Contractor dossier
366 projects on file, including joint ventures this contractor is part of.
Total projects
366
Total budget
₱18.8B
Average progress
89.5%
Completion rate
75.4%
Average risk score
51.9
Medium risk on average, out of 100
Flagged as unusual
35
9.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 348 | ₱18B | 51.4 | 32 | 90.4% |
| Negros Island Region | 13 | ₱588.2M | 66.7 | 2 | 60.2% |
| Region V | 4 | ₱77.2M | 53.7 | 1 | 100.0% |
| Region IV-B | 1 | ₱48M | 44.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 144 | ₱6B | 48.9 | 5 | 89.5% |
| Flood Control and Drainage | 104 | ₱7.6B | 58.0 | 10 | 91.2% |
| Buildings and Facilities | 67 | ₱1.7B | 37.6 | 4 | 94.3% |
| OTHER | 21 | ₱1.6B | 71.4 | 5 | 94.6% |
| Bridges | 19 | ₱1.1B | 52.8 | 5 | 76.3% |
| GAA 2025 SSP | 5 | ₱313.1M | 94.7 | 5 | 66.3% |
| GAA 2025 OO-2 | 3 | ₱376M | 93.3 | 1 | 86.8% |
| Water Provision and Storage | 3 | ₱38.2M | 49.3 | 0 | 7.7% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HD0037CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST. OF FLOOD CONTROL STRUCTURE, PACKAGE 1, SITIO BOKYOL, POBLACION III | Region VII | Cebu 1st DEO | On-Going | ₱101.3M | 90% | High risk95 | Flagged0.020 |
| 25HN0028SSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BLDGS./ FACILITIES -CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG JAGOBIAO CREEK, BARANGAY CASILI, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱135M | 90% | High risk95 | Flagged0.025 |
| 25HN0179SSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF ROAD WITH DRAINAGE FACILITIES, TIMPOLOK ROAD, BARANGAY GUN-OB AND BARANGAY BABAG (PHASE 3), LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱19.2M | 52% | High risk95 | Flagged0.024 |
| 25HI0104CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF ROAD, BARANGAY POBLACION TO BARANGAY PANSOY, SOGOD, CEBU | Region VII | Cebu 5th DEO | On-Going | ₱38.4M | 53% | High risk95 | Flagged0.022 |
| 25HN0140SSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF ROAD WITH DRAINAGE FACILITIES, TIMPOLOK ROAD, BRGY. GUN-OB AND BRGY. BABAG (PHASE 4), LAPU-LAPU CITY | Region VII | Cebu 6th DEO | On-Going | ₱19.2M | 46% | High risk94 | Flagged0.026 |
| 25HN0101OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONST./ MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CALAWISAN CREEK, BARANGAY CALAWISAN, LAPU-LAPU CITY | Region VII | Cebu 6th DEO | On-Going | ₱96.4M | 86% | High risk93 | —-0.008 |
| 25H00065OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST./ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONST. OF FLOOD CONTROL STRUCTURE ALONG CALAWISAN CREEK (PACKAGE 2), BRGY. CALAWISAN, LAPU-LAPU CITY | Region VII | Region VII | On-Going | ₱144.6M | 75% | High risk93 | Flagged0.005 |
| 25HN0038OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUTUANON RIVER, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱135M | 99% | High risk93 | —-0.006 |
| 24HN0227LOCAL PROGRAM: NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES -MULTIPURPOSE/FACILITIES - CONSTRUCTION (COMPLETION) OF CEBU 6TH DISTRICT ENGINEERING OFFICE BUILDING, A.C. CORTES AVENUE, PHASE 4, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱115.7M | 86% | High risk90 | Flagged0.064 |
| 23H00114CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF INFECTIOUS DISEASE CENTER, VICENTE SOTTO, CEBU CITY | Region VII | Region VII | On-Going | ₱115.8M | 41% | High risk89 | Flagged0.085 |
| 23HO0260CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BRGY. PAWA (PACKAGE 1), DUMANJUG, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱71.3M | 0% | High risk82 | Flagged0.076 |
| 23HO0261CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF ROAD DIKE AT BRGY. KANG-ACTOL (DOWNSTREAM), DUMANJUG, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱71.3M | 0% | High risk82 | Flagged0.076 |
| 23HO0276CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BRGY. PAWA (PACKAGE 2), DUMANJUG, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱71.3M | 0% | High risk82 | Flagged0.078 |
| 24H00030CSSP, BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF MANTAYUPAN ROAD (LEADING TO BANGAG LAPOS CAVE), BARILI, CEBU | Region VII | Region VII | On-Going | ₱178.2M | 81% | High risk78 | Flagged0.029 |
| 25HM0055CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT TACULING RIVER II, BARANGAY TACULING, LAREN | Negros Island Region | Siquijor DEO | On-Going | ₱97M | 61% | High risk78 | Flagged0.006 |
| 24HN0127CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONST. OF ROAD LEADING TO RORO PORT PHASE 1, BRGY. POBLACION, CORDOVA, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱144.8M | 100% | High risk76 | Flagged0.018 |
| 18FI0026NETWORK DEVELOPMENT PROGRAM, OFF-CARRIAGEWAY IMPROVEMENT, SECONDARY ROADS, MASBATE-MILAGROS RD, K000 | Region V | Masbate 2nd DEO | Completed | ₱25.4M | 100% | High risk76 | —-0.033 |
| 21HN0102LP: LOCAL INFRASTRUCTURE PROGRAM -LOCAL ROADS AND BRIDGES -LOCAL ROADS -CONSTRUCTION OF SAN MIGUEL - PILIPOG COASTAL ROAD (ROCK CAUSEWAY) LEADING TO HOTELS/RESORTS (PHASE 1), CORDOVA, CEBU | Region VII | Cebu 6th DEO | Completed | ₱99M | 100% | High risk74 | —-0.019 |
| 24HG0119CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF LENGIGON FLOOD CONTROL, LENGIGON, ARGAO CEBU | Region VII | Cebu 2nd DEO | On-Going | ₱96.4M | 88% | High risk74 | Flagged0.033 |
| 24HG0120CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ANAHAW FLOOD CONTROL, ANAHAW, ARGAO, CEBU | Region VII | Cebu 2nd DEO | On-Going | ₱96.4M | 90% | High risk74 | Flagged0.031 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23H00114CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF INFECTIOUS DISEASE CENTER, VICENTE SOTTO, CEBU CITY | Region VII | Region VII | On-Going | ₱115.8M | 41% | High risk89 | Flagged0.085 |
| 23HO0276CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BRGY. PAWA (PACKAGE 2), DUMANJUG, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱71.3M | 0% | High risk82 | Flagged0.078 |
| 23HO0260CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BRGY. PAWA (PACKAGE 1), DUMANJUG, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱71.3M | 0% | High risk82 | Flagged0.076 |
| 23HO0261CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF ROAD DIKE AT BRGY. KANG-ACTOL (DOWNSTREAM), DUMANJUG, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱71.3M | 0% | High risk82 | Flagged0.076 |
| 24HN0227LOCAL PROGRAM: NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES -MULTIPURPOSE/FACILITIES - CONSTRUCTION (COMPLETION) OF CEBU 6TH DISTRICT ENGINEERING OFFICE BUILDING, A.C. CORTES AVENUE, PHASE 4, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱115.7M | 86% | High risk90 | Flagged0.064 |
| 24H00187CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE FACILITY PHASE 2 AT BARANGAY LOOC, LAPU-LAPU CITY, CEBU | Region VII | Region VII | On-Going | ₱145.5M | 0% | High risk62 | Flagged0.063 |
| 24H00186CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE FACILITY PHASE 1 AT BARANGAY LOOC, LAPU-LAPU CITY, CEBU | Region VII | Region VII | On-Going | ₱145.5M | 0% | High risk62 | Flagged0.063 |
| 24HI0156BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MUNICIPAL HALL BUILDING OF MUNICIPALITY OF COMPOSTELA, PROVINCE OF CEBU | Region VII | Cebu 5th DEO | On-Going | ₱97M | 12% | High risk61 | Flagged0.054 |
| 23HM0132CAPITAL OUTLAY - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE (UPSTREAM) AT BAGACAY, LARENA, SIQUIJOR | Negros Island Region | Siquijor DEO | On-Going | ₱38.5M | 82% | High risk69 | Flagged0.045 |
| 24HE0236CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST OF TINA-AN RIVER CAPACITY ENHANCEMENT STRUCTURE (UPSTREAM - BOTH SIDES), N | Region VII | Cebu 1st DEO | On-Going | ₱96.4M | 81% | High risk73 | Flagged0.033 |
| 24HG0119CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF LENGIGON FLOOD CONTROL, LENGIGON, ARGAO CEBU | Region VII | Cebu 2nd DEO | On-Going | ₱96.4M | 88% | High risk74 | Flagged0.033 |
| 24HG0120CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ANAHAW FLOOD CONTROL, ANAHAW, ARGAO, CEBU | Region VII | Cebu 2nd DEO | On-Going | ₱96.4M | 90% | High risk74 | Flagged0.031 |
| 24H00030CSSP, BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF MANTAYUPAN ROAD (LEADING TO BANGAG LAPOS CAVE), BARILI, CEBU | Region VII | Region VII | On-Going | ₱178.2M | 81% | High risk78 | Flagged0.029 |
| 25HN0140SSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF ROAD WITH DRAINAGE FACILITIES, TIMPOLOK ROAD, BRGY. GUN-OB AND BRGY. BABAG (PHASE 4), LAPU-LAPU CITY | Region VII | Cebu 6th DEO | On-Going | ₱19.2M | 46% | High risk94 | Flagged0.026 |
| 25HN0028SSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BLDGS./ FACILITIES -CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG JAGOBIAO CREEK, BARANGAY CASILI, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱135M | 90% | High risk95 | Flagged0.025 |
| 25HD0191REPAIR/REHABILITATION AND CONSTRUCTION OF FARM-TO-MARKET ROADS - CONCRETING OF BRGY. YLAYA FMR, BRGY. YLAYA, SAN FERNANDO, CEBU | Region VII | Cebu 1st DEO | On-Going | ₱49.7M | 32% | Medium risk53 | Flagged0.025 |
| 25HN0179SSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF ROAD WITH DRAINAGE FACILITIES, TIMPOLOK ROAD, BARANGAY GUN-OB AND BARANGAY BABAG (PHASE 3), LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱19.2M | 52% | High risk95 | Flagged0.024 |
| 25HI0104CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF ROAD, BARANGAY POBLACION TO BARANGAY PANSOY, SOGOD, CEBU | Region VII | Cebu 5th DEO | On-Going | ₱38.4M | 53% | High risk95 | Flagged0.022 |
| 24H00192CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF COASTAL ROAD, PHASE 1, BARANGAY IBO, LAPULAPU CITY, CEBU | Region VII | Region VII | On-Going | ₱231.5M | 0% | High risk64 | Flagged0.022 |
| 25HD0037CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST. OF FLOOD CONTROL STRUCTURE, PACKAGE 1, SITIO BOKYOL, POBLACION III | Region VII | Cebu 1st DEO | On-Going | ₱101.3M | 90% | High risk95 | Flagged0.020 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 251 | 20HE0091FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTURES/FACILITIES - LOCAL INFRASTRUCTURE PROGRAM - CONSTRUCTION OF FLOOD CONTROL, CANSOJONG, TALISAY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱29.7M | 100% | Medium risk47 | —-0.078 |
| 252 | 20HE0090FLOOD CONTROL AND DRAINAGE - FLOOD CONTROL STRUCTURES/FACILITIES - CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONSTRUCTION OF SEAWALL IN BRGY. POBLACION, TALISAY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱14.7M | 100% | Medium risk47 | —-0.077 |
| 253 | 21HH0117OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION / MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE AT BARANGAY SUBA, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱24.1M | 100% | Medium risk47 | —-0.079 |
| 254 | 22HE0068CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTUTES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF SEAWALL, BRGY. TANGKE, TALISAY CITY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱14.9M | 100% | Medium risk47 | —-0.077 |
| 255 | 18HN0062CONSTRUCTION OF 4-STOREY, 12-CL SCHOOL BUILDING AT JUGAN ES, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱31.1M | 100% | Medium risk47 | —-0.047 |
| 256 | 22HE0067CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF SEAWALL, BRGY. CANSOJONG, TALISAY CITY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱9.9M | 100% | Medium risk47 | —-0.078 |
| 257 | 20HG0085CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, ACCESS ROAD LEADING TO DALAGUETE BEACH PARK, DALAGUETE, CEBU | Region VII | Cebu 2nd DEO | Completed | ₱23.3M | 100% | Medium risk47 | —-0.095 |
| 258 | 24HG0001OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - N BACALSO AVE (CEBU SOUTH RD) - K0072+000 - K0073+000 | Region VII | Cebu 2nd DEO | Completed | ₱25.9M | 100% | Medium risk47 | —-0.096 |
| 259 | 21HG0155OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION REHABILITATION/ RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS, N. BACALSO AVE (CEBU SOUTH ROAD) - K0063+600 - K0065+313 | Region VII | Cebu 2nd DEO | Completed | ₱28M | 100% | Medium risk47 | —-0.096 |
| 260 | 25HD0035ORGANIZATIONAL OUTCOME 1; ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - CONST./UPGRADING/REHAB. OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS -N BACALSO AVE (CEBU SOUTH RD) - K0052+560 - K0053+100, SIBONGA, CEBU | Region VII | Cebu 1st DEO | Completed | ₱19.3M | 100% | Medium risk47 | —-0.097 |
| 261 | 20HG0053ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM; ASSET PRESERVATION PROGRAM; REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS; RECONSTRUCTION TO CONCRETE PAVEMENT, N. BACALSO AVE. (CEBU SOUTH ROAD) - K | Region VII | Cebu 2nd DEO | Completed | ₱27.6M | 100% | Medium risk47 | —-0.096 |
| 262 | 25HD0017ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM -REHAB/RECONST OF ROAD WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - N BACALSO AVE (CEBU SOUTH RD) - K0045+828 - K0046+882, SIBONGA, CEBU | Region VII | Cebu 1st DEO | Completed | ₱26.2M | 100% | Medium risk47 | —-0.096 |
| 263 | 24HE0142ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHAB/RECONST OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - N BACALSO AVE (CEBU SOUTH RD) - K0052+645 - K0052+870, SIBONGA, CEBU | Region VII | Cebu 1st DEO | Completed | ₱15.9M | 100% | Medium risk47 | —-0.097 |
| 264 | 25HD0015ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - N BACALSO AVE (CEBU SOUTH RD) - K0045+870 - K0046+400, SIBONGA, CEBU | Region VII | Cebu 1st DEO | Completed | ₱21.2M | 100% | Medium risk47 | —-0.097 |
| 265 | 19HE0086CONCRETING OF SITIO LUMBANG TO SITIO KAANDAY TANAÑAS ROAD, BRGY. TANAÑAS, SAN FERNANDO, CEBU | Region VII | Cebu 1st DEO | Completed | ₱24.1M | 100% | Medium risk47 | —-0.096 |
| 266 | 23HE0072ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS - N BACALSO AVE (CEBU SOUTH RD) - K0036+500 - K0036+720, CARCAR CITY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱19.7M | 100% | Medium risk47 | —-0.096 |
| 267 | 23HE0071ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS - N BACALSO AVE (CEBU SOUTH RD) - K0035+000 - K0035+220, CARCAR CITY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱16.7M | 100% | Medium risk47 | —-0.097 |
| 268 | 18HH0010CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, F. RAMOS STREET LEADING TO BASILICA MINORE DEL STO. NIÑO, MAGELLAN'S CROSS, FUENTE OSMEÑA, CEBU PROVINCIAL CAPITOL, MANGO NIGHT ENTERTAINMENT CENTERS, BRGY. STA. CRUZ (PO | Region VII | Cebu City DEO | Completed | ₱19.3M | 100% | Medium risk46 | —-0.097 |
| 269 | 21HH0009OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - TERTIARY ROADS - RR LANDON ST. (S00057CB) CHAINAGE 000 - CHAINAGE 431, (S00060CB) CHAINAGE 000 - CHAINAGE 227, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱19.1M | 100% | Medium risk46 | —-0.098 |
| 270 | 22HH0003OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM- PREVENTIVE MAINTENANCE-TERTIARY ROADS-GEN. MAXILOM EXT. -(S00337CB) CHAINAGE 000 - CHAINAGE 300, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱18.1M | 100% | Medium risk46 | —-0.098 |
| 271 | 24HE0200BASIC EDUCATIONAL FACILITIES FUND (BEFF) CONST OF ELEMENTARY AND SECONDARY CLASSROOMS UNDER THE DEPEDS BASIC EDUCATION FACILITIES FUND CONST OF 2-STOREY 12-CLASSROOM SCHOOL BUILDING IN LIBURON ELEMENTARY SCHOOL, BARANGAY LIBURON, CITY OF CARCAR | Region VII | Cebu 1st DEO | Completed | ₱39.8M | 100% | Medium risk46 | —-0.044 |
| 272 | 20HE0098LOCAL ROADS AND BRIDGES - LOCAL ROADS - LOCAL INFRASTRUCTURE PROGRAM - ROAD CONCRETING, BRGY. CANSOJONG, TALISAY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱19.8M | 100% | Medium risk46 | —-0.097 |
| 273 | 23HC0024RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES- CLUSTER II 1.VIGO BR. (B00129BH) TAGBILARAN EAST ROAD (TAGBILARAN-JAGNA) SECTION =P 6,468,000.00 2.) SUN-OK BR. (B00242BH) TAGBILARAN EAST ROAD (TAGBILARAN-JAGNA) SECTION =P 4,410,000.00 3.) SOOM BR. (B00 | Region VII | Bohol 2nd DEO | Completed | ₱35.9M | 100% | Medium risk46 | —-0.054 |
| 274 | 19HN0008OO3: CONVERGENCE AND SPECIAL SUPPORT PROGRAM CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO SEAPORTS - OFF-CARRIAGEWAY IMPROVEMENT: SHOULDER PAVING/CONSTRUCTION - CENTENNIAL AVENUE (CENTER ISLAND AND SIDEWALK) LEADING TO CORDOVA RORO PORT, CORDOVA | Region VII | Cebu 6th DEO | Completed | ₱23M | 100% | Medium risk46 | —-0.095 |
| 275 | 20HG0076CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, MANTALONGON-LAPA-LUGSANGAN EXTENSION ROAD LEADING TO LUGSANGAN PEAK AND MONKEY HABITAT, DALAGUETE, CEBU | Region VII | Cebu 2nd DEO | Completed | ₱9.5M | 100% | Medium risk46 | —-0.096 |