Contractor dossier
174 projects on file, including joint ventures this contractor is part of.
Total projects
174
Total budget
₱6.6B
Average progress
97.4%
Completion rate
93.1%
Average risk score
48.8
Medium risk on average, out of 100
Flagged as unusual
5
2.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region V | 51 | ₱2B | 54.6 | 4 | 96.4% |
| Region IV-A | 40 | ₱1.4B | 43.8 | 0 | 98.3% |
| National Capital Region | 38 | ₱2B | 51.2 | 0 | 98.5% |
| Region I | 29 | ₱517.2M | 44.0 | 0 | 97.9% |
| Region III | 8 | ₱387M | 40.5 | 0 | 100.0% |
| Region VIII | 6 | ₱300.4M | 48.1 | 0 | 100.0% |
| Cordillera Administrative Region | 1 | ₱100M | 69.0 | 1 | 20.8% |
| Region IV-B | 1 | ₱14.7M | 49.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 65 | ₱2.7B | 49.2 | 2 | 99.3% |
| Buildings and Facilities | 53 | ₱1.8B | 42.0 | 1 | 97.4% |
| Roads | 37 | ₱1.4B | 52.4 | 0 | 97.4% |
| OTHER | 9 | ₱424.2M | 68.7 | 1 | 100.0% |
| Bridges | 8 | ₱142.4M | 46.4 | 0 | 89.4% |
| Bridges, Roads | 2 | ₱215.5M | 67.0 | 1 | 60.4% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23FF0014001;NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-TERTIARY ROAD-NAGA CITY BOUNDARY-CALABANGA- BALONGAY ROAD,KO441+450-K0442+975.30,MAGARAO CAMARINES SUR | Region V | Camarines Sur 3rd DEO | On-Going | ₱94.5M | 100% | High risk82 | Flagged0.007 |
| 17FB0008OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, , LEGAZPI CITY-PUNTA DE JESUS ROAD, S05860LZ, K0539+241-K0541+000, K0541+656-K0543+000 | Region V | Albay 2nd DEO | Completed | ₱45.3M | 100% | High risk77 | —-0.036 |
| 24CC0173CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE AT BARANGAY SULIVAN (PUROK 3), BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱77.2M | 100% | High risk76 | —-0.060 |
| 17FC0059REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS,SLOPE COLLAPSE AND LANDSLIDE,TERTIARY BAG | Region V | Camarines Norte DEO | Completed | ₱17.2M | 100% | High risk73 | —-0.034 |
| 17AD0004CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS: CONSTRUCTION OF STA. CRUZ-SUYO-SIGAY-DEL PILAR ROAD LEADING TO TIRAD PASS SHRINE. STA. CRUZ, ILOCOS SUR, 2ND LD | Region I | Ilocos Sur 2nd DEO | Completed | ₱49M | 100% | High risk73 | —-0.023 |
| 16DK0120CONST AND MAINT OF BRIDGES ALONG NAT'L ROADS REPLACEMENT OF WEAK BRIDGE @ CAMAYSA BRIDGE-TAYABAS CIT | Region IV-A | Quezon 1st DEO | Completed | ₱49M | 100% | High risk72 | —-0.031 |
| 22AD0042CONSTRUCTION OF SIDAOEN-BACSAYAN ROAD LEADING TO SANGBAY NI RAGSAK FALLS, BARANGAYS SIDAOEN AND BACSAYAN, STA. CRUZ, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱9.9M | 100% | High risk72 | —-0.029 |
| 18P00055CLUSTER I :A) REPAIR/REHABILITATION/IMPROVEMENT OF LUZONG-TUQUIPA ROAD, BRGYS. LUZONG AND TUQUIPA, LUBA, ABRAB) REPAIR/ REHABILITATION/ IMPROVEMENT OF SITIO CABA-GAYAMAN ROAD, BRGY GAYAMAN, LUBA, ABRAC) REPAIR/REHABILITATION/ IMPROVEMENT OF SABNANGA | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱100M | 21% | High risk69 | Flagged0.082 |
| 17DB0100CONSTRUCTION OF BAYWALK IN BUTONG, TAAL, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱47.5M | 100% | High risk68 | —-0.073 |
| 16F00145RECONSTRUCTION/REHABILITATION/RESTORATION OF VARIOUS FLOOD CONTROL PROJECTS IN THE PROVINCE OF CAMARINES SUR: ANAYAN RIVER ( ANAYAN DAM),SAN ISIDRO, BULA, CAMARINES SUR, CAMARINES SUR 5TH LEGISLATIVE DISTRICT | Region V | Region V | Completed | ₱79.6M | 100% | High risk67 | Flagged0.002 |
| 17A00015ASSET PRESERVATION, REHAB/RECON/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INC. DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4), TAGUDIN-CERVANTES ROAD, K0324+854-K0325+1001, K0326+000-K0326+277, K0348+730-K0349+29 | Region I | Region I | Completed | ₱68.7M | 100% | High risk67 | —-0.048 |
| 16F00141RECONST./REHAB./REST. OF VARIOUS FLOOD CONTROL PROJECTS IN THE PROVINCE OF CAMARINES SUR, PAWILI RIVER (SAN JOSE SECTION), SAN JOSE, BULA, CAMARINES SUR 5TH LEGISLATIVE DISTRICT | Region V | Region V | Completed | ₱81.5M | 100% | High risk67 | Flagged0.003 |
| 19FA0080CLUSTER 44-REHAB/RESTORATION/RECONSTRUCTION OF COMUN FC DOWNSTREAM, MALINAO,ALBAY; TAYHI RC,TABACO CITY AND BAGONG SAN ROQUE SITE 1 RC, STO. DOMINGO, ALBAY | Region V | Albay 1st DEO | Completed | ₱84.7M | 100% | High risk66 | —-0.022 |
| 23OD0241CLUSTER 01: CONSTRUCTION OF NEW PUP CAMPUS IN CALOOCAN NORTH, BARANGAY 168, CALOOCAN CITYA. CONSTRUCTION OF NEW POLYTECHNIC UNIVERSITY OF THE PHILIPPINES, BARANGAY 168, CALOOCAN CITYB. CONSTRUCTION OF ADMINISTRATIVE BUILDING - POLYTECHNIC UNIVERSITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱116.4M | 100% | High risk65 | —-0.026 |
| 17FE0005ASSET PRESERVATION OF NATIONAL ROADS-PREVENTIVE MAINTENANCE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT 4 (HDM-4)-TERTIARY, NAGA CITY BDRY-CALABANGA-BALONGAY ROAD, K0454+757-K0457+000 | Region V | Camarines Sur 3rd DEO | Completed | ₱15.4M | 100% | High risk65 | —-0.065 |
| 21OF0192CONSTRUCTION OF FLOOD CONTROL STRUCTURES AT BARANGAY COMMONWEALTH, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱95M | 100% | High risk65 | —-0.074 |
| 21OF0193CONSTRUCTION OF FLOOD CONTROL STRUCTURES AT BARANGAY BAGONG SILANGAN, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱95M | 100% | High risk65 | —-0.074 |
| 20D00036FY 2020 DPWH INFRASTRUCTURE PROGRAM ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF MISSING LINKS/NEW ROADS, TAGAYTAY CALAMBA ROAD VIA CANLUBANG, LAGUNA SECTION, LAGUNA | Region IV-A | Region IV-A | Completed | ₱115.4M | 100% | High risk65 | —-0.056 |
| 17AD0011CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF FLOOD CONTROL ALONG SEVILLA BRIDGE MNR (DEEPENING OF WATERWAY AND CONSTRUCTION OF REVETMENT WALL), STA. CRUZ, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱10.7M | 100% | High risk65 | —-0.044 |
| 25DM0092CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT PIRIS RIVER, BRGY. SABANG PIRIS, BUENAVISTA, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.7M | 52% | High risk65 | —-0.029 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 18P00055CLUSTER I :A) REPAIR/REHABILITATION/IMPROVEMENT OF LUZONG-TUQUIPA ROAD, BRGYS. LUZONG AND TUQUIPA, LUBA, ABRAB) REPAIR/ REHABILITATION/ IMPROVEMENT OF SITIO CABA-GAYAMAN ROAD, BRGY GAYAMAN, LUBA, ABRAC) REPAIR/REHABILITATION/ IMPROVEMENT OF SABNANGA | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱100M | 21% | High risk69 | Flagged0.082 |
| 18FB0308CONSTRUCTION OF CLASSROOM 4STY8CL, PAG-ASA NATIONAL HIGH SCHOOL, PAG-ASA, RAWIS, LEGAZPI CITY (9.5M X 28.00M) | Region V | Albay 2nd DEO | On-Going | ₱37.1M | 100% | High risk61 | Flagged0.017 |
| 23FF0014001;NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-TERTIARY ROAD-NAGA CITY BOUNDARY-CALABANGA- BALONGAY ROAD,KO441+450-K0442+975.30,MAGARAO CAMARINES SUR | Region V | Camarines Sur 3rd DEO | On-Going | ₱94.5M | 100% | High risk82 | Flagged0.007 |
| 16F00141RECONST./REHAB./REST. OF VARIOUS FLOOD CONTROL PROJECTS IN THE PROVINCE OF CAMARINES SUR, PAWILI RIVER (SAN JOSE SECTION), SAN JOSE, BULA, CAMARINES SUR 5TH LEGISLATIVE DISTRICT | Region V | Region V | Completed | ₱81.5M | 100% | High risk67 | Flagged0.003 |
| 16F00145RECONSTRUCTION/REHABILITATION/RESTORATION OF VARIOUS FLOOD CONTROL PROJECTS IN THE PROVINCE OF CAMARINES SUR: ANAYAN RIVER ( ANAYAN DAM),SAN ISIDRO, BULA, CAMARINES SUR, CAMARINES SUR 5TH LEGISLATIVE DISTRICT | Region V | Region V | Completed | ₱79.6M | 100% | High risk67 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 18FC0104FLOOD MANAGEMENT PROGRAM: CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND | Region V | Camarines Norte DEO | Completed | ₱19.1M | 100% | Medium risk47 | —-0.086 |
| 102 | 19DD0121LOCAL PROGRAM, FLOOD CONTROL AND DRAINAGE, DRAINAGE/ PROTECTION WORKS- CONSTRUCTION/REPAIR/REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, CONSTRUCTION/REHABILITATION OF DRAINAGE SYSTEM AT BARANGAY MABINI, LIPA CITY, BATANG | Region IV-A | Batangas 4th DEO | Completed | ₱9.5M | 100% | Medium risk47 | —-0.088 |
| 103 | 19IJ0004CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BUGTONG RIVER (DOWNSTREAM), CALBAYOG CITY, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱43.1M | 100% | Medium risk47 | —-0.084 |
| 104 | 19IJ0045CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG CAGPALALE CREEK, (ABUTMENT A AND B), CALBAYOG CITY, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱43.7M | 100% | Medium risk46 | —-0.082 |
| 105 | 19IJ0049CONSTRUCTION OF FLOOD CONTROL STRUCTUES ALONG MAG-UBAY CREEK, BRGY. MAG-UBAY, CALBAYOG CITY, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱42.3M | 100% | Medium risk46 | —-0.082 |
| 106 | 19IJ0090002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM, CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BINALIW RIVER(PHASE III), CALBAYOG CITY, SAMAR | Region VIII | Samar 1st DEO | Completed | ₱42.3M | 100% | Medium risk46 | —-0.083 |
| 107 | 18OC0062IMPROVEMENT/SHEET PILING OF DON GALO RIVER (SOUTH SIDE), BARANGAY LA HUERTA,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱46.1M | 100% | Medium risk46 | —-0.080 |
| 108 | 18OF0090PREVENTIVE MAINTENANCE OF LA MESA DAM, Q.C. | National Capital Region | Quezon City 1st DEO | Completed | ₱26.2M | 100% | Medium risk46 | —-0.096 |
| 109 | 20FE0048OO2: FLOOD MANAGEMENT - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF DIKE (ALONG LIBMANAN RIVER) WITHIN BICOL RIVER BASIN, BRGY. ASLONG, LIBMANAN, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱45.4M | 100% | Medium risk46 | —-0.087 |
| 110 | 18FE0065ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS- FLOOD MANAGEMENT PROGRAM CONSTRUCTION/REHABILITATION/IMPROVEMENT OF MAGARAO FLOOD CONTROL (SIPATAN CREEK) MAGARAO , CAMARINES SUR INCLUDING ROW BRGY. SAN ISIDRO-BRGY. STO. TOMAS | Region V | Camarines Sur 3rd DEO | Completed | ₱32.4M | 100% | Medium risk46 | —-0.087 |
| 111 | 18OF0210CONSTRUCTION OF SLOPE PROTECTION TULLAHAN RIVER, BRGY. SAN BARTOLOME (PHASE 6), Q.C. | National Capital Region | Quezon City 1st DEO | Terminated | ₱37.4M | 100% | Medium risk46 | —-0.037 |
| 112 | 18OD0086CONSTRUCTION OF FLOOD CONTROL WALL/RIPRAPPING ALONG BANKS OF CREEKS IN BRGY. 188, CALOOCAN CITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱28.9M | 100% | Medium risk46 | —-0.087 |
| 113 | 22FF0052BIP;FLOOD MITIGATION STRUCTURE PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES CONST. OF SLOPE PROTECTION(RIPRAPPING) BRGY. CARANGCANG MAGARAO CAMARINES SUR | Region V | Camarines Sur 3rd DEO | Completed | ₱28.2M | 100% | Medium risk46 | —-0.087 |
| 114 | 18OC0050CONSTRUCTION OF REVETMENT WALL ALONG ESTERO TRIPA DE GALLINA, BARANGAY PIO DEL PILAR, DISTRICT I, MAKATI CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱29.4M | 100% | Medium risk46 | —-0.089 |
| 115 | 20FF0010ORGANIZATIONAL OUTCOME 2:PROTECT LIVES &PROPERTIES AGAINST MAJOR FLOOD-FLOOD MGT. PROG. CONST./REHAB. OF FLOOD MITIGATON FACILITIES W/IN MAJOR RIVER BASINS CONST. OF BICOL RIVER FLOOD CONTROL( TABUCO SECT.) NAGA CITY CAMARINES SUR | Region V | Camarines Sur 3rd DEO | Completed | ₱24.5M | 100% | Medium risk46 | —-0.087 |
| 116 | 18OF0093REHABILITATION/ IMPROVEMENT OF TULLAHAN RIVER, BRGY. NORTH FAIRVIEW (PHASE II), Q.C. | National Capital Region | Quezon City 1st DEO | Completed | ₱46.5M | 100% | Medium risk46 | —-0.086 |
| 117 | 20FE0058OO2: FLOOD MANAGEMENT - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF REVETMENT (ALONG LIBMANAN RIVER) WITHIN BICOL RIVER BASIN, BRGY. TAMPUHAN, LIBMANAN, CAMARINES SUR | Region V | Camarines Sur 2nd DEO | Completed | ₱45.4M | 100% | Medium risk46 | —-0.086 |
| 118 | 18FE0028ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION/IMPROVEMENT OF CALABANGA FLOOD CONTROL, SAN ANTONIO CREEK, BRGY. QUIPAYO, CALABANGA CAMARINES SUR (WITH ROW ACQUISITION) | Region V | Camarines Sur 3rd DEO | Completed | ₱26.7M | 100% | Medium risk46 | —-0.085 |
| 119 | 20FF0005ORGANIZATIONAL OUTCOME 2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOOD FLOOD MGT. PROGRAM-CONST. /REHAB. OF FLOOD MITIGATON FACILITIES W/IN MAJOR RIVER BASINS-CONST. OF BICOL RIVER FLOOD CONTROL (PONONG SECT.)MAGARAO CAMARINES SUR | Region V | Camarines Sur 3rd DEO | Completed | ₱20.4M | 100% | Medium risk46 | —-0.087 |
| 120 | 20FF0004ORGANIZATIONAL OUTCOME 2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOOD-FLOOD MGT. PROGRAM CONST./REHAB. OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASIN CONST. OF BICOL RIVER FLOOD CONTROL,BRGY. IQUIN,CANAMAN CAMARINES SUR | Region V | Camarines Sur 3rd DEO | Completed | ₱23.6M | 100% | Medium risk46 | —-0.087 |
| 121 | 18OC0124IMPROVEMENT OF PARAÑAQUE RIVER SOUTH NEAR PARAÑAQUE NATIONAL HIGH SCHOOL,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱46.1M | 100% | Medium risk46 | —-0.086 |
| 122 | 19FH0066CONSTRUCTION OF FLOOD MITIGATION STRUCTURE CONSTRUCTION OF DRAINAGE SYSTEM AT STA. ELENA-SAN ROQUE (PHASE II), VIRAC, CATANDUANES | Region V | Catanduanes DEO | Completed | ₱39.2M | 100% | Medium risk46 | —-0.087 |
| 123 | 18OC0051CONSTRUCTION OF REVETMENT WALL ALONG ESTERO TRIPA DE GALLINA, BARANGAY PALANAN, DISTRICT I,MAKATI CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱27.6M | 100% | Medium risk46 | —-0.088 |
| 124 | 18OC0072UPGRADING AND DRAINAGE IMPROVEMENT OF FILMORE STREET INCLUDING LATERALS, BARANGAY PALANAN, DISTRICT I,MAKATI CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | Completed | ₱18.3M | 100% | Medium risk46 | —-0.087 |
| 125 | 18AD0043CONSTRUCTION IMPROVEMENT OF ACCESS ROADS LEADING TO TOURISM DESTINATION, CERVANTES-SIGAY ROAD LEADING TO TIRAD PASS VIA BRGY. LIBANG, CERVANTES, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱18.9M | 100% | Medium risk45 | —-0.088 |