343 projects on file, including joint ventures this contractor is part of.
Total projects
343
Total budget
₱29.6B
Average progress
98.5%
Completion rate
97.4%
Average risk score
55.0
Medium risk on average, out of 100
Flagged as unusual
10
2.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Cordillera Administrative Region | 235 | ₱19.9B | 55.1 | 3 | 99.8% |
| Region IV-A | 34 | ₱3.2B | 63.3 | 0 | 100.0% |
| Region II | 23 | ₱883.6M | 50.9 | 5 | 88.3% |
| Region I | 19 | ₱2.7B | 57.3 | 2 | 89.5% |
| Region XIII | 10 | ₱851M | 46.1 | 0 | 100.0% |
| Region IV-B | 8 | ₱885M | 53.9 | 0 | 100.0% |
| Region XI | 7 | ₱909.8M | 62.0 | 0 | 100.0% |
| Region VII | 4 | ₱22.7M | 23.6 | 0 | 100.0% |
| Region XII | 3 | ₱242.8M | 35.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 225 | ₱22.4B | 55.8 | 2 | 99.4% |
| Bridges | 59 | ₱3.9B | 55.6 | 5 | 97.0% |
| Buildings and Facilities | 26 | ₱429M | 38.3 | 1 | 96.2% |
| Flood Control and Drainage | 24 | ₱2.2B | 56.3 | 0 | 100.0% |
| OTHER | 9 | ₱578.2M | 76.9 | 2 | 88.9% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24A00673ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS, AGOO-BAGUIO CITY ROAD - K0244 + 605 - K0247 + 435 (PACKAGE 05) | Region I | Region I | On-Going | ₱81.2M | 0% | High risk87 | Flagged0.083 |
| 25BK0088CONCRETING OF GAMIS - TRES REYES FMR, BRGY. GAMIS - TRES REYES, SAGUDAY, QUIRINO | Region II | Quirino DEO | Completed | ₱14.7M | 100% | High risk85 | Flagged0.013 |
| 21DK0060REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS, WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDES, FAMY-REAL-INFANTA-DINAHICAN PORT ROAD, K0112+790-K0112+850, REAL, QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱96.5M | 100% | High risk76 | —-0.029 |
| 21DK0059REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS, WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDES, FAMY-REAL-INFANTA-DINAHICAN PORT ROAD, K0112+730-K0112+790, REAL, QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱96.5M | 100% | High risk76 | —-0.029 |
| 21DK0058REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS, WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDES, FAMY-REAL-INFANTA-DINAHICAN PORT ROAD, K0112+670-K0112+730, REAL, QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱96.5M | 100% | High risk76 | —-0.029 |
| 20DK0085RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDES ALONG MARIKINA-INFANTA ROAD (PACKAGE B) INFANTA, QUEZON, K0116+642-K0116+950 | Region IV-A | Quezon 1st DEO | Completed | ₱47.9M | 100% | High risk73 | —-0.037 |
| 20DK0084RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDES ALONG MARIKINA-INFANTA ROAD (PACKAGE A) INFANTA, QUEZON, K0116+102-K0116+293 | Region IV-A | Quezon 1st DEO | Completed | ₱47.5M | 100% | High risk73 | —-0.038 |
| 20DK0086RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSEAND LANDSLIDES ALONG MARIKINA-INFANTA ROAD (PACKAGE C) INFANTA, QUEZON, K0117+308-K0177+680 | Region IV-A | Quezon 1st DEO | Completed | ₱48.8M | 100% | High risk72 | —-0.038 |
| 20DK0087RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDES ALONG MARIKINA-INFANTA ROAD (PACKAGE D) INFANTA, QUEZON, K0118+230-K0118+500 | Region IV-A | Quezon 1st DEO | Completed | ₱48.6M | 100% | High risk72 | —-0.037 |
| 24A00674ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS, AGOO-BAGUIO CITY ROAD - K0247 + 435 - K0250 + 265 (PACKAGE 06) | Region I | Region I | On-Going | ₱79.6M | 0% | High risk69 | Flagged0.062 |
| 23E00163SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONST. OF DIKE ALONG DULANGAN RIVER, SITIO BAYANAN, NAUJAN, OR. MINDORO | Region IV-B | Region IV-B | Completed | ₱241.2M | 100% | High risk68 | —-0.039 |
| 21D00007PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG CALUMPANG RIVER, BATANGAS | Region IV-A | Region IV-A | Completed | ₱143.9M | 100% | High risk68 | —-0.057 |
| 20P00043ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - REPLACEMENT OF PERMANENT WEAK BRIDGES SOOT BRIDGE (B00989LZ) ALONG ABRA - ILOCOS NORTE ROAD | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱530.8M | 100% | High risk67 | Flagged0.026 |
| 21D00008PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAMCONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG CALUMPANG RIVER, BATANGAS (PHASE II) | Region IV-A | Region IV-A | Completed | ₱144.7M | 100% | High risk67 | —-0.055 |
| 23PA0106SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION (COMPLETION) OF DOLORES BRIDGE, CARDONA AND POBLACION, DOLORES, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱124.6M | 100% | High risk66 | —-0.031 |
| 18PA0095DREDGING / RECHANNELING OF ALONG POBLACION-MALABBAGA, LAPAZ, ABRA, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱95.2M | 100% | High risk66 | —-0.052 |
| 21L00142ROCKFALL NETTING INCLUDING IMPROVEMENT OF CRITICAL INTERSECTION AT JCT. SHRINE HILLS ALONG DAVAO CITY DIVERSION ROAD, MATINA CROSSING, DAVAO CITY | Region XI | Region XI | Completed | ₱333.7M | 100% | High risk66 | —-0.047 |
| 18PA0096DREDGING / RECHANNELING OF ALONG SAN GREGORIO-CANAN, LAPAZ, ABRA, LA PAZ, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱95.4M | 100% | High risk65 | —-0.052 |
| 17B00024BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP)-DESIGN AND BUILD BRIDGES FOR LUZON, LA CONWAP BRIDGE AND APPROACHES PHASE 2 INCLUDING RIGHT OF WAY ACQUISITION ALONG JCT. ABBAG-GUINGIN BOUNDARY ROAD, QUIRINO | Region II | Region II | On-Going | ₱56.6M | 31% | High risk65 | Flagged0.048 |
| 17B00031BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP) 1 DESIGN AND BUILD BRIDGES FOR LUZON, NGILINAN BRIDGE AND APPROACHES PHASE 2 INCLUDING RIGHT-OF-WAY ACQUISITION ALONG NRJ VILLA SUR-SAN PEDRO CABUAN-YSMAEL DISIMUNGAL, QURINO LONE DISTRICT, QUIRINO | Region II | Region II | Completed | ₱81.9M | 100% | High risk65 | Flagged0.001 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24A00673ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS, AGOO-BAGUIO CITY ROAD - K0244 + 605 - K0247 + 435 (PACKAGE 05) | Region I | Region I | On-Going | ₱81.2M | 0% | High risk87 | Flagged0.083 |
| 24A00674ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS, AGOO-BAGUIO CITY ROAD - K0247 + 435 - K0250 + 265 (PACKAGE 06) | Region I | Region I | On-Going | ₱79.6M | 0% | High risk69 | Flagged0.062 |
| 17B00024BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP)-DESIGN AND BUILD BRIDGES FOR LUZON, LA CONWAP BRIDGE AND APPROACHES PHASE 2 INCLUDING RIGHT OF WAY ACQUISITION ALONG JCT. ABBAG-GUINGIN BOUNDARY ROAD, QUIRINO | Region II | Region II | On-Going | ₱56.6M | 31% | High risk65 | Flagged0.048 |
| 20P00043ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - REPLACEMENT OF PERMANENT WEAK BRIDGES SOOT BRIDGE (B00989LZ) ALONG ABRA - ILOCOS NORTE ROAD | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱530.8M | 100% | High risk67 | Flagged0.026 |
| 24B00159DOH - FY 2024 HEALTH CARE FACILITIES ENHANCEMENT PROGRAM (HFEP): LGU HOSPITALS: LGU HOSPITALS - QUIRINO PROVINCIAL MEDICAL CENTER | Region II | Region II | On-Going | ₱9.8M | 0% | Medium risk43 | Flagged0.020 |
| 25BK0062BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - DECURABAN BR.1 (B03242LZ) ALONG CORDON - AURORA BDRY RD (JCT. DUMABATO - AURORA BDRY), NAGTIPUNAN, QUIRINO | Region II | Quirino DEO | On-Going | ₱30.3M | 0% | Medium risk59 | Flagged0.016 |
| 25BK0088CONCRETING OF GAMIS - TRES REYES FMR, BRGY. GAMIS - TRES REYES, SAGUDAY, QUIRINO | Region II | Quirino DEO | Completed | ₱14.7M | 100% | High risk85 | Flagged0.013 |
| 22P00014ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF MISSING LINKS/NEW ROADS BAGUIO - LA TRINIDAD - ITOGON - SABLAN TUBA AND TUBLAY, KAMOG JCT. - CALOT - PAPPA - BAGONG - BALLUAY - TUEL JCT | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱287.4M | 61% | Medium risk57 | Flagged0.012 |
| 17B00031BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP) 1 DESIGN AND BUILD BRIDGES FOR LUZON, NGILINAN BRIDGE AND APPROACHES PHASE 2 INCLUDING RIGHT-OF-WAY ACQUISITION ALONG NRJ VILLA SUR-SAN PEDRO CABUAN-YSMAEL DISIMUNGAL, QURINO LONE DISTRICT, QUIRINO | Region II | Region II | Completed | ₱81.9M | 100% | High risk65 | Flagged0.001 |
| 22PA0167SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF MADEGNAC BRIDGE PHASE II-A, ALAOA, TINEG, ABRA | Cordillera Administrative Region | Abra DEO | On-Going | ₱46.5M | 99% | Medium risk51 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 21DK0075REHABILITATION/ RECONSTRUCTION OF ROADS, WITH SLIPS SLOPE COLLAPSE AND LANDSLIDE, TERTIARY ROADS MARIKINA-INFANTA ROAD, K0109+430-K0109+624, INFANTA, QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.093 |
| 77 | 21DK0073REHABILITATION/ RECONSTRUCTION OF ROADS, WITH SLIPS SLOPE COLLAPSE AND LANDSLIDE, TERTIARY ROADS MARIKINA-INFANTA ROAD, K0108+446-K0108+920, INFANTA, QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.093 |
| 78 | 22DK0002ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS MARIKINA-INFANTA RD - K0112 + 105 - K0112 + 210 | Region IV-A | Quezon 1st DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.095 |
| 79 | 22P00081MT. PROV - CAGAYAN VIA TABUK - ENRILE RD - KO406+746 - KO406+941SADANGA, MT. PROVINCE | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱241.3M | 100% | Medium risk60 | —-0.042 |
| 80 | 21DK0074REHABILITATION/ RECONSTRUCTION OF ROADS, WITH SLIPS SLOPE COLLAPSE AND LANDSLIDE, TERTIARY ROADS MARIKINA-INFANTA ROAD, K0109+000-K0109+140, INFANTA, QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.093 |
| 81 | 22DK0004ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS MARIKINA-INFANTA RD - K0116 + 300 - K0116 + 400 | Region IV-A | Quezon 1st DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.095 |
| 82 | 22DK0003ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS MARIKINA-INFANTA RD - K0114 + 610 - K0114 + 650 | Region IV-A | Quezon 1st DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.095 |
| 83 | 22DK0100ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - MARIKINA-INFANTA RD - K0100+850 - K0101+000 | Region IV-A | Quezon 1st DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.095 |
| 84 | 22DK0011ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS MARIKINA-INFANTA RD - K0112 + 308 - K0112 + 350 | Region IV-A | Quezon 1st DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.095 |
| 85 | 22DK0007ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - TERTIARY ROADS MARIKINA-INFANTA RD - K0120 + 121 - K0120 + 200 | Region IV-A | Quezon 1st DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.095 |
| 86 | 22P00070MT PROV - CAGAYAN VIA TABUK - ENRILE RD, K0406+453 - KO406+692SADANGA, MT. PROVINCE | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱289.5M | 100% | Medium risk60 | —-0.036 |
| 87 | 21DK0136REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS MARIKINA-INFANTA RD - K0111+490-K0111+563 | Region IV-A | Quezon 1st DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.093 |
| 88 | 21DK0134REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS MARIKINA-INFANTA RD - K0110+440-K0110+555 | Region IV-A | Quezon 1st DEO | Completed | ₱96.5M | 100% | Medium risk60 | —-0.093 |
| 89 | 20PL0095MT. PROVINCE BOUNDARY-CALANAN-PINUKPUK-ABBUT ROAD, K0529+104-K0529+192, PINUKPUK, KALINGA | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱96M | 100% | Medium risk60 | —-0.072 |
| 90 | 18PA0009REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, ABRA KALINGA ROAD K0469+400-K0469+950, ABRA-KALINGA ROAD, KO469+400 - KO469+950, BAAY-LICUAN, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱91.8M | 100% | Medium risk60 | —-0.073 |
| 91 | 20PL0096MT. PROVINCE BOUNDARY-CALANAN-PINUKPUK-ABBUT ROAD, K0492+136-K0492+320, TABUK CITY, KALINGA | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱96M | 100% | Medium risk59 | —-0.072 |
| 92 | 20PL0097MT. PROVINCE BOUNDARY-CALANAN-PINUKPUK-ABBUT ROAD, K0492+320-K0492+572, TABUK CITY, KALINGA | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱96M | 100% | Medium risk59 | —-0.072 |
| 93 | 20PL0060ASSET PRESERVATION - RECONSTRUCTION/REHABILITATION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS ALONG MT. PROVINCE BOUNDARY-CALANAN-PINUKPUK-ABBUT ROAD (CAGALUAN-CALANAN SECTION), K0481+861-K0481+901, TABUK CITY, KALINGA | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱96M | 100% | Medium risk59 | —-0.074 |
| 94 | 21PA0276REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS, ABRA-KALINGA ROAD K0467+000-K0468+000, LICUAN-BAAY, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱95.5M | 100% | Medium risk59 | —-0.073 |
| 95 | 22P00078JCT TALUBIN-BARLIG-NATONIN-PARACELIS-CALACCAD RD - K0402 + 323 - K0408 + 741, K0408 + 939 - K0409 + 040, K0409 + 090, - K0410 + 816, K0410 + 942 - K0416 + 126, K0416 + 301 - K0418 + 000BARLIG, MT. PROVINCE | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱241.3M | 100% | Medium risk59 | —-0.041 |
| 96 | 22P00077JCT TALUBIN-BARLIG-NATONIN-PARACELIS-CALACCAD RD - K0438 + 000 - K0444 + 150, K0444 + 220 - K0453 + 800NATONIN, MT. PROVINCE | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱241.3M | 100% | Medium risk59 | —-0.042 |
| 97 | 22P00076JCT TALUBIN-BARLIG-NATONIN-PARACELIS-CALACCAD RD - K0388 + (-1036) - K0399 + 280, K0399 + 362 - K0399 + 504, K0399 + 546 - K0402 + 323BARLIG, MT. PROVINCE | Cordillera Administrative Region | Cordillera Administrative Region | Completed | ₱241.3M | 100% | Medium risk59 | —-0.043 |
| 98 | 21PA0278REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS-SECONDARY ROADS, ABRA-KALINGA ROAD K0455+100-K0456+600, LICUAN-BAAY, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱95.5M | 100% | Medium risk59 | —-0.072 |
| 99 | 18PA0024REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, ABRA ILOCOS NORTE ROAD K0426+500-K0426+700; K0432+865-K0432+1000; K0433+347-K0433+500; K0434+024-K0434+100, DANGLAS, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱93.2M | 100% | Medium risk59 | —-0.069 |
| 100 | 18PA0019REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE, ABRA ILOCOS NORTE ROAD, K0431+700-K0432+100, DANGLAS, ABRA | Cordillera Administrative Region | Abra DEO | Completed | ₱93.4M | 100% | Medium risk59 | —-0.069 |