Contractor dossier
163 projects on file, including joint ventures this contractor is part of.
Total projects
163
Total budget
₱8.9B
Average progress
97.2%
Completion rate
91.4%
Average risk score
46.8
Medium risk on average, out of 100
Flagged as unusual
9
5.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region X | 134 | ₱6.5B | 43.5 | 1 | 100.0% |
| Region IX | 22 | ₱1.8B | 64.9 | 8 | 79.2% |
| Region XIII | 5 | ₱357.2M | 51.4 | 0 | 100.0% |
| Region XI | 2 | ₱184M | 57.7 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 72 | ₱4.3B | 50.0 | 0 | 100.0% |
| Buildings and Facilities | 35 | ₱361.8M | 20.0 | 0 | 100.0% |
| Flood Control and Drainage | 30 | ₱2.4B | 56.4 | 5 | 87.2% |
| OTHER | 17 | ₱1.7B | 76.9 | 4 | 95.7% |
| Bridges | 6 | ₱142M | 45.6 | 0 | 100.0% |
| Water Provision and Storage | 3 | ₱7.4M | 18.4 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23J00140CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF TUMAGA RIVER FLOOD CONTROL (GUIWAN-TUGBUNGAN SECTION) WITH ESPLANADE, PACKAGE 2, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱143.2M | 88% | High risk84 | Flagged0.036 |
| 22J00126PREVENTIVE MAINTENANCE - PRIMARY ROADS PAGADIAN CITY - ZAMBOANGA CITY ROAD | Region IX | Region IX | On-Going | ₱98.6M | 76% | High risk82 | Flagged0.038 |
| 24J00304FLOOD MITIGATION STRUCTURES PROTECTING MAJOR / STRATEGIC PUB-LIC BUILDINGS / FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUC-TURE, TUMAGA RIVER (TUGBUNGAN SECTION), PACKAGE 3A, ZAM-BOANGA CITY | Region IX | Region IX | On-Going | ₱105.9M | 0% | High risk82 | Flagged0.069 |
| 24J00284CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF TUMAGA RIVER FLOOD CONTROL (TUGBUNGAN SECTION), ZAM-BOANGA CITY, PACKAGE 4 | Region IX | Region IX | On-Going | ₱96.2M | 62% | High risk81 | Flagged0.059 |
| 24JA0174CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TUMAGA RIVER (TETUAN SECTION), PACKAGE 3, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱96.6M | 0% | High risk80 | Flagged0.052 |
| 22K00371OFF-CARRIAGEWAY IMPROVEMENT-PRIMARY ROADS, SAYRE HIGHWAY K1480 + 940.000 - K1482 + 048.776, K1482 + 911.490 - K1483 +661.420, K1512 + 000 - K1515 + 000 | Region X | Region X | Completed | ₱142.6M | 100% | High risk79 | —-0.011 |
| 22KA0088OFF-CARRIAGEWAY IMPROVEMENT ALONG JCT SH-AGLAYAN-ALANIB-TICALAAN RD (AGLAYAN-BASAK)-K1528+000 - K1536+507, LANTAPAN, BUKIDNON, BANTUANON-BACLAYON, LANTAPAN, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | Completed | ₱96.5M | 100% | High risk79 | —-0.021 |
| 23K00185CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT MANTICAO RIVER (DOWNSTREAM OF MANTICAO BRIDGE) MANTICAO, MISAMIS ORIENTAL | Region X | Region X | Completed | ₱198M | 100% | High risk79 | —-0.009 |
| 22K00370ROAD WIDENING-TERTIARY ROADS, JCT. SH AGLAYAN-ZAMBOANGUITA RD.K1520 + 988.549-K1521 + 284.490, K1521 + 325.000-K1522 + 504.000, K1522 + 890.00, K1522 +943.750, K1522+977.000 - K1523 +847.402, K1542 + 500-K1544 + 500 | Region X | Region X | Completed | ₱116M | 100% | High risk78 | —-0.016 |
| 18K00257CLUSTER 57 CONST./IMPRVT. OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES & ECONOMIC ZONES & PAVING OF | Region X | Region X | Completed | ₱262.7M | 100% | High risk78 | Flagged0.000 |
| 23J00139CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF TUMAGA RIVER FLOOD CONTROL (GUIWAN-TUGBUNGAN SECTION) WITH ESPLANADE, PACKAGE 1, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱143.2M | 62% | High risk78 | Flagged0.025 |
| 22NG0091CONSTRUCTION OF ROAD, BARANGAY CAMP EDUARD, ALEGRIA, SURIGAO DEL NORTE / BARANGAY CAMP EDUARD, ALEGRIA, SURIGAO DEL NORTE | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱77.2M | 100% | High risk77 | —-0.012 |
| 23J00138CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF TUMAGA RIVER FLOOD CONTROL (TUGBUNGAN SECTION), ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱143.3M | 61% | High risk76 | Flagged0.005 |
| 24J00017CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TUMAGA RIVER (TUGBUNGAN SECTION) PHASE II, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱145.4M | 20% | High risk76 | Flagged0.010 |
| 24J00018CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TUMAGA RIVER (TUGBUNGAN SECTION) PHASE III, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱145.4M | 72% | High risk76 | —-0.004 |
| 22KB0083CONSTRUCTION OF REVETMENT, DOWNSTREAM AND UPSTREAM OF MANUTO BRIDGE (B01380MN) ALONG BUKIDNON-DAVAO CITY ROAD, MANUTO BRIDGE, BRGY SALAWAGAN, QUEZON, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱67.6M | 100% | High risk75 | —-0.030 |
| 22KB0086CONSTRUCTION OF REVETMENT, DOWNSTREAM AND UPSTREAM OF APOLANG BRIDGE (B01389MN) ALONG KIBAWE-KADINGILAN-KALILANGAN ROAD, APOLANG BRIDGE, BRGY WEST KIBAWE, KIBAWE, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱57.9M | 100% | High risk75 | —-0.031 |
| 24K00034CONST. OF BY-PASS AND DIVERSION ROADS,OPOL DIVERSION ROAD(OPOL-CANITOAN), PACKAGE 17, CAGAYAN DE ORO CITY | Region X | Region X | On-Going | ₱47.8M | 100% | High risk75 | —-0.006 |
| 22KB0072CONSTRUCTION OF REVETMENT, DOWNSTREAM AND UPSTREAM OF RAWARI BRIDGE (B01384MN) ALONG BUKIDNON-DAVAO CITY ROAD, RAWARI BRIDGE, SITIO RAWARI, KITAOTAO, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱67.6M | 100% | High risk75 | —-0.026 |
| 22KB0073CONSTRUCTION OF REVETMENT, DOWNSTREAM AND UPSTREAM OF SAN MIGUEL BRIDGE (B01432MN) ALONG MARAMAG-MARADUGAO ROAD, SAN MIGUEL BRIDGE, SAN MIGUEL, MARAMAG, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱67.6M | 100% | High risk75 | —-0.032 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24J00304FLOOD MITIGATION STRUCTURES PROTECTING MAJOR / STRATEGIC PUB-LIC BUILDINGS / FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUC-TURE, TUMAGA RIVER (TUGBUNGAN SECTION), PACKAGE 3A, ZAM-BOANGA CITY | Region IX | Region IX | On-Going | ₱105.9M | 0% | High risk82 | Flagged0.069 |
| 24J00284CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF TUMAGA RIVER FLOOD CONTROL (TUGBUNGAN SECTION), ZAM-BOANGA CITY, PACKAGE 4 | Region IX | Region IX | On-Going | ₱96.2M | 62% | High risk81 | Flagged0.059 |
| 24JA0174CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TUMAGA RIVER (TETUAN SECTION), PACKAGE 3, ZAMBOANGA CITY | Region IX | Zamboanga City 2nd DEO | On-Going | ₱96.6M | 0% | High risk80 | Flagged0.052 |
| 22J00126PREVENTIVE MAINTENANCE - PRIMARY ROADS PAGADIAN CITY - ZAMBOANGA CITY ROAD | Region IX | Region IX | On-Going | ₱98.6M | 76% | High risk82 | Flagged0.038 |
| 23J00140CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF TUMAGA RIVER FLOOD CONTROL (GUIWAN-TUGBUNGAN SECTION) WITH ESPLANADE, PACKAGE 2, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱143.2M | 88% | High risk84 | Flagged0.036 |
| 23J00139CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF TUMAGA RIVER FLOOD CONTROL (GUIWAN-TUGBUNGAN SECTION) WITH ESPLANADE, PACKAGE 1, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱143.2M | 62% | High risk78 | Flagged0.025 |
| 24J00017CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TUMAGA RIVER (TUGBUNGAN SECTION) PHASE II, ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱145.4M | 20% | High risk76 | Flagged0.010 |
| 23J00138CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF TUMAGA RIVER FLOOD CONTROL (TUGBUNGAN SECTION), ZAMBOANGA CITY | Region IX | Region IX | On-Going | ₱143.3M | 61% | High risk76 | Flagged0.005 |
| 18K00257CLUSTER 57 CONST./IMPRVT. OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES & ECONOMIC ZONES & PAVING OF | Region X | Region X | Completed | ₱262.7M | 100% | High risk78 | Flagged0.000 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 21JG0064ROAD WIDENING - PRIMARY ROADS PAGADIAN CITY - ZAMBOANGA CITY RD - K1699 + 052 - K1700 + 324, TUBOD, LAKEWOOD, ZAMBOANGA DEL SUR | Region IX | Zamboanga del Sur 2nd DEO | Completed | ₱41.3M | 100% | Medium risk54 | —-0.084 |
| 52 | 20KC0131ROAD WIDENING ALONG KIBAWE-KADINGILAN-KALILANGAN RD. K1605+(-401)-K1605+756, K1605+790-K1606+483, PANGANTUCAN, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱91.7M | 100% | Medium risk54 | —-0.078 |
| 53 | 20KB0041REHAB/RECONST OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG BUKIDNON-DAVAO CITY ROAD, K1605+950-K1606+145, PALACAPAO, QUEZON, BUKIDNON | Region X | Bukidnon 2nd DEO | Completed | ₱81.6M | 100% | Medium risk52 | —-0.080 |
| 54 | 18K00078ROAD WIDENING BARANDIAS-DOMINOROG RD-K1590+(-1023)-K1591+425.323,K1592+220-K1593+270,K1596+081-K1596 | Region X | Region X | Completed | ₱84.1M | 100% | Medium risk52 | —-0.082 |
| 55 | 22K00028CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAGUIARAN RIVER, KALILANGAN, BUKIDNON, PACKAGE 4 (STA.1+380.00-STA.1+830.00) | Region X | Region X | Completed | ₱77.2M | 100% | Medium risk52 | —-0.053 |
| 56 | 22K00018CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAGUIARAN RIVER, KALILANGAN, BUKIDNON, PACKAGE 3 (STA. 0+920.00 - STA. 1+380.00) | Region X | Region X | Completed | ₱74.1M | 100% | Medium risk52 | —-0.062 |
| 57 | 22K00019CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAGUIARAN RIVER, KALILANGAN, BUKIDNON, PACKAGE 1 (STA. 0+000.00 - STA. 0+480.00) | Region X | Region X | Completed | ₱74.9M | 100% | Medium risk52 | —-0.062 |
| 58 | 21K00294CLUSTER RO-01 CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITH MAJOR RIVER BASINS AND PRINCIPAL RIVERS | Region X | Region X | Completed | ₱85.2M | 100% | Medium risk52 | —-0.065 |
| 59 | 22K00020CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAGUIARAN RIVER, KALILANGAN, BUKIDNON, PACKAGE 2 (STA. 0+480.00 - STA. 0+920.00) | Region X | Region X | Completed | ₱74.9M | 100% | Medium risk52 | —-0.068 |
| 60 | 18KC0005CONSTRUCTION OF CONCRETE ROAD-ACCESS ROAD FROM CAGAYAN DE ORO CITY LEADING TO ULTRA WINDS MOUNTAIN RESORT, PUALAS, BAUNGON, BUKIDNON | Region X | Bukidnon 3rd DEO | Completed | ₱82.5M | 100% | Medium risk52 | —-0.083 |
| 61 | 21KK0101CONCRETING OF ROAD IN LAGONGLONG, MISAMIS ORIENTAL | Region X | Misamis Oriental 1st DEO | Completed | ₱78.4M | 100% | Medium risk51 | —-0.083 |
| 62 | 18K00075CONST./IMPRVT. OF ACCESS RD. LEADING TO DECLARED DESTINATIONS AIRPORTS ACCESS RD.LEADING TO MALANANG | Region X | Region X | Completed | ₱59.1M | 100% | Medium risk51 | —-0.089 |
| 63 | 18K00068REHAB./RECONST. OF NAT'L. RD. W/ SLIPS, SLOPE COLLAPSE & LANDSLIDE GINGOOG-CLAVERIA-VILLANUEVA RD | Region X | Misamis Oriental 1st DEO | Completed | ₱69.5M | 100% | Medium risk51 | —-0.086 |
| 64 | 22KK0039ROAD WIDENING - SECONDARY ROADS - GINGOOG - CLAVERIA -VILLANUEVA RD - K1325 + 418 - K1327 + 000 | Region X | Misamis Oriental 1st DEO | Completed | ₱65.5M | 100% | Medium risk51 | —-0.087 |
| 65 | 22K00030CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAGUIARAN RIVER, PACKAGE 6, KALILANGAN, BUKIDNON (STA.2+355.956-STA.2+660.0) | Region X | Region X | Completed | ₱67.6M | 100% | Medium risk51 | —-0.065 |
| 66 | 19KL0084ASSET PRESERVATION REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE SECONDARY ROADS, GINGOOG CITY CLAVERIA VILLANUEVA ROAD, K1346+700 K1346+815, K1348+078.77 K1348+180, K1348+224 K1348+478, K1355+405 | Region X | Misamis Oriental 2nd DEO | Completed | ₱82.4M | 100% | Medium risk51 | —-0.083 |
| 67 | 23KH0034CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG IPONAN RIVER BARANGAY PAGATPAT CAGAYAN DE ORO CITY | Region X | Cagayan de Oro City 1st DEO | Completed | ₱71.3M | 100% | Medium risk50 | —-0.075 |
| 68 | 17LA0052RECHANNELING AND CONSTRUCTION OF DIKE IN KINGKING RIVER PRK. MAUSWAGON SECTION (LEFT SIDE) PANTUKAN 2ND LD, COMPOSTELA VALLEY PROVINCE | Region XI | Davao de Oro 1st DEO | Completed | ₱44.7M | 100% | Medium risk50 | —-0.047 |
| 69 | 22KL0042CONSTRUCTION OF FLOOD CONTROL STRUCTURE, LUGAIT RIVER (PACKAGE 1) LUGAIT, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | Completed | ₱67.6M | 100% | Medium risk50 | —-0.078 |
| 70 | 23KL0070CONSTRUCTION OF ROAD, BARANGAY AWANG, OPOL, MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | Completed | ₱49.5M | 100% | Medium risk49 | —-0.094 |
| 71 | 20KL0041NETWORK DEVELOPMENT - ROAD WIDENING - SECONDARY ROADS (2-4 LANES) GINGOOG CITY-CLAVERIA-VILLANUEVA RD., K1351+765 - K1352+1000 | Region X | Misamis Oriental 2nd DEO | Completed | ₱55.5M | 100% | Medium risk49 | —-0.090 |
| 72 | 21KA0117CONCRETING OF SITIO MABUHAY ROAD, BRGY. SAN JOSE, MALAYBALAY CITY, BUKIDNONBRGY. SAN JOSE, MALAYBALAY CITY, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.091 |
| 73 | 20KL0040NETWORK DEVELOPMENT - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, OPOL DIVERSION ROAD (OPOL-CANITOAN), MISAMIS ORIENTAL | Region X | Misamis Oriental 2nd DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.094 |
| 74 | 17NF0001OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE, SECONDARY ROADS / SURIGAO - DAVAO COASTAL ROAD (K1148+500 - K1149+000; K1150+621 - K1151+812; K1153+536 - K1154+106; BRGY. BUGAS-BUGAS - BRGY. AMOSLOG | Region XIII | Surigao del Norte 2nd DEO | Completed | ₱43.6M | 100% | Medium risk49 | —-0.054 |
| 75 | 22KL0039ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROAD GINGOOG CITY - CLAVERIA - VILLANUEVA RD - K1348 + 600 - K1348 + 800 | Region X | Misamis Oriental 2nd DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.092 |