Contractor dossier
174 projects on file, including joint ventures this contractor is part of.
Total projects
174
Total budget
₱6.6B
Average progress
97.4%
Completion rate
93.1%
Average risk score
48.8
Medium risk on average, out of 100
Flagged as unusual
5
2.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region V | 51 | ₱2B | 54.6 | 4 | 96.4% |
| Region IV-A | 40 | ₱1.4B | 43.8 | 0 | 98.3% |
| National Capital Region | 38 | ₱2B | 51.2 | 0 | 98.5% |
| Region I | 29 | ₱517.2M | 44.0 | 0 | 97.9% |
| Region III | 8 | ₱387M | 40.5 | 0 | 100.0% |
| Region VIII | 6 | ₱300.4M | 48.1 | 0 | 100.0% |
| Cordillera Administrative Region | 1 | ₱100M | 69.0 | 1 | 20.8% |
| Region IV-B | 1 | ₱14.7M | 49.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 65 | ₱2.7B | 49.2 | 2 | 99.3% |
| Buildings and Facilities | 53 | ₱1.8B | 42.0 | 1 | 97.4% |
| Roads | 37 | ₱1.4B | 52.4 | 0 | 97.4% |
| OTHER | 9 | ₱424.2M | 68.7 | 1 | 100.0% |
| Bridges | 8 | ₱142.4M | 46.4 | 0 | 89.4% |
| Bridges, Roads | 2 | ₱215.5M | 67.0 | 1 | 60.4% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23FF0014001;NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-TERTIARY ROAD-NAGA CITY BOUNDARY-CALABANGA- BALONGAY ROAD,KO441+450-K0442+975.30,MAGARAO CAMARINES SUR | Region V | Camarines Sur 3rd DEO | On-Going | ₱94.5M | 100% | High risk82 | Flagged0.007 |
| 17FB0008OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, , LEGAZPI CITY-PUNTA DE JESUS ROAD, S05860LZ, K0539+241-K0541+000, K0541+656-K0543+000 | Region V | Albay 2nd DEO | Completed | ₱45.3M | 100% | High risk77 | —-0.036 |
| 24CC0173CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE AT BARANGAY SULIVAN (PUROK 3), BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱77.2M | 100% | High risk76 | —-0.060 |
| 17FC0059REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS,SLOPE COLLAPSE AND LANDSLIDE,TERTIARY BAG | Region V | Camarines Norte DEO | Completed | ₱17.2M | 100% | High risk73 | —-0.034 |
| 17AD0004CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS: CONSTRUCTION OF STA. CRUZ-SUYO-SIGAY-DEL PILAR ROAD LEADING TO TIRAD PASS SHRINE. STA. CRUZ, ILOCOS SUR, 2ND LD | Region I | Ilocos Sur 2nd DEO | Completed | ₱49M | 100% | High risk73 | —-0.023 |
| 16DK0120CONST AND MAINT OF BRIDGES ALONG NAT'L ROADS REPLACEMENT OF WEAK BRIDGE @ CAMAYSA BRIDGE-TAYABAS CIT | Region IV-A | Quezon 1st DEO | Completed | ₱49M | 100% | High risk72 | —-0.031 |
| 22AD0042CONSTRUCTION OF SIDAOEN-BACSAYAN ROAD LEADING TO SANGBAY NI RAGSAK FALLS, BARANGAYS SIDAOEN AND BACSAYAN, STA. CRUZ, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱9.9M | 100% | High risk72 | —-0.029 |
| 18P00055CLUSTER I :A) REPAIR/REHABILITATION/IMPROVEMENT OF LUZONG-TUQUIPA ROAD, BRGYS. LUZONG AND TUQUIPA, LUBA, ABRAB) REPAIR/ REHABILITATION/ IMPROVEMENT OF SITIO CABA-GAYAMAN ROAD, BRGY GAYAMAN, LUBA, ABRAC) REPAIR/REHABILITATION/ IMPROVEMENT OF SABNANGA | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱100M | 21% | High risk69 | Flagged0.082 |
| 17DB0100CONSTRUCTION OF BAYWALK IN BUTONG, TAAL, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱47.5M | 100% | High risk68 | —-0.073 |
| 16F00145RECONSTRUCTION/REHABILITATION/RESTORATION OF VARIOUS FLOOD CONTROL PROJECTS IN THE PROVINCE OF CAMARINES SUR: ANAYAN RIVER ( ANAYAN DAM),SAN ISIDRO, BULA, CAMARINES SUR, CAMARINES SUR 5TH LEGISLATIVE DISTRICT | Region V | Region V | Completed | ₱79.6M | 100% | High risk67 | Flagged0.002 |
| 17A00015ASSET PRESERVATION, REHAB/RECON/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INC. DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4), TAGUDIN-CERVANTES ROAD, K0324+854-K0325+1001, K0326+000-K0326+277, K0348+730-K0349+29 | Region I | Region I | Completed | ₱68.7M | 100% | High risk67 | —-0.048 |
| 16F00141RECONST./REHAB./REST. OF VARIOUS FLOOD CONTROL PROJECTS IN THE PROVINCE OF CAMARINES SUR, PAWILI RIVER (SAN JOSE SECTION), SAN JOSE, BULA, CAMARINES SUR 5TH LEGISLATIVE DISTRICT | Region V | Region V | Completed | ₱81.5M | 100% | High risk67 | Flagged0.003 |
| 19FA0080CLUSTER 44-REHAB/RESTORATION/RECONSTRUCTION OF COMUN FC DOWNSTREAM, MALINAO,ALBAY; TAYHI RC,TABACO CITY AND BAGONG SAN ROQUE SITE 1 RC, STO. DOMINGO, ALBAY | Region V | Albay 1st DEO | Completed | ₱84.7M | 100% | High risk66 | —-0.022 |
| 23OD0241CLUSTER 01: CONSTRUCTION OF NEW PUP CAMPUS IN CALOOCAN NORTH, BARANGAY 168, CALOOCAN CITYA. CONSTRUCTION OF NEW POLYTECHNIC UNIVERSITY OF THE PHILIPPINES, BARANGAY 168, CALOOCAN CITYB. CONSTRUCTION OF ADMINISTRATIVE BUILDING - POLYTECHNIC UNIVERSITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱116.4M | 100% | High risk65 | —-0.026 |
| 17FE0005ASSET PRESERVATION OF NATIONAL ROADS-PREVENTIVE MAINTENANCE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT 4 (HDM-4)-TERTIARY, NAGA CITY BDRY-CALABANGA-BALONGAY ROAD, K0454+757-K0457+000 | Region V | Camarines Sur 3rd DEO | Completed | ₱15.4M | 100% | High risk65 | —-0.065 |
| 21OF0192CONSTRUCTION OF FLOOD CONTROL STRUCTURES AT BARANGAY COMMONWEALTH, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱95M | 100% | High risk65 | —-0.074 |
| 21OF0193CONSTRUCTION OF FLOOD CONTROL STRUCTURES AT BARANGAY BAGONG SILANGAN, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱95M | 100% | High risk65 | —-0.074 |
| 20D00036FY 2020 DPWH INFRASTRUCTURE PROGRAM ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF MISSING LINKS/NEW ROADS, TAGAYTAY CALAMBA ROAD VIA CANLUBANG, LAGUNA SECTION, LAGUNA | Region IV-A | Region IV-A | Completed | ₱115.4M | 100% | High risk65 | —-0.056 |
| 17AD0011CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF FLOOD CONTROL ALONG SEVILLA BRIDGE MNR (DEEPENING OF WATERWAY AND CONSTRUCTION OF REVETMENT WALL), STA. CRUZ, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱10.7M | 100% | High risk65 | —-0.044 |
| 25DM0092CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT PIRIS RIVER, BRGY. SABANG PIRIS, BUENAVISTA, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.7M | 52% | High risk65 | —-0.029 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 18P00055CLUSTER I :A) REPAIR/REHABILITATION/IMPROVEMENT OF LUZONG-TUQUIPA ROAD, BRGYS. LUZONG AND TUQUIPA, LUBA, ABRAB) REPAIR/ REHABILITATION/ IMPROVEMENT OF SITIO CABA-GAYAMAN ROAD, BRGY GAYAMAN, LUBA, ABRAC) REPAIR/REHABILITATION/ IMPROVEMENT OF SABNANGA | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱100M | 21% | High risk69 | Flagged0.082 |
| 18FB0308CONSTRUCTION OF CLASSROOM 4STY8CL, PAG-ASA NATIONAL HIGH SCHOOL, PAG-ASA, RAWIS, LEGAZPI CITY (9.5M X 28.00M) | Region V | Albay 2nd DEO | On-Going | ₱37.1M | 100% | High risk61 | Flagged0.017 |
| 23FF0014001;NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-TERTIARY ROAD-NAGA CITY BOUNDARY-CALABANGA- BALONGAY ROAD,KO441+450-K0442+975.30,MAGARAO CAMARINES SUR | Region V | Camarines Sur 3rd DEO | On-Going | ₱94.5M | 100% | High risk82 | Flagged0.007 |
| 16F00141RECONST./REHAB./REST. OF VARIOUS FLOOD CONTROL PROJECTS IN THE PROVINCE OF CAMARINES SUR, PAWILI RIVER (SAN JOSE SECTION), SAN JOSE, BULA, CAMARINES SUR 5TH LEGISLATIVE DISTRICT | Region V | Region V | Completed | ₱81.5M | 100% | High risk67 | Flagged0.003 |
| 16F00145RECONSTRUCTION/REHABILITATION/RESTORATION OF VARIOUS FLOOD CONTROL PROJECTS IN THE PROVINCE OF CAMARINES SUR: ANAYAN RIVER ( ANAYAN DAM),SAN ISIDRO, BULA, CAMARINES SUR, CAMARINES SUR 5TH LEGISLATIVE DISTRICT | Region V | Region V | Completed | ₱79.6M | 100% | High risk67 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 20OD0213CONSTRUCTION OF ALERT MULTI-PURPOSE BUILDING BRGY. MALINTA, VALENZUELA CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱100.6M | 100% | High risk63 | —-0.078 |
| 27 | 24OB0445CONSTRUCTION OF MULTI-PURPOSE BUILDING, SALAPAN ELEMENTARY SCHOOL, SAN JUAN CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱117M | 74% | High risk63 | —-0.034 |
| 28 | 22OE0093CONSTRUCTION OF MULTI - PURPOSE BUILDING, CONVENTION HALL AT F. BALAGTAS ELEMENTARY SCHOOL, MANILA | National Capital Region | North Manila DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.072 |
| 29 | 20OE0185CONSTRUCTION OF MULTI-PURPOSE BUILDING (RIZAL COVERED COURT), CITY OF MANILA | National Capital Region | North Manila DEO | Completed | ₱96.5M | 100% | High risk62 | —-0.084 |
| 30 | 18FB0308CONSTRUCTION OF CLASSROOM 4STY8CL, PAG-ASA NATIONAL HIGH SCHOOL, PAG-ASA, RAWIS, LEGAZPI CITY (9.5M X 28.00M) | Region V | Albay 2nd DEO | On-Going | ₱37.1M | 100% | High risk61 | Flagged0.017 |
| 31 | 20FB0025OFF-CARRIAGEWAY IMPROVEMENT: SHOULDER PAVING/CONSTRUCTION - SECONDARY ROADS - LEGAZPI CITY-PUNTA DE JESUS ROAD (S05860LZ) - K0561+549 - K0562+600 | Region V | Albay 2nd DEO | Completed | ₱30.4M | 100% | High risk61 | —-0.101 |
| 32 | 18D00083WORLD CLASS MULTI-MEDIA PRODUCTIONBUILDING, UP OPEN UNIVERSITY, LOS BAÑOS, LAGUNA | Region IV-A | Region IV-A | Completed | ₱99.3M | 100% | High risk61 | —-0.019 |
| 33 | 18FK0081CONSTRUCTION OF CORE SHELTER, CASIGURAN | Region V | Sorsogon DEO | Completed | ₱85.5M | 100% | High risk60 | —-0.070 |
| 34 | 22F00066OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT-CONSTRUCTION OF MISSING LINKS/NEW ROADS, SAN FERNANDO-SAN JACINTO-MONREAL ROAD, PACKAGE 1, MASBATE, SAN FERNANDO, MASBATE (1ST LEGISLATIVE DISTRICT) | Region V | Region V | On-Going | ₱36.3M | 70% | Medium risk60 | —-0.039 |
| 35 | 20FA0044CLUSTER 24-CONSTRUCTION/IMPV'T. OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS IN THE FIRST DISTRICT OF ALBAY | Region V | Albay 1st DEO | Completed | ₱88.2M | 100% | Medium risk59 | —-0.092 |
| 36 | 17FB0032CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF COMUN-BONGABONG FLOOD CONTROL SYSTEM, BRGY. COMUN-BONGABONG, CAMALIG, ALBAY 2ND LD | Region V | Albay 2nd DEO | Completed | ₱38.8M | 100% | Medium risk59 | —-0.057 |
| 37 | 19FA0026CLUSTER 6-ROAD WIDENING & REHAB./RECONSTRUCTION OF DAMAGED PAVED NATIONAL ROADS-SECONDARY ROADS ALONG DM-JCT-LEGAZPI-STO. DOMINGO-TABACO-CAM. SUR BDRY ROAD-MALINAO AND TIWI, ALBAY | Region V | Albay 1st DEO | Completed | ₱72.5M | 100% | Medium risk59 | —-0.095 |
| 38 | 20FN0007CONSTRUCTION OF BULA RIVER CONTROL, (SAN ROQUE - OMBAO SECTION), BULA, CAMARINES SURSTA. 2+008.00 - STA. 2+206.00 | Region V | Camarines Sur 5th DEO | Completed | ₱27.9M | 100% | Medium risk59 | —-0.057 |
| 39 | 18F00048OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING-SECONDARY ROADS: IRIGA CITY-SAN ISIDRO-SAGRADA-SAN RAMON-HANAWAN ROAD, CAMARINES SUR, CAMARINES SUR | Region V | Region V | Completed | ₱74.4M | 100% | Medium risk59 | —-0.095 |
| 40 | 20F00071OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, JUBAN-BULAN DIVERSION ROAD, BULAN SECTION, SORSOGON, BULAN, SORSOGON (2ND LEGISLATIVE DISTRICT) | Region V | Region V | Completed | ₱38.3M | 100% | Medium risk58 | —-0.092 |
| 41 | 17FG0033INDV. PROJECT - CHANNEL IMPV'T./REVETMENT AT BARIT RIVER DOWNSTREAM OF CRESINI BRIDGE, IRIGA CITY (STA. 0+000-STA. 0+142.60) (R) | Region V | Camarines Sur 5th DEO | Completed | ₱18.4M | 100% | Medium risk58 | —-0.057 |
| 42 | 21FD0092REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS, DAANG MAHARLIKA (LZ) K0387+000 - K0387+400; K0395+000 - K0396+461 | Region V | Camarines Sur 1st DEO | Completed | ₱53.1M | 100% | Medium risk58 | —-0.098 |
| 43 | 18FB0059CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL SYSTEM ALONG TALADONG RIVER, TALADONG, CAMALIG, ALBAY | Region V | Albay 2nd DEO | Completed | ₱22.6M | 100% | Medium risk58 | —-0.087 |
| 44 | 18OI0054COMPLETION OF MULTI-PURPOSE BUILDING PHASE 2, BRGY. ALABANG, MUNITNLUPA CITY | National Capital Region | Las Piñas-Muntinlupa DEO | Completed | ₱64M | 100% | Medium risk58 | —-0.090 |
| 45 | 21OE0027CONSTRUCTION / REHABILITATION OF MULTI - PURPOSE BUILDING ZONE 25,32,33,34,35 CITY OF MANILA | National Capital Region | North Manila DEO | Completed | ₱71.4M | 100% | Medium risk58 | —-0.081 |
| 46 | 20OE0184CONSTRUCTION OF MULTI-PURPOSE BUILDING, ZONE 25-40, MANILA CITY | National Capital Region | North Manila DEO | Completed | ₱67.2M | 100% | Medium risk58 | —-0.085 |
| 47 | 23OF0034CONSTRUCTION OF 3 - STOREY MULTI - PURPOSE BUILDING, BARANGAY TALAYAN, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱67.9M | 68% | Medium risk58 | —-0.033 |
| 48 | 20CC0200CONSTRUCTION OF WATER PUMPING STATION NO. 3, LOLOMBOY, BOCAUE, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱99M | 100% | Medium risk57 | —-0.076 |
| 49 | 19IJ0182LOCAL PROGRAM: CONSTRUCTION/WIDENING/REHABILITATION OF CALBAYOG-CATARMAN ROAD WITH SLOPE PROTECTION,BARANGAY JOSE ROÑO,CALBAYOG CITY,SAMAR | Region VIII | Samar 1st DEO | Completed | ₱90M | 100% | Medium risk57 | —-0.084 |
| 50 | 19FK0074FLOOD MITIGATION PROGRAM-CONST./MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS-CONS./REHAB. OF LUNGIB SEAWALL AND EMBANKMENT PHASE II CASIGURAN, SORSOGON | Region V | Sorsogon DEO | Completed | ₱73.9M | 100% | Medium risk55 | —-0.075 |