Contractor dossier
712 projects on file, including joint ventures this contractor is part of.
Total projects
712
Total budget
₱45.9B
Average progress
83.8%
Completion rate
68.7%
Below 70%
Average risk score
54.0
Medium risk on average, out of 100
Flagged as unusual
63
8.8% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 650 | ₱43.7B | 54.3 | 62 | 82.4% |
| Negros Island Region | 56 | ₱1.7B | 50.3 | 0 | 99.3% |
| Region VIII | 4 | ₱343.4M | 58.0 | 1 | 89.4% |
| Region VI | 1 | ₱96.5M | 63.5 | 0 | 74.1% |
| Region IV-B | 1 | ₱38.7M | 37.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 363 | ₱23.3B | 52.2 | 23 | 83.9% |
| Flood Control and Drainage | 212 | ₱15.2B | 58.3 | 18 | 85.1% |
| Buildings and Facilities | 64 | ₱2.1B | 42.2 | 3 | 86.7% |
| Bridges | 50 | ₱3.3B | 55.4 | 10 | 76.7% |
| OTHER | 17 | ₱1.4B | 69.0 | 5 | 80.4% |
| GAA 2025 SSP | 3 | ₱382.4M | 95.6 | 3 | 69.2% |
| GAA 2025 OO-2 | 1 | ₱64.3M | 92.3 | 1 | 27.1% |
| Bridges, Roads | 1 | ₱97.5M | 65.0 | 0 | 38.2% |
| Water Provision and Storage | 1 | ₱33.8M | 49.7 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HO0135CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, SITIO CAMBINOCOT TO | Region VII | Cebu 7th DEO | On-Going | ₱141.9M | 38% | High risk96 | Flagged0.040 |
| 25HO0149CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE, PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF BRGY. KANTANGKAS- BRGY. PACULOB ROAD, DUMANJUG, CE | Region VII | Cebu 7th DEO | On-Going | ₱145.5M | 72% | High risk96 | Flagged0.033 |
| 25HO0046CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BARANGAY COLABTINGON (DOWNSTREAM LEFT SIDE), | Region VII | Cebu 7th DEO | On-Going | ₱95.1M | 98% | High risk95 | Flagged0.016 |
| 25HH0138OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BULACAO RIVER, CEBU CITY | Region VII | Cebu City DEO | On-Going | ₱64.3M | 27% | High risk92 | Flagged0.001 |
| 23HO0249CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTSALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BRGY. MATALAO (DOWNSTREAM), DUMANJUG, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱95M | 0% | High risk87 | Flagged0.081 |
| 23HO0250CONVERGENCE ANDSPECIAL SUPPORT PROGRAM,SUSTAINABLE INFRASTRUCTURE PROJECTSALLEVIATING GAPS, FLOOD MITIGATIONSTRUCTURES PROTECTING PUBLICINFRASTRUCTURES/FACILITIES,CONSTRUCTION OF REVETMENT WALL ATBRGY. KANTANGKAS (DOWNSTREAM),DUMANJUG, CE | Region VII | Cebu 7th DEO | On-Going | ₱95M | 0% | High risk87 | Flagged0.081 |
| 24HO0169CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF BANK PROTECTION STRUCTURES AT SITIO LALAO, BARANGA | Region VII | Cebu 7th DEO | On-Going | ₱95.1M | 0% | High risk87 | Flagged0.072 |
| 23HO0285CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BARANGAY KANTANGKAS (UPSTREAM), | Region VII | Cebu 7th DEO | On-Going | ₱95M | 0% | High risk87 | Flagged0.072 |
| 24HO0153CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BARANGAY MATALAO (UPSTREAM), DUMAN | Region VII | Cebu 7th DEO | On-Going | ₱95M | 0% | High risk87 | Flagged0.072 |
| 24HO0177CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BARANGAY COLABTINGON - BARANGAY | Region VII | Cebu 7th DEO | On-Going | ₱95.1M | 0% | High risk87 | Flagged0.069 |
| 24HO0176CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BARANGAY KANTANGKAS - KANG-ACTOL | Region VII | Cebu 7th DEO | On-Going | ₱95.1M | 0% | High risk87 | Flagged0.069 |
| 23HO0294CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ALEGRIA SEAWALL PROTECTION STRUCTURE (PACKAGE 2), | Region VII | Cebu 7th DEO | On-Going | ₱95M | 0% | High risk87 | Flagged0.073 |
| 24I00057NETWORK DEVELOPMENT - ROAD WIDENING - PRIMARY ROADS - DAANG MAHARLIKA (S00223LT) - K1014+000 - K1014+727, K1016+865 - K1017+000, K1017+085 - K1018+620 | Region VIII | Region VIII | On-Going | ₱217.5M | 58% | High risk85 | Flagged0.039 |
| 23HO0280CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG DOBDOB SECTION, BADIAN, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱66.5M | 0% | High risk82 | Flagged0.076 |
| 21HO0001REPAIR / REHABILITATION / RECONSTRUCTION OF NATIONAL ROADS AND BRIDGES, FLOOD CONTROL, OTHER PUBLIC | Region VII | Cebu 7th DEO | Completed | ₱250.9M | 100% | High risk79 | —-0.002 |
| 24HO0150CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BARANGAY MANLAPAY - | Region VII | Cebu 7th DEO | On-Going | ₱142.6M | 0% | High risk78 | Flagged0.073 |
| 23HO0282CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF DALAGUETE-MANTALONGON-BAD | Region VII | Cebu 7th DEO | On-Going | ₱142.6M | 0% | High risk78 | Flagged0.073 |
| 24HO0163CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROADWAY LIGHTING ALONG SANTANDER-BARILI-TOLEDO RD, BARANGAY MONTAÑEZA, MALABUYOC, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱142.6M | 0% | High risk78 | Flagged0.074 |
| 23HO0283ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING - SECONDARY ROADS, SANTANDER-BARILI-TOLEDO RD, K0178+000 - K0178+177 | Region VII | Cebu 7th DEO | On-Going | ₱142.6M | 0% | High risk78 | Flagged0.073 |
| 23HO0306CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF DUMANJUG BY-PASS ROAD (PH | Region VII | Cebu 7th DEO | On-Going | ₱95M | 0% | High risk78 | Flagged0.064 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23HO0249CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTSALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BRGY. MATALAO (DOWNSTREAM), DUMANJUG, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱95M | 0% | High risk87 | Flagged0.081 |
| 23HO0250CONVERGENCE ANDSPECIAL SUPPORT PROGRAM,SUSTAINABLE INFRASTRUCTURE PROJECTSALLEVIATING GAPS, FLOOD MITIGATIONSTRUCTURES PROTECTING PUBLICINFRASTRUCTURES/FACILITIES,CONSTRUCTION OF REVETMENT WALL ATBRGY. KANTANGKAS (DOWNSTREAM),DUMANJUG, CE | Region VII | Cebu 7th DEO | On-Going | ₱95M | 0% | High risk87 | Flagged0.081 |
| 23HO0280CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG DOBDOB SECTION, BADIAN, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱66.5M | 0% | High risk82 | Flagged0.076 |
| 24HO0163CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROADWAY LIGHTING ALONG SANTANDER-BARILI-TOLEDO RD, BARANGAY MONTAÑEZA, MALABUYOC, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱142.6M | 0% | High risk78 | Flagged0.074 |
| 23HO0283ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, ROAD WIDENING - SECONDARY ROADS, SANTANDER-BARILI-TOLEDO RD, K0178+000 - K0178+177 | Region VII | Cebu 7th DEO | On-Going | ₱142.6M | 0% | High risk78 | Flagged0.073 |
| 23HO0282CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF DALAGUETE-MANTALONGON-BAD | Region VII | Cebu 7th DEO | On-Going | ₱142.6M | 0% | High risk78 | Flagged0.073 |
| 24HO0150CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BARANGAY MANLAPAY - | Region VII | Cebu 7th DEO | On-Going | ₱142.6M | 0% | High risk78 | Flagged0.073 |
| 23HO0294CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ALEGRIA SEAWALL PROTECTION STRUCTURE (PACKAGE 2), | Region VII | Cebu 7th DEO | On-Going | ₱95M | 0% | High risk87 | Flagged0.073 |
| 24HO0169CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF BANK PROTECTION STRUCTURES AT SITIO LALAO, BARANGA | Region VII | Cebu 7th DEO | On-Going | ₱95.1M | 0% | High risk87 | Flagged0.072 |
| 23HO0285CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BARANGAY KANTANGKAS (UPSTREAM), | Region VII | Cebu 7th DEO | On-Going | ₱95M | 0% | High risk87 | Flagged0.072 |
| 24HO0153CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BARANGAY MATALAO (UPSTREAM), DUMAN | Region VII | Cebu 7th DEO | On-Going | ₱95M | 0% | High risk87 | Flagged0.072 |
| 24HO0177CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BARANGAY COLABTINGON - BARANGAY | Region VII | Cebu 7th DEO | On-Going | ₱95.1M | 0% | High risk87 | Flagged0.069 |
| 24HO0176CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BARANGAY KANTANGKAS - KANG-ACTOL | Region VII | Cebu 7th DEO | On-Going | ₱95.1M | 0% | High risk87 | Flagged0.069 |
| 23HO0293CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC), INSTALLATION OF SOLAR LED STREET LIGHTS ALONG SECONDARY ROAD, SANTANDER-BARILI-TOLEDO RD, (RONDA-DUMANJUG SECTION), RONDA, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱118.9M | 0% | High risk76 | Flagged0.067 |
| 24HO0172CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROADWAY LIGHTING ALONG SANTANDER-BARILI-TOLEDO RD, BARANGAY POBLACION- BARANGAY SANTA FILOMENA, ALEGRIA, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱95.1M | 0% | High risk77 | Flagged0.065 |
| 24HO0170CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROADWAY LIGHTING ALONG SANTANDER-BARILI- TOLEDO RD, BARANGAY MALABAGO - BARANGAY HINABLAN, BADIAN, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱95.1M | 0% | High risk77 | Flagged0.065 |
| 24HO0171CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROADWAY LIGHTING ALONG SANTANDER-BARILI-TOLEDO RD, BARANGAY MALHIAO - BARANGAY BUGAS, BADIAN, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱95.1M | 0% | High risk77 | Flagged0.065 |
| 23HO0314CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC), INSTALLATION OF SOLAR LED STREET LIGHTS ALONG SANTANDER-BARILI-TOLEDO RD, BADIAN SECTION, BADIAN, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱94.1M | 0% | High risk77 | Flagged0.065 |
| 23HO0295CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BARANGAY MATALAO - | Region VII | Cebu 7th DEO | On-Going | ₱95.8M | 0% | High risk77 | Flagged0.064 |
| 23HO0307CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BARANGAY MATALAO - | Region VII | Cebu 7th DEO | On-Going | ₱95.8M | 0% | High risk77 | Flagged0.064 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 201 | 23HO0035CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/ FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURES, SITIO SULOK-SITIO DAO (RIGHT SIDE UPSTREAM), BARANGAY MINDANA | Region VII | Cebu 7th DEO | Completed | ₱96.5M | 100% | High risk63 | —-0.067 |
| 202 | 23HO0202CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF STORM SURGE PROTECTION STRUCTURES AT BRGY. LEGASPI, ALEGRIA, C | Region VII | Cebu 7th DEO | Completed | ₱96.5M | 100% | High risk63 | —-0.067 |
| 203 | 25HD0170CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST OF REVETMENT WALL ALONG MANANGA RIVER (RIGHT SIDE), SITIO TINUBDAN, BRGY JACLUPAN, TA | Region VII | Cebu 1st DEO | On-Going | ₱106.7M | 46% | High risk63 | —-0.003 |
| 204 | 23HO0190CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF STORM SURGE PROTECTION STRUCTURES AT SITIO LALA-O, BARANGAY MO | Region VII | Cebu 7th DEO | Completed | ₱96.5M | 100% | High risk63 | —-0.067 |
| 205 | 22H00013ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, WIDENING OF PERMANENT BRIDGES, ARGAO BR. (B00022CB) ALONG N BACALSO AVE (CEBU SOUTH RD), ARGAO, CEBU PROVINCE | Region VII | Region VII | Completed | ₱106.1M | 100% | High risk63 | —-0.035 |
| 206 | 25HD0171CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES -CONST OF REVETMENT WALL ALONG MANANGA RIVER (RIGHT SIDE) AT SITIO BURIAS, BRGY LAGTA | Region VII | Cebu 1st DEO | On-Going | ₱97M | 36% | High risk63 | —-0.001 |
| 207 | 24H00046CSSP, BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (NEW MUNICIPAL HALL), POBLACION, DUMANJUG, CEBU | Region VII | Region VII | On-Going | ₱313.6M | 32% | High risk63 | Flagged0.005 |
| 208 | 20H00057LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, 2A-2C, POBLACION EAST MOALBOAL, CEBU | Region VII | Region VII | Completed | ₱137M | 100% | High risk63 | —-0.074 |
| 209 | 20H00082ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, METRO CEBU EXPRESSWAY, STA. 0+000 - STA. 2+500 (SIDEWALK, R.C. LINED CANAL AND SLOPE PROTECTION), CEBU PROVINCE | Region VII | Region VII | Completed | ₱130.9M | 100% | High risk63 | —-0.007 |
| 210 | 16HL0139CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. TUGAWE, DAUIN, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 3rd DEO | Completed | ₱4.9M | 100% | High risk63 | —-0.060 |
| 211 | 24HK0052ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - REHABILITATION OF TAMOGONG RIVER CONTROL STRUCTURE, BAIS CITY, NEGROS | Negros Island Region | Negros Oriental 2nd DEO | Completed | ₱115.8M | 100% | High risk63 | —-0.055 |
| 212 | 23H00017ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, METRO CEBU EXPRESSWAY, PACKAGE 2, CEBU | Region VII | Region VII | On-Going | ₱133.2M | 96% | High risk63 | —-0.029 |
| 213 | 17HL0006CONCRETING OF MUNICIPAL STREETS, BRGY. POBLACION, ZAMBOANGUITA, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 3rd DEO | Completed | ₱6.5M | 100% | High risk63 | —-0.057 |
| 214 | 23HO0198CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION, CONSTRUCTION OF ALEGRIA COASTAL ROAD, ALEGRIA, CEBU (PACKAGE 1) | Region VII | Cebu 7th DEO | Completed | ₱96.5M | 100% | High risk63 | —-0.046 |
| 215 | 21H00019ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF MISSING LINKS/NEW ROADS, ALCOY-ALEGRIA ROAD (ALCOY SECTION), CEBU, STATION 0+000-0+427, STATION 1+681-2+440, STATION 2+780-4+020, CEBU PR | Region VII | Region VII | Completed | ₱131.3M | 100% | High risk62 | —-0.072 |
| 216 | 18H00034ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM--REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE SECONDARY ROADS -CEBU-TOLEDO WHARF RD (JCT NAGA-ULING)-K0024+240-K0024+ | Region VII | Region VII | Completed | ₱137M | 100% | High risk62 | —-0.068 |
| 217 | 23HF0113RECONSTRUCTION OF FLOOD CONTROL ALONG SANTANDER-BARILI-TOLEDO ROAD, K0065+400-K0065+700 | Region VII | Cebu 3rd DEO | Completed | ₱92.1M | 100% | High risk62 | —-0.067 |
| 218 | 18HG0149CONCRETING OF BRGY. KANG-ACTOL - BRGY. KABALAASNAN FMR, BRGY. KANG-ACTOL AND BRGY. KABALAASNAN, DUMANJUG, CEBU | Region VII | Cebu 2nd DEO | Completed | ₱9.4M | 100% | High risk62 | —-0.012 |
| 219 | 23HN0154LP: NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES- MULTIPURPOSE/FACILITIES - CONSTRUCTION (COMPLETION) OF CEBU 6TH DISTRICT ENGINEERING OFFICE BUILDING, A.C. CORTES AVENUE, MANDAUE CITY, CEBU, PHASE 3 | Region VII | Cebu 6th DEO | Completed | ₱96.4M | 100% | High risk61 | —-0.077 |
| 220 | 20H00023CONVERGENCE AND SPECIAL SUPPORT PROGRAM CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, CONSTRUCTION OF ACCESS ROADS LEADING TO HERMIT COVE, (ALOGUINSAN-BUHO-CANTABOGON) ALOGUINSAN, CEBU, SECTION 1: STATION 0+000-STATION | Region VII | Region VII | Completed | ₱130.3M | 100% | High risk61 | —-0.075 |
| 221 | 19H00022LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, NATIONAL ROADS AND BRIDGES, CONCRETING OF POBLACION-DOBDOB-TALAYONG TAYTAY ROAD CONNECTING POBLACION URBAN DISTRICT AND BADIAN-DALAGUETE NATIONAL ROAD, CEBU, STA.0+000-STA.0+659.68-STA.0+686.15-STA.4+460 | Region VII | Region VII | Completed | ₱127.6M | 100% | High risk61 | —-0.076 |
| 222 | 25HO0066CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BARANGAY KANYUKO - | Region VII | Cebu 7th DEO | On-Going | ₱95.1M | 34% | High risk61 | —-0.038 |
| 223 | 25HO0055CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, BARANGAY TUBOD BITO | Region VII | Cebu 7th DEO | On-Going | ₱95.1M | 52% | High risk61 | —-0.044 |
| 224 | 20H00025CONVERGENCE AND SPECIAL SUPPORT PROGRAM: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, MALABAGO-KALANGKANG-SANLAGAN-CANDIIS-SULSOGON ROAD LEADING TO KAWASAN FALLS, BADIAN, CEBU, STATION 0+420-STATION 2+171, CEBU PROVIN | Region VII | Region VII | Completed | ₱127M | 100% | High risk61 | —-0.076 |
| 225 | 25HO0137ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE - SECONDARY ROADS, SANTANDER-BARILI-TOLEDO RD - K0187+000 - K0188+000 | Region VII | Cebu 7th DEO | On-Going | ₱94.6M | 28% | High risk61 | —-0.032 |