24.7M | 94% | Medium risk50 | —-0.003 |
| 292 | 20E00058CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VIILP - CALAPAN NORTH ROAD (S00008MR) K0024+375.00 - K0024+556.10, CALAPAN, MINDORO ORIENTAL | Region IV-B | Region IV-B | Completed | ₱90.2M | 100% | Medium risk50 | —-0.081 |
| 293 | 22PA0358REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS -TERTIARY ROADS, ABRA-ILOCOS NORTE ROAD, K0447+400-K0447+470 | Cordillera Administrative Region | Abra DEO | Completed | ₱14.9M | 100% | Medium risk50 | —-0.077 |
| 294 | 22PA0359REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS -TERTIARY ROADS, ABRA-ILOCOS NORTE ROAD, K0447+614-K0447+700 | Cordillera Administrative Region | Abra DEO | Completed | ₱18M | 100% | Medium risk50 | —-0.078 |
| 295 | 22PA0357REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS -TERTIARY ROADS, ABRA-ILOCOS NORTE ROAD, K0446+837-K0446+920 | Cordillera Administrative Region | Abra DEO | Completed | ₱17.5M | 100% | Medium risk50 | —-0.078 |
| 296 | 19PA0015REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS, ABRA-ILOCOS NORTE ROAD, K0431+935-K0431+975, NAGAPARAN, DANGLAS, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱25.9M | 100% | Medium risk50 | —-0.079 |
| 297 | 18B00068PROPOSED CONSTRUCTION OF REGIONAL EVACUATION CENTER, BRGY. ZAMORA, CABARROGUIS, PROVINCE OF QUIRINO | Region II | Region II | Completed | ₱33.7M | 100% | Medium risk49 | —-0.069 |
| 298 | 21NG0105CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ALONG SURIGAO-AGUSAN WEST COASTAL ROAD STA. 29+072 - STA. 29+222.68, MALIMONO, SURIGAO DEL NORTE/MALIMONO, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱92.7M | 100% | Medium risk49 | —-0.063 |
| 299 | 21NG0098CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ALONG SURIGAO-AGUSAN WEST COASTAL ROAD - STA.36+430 - STA.36+685.8 / MALIMONO, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱92.7M | 100% | Medium risk49 | —-0.063 |
| 300 | 21NG0099CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE ALONG SURIGAO-AGUSAN WEST COASTAL ROAD - STA.42+200 - STA.42+320 / MALIMONO, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱92.7M | 100% | Medium risk49 | —-0.063 |