Contractor dossier
163 projects on file, including joint ventures this contractor is part of.
Total projects
163
Total budget
₱8.9B
Average progress
97.2%
Completion rate
91.4%
Average risk score
46.8
Medium risk on average, out of 100
Flagged as unusual
9
5.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region X | 134 | ₱6.5B | 43.5 | 1 | 100.0% |
| Region IX | 22 | ₱1.8B | 64.9 | 8 | 79.2% |
| Region XIII | 5 | ₱357.2M | 51.4 | 0 | 100.0% |
| Region XI | 2 | ₱184M | 57.7 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 72 | ₱4.3B | 50.0 | 0 | 100.0% |
| Buildings and Facilities | 35 | ₱361.8M | 20.0 | 0 | 100.0% |
| Flood Control and Drainage | 30 | ₱2.4B | 56.4 | 5 | 87.2% |
| OTHER | 17 | ₱1.7B | 76.9 | 4 | 95.7% |
| Bridges | 6 | ₱142M | 45.6 | 0 | 100.0% |
| Water Provision and Storage | 3 | ₱7.4M | 18.4 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23J00140CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF TUMAGA RIVER FLOOD CONTROL (GUIWAN-TUGBUNGAN SECTION) WITH ESPLANADE, PACKAGE 2, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱143.2M | 88% | High risk84 | Flagged0.036 |
| 22J00126PREVENTIVE MAINTENANCE - PRIMARY ROADS PAGADIAN CITY - ZAMBOANGA CITY ROAD | Region IX | Region IX | On-Going | ₱98.6M | 76% | High risk82 | Flagged0.038 |
| 24J00304FLOOD MITIGATION STRUCTURES PROTECTING MAJOR / STRATEGIC PUB-LIC BUILDINGS / FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUC-TURE, TUMAGA RIVER (TUGBUNGAN SECTION), PACKAGE 3A, ZAM-BOANGA CITY | Region IX | Region IX | On-Going | ₱105.9M | 0% | High risk82 | Flagged0.069 |
| 24J00284CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF TUMAGA RIVER FLOOD CONTROL (TUGBUNGAN SECTION), ZAM-BOANGA CITY, PACKAGE 4 | Region IX | Region IX | On-Going | ₱96.2M | 62% | High risk81 | Flagged0.059 |
| 24JA0174CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TUMAGA RIVER (TETUAN SECTION), PACKAGE 3, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱96.6M | 0% | High risk80 | Flagged0.052 |
| 22K00371OFF-CARRIAGEWAY IMPROVEMENT-PRIMARY ROADS, SAYRE HIGHWAY K1480 + 940.000 - K1482 + 048.776, K1482 + 911.490 - K1483 +661.420, K1512 + 000 - K1515 + 000 | Region X | Region X | Completed | ₱142.6M | 100% | High risk79 | —-0.011 |
| 22KA0088OFF-CARRIAGEWAY IMPROVEMENT ALONG JCT SH-AGLAYAN-ALANIB-TICALAAN RD (AGLAYAN-BASAK)-K1528+000 - K1536+507, LANTAPAN, BUKIDNON, BANTUANON-BACLAYON, LANTAPAN, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.021 |
| 23K00185CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT MANTICAO RIVER (DOWNSTREAM OF MANTICAO BRIDGE) MANTICAO, MISAMIS ORIENTAL | Region X | Region X | Completed | ₱198M | 100% | High risk79 | —-0.009 |
| 22K00370ROAD WIDENING-TERTIARY ROADS, JCT. SH AGLAYAN-ZAMBOANGUITA RD.K1520 + 988.549-K1521 + 284.490, K1521 + 325.000-K1522 + 504.000, K1522 + 890.00, K1522 +943.750, K1522+977.000 - K1523 +847.402, K1542 + 500-K1544 + 500 | Region X | Region X | Completed | ₱116M | 100% | High risk78 | —-0.016 |
| 18K00257CLUSTER 57 CONST./IMPRVT. OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES & ECONOMIC ZONES & PAVING OF | Region X | Region X | Completed | ₱262.7M | 100% | High risk78 | Flagged0.000 |
| 23J00139CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF TUMAGA RIVER FLOOD CONTROL (GUIWAN-TUGBUNGAN SECTION) WITH ESPLANADE, PACKAGE 1, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱143.2M | 62% | High risk78 | Flagged0.025 |
| 22NG0091CONSTRUCTION OF ROAD, BARANGAY CAMP EDUARD, ALEGRIA, SURIGAO DEL NORTE / BARANGAY CAMP EDUARD, ALEGRIA, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱77.2M | 100% | High risk77 | —-0.012 |
| 23J00138CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF TUMAGA RIVER FLOOD CONTROL (TUGBUNGAN SECTION), ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱143.3M | 61% | High risk76 | Flagged0.005 |
| 24J00017CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TUMAGA RIVER (TUGBUNGAN SECTION) PHASE II, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱145.4M | 20% | High risk76 | Flagged0.010 |
| 24J00018CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TUMAGA RIVER (TUGBUNGAN SECTION) PHASE III, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱145.4M | 72% | High risk76 | —-0.004 |
| 22KB0083CONSTRUCTION OF REVETMENT, DOWNSTREAM AND UPSTREAM OF MANUTO BRIDGE (B01380MN) ALONG BUKIDNON-DAVAO CITY ROAD, MANUTO BRIDGE, BRGY SALAWAGAN, QUEZON, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱67.6M | 100% | High risk75 | —-0.030 |
| 22KB0086CONSTRUCTION OF REVETMENT, DOWNSTREAM AND UPSTREAM OF APOLANG BRIDGE (B01389MN) ALONG KIBAWE-KADINGILAN-KALILANGAN ROAD, APOLANG BRIDGE, BRGY WEST KIBAWE, KIBAWE, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱57.9M | 100% | High risk75 | —-0.031 |
| 24K00034CONST. OF BY-PASS AND DIVERSION ROADS,OPOL DIVERSION ROAD(OPOL-CANITOAN), PACKAGE 17, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱47.8M | 100% | High risk75 | —-0.006 |
| 22KB0072CONSTRUCTION OF REVETMENT, DOWNSTREAM AND UPSTREAM OF RAWARI BRIDGE (B01384MN) ALONG BUKIDNON-DAVAO CITY ROAD, RAWARI BRIDGE, SITIO RAWARI, KITAOTAO, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱67.6M | 100% | High risk75 | —-0.026 |
| 22KB0073CONSTRUCTION OF REVETMENT, DOWNSTREAM AND UPSTREAM OF SAN MIGUEL BRIDGE (B01432MN) ALONG MARAMAG-MARADUGAO ROAD, SAN MIGUEL BRIDGE, SAN MIGUEL, MARAMAG, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱67.6M | 100% | High risk75 | —-0.032 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24J00304FLOOD MITIGATION STRUCTURES PROTECTING MAJOR / STRATEGIC PUB-LIC BUILDINGS / FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUC-TURE, TUMAGA RIVER (TUGBUNGAN SECTION), PACKAGE 3A, ZAM-BOANGA CITY | Region IX | Region IX | On-Going | ₱105.9M | 0% | High risk82 | Flagged0.069 |
| 24J00284CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF TUMAGA RIVER FLOOD CONTROL (TUGBUNGAN SECTION), ZAM-BOANGA CITY, PACKAGE 4 | Region IX | Region IX | On-Going | ₱96.2M | 62% | High risk81 | Flagged0.059 |
| 24JA0174CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TUMAGA RIVER (TETUAN SECTION), PACKAGE 3, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱96.6M | 0% | High risk80 | Flagged0.052 |
| 22J00126PREVENTIVE MAINTENANCE - PRIMARY ROADS PAGADIAN CITY - ZAMBOANGA CITY ROAD | Region IX | Region IX | On-Going | ₱98.6M | 76% | High risk82 | Flagged0.038 |
| 23J00140CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF TUMAGA RIVER FLOOD CONTROL (GUIWAN-TUGBUNGAN SECTION) WITH ESPLANADE, PACKAGE 2, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱143.2M | 88% | High risk84 | Flagged0.036 |
| 23J00139CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF TUMAGA RIVER FLOOD CONTROL (GUIWAN-TUGBUNGAN SECTION) WITH ESPLANADE, PACKAGE 1, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱143.2M | 62% | High risk78 | Flagged0.025 |
| 24J00017CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TUMAGA RIVER (TUGBUNGAN SECTION) PHASE II, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱145.4M | 20% | High risk76 | Flagged0.010 |
| 23J00138CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF TUMAGA RIVER FLOOD CONTROL (TUGBUNGAN SECTION), ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱143.3M | 61% | High risk76 | Flagged0.005 |
| 18K00257CLUSTER 57 CONST./IMPRVT. OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES & ECONOMIC ZONES & PAVING OF | Region X | Region X | Completed | ₱262.7M | 100% | High risk78 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 23J00140CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF TUMAGA RIVER FLOOD CONTROL (GUIWAN-TUGBUNGAN SECTION) WITH ESPLANADE, PACKAGE 2, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱143.2M | 88% | High risk84 | Flagged0.036 |
| 2 | 22J00126PREVENTIVE MAINTENANCE - PRIMARY ROADS PAGADIAN CITY - ZAMBOANGA CITY ROAD | Region IX | Region IX | On-Going | ₱98.6M | 76% | High risk82 | Flagged0.038 |
| 3 | 24J00304FLOOD MITIGATION STRUCTURES PROTECTING MAJOR / STRATEGIC PUB-LIC BUILDINGS / FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUC-TURE, TUMAGA RIVER (TUGBUNGAN SECTION), PACKAGE 3A, ZAM-BOANGA CITY | Region IX | Region IX | On-Going | ₱105.9M | 0% | High risk82 | Flagged0.069 |
| 4 | 24J00284CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF TUMAGA RIVER FLOOD CONTROL (TUGBUNGAN SECTION), ZAM-BOANGA CITY, PACKAGE 4 | Region IX | Region IX | On-Going | ₱96.2M | 62% | High risk81 | Flagged0.059 |
| 5 | 24JA0174CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TUMAGA RIVER (TETUAN SECTION), PACKAGE 3, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱96.6M | 0% | High risk80 | Flagged0.052 |
| 6 | 22K00371OFF-CARRIAGEWAY IMPROVEMENT-PRIMARY ROADS, SAYRE HIGHWAY K1480 + 940.000 - K1482 + 048.776, K1482 + 911.490 - K1483 +661.420, K1512 + 000 - K1515 + 000 | Region X | Region X | Completed | ₱142.6M | 100% | High risk79 | —-0.011 |
| 7 | 22KA0088OFF-CARRIAGEWAY IMPROVEMENT ALONG JCT SH-AGLAYAN-ALANIB-TICALAAN RD (AGLAYAN-BASAK)-K1528+000 - K1536+507, LANTAPAN, BUKIDNON, BANTUANON-BACLAYON, LANTAPAN, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.021 |
| 8 | 23K00185CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT MANTICAO RIVER (DOWNSTREAM OF MANTICAO BRIDGE) MANTICAO, MISAMIS ORIENTAL | Region X | Region X | Completed | ₱198M | 100% | High risk79 | —-0.009 |
| 9 | 22K00370ROAD WIDENING-TERTIARY ROADS, JCT. SH AGLAYAN-ZAMBOANGUITA RD.K1520 + 988.549-K1521 + 284.490, K1521 + 325.000-K1522 + 504.000, K1522 + 890.00, K1522 +943.750, K1522+977.000 - K1523 +847.402, K1542 + 500-K1544 + 500 | Region X | Region X | Completed | ₱116M | 100% | High risk78 | —-0.016 |
| 10 | 18K00257CLUSTER 57 CONST./IMPRVT. OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES & ECONOMIC ZONES & PAVING OF | Region X | Region X | Completed | ₱262.7M | 100% | High risk78 | Flagged0.000 |
| 11 | 23J00139CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF TUMAGA RIVER FLOOD CONTROL (GUIWAN-TUGBUNGAN SECTION) WITH ESPLANADE, PACKAGE 1, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱143.2M | 62% | High risk78 | Flagged0.025 |
| 12 | 22NG0091CONSTRUCTION OF ROAD, BARANGAY CAMP EDUARD, ALEGRIA, SURIGAO DEL NORTE / BARANGAY CAMP EDUARD, ALEGRIA, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱77.2M | 100% | High risk77 | —-0.012 |
| 13 | 23J00138CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF TUMAGA RIVER FLOOD CONTROL (TUGBUNGAN SECTION), ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱143.3M | 61% | High risk76 | Flagged0.005 |
| 14 | 24J00017CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TUMAGA RIVER (TUGBUNGAN SECTION) PHASE II, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱145.4M | 20% | High risk76 | Flagged0.010 |
| 15 | 24J00018CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TUMAGA RIVER (TUGBUNGAN SECTION) PHASE III, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱145.4M | 72% | High risk76 | —-0.004 |
| 16 | 22KB0083CONSTRUCTION OF REVETMENT, DOWNSTREAM AND UPSTREAM OF MANUTO BRIDGE (B01380MN) ALONG BUKIDNON-DAVAO CITY ROAD, MANUTO BRIDGE, BRGY SALAWAGAN, QUEZON, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱67.6M | 100% | High risk75 | —-0.030 |
| 17 | 22KB0086CONSTRUCTION OF REVETMENT, DOWNSTREAM AND UPSTREAM OF APOLANG BRIDGE (B01389MN) ALONG KIBAWE-KADINGILAN-KALILANGAN ROAD, APOLANG BRIDGE, BRGY WEST KIBAWE, KIBAWE, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱57.9M | 100% | High risk75 | —-0.031 |
| 18 | 24K00034CONST. OF BY-PASS AND DIVERSION ROADS,OPOL DIVERSION ROAD(OPOL-CANITOAN), PACKAGE 17, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱47.8M | 100% | High risk75 | —-0.006 |
| 19 | 22KB0072CONSTRUCTION OF REVETMENT, DOWNSTREAM AND UPSTREAM OF RAWARI BRIDGE (B01384MN) ALONG BUKIDNON-DAVAO CITY ROAD, RAWARI BRIDGE, SITIO RAWARI, KITAOTAO, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱67.6M | 100% | High risk75 | —-0.026 |
| 20 | 22KB0073CONSTRUCTION OF REVETMENT, DOWNSTREAM AND UPSTREAM OF SAN MIGUEL BRIDGE (B01432MN) ALONG MARAMAG-MARADUGAO ROAD, SAN MIGUEL BRIDGE, SAN MIGUEL, MARAMAG, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱67.6M | 100% | High risk75 | —-0.032 |
| 21 | 23KB0039CONSTRUCTION OF REVETMENT, DOWNSTREAM AND UPSTREAM OF STEEL BRIDGE ALONG PULANGI RIVER, BARANGAY NATULONGAN, KIBAWE, BUKIDNON PACKAGE 2, NATULONGAN, KIBAWE, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱53.1M | 100% | High risk74 | —-0.036 |
| 22 | 22KB0082CONSTRUCTION OF REVETMENT, DOWNSTREAM AND UPSTREAM OF STEEL BRIDGE ALONG PULANGI RIVER, BARANGAY NATULONGAN, KIBAWE, BUKIDNON, STEEL BRIDGE, BRGY NATULONGAN, KIBAWE, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱39.2M | 100% | High risk72 | —-0.036 |
| 23 | 23K00118CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, OPOL DIVERSION ROAD (OPOL-CANITOAN), PACKAGE 15, CAGAYAN DE ORO CITY SECTION, CAGAYAN DE ORO CITY | Region X | Region X | Completed | ₱42.9M | 100% | High risk72 | —-0.028 |
| 24 | 21J00036ROAD WIDENING - PRIMARY ROADS - PAGADIAN CITY - ZAMBOANGA CITY ROAD | Region IX | Region IX | Completed | ₱94.6M | 100% | High risk70 | —-0.064 |
| 25 | 20J00010ROAD WIDENING - PRIMARY ROADS - PAGADIAN CITY - ZAMBOANGA CITY ROAD | Region IX | Region IX | Completed | ₱121.9M | 100% | High risk70 | —-0.069 |