Contractor dossier
251 projects on file, including joint ventures this contractor is part of.
Total projects
251
Total budget
₱6B
Average progress
95.4%
Completion rate
85.3%
Average risk score
42.8
Medium risk on average, out of 100
Flagged as unusual
5
2.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 220 | ₱5.1B | 43.0 | 3 | 95.0% |
| National Capital Region | 18 | ₱498.3M | 42.0 | 0 | 100.0% |
| Region III | 6 | ₱277.7M | 35.8 | 0 | 100.0% |
| Region I | 3 | ₱88.5M | 47.1 | 0 | 100.0% |
| Region V | 2 | ₱55.4M | 53.6 | 2 | 77.5% |
| Region IV-B | 1 | ₱9.2M | 31.7 | 0 | 100.0% |
| Region VI | 1 | ₱951.1K | 19.6 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 147 | ₱2.6B | 38.9 | 2 | 96.6% |
| Roads | 58 | ₱1.7B | 45.8 | 1 | 94.7% |
| Flood Control and Drainage | 26 | ₱1.5B | 50.5 | 0 | 91.0% |
| OTHER | 7 | ₱214.7M | 66.2 | 1 | 92.9% |
| Water Provision and Storage | 7 | ₱21.6M | 30.1 | 0 | 99.0% |
| Bridges | 3 | ₱13M | 31.5 | 0 | 100.0% |
| GAA 2025 SSP | 1 | ₱48M | 95.2 | 1 | 45.6% |
| GAA 2025 OO-1 | 1 | ₱5.8M | 90.1 | 0 | 100.0% |
| GAA 2025 OO-2 | 1 | ₱14.3M | 88.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DH0070CONSTRUCTION OF MULTI-PURPOSE BUILDING, BUILDING 1, PILA, LAGUNA | Region IV-A | Laguna 1st DEO | On-Going | ₱48M | 46% | High risk95 | Flagged0.010 |
| 25DH0008ROAD WIDENING-PRIMARY ROADS-CALAMBA-STA. CRUZ-FAMY JCT RD-K0084+723-K0084+794, STA. CRUZ, LAGUNA | Region IV-A | Laguna 1st DEO | On-Going | ₱5.8M | 100% | High risk90 | —-0.015 |
| 25DH0015CONSTRUCTION OF FLOOD CONTROL STRUCTURE (TUNGKOD RIVER), PAAGAHAN CIS, MABITAC, LAGUNA | Region IV-A | Laguna 1st DEO | On-Going | ₱14.3M | 100% | High risk88 | —-0.033 |
| 24DI0158REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - CALAMBA-STA CRUZ-FAMY JCT RD - K0068 + (-282) - K0069 + 098 | Region IV-A | Laguna 2nd DEO | On-Going | ₱120.5M | 50% | High risk75 | Flagged0.011 |
| 24DH0080CONSTRUCTION OF MULTI PURPOSE BUILDING (COVERED COURT) FOR BRGY. SARAY, PAKIL, LAGUNA | Region IV-A | Laguna 1st DEO | On-Going | ₱8.7M | 100% | High risk73 | —-0.014 |
| 20DI0139CONSTRUCTION OF MULTI-PURPOSE BUILDING, WOMEN'S DEVELOPMENT CENTER, CABUYAO, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱9.6M | 100% | High risk72 | —-0.015 |
| 21DI0071OFF-CARRIAGEWAY IMPROVEMENT - TERTIARY ROADS - BAY POBLACION RD - K0067 + 188 - K0067 + 570 | Region IV-A | Laguna 2nd DEO | Completed | ₱14M | 100% | High risk70 | —-0.038 |
| 21DI0076ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - MT. MAKILING ECO GARDEN RD. - K0064+080 - K0064+300, K0064+330 - K0064+440, K0064+500 - K0064+664, K0065+195 - K006 | Region IV-A | Laguna 2nd DEO | Completed | ₱51.2M | 100% | High risk70 | —-0.043 |
| 18DI0078LIP - LOCAL ROADS AND BRIDGES - LOCAL ROADS -CONSTRUCTION OF ROAD, SIDEWALK, CURVES/ GUTTER AND DRAINAGE OF BRGY. PULONG SANTA CRUZ LEADING TO INDUSTRIAL AREAS AND RELOCATION SITES (23MX6MX300M, 24 RCP), BRGY. PULONG STA. CRUZ, SANTA ROSA, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱14.9M | 100% | High risk68 | —-0.041 |
| 25DI0064CONSTRUCTION OF REVETMENT ALONG MAYAPA WATERWAYS (SITIO RIVERSIDE) CALAMBA CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱94.7M | 26% | High risk65 | —-0.025 |
| 25DI0065CONSTRUCTION OF STRUCTURE FOR RIVER PROTECTION AT SAN CRISTOBAL RIVER, BRGY. PACIANO, CALAMBA CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱94.7M | 76% | High risk65 | —-0.039 |
| 25DI0017CONSTRUCTION OF RIVER PROTECTION STRUCTURE, NEAR SAMPIRUHAN, CALAMBA CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱94M | 75% | High risk65 | —-0.037 |
| 20D00057CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION/IMPROVEMENT OF TRIBUTARY CREEK AS OUTFALL OF THE DETENTION POND AT BRGY. MAMPLASAN LEADING TO CARMONA-BIÑAN RIVER, BIÑAN CITY, LAGUNA | Region IV-A | Region IV-A | Completed | ₱115.7M | 100% | High risk65 | —-0.074 |
| 23DD0310CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), EVACUATION CENTERS/ QUARANTINE FACILITIES/ PUBLIC HEALTH FACILITIES, CONSTRUCTION OF MULTI-PURPOSE BUILDING INCLUDING FACILITIES, DOH REGION IV-A OFFICE, LIPA CITY | Region IV-A | Batangas 4th DEO | Completed | ₱144.1M | 100% | High risk65 | —-0.074 |
| 25DI0066CONSTRUCTION OF STRUCTURE FOR RIVER PROTECTION ALONG SAN JUAN RIVER, BARANDAL SIDE (NEAR HOLY GARDENS), CALAMBA CITY, LAGUNA PHASE 1 | Region IV-A | Laguna 2nd DEO | On-Going | ₱97.1M | 0% | High risk64 | —-0.018 |
| 24DH0040CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ROMELO RIVER, SINILOAN, LAGUNA | Region IV-A | Laguna 1st DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.075 |
| 24DH0029CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG INAWASAN RIVER, FAMY, LAGUNA | Region IV-A | Laguna 1st DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.078 |
| 23DD0188ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT ALONG MALAKING ILOG RIVER (LIPAHAN SECTION), SA | Region IV-A | Batangas 4th DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.077 |
| 23DD0227ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT ALONG MALAKING ILOG RIVER (TIPAZ SECTION), SAN | Region IV-A | Batangas 4th DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.078 |
| 23DH0079CONSTRUCTION OF MULTI-PURPOSE BUILDING, PILA, LAGUNA | Region IV-A | Laguna 1st DEO | Completed | ₱94.3M | 100% | High risk63 | —-0.084 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24DD0283LOCALLY-FUNDED PROJECTS, NATIONAL BUILDING PROGRAM, BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES, CONSTRUCTION OF DEPARTMENT OF HEALTH REGION 4A REGIONAL OFFICE MARAWOY, LIPA CITY, BATANGAS | Region IV-A | Batangas 4th DEO | On-Going | ₱140.4M | 12% | High risk63 | Flagged0.038 |
| 24DI0158REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - CALAMBA-STA CRUZ-FAMY JCT RD - K0068 + (-282) - K0069 + 098 | Region IV-A | Laguna 2nd DEO | On-Going | ₱120.5M | 50% | High risk75 | Flagged0.011 |
| 25DH0070CONSTRUCTION OF MULTI-PURPOSE BUILDING, BUILDING 1, PILA, LAGUNA | Region IV-A | Laguna 1st DEO | On-Going | ₱48M | 46% | High risk95 | Flagged0.010 |
| 23F00420CONVERGENCE AND SPECIAL SUPPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD AT MARAMBONG, PANDAN, CA | Region V | Region V | On-Going | ₱46.8M | 97% | Medium risk59 | Flagged0.003 |
| 24F00438CAPITAL OUTLAY-DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP)-LGU HOSPITALS-GIGMOTO DISTRICT HOSPITAL, CATANDUANES, GIGMOTO, CATANDUANES (LONE DISTRICT) | Region V | Region V | On-Going | ₱8.6M | 58% | Medium risk48 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 18DH0080ROAD CONSTRUCTION, BRGY. SAN ISIDRO, LUISIANA LAGUNA | Region IV-A | Laguna 1st DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.101 |
| 127 | 19DP0003ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - CALAMBA - STA. CRUZ - FAMY ROAD (S01706LZ) K0069 + 469 - K0071 + 760 | Region IV-A | Laguna 3rd DEO | Completed | ₱23.1M | 100% | Medium risk46 | —-0.105 |
| 128 | 19DO0018OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - TERTIARY ROADS - SAGBAT-PILILLA DIVERSION RD. - K0054+706 - K0055+200, TANAY, RIZAL | Region IV-A | Rizal 2nd DEO | Completed | ₱19.6M | 100% | Medium risk46 | —-0.102 |
| 129 | 20DI0014CONSTRUCTION OF DRAINAGE CANAL, BRGY. TRANCA, BAY, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱4.9M | 100% | Medium risk46 | —-0.089 |
| 130 | 21DH0016REPAIR/REHABILITATION OF ROAD ALONG PAETE - FAMY POBLACION ROAD, K0111 + 549 TO K0112 + 084, K0112 +104 TO K0112 + 496, K0112 + 510 TO K0112 + 901, SINILOAN, LAGUNA | Region IV-A | Laguna 1st DEO | Completed | ₱22.1M | 100% | Medium risk46 | —-0.104 |
| 131 | 19OD0105CONSTRUCTION, UPGRADING AND IMPROVEMENT OF ROAD AND DRAINAGE OF BIGNAY TO PUNTURIN BYPASS ROAD, VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱28.1M | 100% | Medium risk46 | —-0.094 |
| 132 | 18DQ0058LOCAL PROGRAM LOCAL INFRASTRUCTURE PROGRAM LOCAL ROADS AND BRIDGES LOCAL ROADS CONCRETING OF ROAD (SITIO PALIGAWANG MATANDA), BRGY. LANTIC, CARMONA, CAVITE, CONSTRUCTION OF ROAD, BRGY. LANTIC, CARMONA, CAVITE, AND WIDENING OF ROAD, BRGY, BANCAL, C | Region IV-A | Region IV-A | Completed | ₱8.9M | 100% | Medium risk46 | —-0.109 |
| 133 | 18DI0011NETWORK DEVELOPMENT - OFF CARRIAGEWAY IMPROVEMENT- PRIMARY ROADS - MANILA SOUTH RD. -K0048+700 -K0049+134, K0052+925 - K0053+162, CALAMBA CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱11.2M | 100% | Medium risk46 | —-0.110 |
| 134 | 20DH0099CONSTRUCTION OF THREE (3) STOREY, TWELVE (12) CLASSROOM SCHOOL BUILDING MAYTALANG I E/S, LUMBAN, LAGUNA | Region IV-A | Laguna 1st DEO | Completed | ₱36.5M | 100% | Medium risk46 | —-0.037 |
| 135 | 24DH0032NETWORK DEVELOPMENT-OFF CARRIAGEWAY IMPROVEMENT-PRIMARY ROADS CALAMBA-STA. CRUZ-FAMY JCT RD K0086+299-K0086+421, K0086+455-K0086+553, K0086+637-K0086+646, K0086+676-K0086+692, K0086+749-K0086+764, K0086+828-K0086+858, K0086+880-K0086+886, K0086+908-K0086+ | Region IV-A | Laguna 1st DEO | Completed | ₱10.4M | 100% | Medium risk46 | —-0.106 |
| 136 | 23DH0064CONSTRUCTION OF ROAD, BARANGAY CABANBANAN - SITIO DAANG BAKAL AND SITIO TABING ILOG, PAGSANJAN, LAGUNA | Region IV-A | Laguna 1st DEO | Completed | ₱9.8M | 100% | Medium risk46 | —-0.108 |
| 137 | 23DH0067CONSTRUCTION OF ROAD, BARANGAY BUBOY-ALIPIT, PAGSANJAN, LAGUNA | Region IV-A | Laguna 1st DEO | Completed | ₱9.9M | 100% | Medium risk46 | —-0.110 |
| 138 | 18DL0230B. LOCAL PROGRAM 2. LOCAL INFRASTRUCTURE PROGRAM B. LOCAL ROADS AND BRIDGES 1. LOCAL ROADS 2. REHABILITATION/IMPROVEMENT OF BARANGAY ROAD, BARANGAY SAN ANDRES LABAK-BARANGAY SAN ANDRES BUNDOK, ATIMONAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.103 |
| 139 | 23DH0066CONSTRUCTION OF ROADS, BARANGAY MAGDAPIO-SITIO BUROL, SITIO ILAYA, KABILANG, PAGSANJAN, LAGUNA | Region IV-A | Laguna 1st DEO | Completed | ₱9.8M | 100% | Medium risk46 | —-0.109 |
| 140 | 20DH0039REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE, COLLASE AND LANDSLIDE, SECONDARY ROADS, CALAMBA-STA CRUZ-FAMY JCT. ROAD, K0098 + 584 TO K0098 + 675, KALAYAAN, LAGUNA | Region IV-A | Laguna 1st DEO | Completed | ₱9.5M | 100% | Medium risk46 | —-0.109 |
| 141 | 23DH0062CONSTRUCTION OF ROADS, BARANGAY CALUSICHE-PUROK TRES AND PUROK UNO, PAGSANJAN, LAGUNA | Region IV-A | Laguna 1st DEO | Completed | ₱9.7M | 100% | Medium risk46 | —-0.109 |
| 142 | 23DH0063CONSTRUCTION OF ROADS, BARANGAY DINGIN-DIOWA PUROL 4 AND PUROK DOS PALADIN, PAGSANJAN, LAGUNA | Region IV-A | Laguna 1st DEO | Completed | ₱9.6M | 100% | Medium risk46 | —-0.109 |
| 143 | 23DH0065CONSTRUCTION OF ROAD, BARANGAY LAMBA-PUROK TRES, PAGSANJAN, LAGUNA | Region IV-A | Laguna 1st DEO | Completed | ₱9.7M | 100% | Medium risk46 | —-0.109 |
| 144 | 24DH0079CONSTRUCTION OF ROAD WITH BOX CULVERT, SITIO SAUDI, BARANGAY BALIAN, PANGIL, LAGUNA | Region IV-A | Laguna 1st DEO | On-Going | ₱8.4M | 38% | Medium risk46 | —-0.055 |
| 145 | 18DH0045NETWORK DEVELOPMENT, OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, IMPROVEMENT OF INTERSECTION ALONG CALAMBA-STA. CRUZ-FAMY JCT. ROAD, K0112 + 660, FAMY, LAGUNA | Region IV-A | Laguna 1st DEO | Completed | ₱9.5M | 100% | Medium risk46 | —-0.108 |
| 146 | 18DO0125CONSTRUCTION OF FOUR (4) STOREY EIGHT (8) CLASSROOM SCHOOL BUILDING AT SILANGAN ES (LABAHAN ES), SAN MATEO, RIZAL | Region IV-A | Rizal 2nd DEO | Completed | ₱25.4M | 100% | Medium risk46 | —-0.054 |
| 147 | 18OD0025IMPROVEMENT OF FLOOD CONTROL WALL ALONG PUGAD BABOY CREEK, BRGY. GEN.T. DE LEON, VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱21.5M | 100% | Medium risk46 | —-0.088 |
| 148 | 20OI0045REHABILITATION OF ROAD, BARANGAY CAA, LAS PIÑAS CITY | National Capital Region | Las Piñas-Muntinlupa DEO | Completed | ₱4.9M | 100% | Medium risk46 | —-0.096 |
| 149 | 21OI0027REHABILITATION OF LOCAL ROAD INCLUDING DRAINAGE, BARANGAY CAA, BF INTERNATIONAL VILLAGE, LAS PIÑAS C | National Capital Region | Las Piñas-Muntinlupa DEO | Completed | ₱11.9M | 100% | Medium risk46 | —-0.098 |
| 150 | 23A00395BASIC INFRASTRUCTURE PROGRAM (BIP), REHABILITATION OF FLOOD CONTROL ALONG LIBTONG CREEK, BRGY. LIBTONG, TAGUDIN, ILOCOS SUR | Region I | Region I | Completed | ₱29.7M | 100% | Medium risk45 | —-0.070 |