Contractor dossier
167 projects on file, including joint ventures this contractor is part of.
Total projects
167
Total budget
₱5.1B
Average progress
97.3%
Completion rate
85.0%
Average risk score
44.6
Medium risk on average, out of 100
Flagged as unusual
6
3.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 115 | ₱2.8B | 42.6 | 5 | 96.2% |
| Region X | 50 | ₱2.3B | 48.9 | 1 | 99.6% |
| Region VIII | 1 | ₱62.4M | 54.7 | 0 | 100.0% |
| Negros Island Region | 1 | ₱4.9M | 44.2 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 86 | ₱2.6B | 44.8 | 1 | 97.6% |
| Buildings and Facilities | 37 | ₱885.4M | 36.2 | 2 | 96.4% |
| Flood Control and Drainage | 19 | ₱1.1B | 47.8 | 0 | 99.3% |
| Bridges | 17 | ₱297.5M | 46.5 | 2 | 94.1% |
| OTHER | 7 | ₱212.9M | 66.9 | 1 | 98.9% |
| GAA 2025 OO-1 | 1 | ₱45.3M | 91.6 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25K00345PREVENTIVE MAINTENANCE-PRIMARY ROADS MAHARLIKA HIGHWAY( MALABANG-DOBLESTON-TUKURAN RD) - K1991 + 756 - K1993 + 336 | Region X | Region X | On-Going | ₱45.3M | 100% | High risk92 | —-0.017 |
| 24KG0045CONSTRUCTION OF MULTI-PURPOSE BUILDING (HALL OF JUSTICE) FOR THE PROVINCE OF LANAO DEL NORTE | Region X | Lanao del Norte 1st DEO | On-Going | ₱96.3M | 92% | High risk80 | Flagged0.005 |
| 21KF0009PREVENTIVE MAINTENANCE ALONG LANAO DEL NORTE INTERIOR CIRCUMFERENTIAL ROAD K1588+(-480)-K1588+(-480),K1588+(-480)-K1588+000, K1588+000-K1589+000, LANAO DEL NORTE | Region X | Lanao del Norte 1st DEO | Completed | ₱17.9M | 100% | High risk73 | —-0.038 |
| 25HN0182SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BRGY. PUNTA ENGANO (PHASE 2), LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱88.8M | 0% | High risk66 | Flagged0.005 |
| 24K00056CONST. OF FLOOD CONTROL STRUCTURE ALONG MARANDING RIVER, INCL. ROW, PACKAGE 6, LANAO DEL NORTE | Region X | Region X | On-Going | ₱157.8M | 100% | High risk65 | —-0.021 |
| 24HF0106REHABILITATION OF FLOOD CONTROL STRUCTURE AT CAMANCHILLES RIVER, BRGY. CAPT. CLAUDIO, TOLEDO CITY | Region VII | Cebu 3rd DEO | Completed | ₱94.6M | 100% | High risk65 | —-0.068 |
| 17HE0034CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS - RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, TABUNOK FLYOVER, TALISAY CITY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱23.6M | 100% | High risk64 | —-0.031 |
| 23H00077CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE FACILITY (LABANGON PUBLIC MARKET), BRGY. LABANGON, CEBU CITY, CEBU | Region VII | Region VII | On-Going | ₱140.6M | 91% | High risk64 | —-0.018 |
| 22H00024CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (CEBU PROVINCIAL GOVERNMENT CENTER), BALAMBAN, CEB | Region VII | Region VII | On-Going | ₱193M | 78% | High risk64 | Flagged0.002 |
| 22HF0104ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE ALONG TOLEDO-PINAMUNGAHAN-ALOGUINSAN-MANTALONGON RD - K0086+784 - K0087+542 | Region VII | Cebu 3rd DEO | Completed | ₱37.9M | 100% | High risk64 | —-0.031 |
| 18HN0035ROAD WIDENING - TERTIARY ROADS - M LOGARTA RD - (S00192CB) CHAINAGE 056.4 - CHAINAGE 1328, (S00194CB) CHAINAGE 000 - CHAINAGE 411, MANDAUE CITY | Region VII | Cebu 6th DEO | Completed | ₱26.5M | 100% | High risk63 | —-0.030 |
| 23HN0054CSSP: BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, BARANGAY PAGSABUNGAN, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱4.9M | 100% | High risk62 | —-0.033 |
| 20HN0056LP: LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES-LOCAL ROADS -CONCRETING OF ROAD INCLUDING DRAINAGE FACILITIES, JAYME ST., BRGY. BAKILID, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱5.6M | 100% | High risk62 | —-0.033 |
| 24KG0019CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG SAGADAN BRIDGE (B00961MN), DOWNSTREAM (R/S), BAROY, LANAO DEL NORTE | Region X | Lanao del Norte 1st DEO | Completed | ₱115.8M | 100% | High risk62 | —-0.065 |
| 25HI0106CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF ROAD LEADING TO MT. KAPAYAS, CATMON, CEBU | Region VII | Cebu 5th DEO | On-Going | ₱76.8M | 12% | High risk62 | —-0.003 |
| 23HG0055OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS, N. BACALSO AVE (CEBU SOUTH RD) - K0111+006.00 - K0111+912.00 AND K0113+905.00 - K0114+433.00 | Region VII | Cebu 2nd DEO | On-Going | ₱98M | 100% | High risk60 | —-0.040 |
| 25HH0072CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF DOÑA MODESTA BRIDGE, BARANGAY | Region VII | Cebu City DEO | On-Going | ₱66.5M | 0% | High risk60 | Flagged0.028 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HE0096CONCRETING OF BRGY. CANSUJE FMR, BRGY. CANSUJE, ARGAO, CEBU | Region VII | Cebu 2nd DEO | On-Going | ₱48.8M | 0% | Medium risk54 | Flagged0.034 |
| 23HN0165CSSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF BRIDGE, BRGY. SABANG, OLANGOISLAND TO PANGAN-AN ISLAND, LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱48.2M | 100% | Medium risk55 | Flagged0.033 |
| 25HH0072CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF DOÑA MODESTA BRIDGE, BARANGAY | Region VII | Cebu City DEO | On-Going | ₱66.5M | 0% | High risk60 | Flagged0.028 |
| 25HN0182SSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BRGY. PUNTA ENGANO (PHASE 2), LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱88.8M | 0% | High risk66 | Flagged0.005 |
| 24KG0045CONSTRUCTION OF MULTI-PURPOSE BUILDING (HALL OF JUSTICE) FOR THE PROVINCE OF LANAO DEL NORTE | Region X | Lanao del Norte 1st DEO | On-Going | ₱96.3M | 92% | High risk80 | Flagged0.005 |
| 22H00024CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (CEBU PROVINCIAL GOVERNMENT CENTER), BALAMBAN, CEB | Region VII | Region VII | On-Going | ₱193M | 78% | High risk64 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 23HH0073CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS / FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY SUBA, CEBU CITY, CEBU | Region VII | Cebu City DEO | Completed | ₱9.9M | 100% | Medium risk48 | —-0.096 |
| 52 | 21HN0074LP: LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES-MULTIPURPOSE/FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY CUBACUB, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱4.9M | 100% | Medium risk48 | —-0.096 |
| 53 | 23KG0037PREVENTIVE MAINTENANCE ALONG LINAMON-ZAMBOANGA ROAD, K1537+103-K1538+000, K1539+000-K1539+460, LINAMON, LANAO DEL NORTE | Region X | Lanao del Norte 1st DEO | Completed | ₱49M | 100% | Medium risk48 | —-0.093 |
| 54 | 23HN0026CSSP: BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE II), BARANGAY SUBANGDAKU, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱9.9M | 100% | Medium risk48 | —-0.096 |
| 55 | 21HN0054LP: LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES -MULTIPURPOSE/FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT, PHASE I), BARANGAY SUBANGDAKU, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱9.6M | 100% | Medium risk48 | —-0.093 |
| 56 | 22HF0031RETROFITTING /STRENGTHENING OF TAJAO BRIDGE (B00651CB) ALONG TOLEDO-PINAMUNGAJAN-ALOGUINSAN-MANTALONGON RD | Region VII | Cebu 3rd DEO | Completed | ₱22.2M | 100% | Medium risk48 | —-0.058 |
| 57 | 23HN0012CSSP: BIP - MULTIPURPOSE/FACILITIES TO SUPPORT SOCIAL SERVICES - IMPROVEMENT OF MULTI-PURPOSE BUILDING (COVERED COURT), COMPREHENSIVE NHS, BRGY. LOOC, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱7.9M | 100% | Medium risk48 | —-0.096 |
| 58 | 21HN0124LP:CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - LOCAL ROADS AND BRIDGES - LOCALBRIDGES - WIDENING/RETROFITTING OF OPAO BRIDGE, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱4.8M | 100% | Medium risk48 | —-0.061 |
| 59 | 21HN0023LP: LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURES -MULTIPURPOSE/FACILITIES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (DAYCARE AND TRAINING CENTER), BARANGAY BABAG, LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱9.7M | 100% | Medium risk48 | —-0.096 |
| 60 | 22KF0039CONSTRUCTION OF SLOPE PROTECTION ALONG KULASIHAN BRIDGE, STA. 0+000.00-STA. 0+280.00, KOLAMBUGAN, LANAO DEL NORTE | Region X | Lanao del Norte 1st DEO | Completed | ₱49M | 100% | Medium risk48 | —-0.081 |
| 61 | 18HE0002REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, MANANGA BR. 3 (B00037CB) ALONG CEBU SOUTH COASTAL ROAD (DESCENDING), CEBU | Region VII | Cebu 1st DEO | Completed | ₱27.9M | 100% | Medium risk48 | —-0.060 |
| 62 | 18HN0063CONSTRUCTION OF 4-STOREY, 20-CL SCHOOL BUILDING AT TAYUD ES, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱39.8M | 100% | Medium risk48 | —-0.043 |
| 63 | 20HN0104LP: LOCAL INFRASTRUCTURE PROGRAM - LOCAL ROADS AND BRIDGES - LOCAL BRIDGES - WIDENING/RETROFITTING OF OPAO BRIDGE, MANDAUE CITY | Region VII | Cebu 6th DEO | Completed | ₱4.9M | 100% | Medium risk48 | —-0.060 |
| 64 | 17HE0028CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS - REHABILITATION/MAJOR REPAIR OF PERMANENT BRDIGES, MANANGA BRIDGE 3, CEBU SOUTH COASTAL ROAD, TALISAY CITY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱4.9M | 100% | Medium risk48 | —-0.032 |
| 65 | 23HN0048CSSP: BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - IMPROVEMENT OF OPAO BRIDGE, PHASE IV, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱4.9M | 100% | Medium risk47 | —-0.057 |
| 66 | 18HN0026REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - CANSAGA BAY BR. (B00613CB) ALONG CANSAGA BAY BRIDGE, CONSOLACION | Region VII | Cebu 6th DEO | Completed | ₱19.6M | 100% | Medium risk47 | —-0.059 |
| 67 | 21HN0014LP -LOCAL INFRASTRUCTURE PROGRAM -LOCAL ROADS AND BRIDGES-LOCAL - BRIDGES - WIDENING/RETROFITTING OF OPAO BRIDGE (PHASE 2) BRGY. OPAO, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱9.4M | 100% | Medium risk47 | —-0.051 |
| 68 | 18HN0030REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES - MARCELO FERNAN VIADUCT (B00643CB) ALONG MARCELO B. FERNAN VIADUCT, MANDAUE CITY AND LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱18.5M | 100% | Medium risk47 | —-0.058 |
| 69 | 18HN0031RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES MARCELO FERNAN BR. (B00619CB) ALONG MARCELO B. FERNAN BR. AND APPROACHES, MANDAUE CITY AND LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱27.3M | 100% | Medium risk47 | —-0.059 |
| 70 | 24HE0047ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS - N BACALSO AVE (CEBU SOUTH RD) - K0054+611 - K0055+071, SIBONGA, CEBU | Region VII | Cebu 1st DEO | Completed | ₱36M | 100% | Medium risk47 | —-0.094 |
| 71 | 22HH0032OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE-TERTIARY ROADS - GOV. CUENCO AVE. - K0005+1002 - K0007+000, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱39.1M | 100% | Medium risk47 | —-0.096 |
| 72 | 24HH0064OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE - TERTIARY ROADS - B RODRIGUEZ ST- CHAINAGE 0 - CHAINAGE 496, CEBU CITY | Region VII | Cebu City DEO | On-Going | ₱42.5M | 100% | Medium risk47 | —-0.054 |
| 73 | 23HH0052OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE-PRIMARY ROADS-N BACALSO AVE (CEBU SOUTH RD)-(S00338CB) CHAINAGE 623-CHAINAGE 709, CHAINAGE 2065-CHAINAGE 2704, (S00344CB) K0005+(-454)-K0005+(-257), | Region VII | Cebu City DEO | Completed | ₱44M | 100% | Medium risk47 | —-0.096 |
| 74 | 23HH0105OO1: ENSURE SAFE AND RELIABLE NATIONAL ROADSYSTEM-ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE-SECONDARY ROADS-CEBU SOUTH COASTAL RD-(S00134CB) K0009+882-K0010+418, (S00135CB) K0010+(-417)-K0010+(-257), CEBU CITY | Region VII | Cebu City DEO | Completed | ₱42M | 100% | Medium risk47 | —-0.095 |
| 75 | 20HE0005ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION - PREVENTIVE MAINTENANCE - SECONDARY ROADS - CEBU SOUTH COASTAL RD (S00137CB) K0012+838-K0012+924, K0012+984-K0011+598 | Region VII | Cebu 1st DEO | Completed | ₱28.9M | 100% | Medium risk47 | —-0.096 |