Contractor dossier
712 projects on file, including joint ventures this contractor is part of.
Total projects
712
Total budget
₱45.9B
Average progress
83.8%
Completion rate
68.7%
Below 70%
Average risk score
54.0
Medium risk on average, out of 100
Flagged as unusual
63
8.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 650 | ₱43.7B | 54.3 | 62 | 82.4% |
| Negros Island Region | 56 | ₱1.7B | 50.3 | 0 | 99.3% |
| Region VIII | 4 | ₱343.4M | 58.0 | 1 | 89.4% |
| Region VI | 1 | ₱96.5M | 63.5 | 0 | 74.1% |
| Region IV-B | 1 | ₱38.7M | 37.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 363 | ₱23.3B | 52.2 | 23 | 83.9% |
| Flood Control and Drainage | 212 | ₱15.2B | 58.3 | 18 | 85.1% |
| Buildings and Facilities | 64 | ₱2.1B | 42.2 | 3 | 86.7% |
| Bridges | 50 | ₱3.3B | 55.4 | 10 | 76.7% |
| OTHER | 17 | ₱1.4B | 69.0 | 5 | 80.4% |
| GAA 2025 SSP | 3 | ₱382.4M | 95.6 | 3 | 69.2% |
| GAA 2025 OO-2 | 1 | ₱64.3M | 92.3 | 1 | 27.1% |
| Bridges, Roads | 1 | ₱97.5M | 65.0 | 0 | 38.2% |
| Water Provision and Storage | 1 | ₱33.8M | 49.7 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HO0135CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, SITIO CAMBINOCOT TO | Region VII | Cebu 7th DEO | On-Going | ₱141.9M | 38% | High risk96 | Flagged0.040 |
| 25HO0149CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE, PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF BRGY. KANTANGKAS- BRGY. PACULOB ROAD, DUMANJUG, CE | Region VII | Cebu 7th DEO | On-Going | ₱145.5M | 72% | High risk96 | Flagged0.033 |
| 25HO0046CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BARANGAY COLABTINGON (DOWNSTREAM LEFT SIDE), | Region VII | Cebu 7th DEO | On-Going | ₱95.1M | 98% | High risk95 | Flagged0.016 |
| 25HH0138OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BULACAO RIVER, CEBU CITY | Region VII | Cebu City DEO | On-Going | ₱64.3M | 27% | High risk92 | Flagged0.001 |
| 23HO0249CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTSALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BRGY. MATALAO (DOWNSTREAM), DUMANJUG, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱95M | 0% | High risk87 | Flagged0.081 |
| 23HO0250CONVERGENCE ANDSPECIAL SUPPORT PROGRAM,SUSTAINABLE INFRASTRUCTURE PROJECTSALLEVIATING GAPS, FLOOD MITIGATIONSTRUCTURES PROTECTING PUBLICINFRASTRUCTURES/FACILITIES,CONSTRUCTION OF REVETMENT WALL ATBRGY. KANTANGKAS (DOWNSTREAM),DUMANJUG, CE | Region VII | Cebu 7th DEO | On-Going | ₱95M | 0% | High risk87 | Flagged0.081 |
| 24HO0169CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF BANK PROTECTION STRUCTURES AT SITIO LALAO, BARANGA | Region VII | Cebu 7th DEO | On-Going | ₱95.1M | 0% | High risk87 | Flagged0.072 |
| 23HO0285CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BARANGAY KANTANGKAS (UPSTREAM), | Region VII | Cebu 7th DEO | On-Going | ₱95M | 0% | High risk87 | Flagged0.072 |
| 24HO0153CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BARANGAY MATALAO (UPSTREAM), DUMAN | Region VII | Cebu 7th DEO | On-Going | ₱95M | 0% | High risk87 | Flagged0.072 |
| 24HO0177CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BARANGAY COLABTINGON - BARANGAY | Region VII | Cebu 7th DEO | On-Going | ₱95.1M | 0% | High risk87 | Flagged0.069 |
| 24HO0176CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BARANGAY KANTANGKAS - KANG-ACTOL | Region VII | Cebu 7th DEO | On-Going | ₱95.1M | 0% | High risk87 | Flagged0.069 |
| 23HO0294CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ALEGRIA SEAWALL PROTECTION STRUCTURE (PACKAGE 2), | Region VII | Cebu 7th DEO | On-Going | ₱95M | 0% | High risk87 | Flagged0.073 |
| 24I00057NETWORK DEVELOPMENT - ROAD WIDENING - PRIMARY ROADS - DAANG MAHARLIKA (S00223LT) - K1014+000 - K1014+727, K1016+865 - K1017+000, K1017+085 - K1018+620 | Region VIII | Region VIII | On-Going | ₱217.5M | 58% | High risk85 | Flagged0.039 |
| 23HO0280CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG DOBDOB SECTION, BADIAN, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱66.5M | 0% | High risk82 | Flagged0.076 |
| 21HO0001REPAIR / REHABILITATION / RECONSTRUCTION OF NATIONAL ROADS AND BRIDGES, FLOOD CONTROL, OTHER PUBLIC | Region VII | Cebu 7th DEO | Completed | ₱250.9M | 100% | High risk79 | —-0.002 |
| 24HO0150CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BARANGAY MANLAPAY - | Region VII | Cebu 7th DEO | On-Going | ₱142.6M | 0% | High risk78 | Flagged0.073 |
| 23HO0282CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF DALAGUETE-MANTALONGON-BAD | Region VII | Cebu 7th DEO | On-Going | ₱142.6M | 0% | High risk78 | Flagged0.073 |
| 24HO0163CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROADWAY LIGHTING ALONG SANTANDER-BARILI-TOLEDO RD, BARANGAY MONTAÑEZA, MALABUYOC, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱142.6M | 0% | High risk78 | Flagged0.074 |
| 23HO0283ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING - SECONDARY ROADS, SANTANDER-BARILI-TOLEDO RD, K0178+000 - K0178+177 | Region VII | Cebu 7th DEO | On-Going | ₱142.6M | 0% | High risk78 | Flagged0.073 |
| 23HO0306CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF DUMANJUG BY-PASS ROAD (PH | Region VII | Cebu 7th DEO | On-Going | ₱95M | 0% | High risk78 | Flagged0.064 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23HO0249CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTSALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BRGY. MATALAO (DOWNSTREAM), DUMANJUG, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱95M | 0% | High risk87 | Flagged0.081 |
| 23HO0250CONVERGENCE ANDSPECIAL SUPPORT PROGRAM,SUSTAINABLE INFRASTRUCTURE PROJECTSALLEVIATING GAPS, FLOOD MITIGATIONSTRUCTURES PROTECTING PUBLICINFRASTRUCTURES/FACILITIES,CONSTRUCTION OF REVETMENT WALL ATBRGY. KANTANGKAS (DOWNSTREAM),DUMANJUG, CE | Region VII | Cebu 7th DEO | On-Going | ₱95M | 0% | High risk87 | Flagged0.081 |
| 23HO0280CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG DOBDOB SECTION, BADIAN, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱66.5M | 0% | High risk82 | Flagged0.076 |
| 24HO0163CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROADWAY LIGHTING ALONG SANTANDER-BARILI-TOLEDO RD, BARANGAY MONTAÑEZA, MALABUYOC, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱142.6M | 0% | High risk78 | Flagged0.074 |
| 23HO0283ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING - SECONDARY ROADS, SANTANDER-BARILI-TOLEDO RD, K0178+000 - K0178+177 | Region VII | Cebu 7th DEO | On-Going | ₱142.6M | 0% | High risk78 | Flagged0.073 |
| 23HO0282CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF DALAGUETE-MANTALONGON-BAD | Region VII | Cebu 7th DEO | On-Going | ₱142.6M | 0% | High risk78 | Flagged0.073 |
| 24HO0150CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BARANGAY MANLAPAY - | Region VII | Cebu 7th DEO | On-Going | ₱142.6M | 0% | High risk78 | Flagged0.073 |
| 23HO0294CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ALEGRIA SEAWALL PROTECTION STRUCTURE (PACKAGE 2), | Region VII | Cebu 7th DEO | On-Going | ₱95M | 0% | High risk87 | Flagged0.073 |
| 24HO0169CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF BANK PROTECTION STRUCTURES AT SITIO LALAO, BARANGA | Region VII | Cebu 7th DEO | On-Going | ₱95.1M | 0% | High risk87 | Flagged0.072 |
| 23HO0285CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BARANGAY KANTANGKAS (UPSTREAM), | Region VII | Cebu 7th DEO | On-Going | ₱95M | 0% | High risk87 | Flagged0.072 |
| 24HO0153CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BARANGAY MATALAO (UPSTREAM), DUMAN | Region VII | Cebu 7th DEO | On-Going | ₱95M | 0% | High risk87 | Flagged0.072 |
| 24HO0177CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BARANGAY COLABTINGON - BARANGAY | Region VII | Cebu 7th DEO | On-Going | ₱95.1M | 0% | High risk87 | Flagged0.069 |
| 24HO0176CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BARANGAY KANTANGKAS - KANG-ACTOL | Region VII | Cebu 7th DEO | On-Going | ₱95.1M | 0% | High risk87 | Flagged0.069 |
| 23HO0293CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC), INSTALLATION OF SOLAR LED STREET LIGHTS ALONG SECONDARY ROAD, SANTANDER-BARILI-TOLEDO RD, (RONDA-DUMANJUG SECTION), RONDA, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱118.9M | 0% | High risk76 | Flagged0.067 |
| 24HO0172CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROADWAY LIGHTING ALONG SANTANDER-BARILI-TOLEDO RD, BARANGAY POBLACION- BARANGAY SANTA FILOMENA, ALEGRIA, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱95.1M | 0% | High risk77 | Flagged0.065 |
| 24HO0170CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROADWAY LIGHTING ALONG SANTANDER-BARILI- TOLEDO RD, BARANGAY MALABAGO - BARANGAY HINABLAN, BADIAN, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱95.1M | 0% | High risk77 | Flagged0.065 |
| 24HO0171CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROADWAY LIGHTING ALONG SANTANDER-BARILI-TOLEDO RD, BARANGAY MALHIAO - BARANGAY BUGAS, BADIAN, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱95.1M | 0% | High risk77 | Flagged0.065 |
| 23HO0314CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC), INSTALLATION OF SOLAR LED STREET LIGHTS ALONG SANTANDER-BARILI-TOLEDO RD, BADIAN SECTION, BADIAN, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱94.1M | 0% | High risk77 | Flagged0.065 |
| 23HO0295CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BARANGAY MATALAO - | Region VII | Cebu 7th DEO | On-Going | ₱95.8M | 0% | High risk77 | Flagged0.064 |
| 23HO0307CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BARANGAY MATALAO - | Region VII | Cebu 7th DEO | On-Going | ₱95.8M | 0% | High risk77 | Flagged0.064 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 601 | 22HG0025OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE - PRIMARY ROADS, N. BACALSO AVENUE (CEBU SOUTH ROAD), K0105+322 - K0106+000 | Region VII | Cebu 2nd DEO | Completed | ₱13.6M | 100% | Medium risk46 | —-0.096 |
| 602 | 21HG0047CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), TUBOD - BASIAO - CANDIIS ROAD LEADING TO SALAGMAYA PEAK, BADIAN, CEBU | Region VII | Cebu 2nd DEO | Completed | ₱9.8M | 100% | Medium risk46 | —-0.096 |
| 603 | 22HG0038CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONST./IMPVT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP), MANTALONGON-LAPA-LUGSANGAN EXTENSION ROAD LEADING TO LUGSANGAN PEAK & MONKEY HABITAT, DALAGUET | Region VII | Cebu 2nd DEO | Completed | ₱9.8M | 100% | Medium risk46 | —-0.097 |
| 604 | 19HG0201CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, ACCESS ROAD LEADING TO BRGY. CAWAYAN - BRGY. LANAO LEADING TO BAT COLONY, DALAGUETE, CEBU | Region VII | Cebu 2nd DEO | Completed | ₱9.8M | 100% | Medium risk46 | —-0.097 |
| 605 | 22HO0010OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - SIBONGA - DUMANJUG RD - K0071+739 - K0072+266 | Region VII | Cebu 7th DEO | Completed | ₱12.1M | 100% | Medium risk46 | —-0.097 |
| 606 | 20HE0102LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRSTRUCTURE INCLUDING LOCAL PROJECTS - CONSTRUCTION OF ROAD, BRGY. POBLACION III, CARCAR, CEBU | Region VII | Cebu 1st DEO | Completed | ₱4.9M | 100% | Medium risk46 | —-0.094 |
| 607 | 23HN0042CSSP: BIP - COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/ CONSERVATION - CONSTRUCTION OF MARIGONDON CAUSEWAY, LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱26.7M | 100% | Medium risk46 | —-0.095 |
| 608 | 21HF0033A. CONCRETING OF ROAD, BARANGAY SAGAY, TOLEDO CITY, CEBU;B. CONCRETING OF ROAD, BARANGAY SAM-ANG (SITIO SINSIN), TOLEDO CITY, CEBU; C. CONCRETING OF ROAD, BARANGAY CANTABACO, TOLEDO CITY, CEBU; D. CONCRETING OF ROAD, BARANGAY BULONGAN, TOLEDO CITY, | Region VII | Cebu 3rd DEO | Completed | ₱9.9M | 100% | Medium risk46 | —-0.098 |
| 609 | 22HF0006ASSET PRESERVATION PROGRAM - CONSTRUCTION OF DRAINAGE ALONG TOLEDO-PINAMUNGAHAN-ALOGUINSAN-MANTALONGON RD - K0064 + 000 - K0064 + 303 | Region VII | Cebu 3rd DEO | Completed | ₱7.3M | 100% | Medium risk46 | —-0.084 |
| 610 | 20HG0040LOCAL PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONCRETING OF BANHIGAN - TUBOD BASIAO ROAD AT BRGY. BANHIGAN & TUBOD, BADIAN, CEBU | Region VII | Cebu 2nd DEO | Completed | ₱5M | 100% | Medium risk46 | —-0.092 |
| 611 | 22HO0045BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS CONNECTING TO INDIGENOUS PEOPLE (IP) COMMUNITIES - IMPROVEMENT OF MANLAPAY-PAWA-COLABTINGON ROAD AT BARANGAY MANLAPAY, PAWA, COLABTINGON, DUMANJUG, CEBU | Region VII | Cebu 7th DEO | Completed | ₱4.9M | 100% | Medium risk46 | —-0.094 |
| 612 | 19HG0163LOCAL PROGRAM, LOCAL_ROADS_AND_BRIDGES, LOCAL ROADS, LOCAL INFRASTRUCTURE PROGRAM, CONSTRUCTION OF CONCRETE ROAD - CONCRETING OF ROAD, BRGY. TANGIL, DUMANJUG, CEBU | Region VII | Cebu 2nd DEO | Completed | ₱5M | 100% | Medium risk46 | —-0.097 |
| 613 | 19HG0193LOCAL PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, LOCAL INFRASTRUCTURE PROGRAM, CONSTRUCTION OF CONCRETE ROAD - CONSTRUCTION OF ROAD, BRGY. CALABOON, DUMANJUG, CEBU | Region VII | Cebu 2nd DEO | Completed | ₱5M | 100% | Medium risk46 | —-0.097 |
| 614 | 19HG0194LOCAL PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, LOCAL INFRASTRUCTURE PROGRAM, CONSTRUCTION OF CONCRETE ROAD - CONSTRUCTION OF ROAD, BRGY. KANYUKO, DUMANJUG, CEBU | Region VII | Cebu 2nd DEO | Completed | ₱5M | 100% | Medium risk46 | —-0.097 |
| 615 | 24HL0041ORGANIZATIONAL OUTCOME 001: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: ASSET PRESERVATION PROGRAM: REHABILITATION / RECONSTRUCTION / UPGRADING OF DAMAGED PAVED ROADS: PRIMARY ROADS: DUMAGUETE SOUTH RD - K0017 + 679 - K0017 + 974, K0026 + 200 - K002 | Negros Island Region | Negros Oriental 3rd DEO | Completed | ₱32.4M | 100% | Medium risk46 | —-0.089 |
| 616 | 20HE0065LOCAL INFRASTRUCTURE PROGRAM-LOCAL ROADS AND BRIDGES-LOCAL ROADS-ROAD CONCRETING, BRGY. POBLACION III, CARCAR CITY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱5M | 100% | Medium risk46 | —-0.094 |
| 617 | 18HG0110LOCAL PROGRAM-LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONCRETING OF PASIL TO LIPTONG BARANGAY ROADS, SANTANDER, CEBU | Region VII | Cebu 2nd DEO | Completed | ₱9.4M | 100% | Medium risk46 | —-0.095 |
| 618 | 18HL0055CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS: ACCESS ROAD LEADING TO TWIN BAYS (SIIT-TAMBOBO), SIATON, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 3rd DEO | Completed | ₱39.2M | 100% | Medium risk46 | —-0.088 |
| 619 | 22HE0013ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - CEBU TOLEDO WHARF RD (JCT NAGA-ULING) - K0013+066-K0013+216, CEBU TOLEDO WHAR | Region VII | Cebu 1st DEO | Completed | ₱5.9M | 100% | Medium risk46 | —-0.098 |
| 620 | 24HE0154ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHAB/RECONST/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - CEBU-TOLEDO WHARF RD (JCT NAGA-ULING) - K0011+028 - K0011+240, TALISAY CITY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱5.9M | 100% | Medium risk46 | —-0.097 |
| 621 | 25HD0055ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM -REHAB/RECONST/UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - CEBU-TOLEDO WHARF RD (JCT. NAGA - ULING) - K0011+028 - K0011+240, TALISAY CITY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱9.6M | 100% | Medium risk46 | —-0.098 |
| 622 | 23HE0038ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - N BACALSO AVE (CEBU SOUTH RD) - (S00281CB) - CHAINAGE 000 - CHAINAGE 299, TALISAY CITY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱13.5M | 100% | Medium risk46 | —-0.098 |
| 623 | 18HJ0050ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM-CONSTRUCTION OF FLOOD CONTROL ALONG BASAK RIVER (D/S B/S) AT BRGY. BASAK, GUIH | Negros Island Region | Negros Oriental 1st DEO | Completed | ₱32.6M | 100% | Medium risk46 | —-0.066 |
| 624 | 18HL0043CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS: CONSTRUCTION OF RIVER CONTROL DIKE AT BRGY. CATICUGAN,SIATON, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 3rd DEO | Completed | ₱24.5M | 100% | Medium risk46 | —-0.066 |
| 625 | 19HG0199CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, CANLUMACAD-BUNLAN ROAD LEADING TO SANTANDER TOURISM INDUSTRY, SANTANDER, CEBU | Region VII | Cebu 2nd DEO | Completed | ₱9.8M | 100% | Medium risk46 | —-0.095 |