Contractor dossier
712 projects on file, including joint ventures this contractor is part of.
Total projects
712
Total budget
₱45.9B
Average progress
83.8%
Completion rate
68.7%
Below 70%
Average risk score
54.0
Medium risk on average, out of 100
Flagged as unusual
63
8.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 650 | ₱43.7B | 54.3 | 62 | 82.4% |
| Negros Island Region | 56 | ₱1.7B | 50.3 | 0 | 99.3% |
| Region VIII | 4 | ₱343.4M | 58.0 | 1 | 89.4% |
| Region VI | 1 | ₱96.5M | 63.5 | 0 | 74.1% |
| Region IV-B | 1 | ₱38.7M | 37.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 363 | ₱23.3B | 52.2 | 23 | 83.9% |
| Flood Control and Drainage | 212 | ₱15.2B | 58.3 | 18 | 85.1% |
| Buildings and Facilities | 64 | ₱2.1B | 42.2 | 3 | 86.7% |
| Bridges | 50 | ₱3.3B | 55.4 | 10 | 76.7% |
| OTHER | 17 | ₱1.4B | 69.0 | 5 | 80.4% |
| GAA 2025 SSP | 3 | ₱382.4M | 95.6 | 3 | 69.2% |
| GAA 2025 OO-2 | 1 | ₱64.3M | 92.3 | 1 | 27.1% |
| Bridges, Roads | 1 | ₱97.5M | 65.0 | 0 | 38.2% |
| Water Provision and Storage | 1 | ₱33.8M | 49.7 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HO0135CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, SITIO CAMBINOCOT TO | Region VII | Cebu 7th DEO | On-Going | ₱141.9M | 38% | High risk96 | Flagged0.040 |
| 25HO0149CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE, PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF BRGY. KANTANGKAS- BRGY. PACULOB ROAD, DUMANJUG, CE | Region VII | Cebu 7th DEO | On-Going | ₱145.5M | 72% | High risk96 | Flagged0.033 |
| 25HO0046CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BARANGAY COLABTINGON (DOWNSTREAM LEFT SIDE), | Region VII | Cebu 7th DEO | On-Going | ₱95.1M | 98% | High risk95 | Flagged0.016 |
| 25HH0138OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BULACAO RIVER, CEBU CITY | Region VII | Cebu City DEO | On-Going | ₱64.3M | 27% | High risk92 | Flagged0.001 |
| 23HO0249CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTSALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BRGY. MATALAO (DOWNSTREAM), DUMANJUG, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱95M | 0% | High risk87 | Flagged0.081 |
| 23HO0250CONVERGENCE ANDSPECIAL SUPPORT PROGRAM,SUSTAINABLE INFRASTRUCTURE PROJECTSALLEVIATING GAPS, FLOOD MITIGATIONSTRUCTURES PROTECTING PUBLICINFRASTRUCTURES/FACILITIES,CONSTRUCTION OF REVETMENT WALL ATBRGY. KANTANGKAS (DOWNSTREAM),DUMANJUG, CE | Region VII | Cebu 7th DEO | On-Going | ₱95M | 0% | High risk87 | Flagged0.081 |
| 24HO0169CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF BANK PROTECTION STRUCTURES AT SITIO LALAO, BARANGA | Region VII | Cebu 7th DEO | On-Going | ₱95.1M | 0% | High risk87 | Flagged0.072 |
| 23HO0285CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BARANGAY KANTANGKAS (UPSTREAM), | Region VII | Cebu 7th DEO | On-Going | ₱95M | 0% | High risk87 | Flagged0.072 |
| 24HO0153CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BARANGAY MATALAO (UPSTREAM), DUMAN | Region VII | Cebu 7th DEO | On-Going | ₱95M | 0% | High risk87 | Flagged0.072 |
| 24HO0177CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BARANGAY COLABTINGON - BARANGAY | Region VII | Cebu 7th DEO | On-Going | ₱95.1M | 0% | High risk87 | Flagged0.069 |
| 24HO0176CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BARANGAY KANTANGKAS - KANG-ACTOL | Region VII | Cebu 7th DEO | On-Going | ₱95.1M | 0% | High risk87 | Flagged0.069 |
| 23HO0294CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ALEGRIA SEAWALL PROTECTION STRUCTURE (PACKAGE 2), | Region VII | Cebu 7th DEO | On-Going | ₱95M | 0% | High risk87 | Flagged0.073 |
| 24I00057NETWORK DEVELOPMENT - ROAD WIDENING - PRIMARY ROADS - DAANG MAHARLIKA (S00223LT) - K1014+000 - K1014+727, K1016+865 - K1017+000, K1017+085 - K1018+620 | Region VIII | Region VIII | On-Going | ₱217.5M | 58% | High risk85 | Flagged0.039 |
| 23HO0280CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG DOBDOB SECTION, BADIAN, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱66.5M | 0% | High risk82 | Flagged0.076 |
| 21HO0001REPAIR / REHABILITATION / RECONSTRUCTION OF NATIONAL ROADS AND BRIDGES, FLOOD CONTROL, OTHER PUBLIC | Region VII | Cebu 7th DEO | Completed | ₱250.9M | 100% | High risk79 | —-0.002 |
| 24HO0150CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BARANGAY MANLAPAY - | Region VII | Cebu 7th DEO | On-Going | ₱142.6M | 0% | High risk78 | Flagged0.073 |
| 23HO0282CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF DALAGUETE-MANTALONGON-BAD | Region VII | Cebu 7th DEO | On-Going | ₱142.6M | 0% | High risk78 | Flagged0.073 |
| 24HO0163CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROADWAY LIGHTING ALONG SANTANDER-BARILI-TOLEDO RD, BARANGAY MONTAÑEZA, MALABUYOC, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱142.6M | 0% | High risk78 | Flagged0.074 |
| 23HO0283ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING - SECONDARY ROADS, SANTANDER-BARILI-TOLEDO RD, K0178+000 - K0178+177 | Region VII | Cebu 7th DEO | On-Going | ₱142.6M | 0% | High risk78 | Flagged0.073 |
| 23HO0306CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF DUMANJUG BY-PASS ROAD (PH | Region VII | Cebu 7th DEO | On-Going | ₱95M | 0% | High risk78 | Flagged0.064 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23HO0249CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTSALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BRGY. MATALAO (DOWNSTREAM), DUMANJUG, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱95M | 0% | High risk87 | Flagged0.081 |
| 23HO0250CONVERGENCE ANDSPECIAL SUPPORT PROGRAM,SUSTAINABLE INFRASTRUCTURE PROJECTSALLEVIATING GAPS, FLOOD MITIGATIONSTRUCTURES PROTECTING PUBLICINFRASTRUCTURES/FACILITIES,CONSTRUCTION OF REVETMENT WALL ATBRGY. KANTANGKAS (DOWNSTREAM),DUMANJUG, CE | Region VII | Cebu 7th DEO | On-Going | ₱95M | 0% | High risk87 | Flagged0.081 |
| 23HO0280CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG DOBDOB SECTION, BADIAN, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱66.5M | 0% | High risk82 | Flagged0.076 |
| 24HO0163CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROADWAY LIGHTING ALONG SANTANDER-BARILI-TOLEDO RD, BARANGAY MONTAÑEZA, MALABUYOC, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱142.6M | 0% | High risk78 | Flagged0.074 |
| 23HO0283ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING - SECONDARY ROADS, SANTANDER-BARILI-TOLEDO RD, K0178+000 - K0178+177 | Region VII | Cebu 7th DEO | On-Going | ₱142.6M | 0% | High risk78 | Flagged0.073 |
| 23HO0282CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF DALAGUETE-MANTALONGON-BAD | Region VII | Cebu 7th DEO | On-Going | ₱142.6M | 0% | High risk78 | Flagged0.073 |
| 24HO0150CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BARANGAY MANLAPAY - | Region VII | Cebu 7th DEO | On-Going | ₱142.6M | 0% | High risk78 | Flagged0.073 |
| 23HO0294CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ALEGRIA SEAWALL PROTECTION STRUCTURE (PACKAGE 2), | Region VII | Cebu 7th DEO | On-Going | ₱95M | 0% | High risk87 | Flagged0.073 |
| 24HO0169CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF BANK PROTECTION STRUCTURES AT SITIO LALAO, BARANGA | Region VII | Cebu 7th DEO | On-Going | ₱95.1M | 0% | High risk87 | Flagged0.072 |
| 23HO0285CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BARANGAY KANTANGKAS (UPSTREAM), | Region VII | Cebu 7th DEO | On-Going | ₱95M | 0% | High risk87 | Flagged0.072 |
| 24HO0153CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BARANGAY MATALAO (UPSTREAM), DUMAN | Region VII | Cebu 7th DEO | On-Going | ₱95M | 0% | High risk87 | Flagged0.072 |
| 24HO0177CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BARANGAY COLABTINGON - BARANGAY | Region VII | Cebu 7th DEO | On-Going | ₱95.1M | 0% | High risk87 | Flagged0.069 |
| 24HO0176CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BARANGAY KANTANGKAS - KANG-ACTOL | Region VII | Cebu 7th DEO | On-Going | ₱95.1M | 0% | High risk87 | Flagged0.069 |
| 23HO0293CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC), INSTALLATION OF SOLAR LED STREET LIGHTS ALONG SECONDARY ROAD, SANTANDER-BARILI-TOLEDO RD, (RONDA-DUMANJUG SECTION), RONDA, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱118.9M | 0% | High risk76 | Flagged0.067 |
| 24HO0172CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROADWAY LIGHTING ALONG SANTANDER-BARILI-TOLEDO RD, BARANGAY POBLACION- BARANGAY SANTA FILOMENA, ALEGRIA, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱95.1M | 0% | High risk77 | Flagged0.065 |
| 24HO0170CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROADWAY LIGHTING ALONG SANTANDER-BARILI- TOLEDO RD, BARANGAY MALABAGO - BARANGAY HINABLAN, BADIAN, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱95.1M | 0% | High risk77 | Flagged0.065 |
| 24HO0171CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROADWAY LIGHTING ALONG SANTANDER-BARILI-TOLEDO RD, BARANGAY MALHIAO - BARANGAY BUGAS, BADIAN, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱95.1M | 0% | High risk77 | Flagged0.065 |
| 23HO0314CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC), INSTALLATION OF SOLAR LED STREET LIGHTS ALONG SANTANDER-BARILI-TOLEDO RD, BADIAN SECTION, BADIAN, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱94.1M | 0% | High risk77 | Flagged0.065 |
| 23HO0295CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BARANGAY MATALAO - | Region VII | Cebu 7th DEO | On-Going | ₱95.8M | 0% | High risk77 | Flagged0.064 |
| 23HO0307CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BARANGAY MATALAO - | Region VII | Cebu 7th DEO | On-Going | ₱95.8M | 0% | High risk77 | Flagged0.064 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 476 | 25HE0099CONCRETING OF BRGY. GAWI TO BRGY. KANANGKAAN FMR, BRGY. GAWI AND BRGY. KANANGKAAN, OSLOB, CEBU | Region VII | Cebu 2nd DEO | On-Going | ₱29.3M | 43% | Medium risk48 | Flagged0.020 |
| 477 | 25HO0126CONCRETING OF BRGY. BUSAY- BRGY. AGBALANGA - BRGY. BATADBATAD, MOALBOAL, CEBU (PACKAGE 2) | Region VII | Cebu 7th DEO | On-Going | ₱29.2M | 98% | Medium risk48 | Flagged0.004 |
| 478 | 25HO0129CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL ALONG PUTAW RIVER, BARANGAY MANLAPA | Region VII | Cebu 7th DEO | On-Going | ₱24M | 9% | Medium risk48 | Flagged0.001 |
| 479 | 25HO0140CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL ALONG PUTAW RIVER, BARANGAY MANLAPA | Region VII | Cebu 7th DEO | On-Going | ₱24M | 8% | Medium risk48 | Flagged0.001 |
| 480 | 25HD0132ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - DUMLOG BR. (B00654CB) ALONG N BACALSO AVE (CEBU SOUTH RD) (PHASE II), SIBONGA, CEBU | Region VII | Cebu 1st DEO | On-Going | ₱24.1M | 65% | Medium risk48 | —-0.018 |
| 481 | 25HD0133ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - STA. FILOMENA BR. (B00045CB) ALONG N BACALSO AVE (CEBU SOUTH RD) (PHASE II), SIBONGA, CEBU | Region VII | Cebu 1st DEO | On-Going | ₱24.1M | 64% | Medium risk48 | —-0.018 |
| 482 | 22HO0041BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - COMPLETION OF LANAO BRIDGE AT BARANGAY LANAO, MOALBOAL, CEBU | Region VII | Cebu 7th DEO | Completed | ₱14.8M | 100% | Medium risk48 | —-0.058 |
| 483 | 20HG0036ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, CONSTRUCTION OF NEW PERMANENT BRIDGE, ABLAYAN BRIDGE ALONG DALAGUETE-MANTALONGON-BADIAN ROAD (DALAGUETE SIDE) | Region VII | Cebu 2nd DEO | Completed | ₱23.7M | 100% | Medium risk48 | —-0.058 |
| 484 | 20HG0162LOCAL PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL BRIDGE, CONSTRUCTION OF LANAO BRIDGE | Region VII | Cebu 2nd DEO | Completed | ₱14.7M | 100% | Medium risk48 | —-0.055 |
| 485 | 25HO0058ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, REHABILITATION/ MAJOR REPAIR OF PERMANENT BRIDGES, TUBOD BR. (B00502CB) ALONG SIBONGA-DUMANJUG RD | Region VII | Cebu 7th DEO | On-Going | ₱13.6M | 98% | Medium risk48 | —-0.028 |
| 486 | 20HG0083ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, WIDENING OF PERMANENT BRIDGES - TALOOT BRIDGE (B00627CB) ALONG NATALIO BACALSO AVENUE (CEBU SOUTH ROAD) | Region VII | Cebu 2nd DEO | Completed | ₱9.5M | 100% | Medium risk48 | —-0.059 |
| 487 | 23HK0054ORGANIZATIONAL OUTCOME 2: PROTECT LIVE AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF BANICA RIVER CONTROL, BAT | Negros Island Region | Negros Oriental 2nd DEO | Completed | ₱49M | 100% | Medium risk48 | —-0.064 |
| 488 | 24HO0051ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF MATUTINAO DRAINAGE SYSTEM, BADIAN, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱38M | 97% | Medium risk48 | —-0.034 |
| 489 | 21HG0136ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS: FLOOD MANAGEMENT PROGRAM; CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS -CONSTRUCTION OF CAMPACAS & MANTALONGON RIVER FLOOD CONTROL, BARANGA | Region VII | Cebu 2nd DEO | Completed | ₱35.8M | 100% | Medium risk48 | —-0.072 |
| 490 | 20HG0087OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF ALCOY SEAWALL, ALCOY, CEBU | Region VII | Cebu 2nd DEO | Completed | ₱46.6M | 100% | Medium risk48 | —-0.077 |
| 491 | 18HL0025CONST/MAINT. OF FLOOD MITIGATION STRUCTURES. . . :CONST/REHAB OF NAGBAGANG SEAWALL, STA. CATALINA, N | Negros Island Region | Negros Oriental 3rd DEO | Completed | ₱49M | 100% | Medium risk48 | —-0.065 |
| 492 | 19HG0080ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINTS MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF TALAYTAY FLOOD CONTROL (PHASE 3), ARGAO, CEBU | Region VII | Cebu 2nd DEO | Completed | ₱39.2M | 100% | Medium risk48 | —-0.078 |
| 493 | 18HG0092ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF TAPON 1 FLOOD CONTROL, K0216+885, DUMANJUG, CEBU | Region VII | Cebu 2nd DEO | Completed | ₱32.6M | 100% | Medium risk48 | —-0.076 |
| 494 | 22HF0036CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT STA. ANA RIVER, STA. 2+530.00 - STA. 2+796.00 | Region VII | Cebu 3rd DEO | Completed | ₱39.2M | 100% | Medium risk48 | —-0.077 |
| 495 | 21HG0052OO2: PROTECTS LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURE AND DRAINAGE SYSTEM, CONSTRUCTION OF TAPON RIVER FLOOD CONTROL (PHASE 2), DUMANJUG, CEBU | Region VII | Cebu 2nd DEO | Completed | ₱33.7M | 100% | Medium risk48 | —-0.077 |
| 496 | 22HO0069CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF WATERWAY ALONG TUBOD RIVER (SECTION 1), DUMANJUG, CEBU | Region VII | Cebu 7th DEO | Completed | ₱45.5M | 100% | Medium risk48 | —-0.077 |
| 497 | 21HG0100OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF YLAYA FLOOD CONTROL (PHASE 2), YLAYA, DUMANJUG, CEBU | Region VII | Cebu 2nd DEO | Completed | ₱29.4M | 100% | Medium risk48 | —-0.077 |
| 498 | 21HO0002ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAITENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF TAPON-TANGIL SEAWALL, DUMANJUG, CEBU | Region VII | Cebu 2nd DEO | Completed | ₱29.4M | 100% | Medium risk48 | —-0.077 |
| 499 | 22HO0057CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL ALONG POLO RIVER, BRGY. POLO, STA. 0+000 - STA. | Region VII | Cebu 7th DEO | Completed | ₱29.4M | 100% | Medium risk48 | —-0.077 |
| 500 | 18HG0082ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF LOOC SHORE PROTECTION, DUMANJUG, CEBU | Region VII | Cebu 2nd DEO | Completed | ₱37.2M | 100% | Medium risk48 | —-0.077 |