Opening the dossier…
Opening the dossier…
Contractor dossier
377 projects on file, including joint ventures this contractor is part of.
Total projects
377
Total budget
₱16.2B
Average progress
99.1%
Completion rate
95.0%
Average risk score
49.0
Medium risk on average, out of 100
Flagged as unusual
2
0.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 169 | ₱4.8B | 46.5 | 1 | 99.5% |
| Region IV-A | 119 | ₱5B | 51.4 | 0 | 98.1% |
| Cordillera Administrative Region | 32 | ₱2B | 53.5 | 0 | 99.8% |
| Region I | 20 | ₱2.9B | 52.8 | 0 | 99.9% |
| Region III | 18 | ₱719M | 41.9 | 0 | 100.0% |
| Region VI | 6 | ₱86.4M | 47.2 | 0 | 100.0% |
| Region IV-B | 5 | ₱235.1M | 55.5 | 0 | 96.6% |
| Region II | 3 | ₱46.9M | 47.2 | 0 | 100.0% |
| Negros Island Region | 2 | ₱63.3M | 45.1 | 0 | 100.0% |
| Central Office | 1 | ₱72.1M | 72.8 | 0 | 100.0% |
| Region XI | 1 | ₱291M | 66.0 | 1 | 100.0% |
| Region XIII | 1 | ₱18.9M | 38.7 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 350 | ₱15.4B | 48.5 | 1 | 99.3% |
| Buildings and Facilities | 10 | ₱152.3M | 50.1 | 0 | 100.0% |
| Flood Control and Drainage | 10 | ₱261.8M | 48.5 | 0 | 100.0% |
| GAA 2025 OO-1 | 3 | ₱109.2M | 88.8 | 1 | 70.1% |
| OTHER | 2 | ₱29.8M | 58.6 | 0 | 100.0% |
| Bridges, Roads | 1 | ₱144.7M | 66.5 | 0 | 100.0% |
| Bridges | 1 | ₱86.8M | 55.1 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DH0025PREVENTIVE MAINTENANCE-SECONDARY ROADS CALAMBA-STA. CRUZ-FAMY JCT RD-K0105+740-K0106+054, PANGIL, LAGUNA | Region IV-A | Laguna 1st DEO | Completed | ₱20.2M | 100% | High risk89 | —-0.038 |
| 25OE0019PREVENTIVE MAINTENANCE - TERTIARY ROADS - E QUINTOS ST - K0009 + 659 - K0010 + 580 | National Capital Region | North Manila DEO | On-Going | ₱40.8M | 10% | High risk89 | Flagged0.005 |
| 25ED0151PREVENTIVE MAINTENANCE ALONG CALAPAN NORTH ROAD - K0037+000 - K0039+000, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱48.2M | 100% | High risk88 | —-0.025 |
| 20C00050REHABILITATION OF PAMPANGA RIVER (INLCUDING PULO) AT ARAYAT AND MACABEBE, PAMPANGA, PROVINCE OF PAMPANGA | Central Office | Flood Control Management Cluster | On-Going | ₱72.1M | 100% | High risk73 | —-0.022 |
| 21C00039CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONST./IMPR'VT. OF VARIOUS INFRASTRUCTURE IN SUPPORT OF NAT'L. SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM-TIKAS) CONST. OF REGIONAL CRIME LABORATORY OFFICE 3, CAMP CAPT. JULIAN OLIVAS, | Region III | Region III | Completed | ₱24.1M | 100% | High risk72 | —-0.069 |
| 25DK0057ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE SECONDARY ROADS FAMY-REAL-INFANTA-DINAHICAN PORT RD K0147+000 - K0149+636 | Region IV-A | Quezon 1st DEO | On-Going | ₱76.6M | 80% | High risk70 | —-0.040 |
| 22CC0161INSTALLATION & FURNISHING OF SAFETY DEVICES, SOLAR STUDS AND PAVEMENT MARKINGS ALONG GEN. ALEJO SANTOS HIGHWAY, K0051+103 - K0052+126, BALIUAG-CANDABA RD., K0052+(-1570) - K0057+350, BALIUAG-BUSTOS RD., K0051+(-103) - K0052+126, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱46.3M | 100% | High risk69 | —-0.067 |
| 17DM0111ASSET PRESERVATION OF NATIONAL ROADS - PREVENTIVE MAINTENANCE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT - 4 (HDM-4) (INTERMITTENT SECTIONS) - NATIONAL ARTERIAL ROADS, A. GUMACA- PITOGO - MULANAY - SAN NARCISO ROAD, K0290+000 | Region IV-A | Quezon 3rd DEO | Completed | ₱80M | 100% | High risk69 | —-0.008 |
| 17DM0112ASSET PRESERVATION OF NATIONAL ROADS - PREVENTIVE MAINTENANCE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT - 4 (HDM-4) (INTERMITTENT SECTIONS) - NATIONAL SECONDARY ROADS, A. LOPEZ-BUENAVISTA ROAD,K0245+600 - K0249+181 B. MULANA | Region IV-A | Quezon 3rd DEO | Completed | ₱60M | 100% | High risk68 | —-0.011 |
| 24DG0016PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY-TAG-TAAL LAKE RD KOO57+(-1209)-K0057+(-403) | Region IV-A | Cavite 2nd DEO | Completed | ₱19.6M | 100% | High risk67 | —-0.040 |
| 22O00099ACTIVE TRANSPORT BIKE SHARE SYSTEM AND SAFE PATHWAYS PROGRAM IN METROPOLITAN AREAS - EXPANSION OF ACTIVE TRANSPORT INFRASTRUCTURE | National Capital Region | National Capital Region | Completed | ₱195.6M | 100% | High risk67 | —-0.008 |
| 21O00080IMPROVEMENT OF BUS LANES ALONG EDSA AND OTHER MAJOR THOROUGHFARES IN NATIONAL CAPITAL REGION | National Capital Region | National Capital Region | Completed | ₱144.7M | 100% | High risk67 | —-0.046 |
| 17DG0037MFO1-ASPHALT OVERLAY ALONG MAR-MAG-AMUYONG RD K0073+200-K0073+949,MAGALLANES,CAV;7TH LD | Region IV-A | Cavite 2nd DEO | Completed | ₱9.2M | 100% | High risk66 | —-0.073 |
| 22L00194UPGRADING, EXPANSION AND MAINTENANCE OF ACTIVE TRANSPORT INFRASTRUCTURE; AND ESTABLISHMENT OF END-OF-TRIP FACILITIES IN METRO DAVAO | Region XI | Region XI | Completed | ₱291M | 100% | High risk66 | Flagged0.017 |
| 25DK0072CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SOLAR STREETLIGHTS ALONG TAYABAS-MAINIT-MAUBAN RD K0141 + 000 - K0152 + 000 | Region IV-A | Quezon 1st DEO | On-Going | ₱142.6M | 32% | High risk65 | —-0.037 |
| 25DK0063CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SOLAR STREETLIGHTS ALONG LUCENA-TAYABAS-LUCBAN-SAMPALOC-MAUBAN PORT RD K0128 + 000 - K0139 + 000 | Region IV-A | Quezon 1st DEO | On-Going | ₱143.2M | 70% | High risk65 | —-0.049 |
| 20O00098METROPOLITAN BIKELANE NETWORKS: PROPOSED BIKELANE IN CIRCUMFERENTIAL ROAD 4 (C-4), FROM ROXAS BLVD. TO MONUMENTO | National Capital Region | National Capital Region | Completed | ₱129.3M | 100% | High risk65 | —-0.020 |
| 17DC0153ASPHALT OVERLAY ALONG TALISAY-LAUREL-AGONCILLO ROAD, K0093+500 TO K0096+180 | Region IV-A | Batangas 3rd DEO | Completed | ₱15M | 100% | High risk64 | —-0.023 |
| 20O00097METROPOLITAN BIKELANE NETWORKS: PROPOSED BIKELANE FROM CIRCUMFERENTIAL ROAD 5 (C-5): NLEX KARUHATAN LINK TO C-5 ROAD EXTENSION | National Capital Region | National Capital Region | Completed | ₱129.3M | 100% | High risk64 | —-0.021 |
| 20O00096METROPOLITAN BIKELANE NETWORKS: PROPOSED BIKE SHARE SYSTEM TO EDSA | National Capital Region | National Capital Region | Completed | ₱117.2M | 100% | High risk64 | —-0.023 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 22L00194UPGRADING, EXPANSION AND MAINTENANCE OF ACTIVE TRANSPORT INFRASTRUCTURE; AND ESTABLISHMENT OF END-OF-TRIP FACILITIES IN METRO DAVAO | Region XI | Region XI | Completed | ₱291M | 100% | High risk66 | Flagged0.017 |
| 25OE0019PREVENTIVE MAINTENANCE - TERTIARY ROADS - E QUINTOS ST - K0009 + 659 - K0010 + 580 | National Capital Region | North Manila DEO | On-Going | ₱40.8M | 10% | High risk89 | Flagged0.005 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25DH0025PREVENTIVE MAINTENANCE-SECONDARY ROADS CALAMBA-STA. CRUZ-FAMY JCT RD-K0105+740-K0106+054, PANGIL, LAGUNA | Region IV-A | Laguna 1st DEO | Completed | ₱20.2M | 100% | High risk89 | —-0.038 |
| 2 | 25OE0019PREVENTIVE MAINTENANCE - TERTIARY ROADS - E QUINTOS ST - K0009 + 659 - K0010 + 580 | National Capital Region | North Manila DEO | On-Going | ₱40.8M | 10% | High risk89 | Flagged0.005 |
| 3 | 25ED0151PREVENTIVE MAINTENANCE ALONG CALAPAN NORTH ROAD - K0037+000 - K0039+000, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | Completed | ₱48.2M | 100% | High risk88 | —-0.025 |
| 4 | 20C00050REHABILITATION OF PAMPANGA RIVER (INLCUDING PULO) AT ARAYAT AND MACABEBE, PAMPANGA, PROVINCE OF PAMPANGA | Central Office | Flood Control Management Cluster | On-Going | ₱72.1M | 100% | High risk73 | —-0.022 |
| 5 | 21C00039CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONST./IMPR'VT. OF VARIOUS INFRASTRUCTURE IN SUPPORT OF NAT'L. SECURITY (TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM-TIKAS) CONST. OF REGIONAL CRIME LABORATORY OFFICE 3, CAMP CAPT. JULIAN OLIVAS, | Region III | Region III | Completed | ₱24.1M | 100% | High risk72 | —-0.069 |
| 6 | 25DK0057ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE SECONDARY ROADS FAMY-REAL-INFANTA-DINAHICAN PORT RD K0147+000 - K0149+636 | Region IV-A | Quezon 1st DEO | On-Going | ₱76.6M | 80% | High risk70 | —-0.040 |
| 7 | 22CC0161INSTALLATION & FURNISHING OF SAFETY DEVICES, SOLAR STUDS AND PAVEMENT MARKINGS ALONG GEN. ALEJO SANTOS HIGHWAY, K0051+103 - K0052+126, BALIUAG-CANDABA RD., K0052+(-1570) - K0057+350, BALIUAG-BUSTOS RD., K0051+(-103) - K0052+126, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱46.3M | 100% | High risk69 | —-0.067 |
| 8 | 17DM0111ASSET PRESERVATION OF NATIONAL ROADS - PREVENTIVE MAINTENANCE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT - 4 (HDM-4) (INTERMITTENT SECTIONS) - NATIONAL ARTERIAL ROADS, A. GUMACA- PITOGO - MULANAY - SAN NARCISO ROAD, K0290+000 | Region IV-A | Quezon 3rd DEO | Completed | ₱80M | 100% | High risk69 | —-0.008 |
| 9 | 17DM0112ASSET PRESERVATION OF NATIONAL ROADS - PREVENTIVE MAINTENANCE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT - 4 (HDM-4) (INTERMITTENT SECTIONS) - NATIONAL SECONDARY ROADS, A. LOPEZ-BUENAVISTA ROAD,K0245+600 - K0249+181 B. MULANA | Region IV-A | Quezon 3rd DEO | Completed | ₱60M | 100% | High risk68 | —-0.011 |
| 10 | 24DG0016PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY-TAG-TAAL LAKE RD KOO57+(-1209)-K0057+(-403) | Region IV-A | Cavite 2nd DEO | Completed | ₱19.6M | 100% | High risk67 | —-0.040 |
| 11 | 22O00099ACTIVE TRANSPORT BIKE SHARE SYSTEM AND SAFE PATHWAYS PROGRAM IN METROPOLITAN AREAS - EXPANSION OF ACTIVE TRANSPORT INFRASTRUCTURE | National Capital Region | National Capital Region | Completed | ₱195.6M | 100% | High risk67 | —-0.008 |
| 12 | 21O00080IMPROVEMENT OF BUS LANES ALONG EDSA AND OTHER MAJOR THOROUGHFARES IN NATIONAL CAPITAL REGION | National Capital Region | National Capital Region | Completed | ₱144.7M | 100% | High risk67 | —-0.046 |
| 13 | 17DG0037MFO1-ASPHALT OVERLAY ALONG MAR-MAG-AMUYONG RD K0073+200-K0073+949,MAGALLANES,CAV;7TH LD | Region IV-A | Cavite 2nd DEO | Completed | ₱9.2M | 100% | High risk66 | —-0.073 |
| 14 | 22L00194UPGRADING, EXPANSION AND MAINTENANCE OF ACTIVE TRANSPORT INFRASTRUCTURE; AND ESTABLISHMENT OF END-OF-TRIP FACILITIES IN METRO DAVAO | Region XI | Region XI | Completed | ₱291M | 100% | High risk66 | Flagged0.017 |
| 15 | 25DK0072CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SOLAR STREETLIGHTS ALONG TAYABAS-MAINIT-MAUBAN RD K0141 + 000 - K0152 + 000 | Region IV-A | Quezon 1st DEO | On-Going | ₱142.6M | 32% | High risk65 | —-0.037 |
| 16 | 25DK0063CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A. 11239 - INSTALLATION OF SOLAR STREETLIGHTS ALONG LUCENA-TAYABAS-LUCBAN-SAMPALOC-MAUBAN PORT RD K0128 + 000 - K0139 + 000 | Region IV-A | Quezon 1st DEO | On-Going | ₱143.2M | 70% | High risk65 | —-0.049 |
| 17 | 20O00098METROPOLITAN BIKELANE NETWORKS: PROPOSED BIKELANE IN CIRCUMFERENTIAL ROAD 4 (C-4), FROM ROXAS BLVD. TO MONUMENTO | National Capital Region | National Capital Region | Completed | ₱129.3M | 100% | High risk65 | —-0.020 |
| 18 | 17DC0153ASPHALT OVERLAY ALONG TALISAY-LAUREL-AGONCILLO ROAD, K0093+500 TO K0096+180 | Region IV-A | Batangas 3rd DEO | Completed | ₱15M | 100% | High risk64 | —-0.023 |
| 19 | 20O00097METROPOLITAN BIKELANE NETWORKS: PROPOSED BIKELANE FROM CIRCUMFERENTIAL ROAD 5 (C-5): NLEX KARUHATAN LINK TO C-5 ROAD EXTENSION | National Capital Region | National Capital Region | Completed | ₱129.3M | 100% | High risk64 | —-0.021 |
| 20 | 20O00096METROPOLITAN BIKELANE NETWORKS: PROPOSED BIKE SHARE SYSTEM TO EDSA | National Capital Region | National Capital Region | Completed | ₱117.2M | 100% | High risk64 | —-0.023 |
| 21 | 17DO0058REPAIR/REHABILITATION/IMPROVEMENT (ASPHALT OVERLAY) OF MANILA EAST ROAD, K0059+500-K0061+350 PILILLA RIZAL | Region IV-A | Rizal 2nd DEO | Completed | ₱18.9M | 100% | High risk64 | —-0.017 |
| 22 | 17DC0152ASPHALT OVERLAY ALONG DAANG MAHARLIKA LZ, STO. TOMAS, BATANGAS K0061+162.4 TO K0062+175 | Region IV-A | Batangas 3rd DEO | Completed | ₱20M | 100% | High risk64 | —-0.017 |
| 23 | 17DC0162ASPHALT OVERLAY ALONG TANAUAN-TALISAY-TAGAYTAY ROAD, K0085+696 TO K0087+980 | Region IV-A | Batangas 3rd DEO | Completed | ₱20M | 100% | High risk64 | —-0.019 |
| 24 | 17DC0163ASPHALT OVERLAY ALONG BANAY-BANAY-MOJON ROAD, K0097+560 TO K0098+000; K0099+000 TO K0099+549; K0100+ | Region IV-A | Batangas 3rd DEO | Completed | ₱20M | 100% | High risk64 | —-0.022 |
| 25 | 17DC0154ASPHALT OVERLAY ALONG TANAUAN-TALISAY-TAGAYTAY ROAD, K0073+928 TO K0076+696 | Region IV-A | Batangas 3rd DEO | Completed | ₱20M | 100% | High risk64 | —-0.019 |