Contractor dossier
11 projects on file, including joint ventures this contractor is part of.
Total projects
11
Total budget
₱222.3M
Average progress
100.0%
Completion rate
90.9%
Average risk score
34.9
Medium risk on average, out of 100
Flagged as unusual
0
0.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| National Capital Region | 3 | ₱55.9M | 41.9 | 0 | 100.0% |
| Region IV-B | 3 | ₱62M | 36.7 | 0 | 100.0% |
| Region XII | 2 | ₱36.3M | 22.7 | 0 | 100.0% |
| Region IV-A | 1 | ₱55M | 51.0 | 0 | 100.0% |
| Region XIII | 1 | ₱11M | 39.3 | 0 | 100.0% |
| Region X | 1 | ₱2M | 12.9 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 6 | ₱112.9M | 37.5 | 0 | 100.0% |
| Buildings and Facilities | 3 | ₱11.7M | 20.8 | 0 | 100.0% |
| Flood Control and Drainage | 2 | ₱97.6M | 48.5 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
Nothing to report.
No high-risk projects here.
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
Nothing to report.
No flagged projects here.
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 20DN0012CONSTRUCTION OF FLOOD CONTROL STRUCTURES, SITIO KAPATAGAN TO SITIO HABITAT RIVER (UPSTREAM PHASE 2), K0035+900 ALONG MARIKINA-INFANTA ROAD ANTIPOLO CITY, RIZAL (SECOND DISTRICT) | Region IV-A | Rizal 1st DEO | Completed | ₱55M | 100% | Medium risk51 | —-0.085 |
| 2 | 17OA0044REHAB. OF LOCAL ROAD, ILANG-ILANG ST. (FROM WALING-WALING ST. TO AZUCENA ST.) BRGY. TANZA, NAV. CITY | National Capital Region | Malabon-Navotas DEO | Completed | ₱10.4M | 100% | Medium risk49 | —-0.068 |
| 3 | 20OG0053REHABILITATION OF LAGARIAN CREEK, QUEZON CITY | National Capital Region | Quezon City 2nd DEO | Terminated | ₱42.6M | 100% | Medium risk46 | —-0.043 |
| 4 | 20NE0034REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG JCT. BOLODBOLOD-ALBOR ROAD, K0062+030-K0062+080, LIBJO, DINAGAT ISLANDS | Region XIII | Dinagat Islands DEO | Completed | ₱11M | 100% | Medium risk39 | —-0.088 |
| 5 | 18EA0116PACKAGE 37-A)CONCRETING OF 1.1 LANE KM. MAKAWAYAN TO PUROK STA. ANA ROAD, BARANGAY MAKAWAYAN, TORRIJ | Region IV-B | Marinduque DEO | Completed | ₱18M | 100% | Medium risk37 | —-0.094 |
| 6 | 18EA0114PACKAGE 35- A) CONCRETING OF 2.0 LANE KM MALIBAGO-MASILIG ROAD, BARANGAY MALIBAGO, TORRIJOS, MARINDU | Region IV-B | Marinduque DEO | Completed | ₱23.7M | 100% | Medium risk37 | —-0.094 |
| 7 | 18EA0117PACKAGE 38- A) CONCRETING OF 0.900 LANE KM. DAMPULAN-MAULAWIN ROAD, BARANGAY DAMPULAN, TORRIJOS, B) | Region IV-B | Marinduque DEO | Completed | ₱20.3M | 100% | Medium risk37 | —-0.091 |
| 8 | 17OB0272REPAIR OF BARANGAY HALL, BARANGAY CORAZON DE JESUS, SAN JUAN CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱2.8M | 100% | Medium risk31 | —-0.073 |
| 9 | 18MC0009TULUNAN (POBLACION) ROAD CONNECTING TO BRGY. DUNGOS, TULUNAN IN SUPPORT OF PALM OIL AND BANANA INDUSTRIES, TULUNAN, NORTH COTABATO STA. 0+000 TO STA. 1+300 | Region XII | Cotabato 2nd DEO | Completed | ₱29.4M | 100% | Low risk26 | —-0.089 |
| 10 | 20MB0115CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. BULA, GENERAL SANTOS CITY | Region XII | South Cotabato 1st DEO | Completed | ₱6.9M | 100% | Low risk19 | —-0.080 |
| 11 | 17KA0024CONSTRUCTION OF MPB, PATPAT, MALAYBALAY, BUKIDNONPATPAT, MALAYBALAY, BUKIDNON | Region X | Bukidnon 1st DEO | Completed | ₱2M | 100% | Low risk13 | —-0.070 |