Contractor dossier
251 projects on file, including joint ventures this contractor is part of.
Total projects
251
Total budget
₱6B
Average progress
95.4%
Completion rate
85.3%
Average risk score
42.8
Medium risk on average, out of 100
Flagged as unusual
5
2.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 220 | ₱5.1B | 43.0 | 3 | 95.0% |
| National Capital Region | 18 | ₱498.3M | 42.0 | 0 | 100.0% |
| Region III | 6 | ₱277.7M | 35.8 | 0 | 100.0% |
| Region I | 3 | ₱88.5M | 47.1 | 0 | 100.0% |
| Region V | 2 | ₱55.4M | 53.6 | 2 | 77.5% |
| Region IV-B | 1 | ₱9.2M | 31.7 | 0 | 100.0% |
| Region VI | 1 | ₱951.1K | 19.6 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 147 | ₱2.6B | 38.9 | 2 | 96.6% |
| Roads | 58 | ₱1.7B | 45.8 | 1 | 94.7% |
| Flood Control and Drainage | 26 | ₱1.5B | 50.5 | 0 | 91.0% |
| OTHER | 7 | ₱214.7M | 66.2 | 1 | 92.9% |
| Water Provision and Storage | 7 | ₱21.6M | 30.1 | 0 | 99.0% |
| Bridges | 3 | ₱13M | 31.5 | 0 | 100.0% |
| GAA 2025 SSP | 1 | ₱48M | 95.2 | 1 | 45.6% |
| GAA 2025 OO-1 | 1 | ₱5.8M | 90.1 | 0 | 100.0% |
| GAA 2025 OO-2 | 1 | ₱14.3M | 88.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DH0070CONSTRUCTION OF MULTI-PURPOSE BUILDING, BUILDING 1, PILA, LAGUNA | Region IV-A | Laguna 1st DEO | On-Going | ₱48M | 46% | High risk95 | Flagged0.010 |
| 25DH0008ROAD WIDENING-PRIMARY ROADS-CALAMBA-STA. CRUZ-FAMY JCT RD-K0084+723-K0084+794, STA. CRUZ, LAGUNA | Region IV-A | Laguna 1st DEO | On-Going | ₱5.8M | 100% | High risk90 | —-0.015 |
| 25DH0015CONSTRUCTION OF FLOOD CONTROL STRUCTURE (TUNGKOD RIVER), PAAGAHAN CIS, MABITAC, LAGUNA | Region IV-A | Laguna 1st DEO | On-Going | ₱14.3M | 100% | High risk88 | —-0.033 |
| 24DI0158REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - CALAMBA-STA CRUZ-FAMY JCT RD - K0068 + (-282) - K0069 + 098 | Region IV-A | Laguna 2nd DEO | On-Going | ₱120.5M | 50% | High risk75 | Flagged0.011 |
| 24DH0080CONSTRUCTION OF MULTI PURPOSE BUILDING (COVERED COURT) FOR BRGY. SARAY, PAKIL, LAGUNA | Region IV-A | Laguna 1st DEO | On-Going | ₱8.7M | 100% | High risk73 | —-0.014 |
| 20DI0139CONSTRUCTION OF MULTI-PURPOSE BUILDING, WOMEN'S DEVELOPMENT CENTER, CABUYAO, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱9.6M | 100% | High risk72 | —-0.015 |
| 21DI0071OFF-CARRIAGEWAY IMPROVEMENT - TERTIARY ROADS - BAY POBLACION RD - K0067 + 188 - K0067 + 570 | Region IV-A | Laguna 2nd DEO | Completed | ₱14M | 100% | High risk70 | —-0.038 |
| 21DI0076ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - MT. MAKILING ECO GARDEN RD. - K0064+080 - K0064+300, K0064+330 - K0064+440, K0064+500 - K0064+664, K0065+195 - K006 | Region IV-A | Laguna 2nd DEO | Completed | ₱51.2M | 100% | High risk70 | —-0.043 |
| 18DI0078LIP - LOCAL ROADS AND BRIDGES - LOCAL ROADS -CONSTRUCTION OF ROAD, SIDEWALK, CURVES/ GUTTER AND DRAINAGE OF BRGY. PULONG SANTA CRUZ LEADING TO INDUSTRIAL AREAS AND RELOCATION SITES (23MX6MX300M, 24 RCP), BRGY. PULONG STA. CRUZ, SANTA ROSA, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱14.9M | 100% | High risk68 | —-0.041 |
| 25DI0064CONSTRUCTION OF REVETMENT ALONG MAYAPA WATERWAYS (SITIO RIVERSIDE) CALAMBA CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱94.7M | 26% | High risk65 | —-0.025 |
| 25DI0065CONSTRUCTION OF STRUCTURE FOR RIVER PROTECTION AT SAN CRISTOBAL RIVER, BRGY. PACIANO, CALAMBA CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱94.7M | 76% | High risk65 | —-0.039 |
| 25DI0017CONSTRUCTION OF RIVER PROTECTION STRUCTURE, NEAR SAMPIRUHAN, CALAMBA CITY, LAGUNA | Region IV-A | Laguna 2nd DEO | On-Going | ₱94M | 75% | High risk65 | —-0.037 |
| 20D00057CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION/IMPROVEMENT OF TRIBUTARY CREEK AS OUTFALL OF THE DETENTION POND AT BRGY. MAMPLASAN LEADING TO CARMONA-BIÑAN RIVER, BIÑAN CITY, LAGUNA | Region IV-A | Region IV-A | Completed | ₱115.7M | 100% | High risk65 | —-0.074 |
| 23DD0310CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), EVACUATION CENTERS/ QUARANTINE FACILITIES/ PUBLIC HEALTH FACILITIES, CONSTRUCTION OF MULTI-PURPOSE BUILDING INCLUDING FACILITIES, DOH REGION IV-A OFFICE, LIPA CITY | Region IV-A | Batangas 4th DEO | Completed | ₱144.1M | 100% | High risk65 | —-0.074 |
| 25DI0066CONSTRUCTION OF STRUCTURE FOR RIVER PROTECTION ALONG SAN JUAN RIVER, BARANDAL SIDE (NEAR HOLY GARDENS), CALAMBA CITY, LAGUNA PHASE 1 | Region IV-A | Laguna 2nd DEO | On-Going | ₱97.1M | 0% | High risk64 | —-0.018 |
| 24DH0040CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ROMELO RIVER, SINILOAN, LAGUNA | Region IV-A | Laguna 1st DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.075 |
| 24DH0029CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG INAWASAN RIVER, FAMY, LAGUNA | Region IV-A | Laguna 1st DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.078 |
| 23DD0188ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT ALONG MALAKING ILOG RIVER (LIPAHAN SECTION), SA | Region IV-A | Batangas 4th DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.077 |
| 23DD0227ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF REVETMENT ALONG MALAKING ILOG RIVER (TIPAZ SECTION), SAN | Region IV-A | Batangas 4th DEO | Completed | ₱96.5M | 100% | High risk64 | —-0.078 |
| 23DH0079CONSTRUCTION OF MULTI-PURPOSE BUILDING, PILA, LAGUNA | Region IV-A | Laguna 1st DEO | Completed | ₱94.3M | 100% | High risk63 | —-0.084 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24DD0283LOCALLY-FUNDED PROJECTS, NATIONAL BUILDING PROGRAM, BUILDINGS AND OTHER STRUCTURES - MULTIPURPOSE / FACILITIES, CONSTRUCTION OF DEPARTMENT OF HEALTH REGION 4A REGIONAL OFFICE MARAWOY, LIPA CITY, BATANGAS | Region IV-A | Batangas 4th DEO | On-Going | ₱140.4M | 12% | High risk63 | Flagged0.038 |
| 24DI0158REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - CALAMBA-STA CRUZ-FAMY JCT RD - K0068 + (-282) - K0069 + 098 | Region IV-A | Laguna 2nd DEO | On-Going | ₱120.5M | 50% | High risk75 | Flagged0.011 |
| 25DH0070CONSTRUCTION OF MULTI-PURPOSE BUILDING, BUILDING 1, PILA, LAGUNA | Region IV-A | Laguna 1st DEO | On-Going | ₱48M | 46% | High risk95 | Flagged0.010 |
| 23F00420CONVERGENCE AND SPECIAL SUPPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF ROAD AT MARAMBONG, PANDAN, CA | Region V | Region V | On-Going | ₱46.8M | 97% | Medium risk59 | Flagged0.003 |
| 24F00438CAPITAL OUTLAY-DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP)-LGU HOSPITALS-GIGMOTO DISTRICT HOSPITAL, CATANDUANES, GIGMOTO, CATANDUANES (LONE DISTRICT) | Region V | Region V | On-Going | ₱8.6M | 58% | Medium risk48 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 151 | 24DD0214CONSTRUCTION OF 2-STOREY 4-CLASSROOM SCHOOL BUILDING IN BIGAIN INTEGRATED SCHOOL, BRGY. BIGAIN SOUTH, SAN JOSE, BATANGAS | Region IV-A | Batangas 4th DEO | On-Going | ₱16.9M | 92% | Medium risk45 | —-0.013 |
| 152 | 18DH0116CONSTRUCTION OF FOUR (4) STOREY, EIGHT (8) CLASSROOM SCHOOL BUILDING, PINAGBAYANAN E/S, PILA, LAGUNA | Region IV-A | Laguna 1st DEO | Completed | ₱17.6M | 100% | Medium risk45 | —-0.056 |
| 153 | 18DI0176COMPLETION OF 4 STOREY 20 CLASSROOMS AT SOUTHVILLE 3A NATIONAL HIGH SCHOOL, SAN PEDRO, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱5.7M | 100% | Medium risk45 | —-0.056 |
| 154 | 19DP0074CONSTRUCTION OF THREE (3) STOREY SIX (6) CLASSROOM AT STA. MARIA MAGDALENA ELEMENTARYSCHOOL, SAN PABLO CITY, LAGUNA | Region IV-A | Laguna 3rd DEO | Completed | ₱15.4M | 100% | Medium risk44 | —-0.058 |
| 155 | 22A00195CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD MITIGATION FACILITIES ALONG AMBURAYAN RIVER BASIN, (PHASE 1), BARANGAY PACAC-BARITAO-LANTAG-PUDOC EAST, TAGUDIN, ILOCOS SUR | Region I | Region I | Completed | ₱19.3M | 100% | Medium risk44 | —-0.072 |
| 156 | 17DH0066CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAINWATER COLLECTORS-RAINWATER COLLECTOR SYSTEM | Region IV-A | Laguna 1st DEO | Completed | ₱3.2M | 100% | Medium risk44 | —-0.045 |
| 157 | 18DH0109CONSTRUCTION OF TWO (2) STOREY, FOUR (4) CLASSROOM SCHOOL BUILDING, CALANGAY E/S, SANTA MARIA, LAGUNA | Region IV-A | Laguna 1st DEO | Completed | ₱9.4M | 100% | Medium risk44 | —-0.061 |
| 158 | 18DJ0124CONSTRUCTION OF TWO (2) STOREY SIX (6) CLASSROOM ACADEMIC SCHOOL BUILDING AT DON SEVERO FILISMINO ELEMENTARY SCHOOL DOLORES, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱14.4M | 100% | Medium risk44 | —-0.060 |
| 159 | 23DD0329CONSTRUCTION OF 2STY2CL, GALAMAY-AMO ELEMENTARY SCHOOL, SAN JOSE, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱12.1M | 100% | Medium risk44 | —-0.059 |
| 160 | 23DD0333CONSTRUCTION OF 1STY2CL, TAYSAN ELEMENTARY SCHOOL, SAN JOSE, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱6.3M | 100% | Medium risk44 | —-0.058 |
| 161 | 23DD0328CONSTRUCTION OF 2STY2CL, BENIGNA DIMATATAC MEMORIAL ELEMENTARY SCHOOL, SAN JOSE, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱12.1M | 100% | Medium risk44 | —-0.059 |
| 162 | 18DD0733COMPLETION OF 4STY16CL SCHOOL BUILDING AT TEODORO M. KALAW MEMORIAL SCHOOL, LIPA CITY, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱6M | 100% | Medium risk43 | —-0.055 |
| 163 | 18DP0088CONSTRUCTION OF TWO (2) STOREY SIX (6) CLASSROOM AT T. DAGUINSIN ES (SAN ROQUE ES), VICTORIA, LAGUNA | Region IV-A | Laguna 3rd DEO | Completed | ₱13M | 100% | Medium risk43 | —-0.061 |
| 164 | 21DD0345CONSTRUCTION/ COMPLETION OF A.) 4STY16CL, BOLBOK ELEMENTARY SCHOOL, B.) 4STY12CL, KAYUMANGGI ES, C.) 4STY16CL, LODLOD ES, D.) 4STY12CL, MABINI ES, E.) 4STY12CL, SAMPAGUITA ES, F.) 4STY20CL, RAFAEL M. LOJO MS, G.) 4STY12CL, PINAGTONGULAN INTEGRATED NATIONA | Region IV-A | Batangas 4th DEO | Completed | ₱12.8M | 100% | Medium risk43 | —-0.056 |
| 165 | 17DI0138CONSTRUCTION/ IMPROVEMENT OF LAGUNA PROVINCIAL HOSPITAL (LPH) - BAY DISTRICT HOSPITAL, BAY, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱15M | 100% | Medium risk43 | —-0.032 |
| 166 | 18DE0129CONCRETING OF BRGY. BUCAL SOUTH FMR, BRGY. BUCAL SOUTH, BATANGAS CITY, BATANGAS | Region IV-A | Batangas 2nd DEO | Completed | ₱9.9M | 100% | Medium risk43 | —-0.056 |
| 167 | 17DI0139CONSTRUCTION/ IMPROVEMENT OF LAGUNA PROVINCIAL HOSPITAL (LPH)- SAN PEDRO DISTRICT HOSPITAL, SAN PEDRO, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱19.6M | 100% | Medium risk43 | —-0.031 |
| 168 | 18DH0063CONCRETING OF SITIO KABATANG, BRGY. SANTO TOMAS FMR, BRGY. SANTO TOMAS, LUISIANA, LAGUNA | Region IV-A | Laguna 1st DEO | Completed | ₱4.8M | 100% | Medium risk43 | —-0.056 |
| 169 | 18DH0068CONCRETING OF BRGY. LAYUG FMR, BRGY. LAYUG, CAVINTI, LAGUNA | Region IV-A | Laguna 1st DEO | Completed | ₱4.8M | 100% | Medium risk43 | —-0.049 |
| 170 | 23DH0110CONCRETING OF BRGY. ROAD, BRGY. GATID, SANTA CRUZ, LAGUNA | Region IV-A | Laguna 1st DEO | Completed | ₱9.4M | 100% | Medium risk42 | —-0.057 |
| 171 | 20DH0092CONCRETING OF BRGY. MAYTOONG FMR, BRGY. MAYTOONG, PAETE, LAGUNA | Region IV-A | Laguna 1st DEO | Completed | ₱11.6M | 100% | Medium risk42 | —-0.054 |
| 172 | 18DM0101CONSTRUCTION OF TWO(2)-STOREY FOUR(4)-CLASSROOM SCHOOL BUILDING AT SAN IGNACIO IBABA ES GENERAL LUNA, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱12M | 100% | Medium risk40 | —-0.059 |
| 173 | 18DL0091CY 2017 BASIC EDUCATION FACILITIES FUND, CONSTRUCTION OF TVL AND OTHER WORKSHOPS, ATIMONAN NCHS, 8 UNITS - REGULAR WORKSHOPS, 2 UNITS - SCIENCE LABS, 2 UNITS - ICT LABS, ATIMONAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱35.8M | 100% | Medium risk40 | —-0.024 |
| 174 | 20DI0097REHABILITATION/IMPROVEMENT OF ROADS INCLUDING DRAINAGE, BRGY. BANLIC, CABUYAO, LAGUNA | Region IV-A | Laguna 2nd DEO | Completed | ₱3.8M | 100% | Medium risk38 | —-0.071 |
| 175 | 17DI0028LIP - CONSTRUCTION OF DRAINAGE CANAL, UNO, CABUYAO CITY, LAGUNA 2ND L.D. | Region IV-A | Laguna 2nd DEO | Completed | ₱2M | 100% | Medium risk37 | —-0.069 |