Contractor dossier
366 projects on file, including joint ventures this contractor is part of.
Total projects
366
Total budget
₱18.8B
Average progress
89.5%
Completion rate
75.4%
Average risk score
51.9
Medium risk on average, out of 100
Flagged as unusual
35
9.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 348 | ₱18B | 51.4 | 32 | 90.4% |
| Negros Island Region | 13 | ₱588.2M | 66.7 | 2 | 60.2% |
| Region V | 4 | ₱77.2M | 53.7 | 1 | 100.0% |
| Region IV-B | 1 | ₱48M | 44.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 144 | ₱6B | 48.9 | 5 | 89.5% |
| Flood Control and Drainage | 104 | ₱7.6B | 58.0 | 10 | 91.2% |
| Buildings and Facilities | 67 | ₱1.7B | 37.6 | 4 | 94.3% |
| OTHER | 21 | ₱1.6B | 71.4 | 5 | 94.6% |
| Bridges | 19 | ₱1.1B | 52.8 | 5 | 76.3% |
| GAA 2025 SSP | 5 | ₱313.1M | 94.7 | 5 | 66.3% |
| GAA 2025 OO-2 | 3 | ₱376M | 93.3 | 1 | 86.8% |
| Water Provision and Storage | 3 | ₱38.2M | 49.3 | 0 | 7.7% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HD0037CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST. OF FLOOD CONTROL STRUCTURE, PACKAGE 1, SITIO BOKYOL, POBLACION III | Region VII | Cebu 1st DEO | On-Going | ₱101.3M | 90% | High risk95 | Flagged0.020 |
| 25HN0028SSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BLDGS./ FACILITIES -CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG JAGOBIAO CREEK, BARANGAY CASILI, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱135M | 90% | High risk95 | Flagged0.025 |
| 25HN0179SSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF ROAD WITH DRAINAGE FACILITIES, TIMPOLOK ROAD, BARANGAY GUN-OB AND BARANGAY BABAG (PHASE 3), LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱19.2M | 52% | High risk95 | Flagged0.024 |
| 25HI0104CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF ROAD, BARANGAY POBLACION TO BARANGAY PANSOY, SOGOD, CEBU | Region VII | Cebu 5th DEO | On-Going | ₱38.4M | 53% | High risk95 | Flagged0.022 |
| 25HN0140SSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF ROAD WITH DRAINAGE FACILITIES, TIMPOLOK ROAD, BRGY. GUN-OB AND BRGY. BABAG (PHASE 4), LAPU-LAPU CITY | Region VII | Cebu 6th DEO | On-Going | ₱19.2M | 46% | High risk94 | Flagged0.026 |
| 25HN0101OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONST./ MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CALAWISAN CREEK, BARANGAY CALAWISAN, LAPU-LAPU CITY | Region VII | Cebu 6th DEO | On-Going | ₱96.4M | 86% | High risk93 | —-0.008 |
| 25H00065OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST./ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONST. OF FLOOD CONTROL STRUCTURE ALONG CALAWISAN CREEK (PACKAGE 2), BRGY. CALAWISAN, LAPU-LAPU CITY | Region VII | Region VII | On-Going | ₱144.6M | 75% | High risk93 | Flagged0.005 |
| 25HN0038OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUTUANON RIVER, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱135M | 99% | High risk93 | —-0.006 |
| 24HN0227LOCAL PROGRAM: NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES -MULTIPURPOSE/FACILITIES - CONSTRUCTION (COMPLETION) OF CEBU 6TH DISTRICT ENGINEERING OFFICE BUILDING, A.C. CORTES AVENUE, PHASE 4, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱115.7M | 86% | High risk90 | Flagged0.064 |
| 23H00114CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF INFECTIOUS DISEASE CENTER, VICENTE SOTTO, CEBU CITY | Region VII | Region VII | On-Going | ₱115.8M | 41% | High risk89 | Flagged0.085 |
| 23HO0260CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BRGY. PAWA (PACKAGE 1), DUMANJUG, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱71.3M | 0% | High risk82 | Flagged0.076 |
| 23HO0261CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF ROAD DIKE AT BRGY. KANG-ACTOL (DOWNSTREAM), DUMANJUG, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱71.3M | 0% | High risk82 | Flagged0.076 |
| 23HO0276CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BRGY. PAWA (PACKAGE 2), DUMANJUG, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱71.3M | 0% | High risk82 | Flagged0.078 |
| 24H00030CSSP, BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF MANTAYUPAN ROAD (LEADING TO BANGAG LAPOS CAVE), BARILI, CEBU | Region VII | Region VII | On-Going | ₱178.2M | 81% | High risk78 | Flagged0.029 |
| 25HM0055CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT TACULING RIVER II, BARANGAY TACULING, LAREN | Negros Island Region | Siquijor DEO | On-Going | ₱97M | 61% | High risk78 | Flagged0.006 |
| 24HN0127CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONST. OF ROAD LEADING TO RORO PORT PHASE 1, BRGY. POBLACION, CORDOVA, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱144.8M | 100% | High risk76 | Flagged0.018 |
| 18FI0026NETWORK DEVELOPMENT PROGRAM, OFF-CARRIAGEWAY IMPROVEMENT, SECONDARY ROADS, MASBATE-MILAGROS RD, K000 | Region V | Masbate 2nd DEO | Completed | ₱25.4M | 100% | High risk76 | —-0.033 |
| 21HN0102LP: LOCAL INFRASTRUCTURE PROGRAM -LOCAL ROADS AND BRIDGES -LOCAL ROADS -CONSTRUCTION OF SAN MIGUEL - PILIPOG COASTAL ROAD (ROCK CAUSEWAY) LEADING TO HOTELS/RESORTS (PHASE 1), CORDOVA, CEBU | Region VII | Cebu 6th DEO | Completed | ₱99M | 100% | High risk74 | —-0.019 |
| 24HG0119CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF LENGIGON FLOOD CONTROL, LENGIGON, ARGAO CEBU | Region VII | Cebu 2nd DEO | On-Going | ₱96.4M | 88% | High risk74 | Flagged0.033 |
| 24HG0120CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ANAHAW FLOOD CONTROL, ANAHAW, ARGAO, CEBU | Region VII | Cebu 2nd DEO | On-Going | ₱96.4M | 90% | High risk74 | Flagged0.031 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23H00114CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF INFECTIOUS DISEASE CENTER, VICENTE SOTTO, CEBU CITY | Region VII | Region VII | On-Going | ₱115.8M | 41% | High risk89 | Flagged0.085 |
| 23HO0276CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BRGY. PAWA (PACKAGE 2), DUMANJUG, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱71.3M | 0% | High risk82 | Flagged0.078 |
| 23HO0260CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BRGY. PAWA (PACKAGE 1), DUMANJUG, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱71.3M | 0% | High risk82 | Flagged0.076 |
| 23HO0261CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF ROAD DIKE AT BRGY. KANG-ACTOL (DOWNSTREAM), DUMANJUG, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱71.3M | 0% | High risk82 | Flagged0.076 |
| 24HN0227LOCAL PROGRAM: NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES -MULTIPURPOSE/FACILITIES - CONSTRUCTION (COMPLETION) OF CEBU 6TH DISTRICT ENGINEERING OFFICE BUILDING, A.C. CORTES AVENUE, PHASE 4, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱115.7M | 86% | High risk90 | Flagged0.064 |
| 24H00187CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE FACILITY PHASE 2 AT BARANGAY LOOC, LAPU-LAPU CITY, CEBU | Region VII | Region VII | On-Going | ₱145.5M | 0% | High risk62 | Flagged0.063 |
| 24H00186CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE FACILITY PHASE 1 AT BARANGAY LOOC, LAPU-LAPU CITY, CEBU | Region VII | Region VII | On-Going | ₱145.5M | 0% | High risk62 | Flagged0.063 |
| 24HI0156BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MUNICIPAL HALL BUILDING OF MUNICIPALITY OF COMPOSTELA, PROVINCE OF CEBU | Region VII | Cebu 5th DEO | On-Going | ₱97M | 12% | High risk61 | Flagged0.054 |
| 23HM0132CAPITAL OUTLAY - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE (UPSTREAM) AT BAGACAY, LARENA, SIQUIJOR | Negros Island Region | Siquijor DEO | On-Going | ₱38.5M | 82% | High risk69 | Flagged0.045 |
| 24HE0236CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST OF TINA-AN RIVER CAPACITY ENHANCEMENT STRUCTURE (UPSTREAM - BOTH SIDES), N | Region VII | Cebu 1st DEO | On-Going | ₱96.4M | 81% | High risk73 | Flagged0.033 |
| 24HG0119CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF LENGIGON FLOOD CONTROL, LENGIGON, ARGAO CEBU | Region VII | Cebu 2nd DEO | On-Going | ₱96.4M | 88% | High risk74 | Flagged0.033 |
| 24HG0120CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ANAHAW FLOOD CONTROL, ANAHAW, ARGAO, CEBU | Region VII | Cebu 2nd DEO | On-Going | ₱96.4M | 90% | High risk74 | Flagged0.031 |
| 24H00030CSSP, BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF MANTAYUPAN ROAD (LEADING TO BANGAG LAPOS CAVE), BARILI, CEBU | Region VII | Region VII | On-Going | ₱178.2M | 81% | High risk78 | Flagged0.029 |
| 25HN0140SSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF ROAD WITH DRAINAGE FACILITIES, TIMPOLOK ROAD, BRGY. GUN-OB AND BRGY. BABAG (PHASE 4), LAPU-LAPU CITY | Region VII | Cebu 6th DEO | On-Going | ₱19.2M | 46% | High risk94 | Flagged0.026 |
| 25HN0028SSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BLDGS./ FACILITIES -CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG JAGOBIAO CREEK, BARANGAY CASILI, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱135M | 90% | High risk95 | Flagged0.025 |
| 25HD0191REPAIR/REHABILITATION AND CONSTRUCTION OF FARM-TO-MARKET ROADS - CONCRETING OF BRGY. YLAYA FMR, BRGY. YLAYA, SAN FERNANDO, CEBU | Region VII | Cebu 1st DEO | On-Going | ₱49.7M | 32% | Medium risk53 | Flagged0.025 |
| 25HN0179SSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF ROAD WITH DRAINAGE FACILITIES, TIMPOLOK ROAD, BARANGAY GUN-OB AND BARANGAY BABAG (PHASE 3), LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱19.2M | 52% | High risk95 | Flagged0.024 |
| 25HI0104CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF ROAD, BARANGAY POBLACION TO BARANGAY PANSOY, SOGOD, CEBU | Region VII | Cebu 5th DEO | On-Going | ₱38.4M | 53% | High risk95 | Flagged0.022 |
| 24H00192CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF COASTAL ROAD, PHASE 1, BARANGAY IBO, LAPULAPU CITY, CEBU | Region VII | Region VII | On-Going | ₱231.5M | 0% | High risk64 | Flagged0.022 |
| 25HD0037CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST. OF FLOOD CONTROL STRUCTURE, PACKAGE 1, SITIO BOKYOL, POBLACION III | Region VII | Cebu 1st DEO | On-Going | ₱101.3M | 90% | High risk95 | Flagged0.020 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 276 | 23HN0004OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - MACTAN CIRCUMFERENTIAL RD - (S00021LP) CHAINAGE 2000 - CHAINAGE 2668, LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱26.3M | 100% | Medium risk46 | —-0.094 |
| 277 | 24HN0017CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - IMPROVEMENT OF ROAD WITH DRAINAGE SYSTEM AT FUENTES ROAD IN BARANGAYS AGUS AND PAJAC (PHASE 2), LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱21.9M | 100% | Medium risk46 | —-0.096 |
| 278 | 24HE0139ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM ASSET PRESERVATION PROGRAM - REHAB/RECONST OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - N BACALSO AVE (CEBU SOUTH RD) - K0047+273 - K0047+550, SIBONGA, CEBU | Region VII | Cebu 1st DEO | Completed | ₱9.8M | 100% | Medium risk46 | —-0.097 |
| 279 | 24HE0145ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHAB/RECONST OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS - N BACALSO AVE (CEBU SOUTH RD) - K0045+484 - K0045+820, SIBONGA, CEBU | Region VII | Cebu 1st DEO | Completed | ₱11.7M | 100% | Medium risk46 | —-0.097 |
| 280 | 18HI0023CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TODECLARED TOURISM, DESTINATION AT DAKIT-AMPONGOL-CABUNGAHAN ROAD LEADING TO LAUAGAN FALLS, BRGY. DAKIT, | Region VII | Cebu 5th DEO | Completed | ₱18.3M | 100% | Medium risk46 | —-0.096 |
| 281 | 24HE0152CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SPECIAL ROAD FUND - MOTOR VEHICLE USERS CHARGE (MVUC) AS PER R.A.11239 - INSTALLATION OF ROAD SAFETY DEVICES AND FACILITIES ALONG NAGA-ULING RD (S00219CB), NAGA CITY, CEBU AND CARCAR-BARILI-MANTAYUPAN RD (S00289C | Region VII | Cebu 1st DEO | Completed | ₱9.8M | 100% | Medium risk46 | —-0.097 |
| 282 | 23HE0002CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, INAYAGAN, NAGA CITY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱4.9M | 100% | Medium risk46 | —-0.098 |
| 283 | 18HF0070CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO CABO SAN MIGUEL RESORT, ADLAWAN BEACH RESORT AND OWAKIKI BEACH RESORT, BRGY. OWAK, ASTURIAS, CEBU | Region VII | Cebu 3rd DEO | Completed | ₱10.7M | 100% | Medium risk46 | —-0.097 |
| 284 | 18HG0085ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROADS SYSTEM, NETWORK DEVELOPMENT PROGRAM-PAVING OF UNPAVED ROADS-TERTIARY ROAD-DALAUETE-MANTALONGON-BADIAN ROAD-K0101+707-K0101+914, CEBU PROVINCE | Region VII | Cebu 2nd DEO | Completed | ₱8.3M | 100% | Medium risk46 | —-0.095 |
| 285 | 20HG0045LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION (COMPLETION) OF ROAD, BRGY. LANAO - DUMALAN, DALAGUETE, CEBU | Region VII | Cebu 2nd DEO | Completed | ₱9.4M | 100% | Medium risk46 | —-0.096 |
| 286 | 18HG0048LOCAL PROGRAM-LOCAL INFRASTRUCTURES PROGRAM; LOCAL ROADS AND BRIDGES; LOCAL ROADS- REHABILITATION OF ROAD, BRGY. CATOLOHAN-NALHUB, DALAGUETE, CEBU | Region VII | Cebu 2nd DEO | Completed | ₱9.4M | 100% | Medium risk46 | —-0.096 |
| 287 | 19HG0065LOCAL PROGRAM, LOCAL_ROADS_AND_BRIDGES, LOCAL ROADS, CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, CONSTRUCTION OF ROAD AT BRGY. DUMALAN - LANAO, DALAGUETE, CEBU | Region VII | Cebu 2nd DEO | Completed | ₱7.5M | 100% | Medium risk46 | —-0.096 |
| 288 | 21HG0153OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION REHABILITATION/ RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS, N. BACALSO AVE (CEBU SOUTH ROAD) - K0066+664 - K0067+080 | Region VII | Cebu 2nd DEO | Completed | ₱7.9M | 100% | Medium risk46 | —-0.097 |
| 289 | 21HG0154OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION REHABILITATION/ RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS, N. BACALSO AVE (CEBU SOUTH ROAD) - K0065+313 - K0065+567 | Region VII | Cebu 2nd DEO | Completed | ₱5M | 100% | Medium risk46 | —-0.098 |
| 290 | 25HO0041CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF STA. FILOMENA-VALENCIA ROAD, BARANGAY SANTA FILOMEN | Region VII | Cebu 7th DEO | On-Going | ₱9.9M | 31% | Medium risk46 | —-0.042 |
| 291 | 19HI0001CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG COTCOT RIVER, LILOAN, CEBU | Region VII | Cebu 5th DEO | Completed | ₱46.6M | 100% | Medium risk46 | —-0.078 |
| 292 | 21HG0152OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET RESERVATION REHABILITATION/ RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS, N. BACALSO AVE (CEBU SOUTH ROAD) - K0058+301 - K0058+802 | Region VII | Cebu 2nd DEO | Completed | ₱9.2M | 100% | Medium risk46 | —-0.097 |
| 293 | 20HE0113LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - ROAD CONCRETING, BRGY. CUANOS-CAMP 7, MINGLANILLA, CEBU | Region VII | Cebu 1st DEO | Completed | ₱4.9M | 100% | Medium risk46 | —-0.095 |
| 294 | 24HO0023CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, IMPROVEMENT OF POBLACION-GUADALUPE ROAD AT BARANGAY POBLACION AND G | Region VII | Cebu 7th DEO | Completed | ₱7.4M | 100% | Medium risk46 | —-0.097 |
| 295 | 24HO0022CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, IMPROVEMENT OF STA. FILOMENA-VALENCIA ROAD AT BARANGAY SANTA FILOME | Region VII | Cebu 7th DEO | Completed | ₱7.4M | 100% | Medium risk46 | —-0.097 |
| 296 | 19HI0004CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG NAGHALIN RIVER AND BAWO RIVER, CATMON - SIDE, CATMON, CEBU | Region VII | Cebu 5th DEO | Completed | ₱9.3M | 100% | Medium risk46 | —-0.069 |
| 297 | 23HE0131CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONCRETING OF ROAD, VITO, MINGLANILLA, CEBU | Region VII | Cebu 1st DEO | Completed | ₱9.9M | 100% | Medium risk46 | —-0.097 |
| 298 | 22HH0073CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND / OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR / STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF ROAD AT BARANGAY GUBA, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱4.9M | 100% | Medium risk46 | —-0.098 |
| 299 | 23HE0041ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - PRIMARY ROADS - N BACALSO AVE (CEBU SOUTH RD) - K0011+823 - K0012+000, TALISAY CITY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱10.1M | 100% | Medium risk46 | —-0.098 |
| 300 | 19HH0063OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM, PREVENTIVE MAINTENANCE - TERTIARY ROADS, F. GONZALEZ ST., (S00157CB) CHAINAGE 85 - CHAINAGE 418, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱8.4M | 100% | Medium risk46 | —-0.096 |