Contractor dossier
712 projects on file, including joint ventures this contractor is part of.
Total projects
712
Total budget
₱45.9B
Average progress
83.8%
Completion rate
68.7%
Below 70%
Average risk score
54.0
Medium risk on average, out of 100
Flagged as unusual
63
8.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 650 | ₱43.7B | 54.3 | 62 | 82.4% |
| Negros Island Region | 56 | ₱1.7B | 50.3 | 0 | 99.3% |
| Region VIII | 4 | ₱343.4M | 58.0 | 1 | 89.4% |
| Region VI | 1 | ₱96.5M | 63.5 | 0 | 74.1% |
| Region IV-B | 1 | ₱38.7M | 37.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 363 | ₱23.3B | 52.2 | 23 | 83.9% |
| Flood Control and Drainage | 212 | ₱15.2B | 58.3 | 18 | 85.1% |
| Buildings and Facilities | 64 | ₱2.1B | 42.2 | 3 | 86.7% |
| Bridges | 50 | ₱3.3B | 55.4 | 10 | 76.7% |
| OTHER | 17 | ₱1.4B | 69.0 | 5 | 80.4% |
| GAA 2025 SSP | 3 | ₱382.4M | 95.6 | 3 | 69.2% |
| GAA 2025 OO-2 | 1 | ₱64.3M | 92.3 | 1 | 27.1% |
| Bridges, Roads | 1 | ₱97.5M | 65.0 | 0 | 38.2% |
| Water Provision and Storage | 1 | ₱33.8M | 49.7 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HO0135CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, SITIO CAMBINOCOT TO | Region VII | Cebu 7th DEO | On-Going | ₱141.9M | 38% | High risk96 | Flagged0.040 |
| 25HO0149CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE, PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF BRGY. KANTANGKAS- BRGY. PACULOB ROAD, DUMANJUG, CE | Region VII | Cebu 7th DEO | On-Going | ₱145.5M | 72% | High risk96 | Flagged0.033 |
| 25HO0046CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BARANGAY COLABTINGON (DOWNSTREAM LEFT SIDE), | Region VII | Cebu 7th DEO | On-Going | ₱95.1M | 98% | High risk95 | Flagged0.016 |
| 25HH0138OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BULACAO RIVER, CEBU CITY | Region VII | Cebu City DEO | On-Going | ₱64.3M | 27% | High risk92 | Flagged0.001 |
| 23HO0249CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTSALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BRGY. MATALAO (DOWNSTREAM), DUMANJUG, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱95M | 0% | High risk87 | Flagged0.081 |
| 23HO0250CONVERGENCE ANDSPECIAL SUPPORT PROGRAM,SUSTAINABLE INFRASTRUCTURE PROJECTSALLEVIATING GAPS, FLOOD MITIGATIONSTRUCTURES PROTECTING PUBLICINFRASTRUCTURES/FACILITIES,CONSTRUCTION OF REVETMENT WALL ATBRGY. KANTANGKAS (DOWNSTREAM),DUMANJUG, CE | Region VII | Cebu 7th DEO | On-Going | ₱95M | 0% | High risk87 | Flagged0.081 |
| 24HO0169CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF BANK PROTECTION STRUCTURES AT SITIO LALAO, BARANGA | Region VII | Cebu 7th DEO | On-Going | ₱95.1M | 0% | High risk87 | Flagged0.072 |
| 23HO0285CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BARANGAY KANTANGKAS (UPSTREAM), | Region VII | Cebu 7th DEO | On-Going | ₱95M | 0% | High risk87 | Flagged0.072 |
| 24HO0153CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BARANGAY MATALAO (UPSTREAM), DUMAN | Region VII | Cebu 7th DEO | On-Going | ₱95M | 0% | High risk87 | Flagged0.072 |
| 24HO0177CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BARANGAY COLABTINGON - BARANGAY | Region VII | Cebu 7th DEO | On-Going | ₱95.1M | 0% | High risk87 | Flagged0.069 |
| 24HO0176CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BARANGAY KANTANGKAS - KANG-ACTOL | Region VII | Cebu 7th DEO | On-Going | ₱95.1M | 0% | High risk87 | Flagged0.069 |
| 23HO0294CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ALEGRIA SEAWALL PROTECTION STRUCTURE (PACKAGE 2), | Region VII | Cebu 7th DEO | On-Going | ₱95M | 0% | High risk87 | Flagged0.073 |
| 24I00057NETWORK DEVELOPMENT - ROAD WIDENING - PRIMARY ROADS - DAANG MAHARLIKA (S00223LT) - K1014+000 - K1014+727, K1016+865 - K1017+000, K1017+085 - K1018+620 | Region VIII | Region VIII | On-Going | ₱217.5M | 58% | High risk85 | Flagged0.039 |
| 23HO0280CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG DOBDOB SECTION, BADIAN, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱66.5M | 0% | High risk82 | Flagged0.076 |
| 21HO0001REPAIR / REHABILITATION / RECONSTRUCTION OF NATIONAL ROADS AND BRIDGES, FLOOD CONTROL, OTHER PUBLIC | Region VII | Cebu 7th DEO | Completed | ₱250.9M | 100% | High risk79 | —-0.002 |
| 24HO0150CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BARANGAY MANLAPAY - | Region VII | Cebu 7th DEO | On-Going | ₱142.6M | 0% | High risk78 | Flagged0.073 |
| 23HO0282CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF DALAGUETE-MANTALONGON-BAD | Region VII | Cebu 7th DEO | On-Going | ₱142.6M | 0% | High risk78 | Flagged0.073 |
| 24HO0163CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROADWAY LIGHTING ALONG SANTANDER-BARILI-TOLEDO RD, BARANGAY MONTAÑEZA, MALABUYOC, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱142.6M | 0% | High risk78 | Flagged0.074 |
| 23HO0283ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING - SECONDARY ROADS, SANTANDER-BARILI-TOLEDO RD, K0178+000 - K0178+177 | Region VII | Cebu 7th DEO | On-Going | ₱142.6M | 0% | High risk78 | Flagged0.073 |
| 23HO0306CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF DUMANJUG BY-PASS ROAD (PH | Region VII | Cebu 7th DEO | On-Going | ₱95M | 0% | High risk78 | Flagged0.064 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23HO0249CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTSALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BRGY. MATALAO (DOWNSTREAM), DUMANJUG, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱95M | 0% | High risk87 | Flagged0.081 |
| 23HO0250CONVERGENCE ANDSPECIAL SUPPORT PROGRAM,SUSTAINABLE INFRASTRUCTURE PROJECTSALLEVIATING GAPS, FLOOD MITIGATIONSTRUCTURES PROTECTING PUBLICINFRASTRUCTURES/FACILITIES,CONSTRUCTION OF REVETMENT WALL ATBRGY. KANTANGKAS (DOWNSTREAM),DUMANJUG, CE | Region VII | Cebu 7th DEO | On-Going | ₱95M | 0% | High risk87 | Flagged0.081 |
| 23HO0280CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG DOBDOB SECTION, BADIAN, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱66.5M | 0% | High risk82 | Flagged0.076 |
| 24HO0163CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROADWAY LIGHTING ALONG SANTANDER-BARILI-TOLEDO RD, BARANGAY MONTAÑEZA, MALABUYOC, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱142.6M | 0% | High risk78 | Flagged0.074 |
| 23HO0283ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING - SECONDARY ROADS, SANTANDER-BARILI-TOLEDO RD, K0178+000 - K0178+177 | Region VII | Cebu 7th DEO | On-Going | ₱142.6M | 0% | High risk78 | Flagged0.073 |
| 23HO0282CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF DALAGUETE-MANTALONGON-BAD | Region VII | Cebu 7th DEO | On-Going | ₱142.6M | 0% | High risk78 | Flagged0.073 |
| 24HO0150CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BARANGAY MANLAPAY - | Region VII | Cebu 7th DEO | On-Going | ₱142.6M | 0% | High risk78 | Flagged0.073 |
| 23HO0294CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ALEGRIA SEAWALL PROTECTION STRUCTURE (PACKAGE 2), | Region VII | Cebu 7th DEO | On-Going | ₱95M | 0% | High risk87 | Flagged0.073 |
| 24HO0169CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF BANK PROTECTION STRUCTURES AT SITIO LALAO, BARANGA | Region VII | Cebu 7th DEO | On-Going | ₱95.1M | 0% | High risk87 | Flagged0.072 |
| 23HO0285CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BARANGAY KANTANGKAS (UPSTREAM), | Region VII | Cebu 7th DEO | On-Going | ₱95M | 0% | High risk87 | Flagged0.072 |
| 24HO0153CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BARANGAY MATALAO (UPSTREAM), DUMAN | Region VII | Cebu 7th DEO | On-Going | ₱95M | 0% | High risk87 | Flagged0.072 |
| 24HO0177CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BARANGAY COLABTINGON - BARANGAY | Region VII | Cebu 7th DEO | On-Going | ₱95.1M | 0% | High risk87 | Flagged0.069 |
| 24HO0176CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BARANGAY KANTANGKAS - KANG-ACTOL | Region VII | Cebu 7th DEO | On-Going | ₱95.1M | 0% | High risk87 | Flagged0.069 |
| 23HO0293CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC), INSTALLATION OF SOLAR LED STREET LIGHTS ALONG SECONDARY ROAD, SANTANDER-BARILI-TOLEDO RD, (RONDA-DUMANJUG SECTION), RONDA, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱118.9M | 0% | High risk76 | Flagged0.067 |
| 24HO0172CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROADWAY LIGHTING ALONG SANTANDER-BARILI-TOLEDO RD, BARANGAY POBLACION- BARANGAY SANTA FILOMENA, ALEGRIA, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱95.1M | 0% | High risk77 | Flagged0.065 |
| 24HO0170CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROADWAY LIGHTING ALONG SANTANDER-BARILI- TOLEDO RD, BARANGAY MALABAGO - BARANGAY HINABLAN, BADIAN, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱95.1M | 0% | High risk77 | Flagged0.065 |
| 24HO0171CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROADWAY LIGHTING ALONG SANTANDER-BARILI-TOLEDO RD, BARANGAY MALHIAO - BARANGAY BUGAS, BADIAN, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱95.1M | 0% | High risk77 | Flagged0.065 |
| 23HO0314CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC), INSTALLATION OF SOLAR LED STREET LIGHTS ALONG SANTANDER-BARILI-TOLEDO RD, BADIAN SECTION, BADIAN, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱94.1M | 0% | High risk77 | Flagged0.065 |
| 23HO0295CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BARANGAY MATALAO - | Region VII | Cebu 7th DEO | On-Going | ₱95.8M | 0% | High risk77 | Flagged0.064 |
| 23HO0307CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BARANGAY MATALAO - | Region VII | Cebu 7th DEO | On-Going | ₱95.8M | 0% | High risk77 | Flagged0.064 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 24HO0170CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROADWAY LIGHTING ALONG SANTANDER-BARILI- TOLEDO RD, BARANGAY MALABAGO - BARANGAY HINABLAN, BADIAN, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱95.1M | 0% | High risk77 | Flagged0.065 |
| 27 | 23HO0314CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC), INSTALLATION OF SOLAR LED STREET LIGHTS ALONG SANTANDER-BARILI-TOLEDO RD, BADIAN SECTION, BADIAN, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱94.1M | 0% | High risk77 | Flagged0.065 |
| 28 | 23HO0293CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC), INSTALLATION OF SOLAR LED STREET LIGHTS ALONG SECONDARY ROAD, SANTANDER-BARILI-TOLEDO RD, (RONDA-DUMANJUG SECTION), RONDA, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱118.9M | 0% | High risk76 | Flagged0.067 |
| 29 | 23HO0086ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF RIVER RETAINING WALL AT BRGY. KANTANGKAS (LEFT SIDE), DUMA | Region VII | Cebu 7th DEO | Completed | ₱96.5M | 100% | High risk76 | —-0.041 |
| 30 | 20HK0043ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- NETWORK DEVELOPMENT PROGRAM- CONSTRUCTION OF BAY-PASS AND DIVERSION ROADS- CONSTRUCTION OF CONCRETE BRIDGE @ BAIS BYPASS ROAD, BAIS CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | Completed | ₱64.7M | 100% | High risk76 | —-0.015 |
| 31 | 17H00005MF0-1 NATIONAL ROAD NETWORK SERVICES, ASSET PRESERVATION OF NATIONAL ROADS-REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDES , SECONDARY ROADS, CEBU-TOLEDO WHARF ROAD (JCT. NAGA-ULING,) K0011+237-K0013+245, K0016+50 | Region VII | Region VII | Completed | ₱289M | 100% | High risk76 | Flagged0.013 |
| 32 | 24HE0239CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDING/FACILITIES - CONST OF FLOOD CONTROL STRUCTURE ALONG DUMLOG RIVER (PACKAGE 2) | Region VII | Cebu 1st DEO | On-Going | ₱96.5M | 72% | High risk74 | Flagged0.035 |
| 33 | 23HO0264CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT PUROK UBE, SITIO WALOG, BARANGAY | Region VII | Cebu 7th DEO | On-Going | ₱28.7M | 0% | High risk74 | Flagged0.063 |
| 34 | 24HE0218ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONST/REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONST OF REVETMENT WALL ALONG MANANGA RIVER, PACKAGE 2, SI | Region VII | Cebu 1st DEO | On-Going | ₱96.5M | 79% | High risk73 | Flagged0.036 |
| 35 | 24HE0240CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRAS PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDING/FACILITIES - CONST OF REVETMENT WALL ALONG MANANGA RIVER (LEFT SIDE) AT SITIO BURLAS | Region VII | Cebu 1st DEO | On-Going | ₱96.5M | 70% | High risk73 | Flagged0.035 |
| 36 | 24HN0128CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONST. OF BASAK-SUGTUNGGAN BYPASS ROAD, LAPU-LAPU CITY CEBU (PHASE 3), LAPU-LAPU CITY CEBU | Region VII | Cebu 6th DEO | On-Going | ₱99M | 1% | High risk73 | Flagged0.041 |
| 37 | 23HO0344CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES, CONSTRUCTION OF RIVER CONTROL STRUCTURE AT BARANGAY PACULOB - BARANGAY YLAYA | Region VII | Cebu 7th DEO | On-Going | ₱66.5M | 0% | High risk73 | Flagged0.013 |
| 38 | 24HN0141CSSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD INCLUDING BRIDGE FROM SUDTUNGGAN TO BRGY. BABAG, LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱144.7M | 8% | High risk73 | Flagged0.045 |
| 39 | 24HE0227CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES CONST OF FLOOD CONTROL STRUCTURE, SITIO CAMBAYE UPPER CAMP 8, MIN | Region VII | Cebu 1st DEO | On-Going | ₱96.5M | 70% | High risk73 | Flagged0.038 |
| 40 | 24HO0173CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROADWAY LIGHTING ALONG SANTANDER-BARILI-TOLEDO RD, BARANGAY YLAYA - BARANGAY TAPON, DUMANJUG, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱47.5M | 0% | High risk73 | Flagged0.059 |
| 41 | 24HN0225OO1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - MACTAN AIRPORT RD - K0018 + (-366) - K0018 + 785, LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱78M | 0% | High risk72 | Flagged0.031 |
| 42 | 24H00179CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF SOLAR LED STREET LIGHTS AND OTHER ROAD SAFETY DEVICES ALONG CEBU SOUTH COASTAL ROAD (CSCR), CEBU CITY, CEBU | Region VII | Region VII | On-Going | ₱173.6M | 40% | High risk72 | Flagged0.062 |
| 43 | 23HE0193ORGANIZATIONAL OUTCOME 2: PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONST./MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMS-CONST. OF REVETMENT WALL ALONG MANANGA RIVER (LEFT SIDE) AT SITIO TIGIB, BRGY. LAGTANG, TALI | Region VII | Cebu 1st DEO | Completed | ₱96.5M | 100% | High risk71 | —-0.011 |
| 44 | 17HK0163ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE, TERTIARY ROADS, ASPHALT OVERLAY ALONG BAYAWAN-MABINAY ROAD-K0145+096-K0146+801, K0147+000-K0148+731, K0149+340-K0152+000, K0153+000 | Negros Island Region | Negros Oriental 2nd DEO | Completed | ₱75.9M | 100% | High risk70 | —-0.048 |
| 45 | 17R00019OFF-CARRIAGEWAY IMPROVEMENT: SHOULDER PAVING/ CONSTRUCTION- VALLEHERMOSO - CANLAON CITY - LA CASTELLANA RD (S00318NR), K0148+ (-992) - K0148+125; K0159+000 - K0159+480; K0159+560 - K0161+858; K0164+000 - K0164+685; K0164+691 - K0164+799; K0166+513 - K0167 | Negros Island Region | Negros Oriental 1st DEO | Completed | ₱67.4M | 100% | High risk69 | —-0.043 |
| 46 | 25HE0078CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SITIO CAMBANGYAO, BARANG | Region VII | Cebu 2nd DEO | On-Going | ₱94.6M | 40% | High risk67 | Flagged0.020 |
| 47 | 25HD0112ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONST/REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONST OF REVETMENT WALL ALONG MANANGA RIVER (DOWNSTREAM), | Region VII | Cebu 1st DEO | On-Going | ₱142.8M | 35% | High risk67 | —-0.007 |
| 48 | 25HD0107ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONST/REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONST OF REVETMENT WALL ALONG MANANGA RIVER (DOWNSTREAM), | Region VII | Cebu 1st DEO | On-Going | ₱142.8M | 45% | High risk67 | —-0.011 |
| 49 | 24HE0167CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST. OF REVETMENT WALL STRUCTURE ALONG MANANGA RIVER (RIGHT SIDE), SITIO BOGO, BAR | Region VII | Cebu 1st DEO | Completed | ₱148.5M | 100% | High risk67 | —-0.054 |
| 50 | 24HE0166CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST. OF REVETMENT WALL STRUCTURE ALONG MANANGA RIVER (LEFT SIDE), SITIO BOGO, BARA | Region VII | Cebu 1st DEO | Completed | ₱148.5M | 100% | High risk67 | —-0.054 |