Contractor dossier
174 projects on file, including joint ventures this contractor is part of.
Total projects
174
Total budget
₱6.6B
Average progress
97.4%
Completion rate
93.1%
Average risk score
48.8
Medium risk on average, out of 100
Flagged as unusual
5
2.9% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region V | 51 | ₱2B | 54.6 | 4 | 96.4% |
| Region IV-A | 40 | ₱1.4B | 43.8 | 0 | 98.3% |
| National Capital Region | 38 | ₱2B | 51.2 | 0 | 98.5% |
| Region I | 29 | ₱517.2M | 44.0 | 0 | 97.9% |
| Region III | 8 | ₱387M | 40.5 | 0 | 100.0% |
| Region VIII | 6 | ₱300.4M | 48.1 | 0 | 100.0% |
| Cordillera Administrative Region | 1 | ₱100M | 69.0 | 1 | 20.8% |
| Region IV-B | 1 | ₱14.7M | 49.8 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Flood Control and Drainage | 65 | ₱2.7B | 49.2 | 2 | 99.3% |
| Buildings and Facilities | 53 | ₱1.8B | 42.0 | 1 | 97.4% |
| Roads | 37 | ₱1.4B | 52.4 | 0 | 97.4% |
| OTHER | 9 | ₱424.2M | 68.7 | 1 | 100.0% |
| Bridges | 8 | ₱142.4M | 46.4 | 0 | 89.4% |
| Bridges, Roads | 2 | ₱215.5M | 67.0 | 1 | 60.4% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23FF0014001;NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-TERTIARY ROAD-NAGA CITY BOUNDARY-CALABANGA- BALONGAY ROAD,KO441+450-K0442+975.30,MAGARAO CAMARINES SUR | Region V | Camarines Sur 3rd DEO | On-Going | ₱94.5M | 100% | High risk82 | Flagged0.007 |
| 17FB0008OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, , LEGAZPI CITY-PUNTA DE JESUS ROAD, S05860LZ, K0539+241-K0541+000, K0541+656-K0543+000 | Region V | Albay 2nd DEO | Completed | ₱45.3M | 100% | High risk77 | —-0.036 |
| 24CC0173CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE AT BARANGAY SULIVAN (PUROK 3), BALIUAG, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱77.2M | 100% | High risk76 | —-0.060 |
| 17FC0059REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS,SLOPE COLLAPSE AND LANDSLIDE,TERTIARY BAG | Region V | Camarines Norte DEO | Completed | ₱17.2M | 100% | High risk73 | —-0.034 |
| 17AD0004CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS: CONSTRUCTION OF STA. CRUZ-SUYO-SIGAY-DEL PILAR ROAD LEADING TO TIRAD PASS SHRINE. STA. CRUZ, ILOCOS SUR, 2ND LD | Region I | Ilocos Sur 2nd DEO | Completed | ₱49M | 100% | High risk73 | —-0.023 |
| 16DK0120CONST AND MAINT OF BRIDGES ALONG NAT'L ROADS REPLACEMENT OF WEAK BRIDGE @ CAMAYSA BRIDGE-TAYABAS CIT | Region IV-A | Quezon 1st DEO | Completed | ₱49M | 100% | High risk72 | —-0.031 |
| 22AD0042CONSTRUCTION OF SIDAOEN-BACSAYAN ROAD LEADING TO SANGBAY NI RAGSAK FALLS, BARANGAYS SIDAOEN AND BACSAYAN, STA. CRUZ, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱9.9M | 100% | High risk72 | —-0.029 |
| 18P00055CLUSTER I :A) REPAIR/REHABILITATION/IMPROVEMENT OF LUZONG-TUQUIPA ROAD, BRGYS. LUZONG AND TUQUIPA, LUBA, ABRAB) REPAIR/ REHABILITATION/ IMPROVEMENT OF SITIO CABA-GAYAMAN ROAD, BRGY GAYAMAN, LUBA, ABRAC) REPAIR/REHABILITATION/ IMPROVEMENT OF SABNANGA | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱100M | 21% | High risk69 | Flagged0.082 |
| 17DB0100CONSTRUCTION OF BAYWALK IN BUTONG, TAAL, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱47.5M | 100% | High risk68 | —-0.073 |
| 16F00145RECONSTRUCTION/REHABILITATION/RESTORATION OF VARIOUS FLOOD CONTROL PROJECTS IN THE PROVINCE OF CAMARINES SUR: ANAYAN RIVER ( ANAYAN DAM),SAN ISIDRO, BULA, CAMARINES SUR, CAMARINES SUR 5TH LEGISLATIVE DISTRICT | Region V | Region V | Completed | ₱79.6M | 100% | High risk67 | Flagged0.002 |
| 17A00015ASSET PRESERVATION, REHAB/RECON/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INC. DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT-4 (HDM-4), TAGUDIN-CERVANTES ROAD, K0324+854-K0325+1001, K0326+000-K0326+277, K0348+730-K0349+29 | Region I | Region I | Completed | ₱68.7M | 100% | High risk67 | —-0.048 |
| 16F00141RECONST./REHAB./REST. OF VARIOUS FLOOD CONTROL PROJECTS IN THE PROVINCE OF CAMARINES SUR, PAWILI RIVER (SAN JOSE SECTION), SAN JOSE, BULA, CAMARINES SUR 5TH LEGISLATIVE DISTRICT | Region V | Region V | Completed | ₱81.5M | 100% | High risk67 | Flagged0.003 |
| 19FA0080CLUSTER 44-REHAB/RESTORATION/RECONSTRUCTION OF COMUN FC DOWNSTREAM, MALINAO,ALBAY; TAYHI RC,TABACO CITY AND BAGONG SAN ROQUE SITE 1 RC, STO. DOMINGO, ALBAY | Region V | Albay 1st DEO | Completed | ₱84.7M | 100% | High risk66 | —-0.022 |
| 23OD0241CLUSTER 01: CONSTRUCTION OF NEW PUP CAMPUS IN CALOOCAN NORTH, BARANGAY 168, CALOOCAN CITYA. CONSTRUCTION OF NEW POLYTECHNIC UNIVERSITY OF THE PHILIPPINES, BARANGAY 168, CALOOCAN CITYB. CONSTRUCTION OF ADMINISTRATIVE BUILDING - POLYTECHNIC UNIVERSITY | National Capital Region | Metro Manila 3rd DEO | Completed | ₱116.4M | 100% | High risk65 | —-0.026 |
| 17FE0005ASSET PRESERVATION OF NATIONAL ROADS-PREVENTIVE MAINTENANCE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT 4 (HDM-4)-TERTIARY, NAGA CITY BDRY-CALABANGA-BALONGAY ROAD, K0454+757-K0457+000 | Region V | Camarines Sur 3rd DEO | Completed | ₱15.4M | 100% | High risk65 | —-0.065 |
| 21OF0192CONSTRUCTION OF FLOOD CONTROL STRUCTURES AT BARANGAY COMMONWEALTH, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱95M | 100% | High risk65 | —-0.074 |
| 21OF0193CONSTRUCTION OF FLOOD CONTROL STRUCTURES AT BARANGAY BAGONG SILANGAN, QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱95M | 100% | High risk65 | —-0.074 |
| 20D00036FY 2020 DPWH INFRASTRUCTURE PROGRAM ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF MISSING LINKS/NEW ROADS, TAGAYTAY CALAMBA ROAD VIA CANLUBANG, LAGUNA SECTION, LAGUNA | Region IV-A | Region IV-A | Completed | ₱115.4M | 100% | High risk65 | —-0.056 |
| 17AD0011CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF FLOOD CONTROL ALONG SEVILLA BRIDGE MNR (DEEPENING OF WATERWAY AND CONSTRUCTION OF REVETMENT WALL), STA. CRUZ, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱10.7M | 100% | High risk65 | —-0.044 |
| 25DM0092CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT PIRIS RIVER, BRGY. SABANG PIRIS, BUENAVISTA, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.7M | 52% | High risk65 | —-0.029 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 18P00055CLUSTER I :A) REPAIR/REHABILITATION/IMPROVEMENT OF LUZONG-TUQUIPA ROAD, BRGYS. LUZONG AND TUQUIPA, LUBA, ABRAB) REPAIR/ REHABILITATION/ IMPROVEMENT OF SITIO CABA-GAYAMAN ROAD, BRGY GAYAMAN, LUBA, ABRAC) REPAIR/REHABILITATION/ IMPROVEMENT OF SABNANGA | Cordillera Administrative Region | Cordillera Administrative Region | On-Going | ₱100M | 21% | High risk69 | Flagged0.082 |
| 18FB0308CONSTRUCTION OF CLASSROOM 4STY8CL, PAG-ASA NATIONAL HIGH SCHOOL, PAG-ASA, RAWIS, LEGAZPI CITY (9.5M X 28.00M) | Region V | Albay 2nd DEO | On-Going | ₱37.1M | 100% | High risk61 | Flagged0.017 |
| 23FF0014001;NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-TERTIARY ROAD-NAGA CITY BOUNDARY-CALABANGA- BALONGAY ROAD,KO441+450-K0442+975.30,MAGARAO CAMARINES SUR | Region V | Camarines Sur 3rd DEO | On-Going | ₱94.5M | 100% | High risk82 | Flagged0.007 |
| 16F00141RECONST./REHAB./REST. OF VARIOUS FLOOD CONTROL PROJECTS IN THE PROVINCE OF CAMARINES SUR, PAWILI RIVER (SAN JOSE SECTION), SAN JOSE, BULA, CAMARINES SUR 5TH LEGISLATIVE DISTRICT | Region V | Region V | Completed | ₱81.5M | 100% | High risk67 | Flagged0.003 |
| 16F00145RECONSTRUCTION/REHABILITATION/RESTORATION OF VARIOUS FLOOD CONTROL PROJECTS IN THE PROVINCE OF CAMARINES SUR: ANAYAN RIVER ( ANAYAN DAM),SAN ISIDRO, BULA, CAMARINES SUR, CAMARINES SUR 5TH LEGISLATIVE DISTRICT | Region V | Region V | Completed | ₱79.6M | 100% | High risk67 | Flagged0.002 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 126 | 22AD0029CONSTRUCTION OF SIGAY-STA.CRUZ ROAD, STA. CRUZ, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱29.4M | 100% | Medium risk45 | —-0.077 |
| 127 | 18AD0042CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION-ACCESS ROAD LEADING TO SANGBAY NI RAGSAK FALLS, BRGY. URZADAN, SUYO, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱32.6M | 100% | Medium risk45 | —-0.079 |
| 128 | 18AD0038CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF BUAYA RIVER CONTROL, (UPSTREAM SECTION, BRGY. TAMPUGO, BESALAN, QUINSORIANO), STA. CRUZ, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱32.9M | 100% | Medium risk45 | —-0.063 |
| 129 | 19AD0067CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DSETINATIONS: CERVANTES-SIGAY ROAD LEADING TO TIRAD PASS IA BRGY. LIBANG, CERVANTES, ILOCOS SUR, BRGY. LIBANG, CERVANTES, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱14M | 100% | Medium risk45 | —-0.088 |
| 130 | 18DQ0102REHABILITATION/ RENOVATION/ IMPROVEMENT OF EXISTING BHS, BENJAMIN TIRONA BHS, MUNICIPALITY OF GENERAL MARIANO ALVAREZ, CAVITE, NEW CONSTRUCTION OF RHU, MEMIJE RHU, MUNICIPALITY OF GENERAL MARIANO ALVAREZ, CAVITE AND CONSTRUCTION/ REPAIR/ RENOVATION/ UPGRA | Region IV-A | Region IV-A | Completed | ₱7.7M | 100% | Medium risk45 | —-0.060 |
| 131 | 18DB0224CONSTRUCTION AND COMPLETION OF SCHOOL BUILDING FOUR (4) STOREY EIGHT (8) CLASSROOM AT NASUGBU WEST CS, NASUGBU, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱16.8M | 100% | Medium risk45 | —-0.055 |
| 132 | 21AD0086CONSTRUCTION OF SIGAY-STA. CRUZ ROAD, STA. CRUZ, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱19.6M | 100% | Medium risk45 | —-0.085 |
| 133 | 18DB0225CONSTRUCTION AND COMPLETION OF SCHOOL BUILDING FOUR (4) STOREY EIGHT (8) CLASSROOM AT BILARAN NATIONAL HIGH SCHOOL, NASUGBU, BATANGAS | Region IV-A | Batangas 1st DEO | Completed | ₱16.9M | 100% | Medium risk45 | —-0.054 |
| 134 | 18AD0035CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS: RECONSTRUCTION OF CONCRETE ROAD ALONG CERVANTES MUNICIPAL STREETS INCLUDING DRAINAGE, (ALEJANDRINO ST., DESIERTO ST., CABAROAN ST.) , CERVANTES, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱9.4M | 100% | Medium risk44 | —-0.087 |
| 135 | 21AD0037CONSTRUCTION OF BUAYA RIVER CONTROL ALONG BARANGAY QUINSORIANO, STA. CRUZ, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱19.6M | 100% | Medium risk44 | —-0.065 |
| 136 | 22AD0086CONSTRUCTION OF BUAYA RIVER CONTROL, STA. CRUZ, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱19.6M | 100% | Medium risk44 | —-0.070 |
| 137 | 18AD0135REHABILITATION OF AMGAYANG FLOOD CONTROL, BRGY. MALAYA, CERVANTES, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱5.7M | 100% | Medium risk44 | —-0.024 |
| 138 | 18AC0061CONSTRUCTION OF NAGCULLOOBAN RIVER CONTROL, NAGCULLOOBAN, SINAIT,ILOCOS SUR | Region I | Ilocos Sur 1st DEO | Completed | ₱16M | 100% | Medium risk44 | —-0.069 |
| 139 | 18AC0019CONSTRUCTION OF CADANGLAAN RIVER CONTROL, SINAIT, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | Completed | ₱15.9M | 100% | Medium risk44 | —-0.069 |
| 140 | 18AC0060CONSTRUCTION OF SEAWALL, KATIPUNAN, SINAIT, ILOCOS SUR | Region I | Ilocos Sur 1st DEO | Completed | ₱16.9M | 100% | Medium risk44 | —-0.058 |
| 141 | 18AD0115CONSTRUCTION AND COMPLETION OF SCHOOL BUILDINGS IN THE ELEMENTARY AND SECONDARY CLASSROOMS, TAGUDIN CS, TAGUDIN, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱19.5M | 100% | Medium risk43 | —-0.038 |
| 142 | 18DD0726COMPLETION OF 4STY20CL SCHOOL BUILDING AT PADRE VALERIO MALABANAN MEMORIAL SCHOOL, LIPA CITY, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱6.4M | 100% | Medium risk43 | —-0.055 |
| 143 | 18DB0240COMPLETION OF SCHOOL BUILDING 4STY 12CL AT BALAYAN WEST CENTRAL SCHOOL | Region IV-A | Batangas 1st DEO | Completed | ₱13.6M | 100% | Medium risk43 | —-0.047 |
| 144 | 18DD0702COMPLETION OF 4STY12CL SCHOOL BUILDING AT RIZAL NATIONAL HIGH SCHOOL, LIPA CITY, BATANGAS | Region IV-A | Batangas 4th DEO | Completed | ₱5.4M | 100% | Medium risk43 | —-0.056 |
| 145 | 18AD0110CONSTRUCTION AND COMPLETION OF SCHOOL BUILDINGS IN THE ELEMENTARY AND SECONDARY CLASSROOMS, SUSO ES, STA. MARIA, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱11.3M | 100% | Medium risk42 | —-0.043 |
| 146 | 18AD0052ROAD UPGRADING/CONCRETING OF ROAD LEADING TO KAGUTUNGAN FALLS, BRGY. DALIGAN, STA. CRUZ, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱8.5M | 100% | Medium risk42 | —-0.088 |
| 147 | 17DO0097CONSTRUCTION OF FOUR (4) STOREY WORKSHOP BUILDING AT BAYUGO NHS, JALAJALA, RIZAL | Region IV-A | Rizal 2nd DEO | Completed | ₱18.4M | 100% | Medium risk42 | —-0.031 |
| 148 | 17DK0126CONSTRUCTION OF TWO(2) UNITS ONE(1) STOREY WORKSHOP BUILDING (REGULAR) @ LANGGAS NATIONAL HIGH SCHOOL, INFANTA, QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱6.7M | 100% | Medium risk39 | —-0.032 |
| 149 | 21AD0113CONCRETING OF SITIO LINGGAWA BRGY. PIDPID FMR, BRGY. PIDPID, STA. CRUZ, ILOCOS SUR | Region I | Ilocos Sur 2nd DEO | Completed | ₱11.9M | 100% | Medium risk39 | —-0.034 |
| 150 | 17FC0405CONST. OF TWO (2) STOREY TWELVE (12) C/L SCHOOL BLDG., LABO ES, LABO CAMS. NORTE (2) | Region V | Camarines Norte DEO | Completed | ₱28.2M | 100% | Medium risk38 | —-0.015 |