Opening the dossier…
Opening the dossier…
Contractor dossier
46 projects on file, including joint ventures this contractor is part of.
Total projects
46
Total budget
₱1.5B
Average progress
86.9%
Completion rate
69.6%
Below 70%
Average risk score
50.2
Medium risk on average, out of 100
Flagged as unusual
10
21.7% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region II | 28 | ₱1.1B | 51.0 | 7 | 83.3% |
| Cordillera Administrative Region | 18 | ₱428.1M | 49.0 | 3 | 92.5% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 18 | ₱284.9M | 41.6 | 0 | 99.4% |
| Flood Control and Drainage | 9 | ₱369.6M | 49.0 | 1 | 88.4% |
| Buildings and Facilities | 6 | ₱73.7M | 36.4 | 0 | 100.0% |
| Bridges | 3 | ₱258.2M | 57.4 | 2 | 33.0% |
| Water Provision and Storage | 3 | ₱10.8M | 28.9 | 0 | 100.0% |
| GAA 2025 SSP | 2 | ₱58.2M | 95.8 | 2 | 58.0% |
| GAA 2025 OO-1 | 2 | ₱61.8M | 92.7 | 2 | 55.9% |
| OTHER | 2 | ₱313.8M | 87.2 | 2 | 61.7% |
| GAA 2025 OO-2 | 1 | ₱48.9M | 90.2 | 1 | 60.7% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25PB0030CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - BIP- MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING CAGLAYAN ELEMENTARY SCHOOL, BARANGAY CAGLAYAN, CONNER, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱9.8M | 91% | High risk96 | Flagged0.012 |
| 25BC0061CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (NWCGH), BRGY. PINILI, LIBERTAD, ABULUG, CAGAYAN (PACKAGE 4) | Region II | Cagayan 2nd DEO | On-Going | ₱48.4M | 25% | High risk96 | Flagged0.033 |
| 25PB0032ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM-REPLACEMENT OF PERMANENT WEAK BRIDGES,MALABANIG BR. (B04237LZ) ALONG-ILOCOS NORTE RD(PHASE II) | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱29.1M | 70% | High risk93 | Flagged0.004 |
| 25B00056OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - ALONG MAHARLIKA HIGHWAY (CAGAYAN VALLEY ROAD), K0534+000 - K0534+142.80, K0534+991 - K0536+000, K0537+000 - | Region II | Region II | On-Going | ₱32.7M | 42% | High risk92 | Flagged0.010 |
| 24BD0230OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF BASI FLOOD CONTROL SYSTEM, PACKAGE 1, BASI, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱95.5M | 34% | High risk91 | Flagged0.075 |
| 25BC0023ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS - CONSTRUCTION OF ALANNAY FLOOD CONTROL STRUCTURE ALONG ZINUNDUNGAN RIVER, LAS | Region II | Cagayan 2nd DEO | On-Going | ₱48.9M | 61% | High risk90 | Flagged0.001 |
| 24B00072OO1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - CONSTRUCTION OF NEW BRIDGES - POBLACION - BAGUNOT BRIDGE, BAGGAO, CAGAYAN | Region II | Region II | On-Going | ₱218.3M | 90% | High risk84 | Flagged0.036 |
| 24BD0229OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF CENTRO FLOOD CONTROL SYSTEM, PACKAGE 1, CENTRO, SOLANA | Region II | Cagayan 3rd DEO | On-Going | ₱95.4M | 21% | High risk71 | Flagged0.048 |
| 25PB0043NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS : PIDDIG, CARASI (ILOCOS NORTE)-CALANASAN-LANGNAO-KABUGAO ROAD - PACKAGE 2 (CONSTRUCTION OF CONCRETE BRIDGE), APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱141.7M | 3% | High risk67 | Flagged0.021 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24BD0230OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF BASI FLOOD CONTROL SYSTEM, PACKAGE 1, BASI, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱95.5M | 34% | High risk91 | Flagged0.075 |
| 24BD0229OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF CENTRO FLOOD CONTROL SYSTEM, PACKAGE 1, CENTRO, SOLANA | Region II | Cagayan 3rd DEO | On-Going | ₱95.4M | 21% | High risk71 | Flagged0.048 |
| 24B00072OO1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - CONSTRUCTION OF NEW BRIDGES - POBLACION - BAGUNOT BRIDGE, BAGGAO, CAGAYAN | Region II | Region II | On-Going | ₱218.3M | 90% | High risk84 | Flagged0.036 |
| 25BC0061CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (NWCGH), BRGY. PINILI, LIBERTAD, ABULUG, CAGAYAN (PACKAGE 4) | Region II | Cagayan 2nd DEO | On-Going | ₱48.4M | 25% | High risk96 | Flagged0.033 |
| 25PB0043NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS : PIDDIG, CARASI (ILOCOS NORTE)-CALANASAN-LANGNAO-KABUGAO ROAD - PACKAGE 2 (CONSTRUCTION OF CONCRETE BRIDGE), APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱141.7M | 3% | High risk67 | Flagged0.021 |
| 25PB0030CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - BIP- MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING CAGLAYAN ELEMENTARY SCHOOL, BARANGAY CAGLAYAN, CONNER, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱9.8M | 91% | High risk96 | Flagged0.012 |
| 25B00080OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - GUISING BR. (B01092LZ) ALONG MAHARLIKA HIGHWAY (CAGAYAN VALLEY RD) | Region II | Region II | On-Going | ₱67.5M | 0% | Medium risk54 | Flagged0.010 |
| 25B00056OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - ALONG MAHARLIKA HIGHWAY (CAGAYAN VALLEY ROAD), K0534+000 - K0534+142.80, K0534+991 - K0536+000, K0537+000 - | Region II | Region II | On-Going | ₱32.7M | 42% | High risk92 | Flagged0.010 |
| 25PB0032ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM-REPLACEMENT OF PERMANENT WEAK BRIDGES,MALABANIG BR. (B04237LZ) ALONG-ILOCOS NORTE RD(PHASE II) | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱29.1M | 70% | High risk93 | Flagged0.004 |
| 25BC0023ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS - CONSTRUCTION OF ALANNAY FLOOD CONTROL STRUCTURE ALONG ZINUNDUNGAN RIVER, LAS | Region II | Cagayan 2nd DEO | On-Going | ₱48.9M | 61% | High risk90 | Flagged0.001 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25PB0030CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - BIP- MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING CAGLAYAN ELEMENTARY SCHOOL, BARANGAY CAGLAYAN, CONNER, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱9.8M | 91% | High risk96 | Flagged0.012 |
| 2 | 25BC0061CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (NWCGH), BRGY. PINILI, LIBERTAD, ABULUG, CAGAYAN (PACKAGE 4) | Region II | Cagayan 2nd DEO | On-Going | ₱48.4M | 25% | High risk96 | Flagged0.033 |
| 3 | 25PB0032ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM-REPLACEMENT OF PERMANENT WEAK BRIDGES,MALABANIG BR. (B04237LZ) ALONG-ILOCOS NORTE RD(PHASE II) | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱29.1M | 70% | High risk93 | Flagged0.004 |
| 4 | 25B00056OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - ALONG MAHARLIKA HIGHWAY (CAGAYAN VALLEY ROAD), K0534+000 - K0534+142.80, K0534+991 - K0536+000, K0537+000 - | Region II | Region II | On-Going | ₱32.7M | 42% | High risk92 | Flagged0.010 |
| 5 | 24BD0230OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF BASI FLOOD CONTROL SYSTEM, PACKAGE 1, BASI, SOLANA, CAGAYAN | Region II | Cagayan 3rd DEO | On-Going | ₱95.5M | 34% | High risk91 | Flagged0.075 |
| 6 | 25BC0023ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEMS - CONSTRUCTION OF ALANNAY FLOOD CONTROL STRUCTURE ALONG ZINUNDUNGAN RIVER, LAS | Region II | Cagayan 2nd DEO | On-Going | ₱48.9M | 61% | High risk90 | Flagged0.001 |
| 7 | 24B00072OO1: ENSURE SAFE & RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - CONSTRUCTION OF NEW BRIDGES - POBLACION - BAGUNOT BRIDGE, BAGGAO, CAGAYAN | Region II | Region II | On-Going | ₱218.3M | 90% | High risk84 | Flagged0.036 |
| 8 | 24BD0229OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF CENTRO FLOOD CONTROL SYSTEM, PACKAGE 1, CENTRO, SOLANA | Region II | Cagayan 3rd DEO | On-Going | ₱95.4M | 21% | High risk71 | Flagged0.048 |
| 9 | 25PB0043NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF MISSING LINKS/ NEW ROADS : PIDDIG, CARASI (ILOCOS NORTE)-CALANASAN-LANGNAO-KABUGAO ROAD - PACKAGE 2 (CONSTRUCTION OF CONCRETE BRIDGE), APAYAO | Cordillera Administrative Region | Apayao 1st DEO | On-Going | ₱141.7M | 3% | High risk67 | Flagged0.021 |
| 10 | 24BB0128CSSP-BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST OF FLOOD MITIGATION STRUCTURE - CONST OF WATERWAY IMPROVEMENTS ALONG RIVERBANKS, BARANGAY BAGUMBAYAN (UPSTREAM), LAL-LO, CAGAYAN RIVER, LAL-LO, CAGAYAN | Region II | Cagayan 1st DEO | On-Going | ₱95.5M | 74% | Medium risk59 | —-0.015 |
| 11 | 19PB0006NETWORK DEVELOPMENT-CONSTRUCTION OF MISSING LINKS / NEW ROADS ABRA-KALINGA-APAYAO ROAD (BULUAN-BANBAN-PUGUIN-SACPIL- PINUKPOK), PACKAGE 3, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱56.3M | 100% | Medium risk56 | —-0.073 |
| 12 | 22PB0013BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY GUINAMGAMAN, CONNER, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱5M | 100% | Medium risk54 | —-0.078 |
| 13 | 25B00080OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - GUISING BR. (B01092LZ) ALONG MAHARLIKA HIGHWAY (CAGAYAN VALLEY RD) | Region II | Region II | On-Going | ₱67.5M | 0% | Medium risk54 | Flagged0.010 |
| 14 | 23PB0038BASIC INFRASTRUCTURE PROGRAM(BIP)- ACCESS ROADS AND/ OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES-CONSTRUCTION OF ROAD, BRGY. CAGLAYAN-MAUBBA TO MAKATEL, CONNER, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱49.5M | 100% | Medium risk52 | —-0.076 |
| 15 | 20PB0005NETWORK DEVELOPMENT - OFF-CARRIAGEWAY IMPROVEMENT - SECONDARY ROADS CONNER-KABUGAO RD (K0598+347 - K0598+617) | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱5.2M | 100% | Medium risk51 | —-0.079 |
| 16 | 24BB0046OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-BRIDGE PROGRAM-CONSTRUCTION OF NEW BRIDGES, CONSTRUCTION OF CONCRETE BRIDGE - TALLANG BRIDGE 1 (PHASE II) ALONG BAYBAYOG-BAGGAO-DALIN-STA. MARGARITA RD, BAGGAO, CAGAYAN | Region II | Cagayan 1st DEO | On-Going | ₱48.9M | 96% | Medium risk51 | —-0.011 |
| 17 | 23PB0014FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF BADDUAT RIVER FLOOD CONTROL ALONG APAYAO-ABULUG RIVER BASIN (UPSTREAM), STA.83+232 - STA.83+292, KABUGAO | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.062 |
| 18 | 21PB0008ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE, SECONDARY ROADS- CONNER-KABUGAO RD-K0597+625 -K0597+725, K0603+216 - K0603+266 | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱4.9M | 100% | Medium risk50 | —-0.079 |
| 19 | 22PB0005FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF BARREN RIVER (UPSTREAM) FLOOD CONTROL STRUCTURE, STA. 39+693 - STA. 39+993 (L/S), BRGY. ILI, CONNER | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱22.9M | 100% | Medium risk49 | —-0.065 |
| 20 | 20PB0015CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF KARAGAWAN RIVER (UPSTREAM) FLOOD CONTROL, BRGY. BADDUAT, KABUGAO, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱18.9M | 100% | Medium risk49 | —-0.061 |
| 21 | 20PB0016CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF KARAGAWAN RIVER (DOWNSTREAM) FLOOD CONTROL, BRGY. LUTTUACAN, KABUGAO, APAYAO | Cordillera Administrative Region | Apayao 1st DEO | Completed | ₱19M | 100% | Medium risk49 | —-0.063 |
| 22 | 24BD0002ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT - ROAD WIDENING - TERTIARY ROADS - CAGAYAN-APAYAO RD. K0495+000 - K0496+572 | Region II | Cagayan 3rd DEO | On-Going | ₱39.5M | 100% | Medium risk49 | —-0.049 |
| 23 | 24BD0038ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - TERTIARY ROADS - CAGAYAN-APAYAO RD - K0491 + 553 - K0492 + 233 | Region II | Cagayan 3rd DEO | On-Going | ₱20.7M | 90% | Medium risk49 | —-0.049 |
| 24 | 20BD0074LOCAL PROGRAM - CONST/REPAIR/REHAB/IMPROVEMENT OF VARIOUS INFRA INCLUDING LOCAL PROJECTS FLOOD CONTROL AND DRAINAGE -DRAINAGE/PROTECTION WORKS,CONST/REHAB OF DRAINAGE SYSTEM ALONGTUG DIVERSION ROAD 2 (CAGAYAN HIGH -TUG DIVERSION RD. 2), TUG CITY, CA | Region II | Cagayan 3rd DEO | Completed | ₱19.2M | 100% | Medium risk48 | —-0.062 |
| 25 | 19BD0001CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES-LAKAMBINI TO BUGNAYVIA MAMBACAG CONNECTING TO PROVINCIAL AND NATIONALROAD TO ROBINA SUGAR MILLING COMPANY (CARSUMCO)IN SUPPOR | Region II | Cagayan 3rd DEO | Completed | ₱14.5M | 100% | Medium risk47 | —-0.083 |