Contractor dossier
366 projects on file, including joint ventures this contractor is part of.
Total projects
366
Total budget
₱18.8B
Average progress
89.5%
Completion rate
75.4%
Average risk score
51.9
Medium risk on average, out of 100
Flagged as unusual
35
9.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 348 | ₱18B | 51.4 | 32 | 90.4% |
| Negros Island Region | 13 | ₱588.2M | 66.7 | 2 | 60.2% |
| Region V | 4 | ₱77.2M | 53.7 | 1 | 100.0% |
| Region IV-B | 1 | ₱48M | 44.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 144 | ₱6B | 48.9 | 5 | 89.5% |
| Flood Control and Drainage | 104 | ₱7.6B | 58.0 | 10 | 91.2% |
| Buildings and Facilities | 67 | ₱1.7B | 37.6 | 4 | 94.3% |
| OTHER | 21 | ₱1.6B | 71.4 | 5 | 94.6% |
| Bridges | 19 | ₱1.1B | 52.8 | 5 | 76.3% |
| GAA 2025 SSP | 5 | ₱313.1M | 94.7 | 5 | 66.3% |
| GAA 2025 OO-2 | 3 | ₱376M | 93.3 | 1 | 86.8% |
| Water Provision and Storage | 3 | ₱38.2M | 49.3 | 0 | 7.7% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HD0037CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST. OF FLOOD CONTROL STRUCTURE, PACKAGE 1, SITIO BOKYOL, POBLACION III | Region VII | Cebu 1st DEO | On-Going | ₱101.3M | 90% | High risk95 | Flagged0.020 |
| 25HN0028SSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BLDGS./ FACILITIES -CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG JAGOBIAO CREEK, BARANGAY CASILI, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱135M | 90% | High risk95 | Flagged0.025 |
| 25HN0179SSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF ROAD WITH DRAINAGE FACILITIES, TIMPOLOK ROAD, BARANGAY GUN-OB AND BARANGAY BABAG (PHASE 3), LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱19.2M | 52% | High risk95 | Flagged0.024 |
| 25HI0104CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF ROAD, BARANGAY POBLACION TO BARANGAY PANSOY, SOGOD, CEBU | Region VII | Cebu 5th DEO | On-Going | ₱38.4M | 53% | High risk95 | Flagged0.022 |
| 25HN0140SSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF ROAD WITH DRAINAGE FACILITIES, TIMPOLOK ROAD, BRGY. GUN-OB AND BRGY. BABAG (PHASE 4), LAPU-LAPU CITY | Region VII | Cebu 6th DEO | On-Going | ₱19.2M | 46% | High risk94 | Flagged0.026 |
| 25HN0101OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONST./ MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CALAWISAN CREEK, BARANGAY CALAWISAN, LAPU-LAPU CITY | Region VII | Cebu 6th DEO | On-Going | ₱96.4M | 86% | High risk93 | —-0.008 |
| 25H00065OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST./ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONST. OF FLOOD CONTROL STRUCTURE ALONG CALAWISAN CREEK (PACKAGE 2), BRGY. CALAWISAN, LAPU-LAPU CITY | Region VII | Region VII | On-Going | ₱144.6M | 75% | High risk93 | Flagged0.005 |
| 25HN0038OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUTUANON RIVER, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱135M | 99% | High risk93 | —-0.006 |
| 24HN0227LOCAL PROGRAM: NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES -MULTIPURPOSE/FACILITIES - CONSTRUCTION (COMPLETION) OF CEBU 6TH DISTRICT ENGINEERING OFFICE BUILDING, A.C. CORTES AVENUE, PHASE 4, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱115.7M | 86% | High risk90 | Flagged0.064 |
| 23H00114CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF INFECTIOUS DISEASE CENTER, VICENTE SOTTO, CEBU CITY | Region VII | Region VII | On-Going | ₱115.8M | 41% | High risk89 | Flagged0.085 |
| 23HO0260CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BRGY. PAWA (PACKAGE 1), DUMANJUG, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱71.3M | 0% | High risk82 | Flagged0.076 |
| 23HO0261CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF ROAD DIKE AT BRGY. KANG-ACTOL (DOWNSTREAM), DUMANJUG, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱71.3M | 0% | High risk82 | Flagged0.076 |
| 23HO0276CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BRGY. PAWA (PACKAGE 2), DUMANJUG, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱71.3M | 0% | High risk82 | Flagged0.078 |
| 24H00030CSSP, BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF MANTAYUPAN ROAD (LEADING TO BANGAG LAPOS CAVE), BARILI, CEBU | Region VII | Region VII | On-Going | ₱178.2M | 81% | High risk78 | Flagged0.029 |
| 25HM0055CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT TACULING RIVER II, BARANGAY TACULING, LAREN | Negros Island Region | Siquijor DEO | On-Going | ₱97M | 61% | High risk78 | Flagged0.006 |
| 24HN0127CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONST. OF ROAD LEADING TO RORO PORT PHASE 1, BRGY. POBLACION, CORDOVA, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱144.8M | 100% | High risk76 | Flagged0.018 |
| 18FI0026NETWORK DEVELOPMENT PROGRAM, OFF-CARRIAGEWAY IMPROVEMENT, SECONDARY ROADS, MASBATE-MILAGROS RD, K000 | Region V | Masbate 2nd DEO | Completed | ₱25.4M | 100% | High risk76 | —-0.033 |
| 21HN0102LP: LOCAL INFRASTRUCTURE PROGRAM -LOCAL ROADS AND BRIDGES -LOCAL ROADS -CONSTRUCTION OF SAN MIGUEL - PILIPOG COASTAL ROAD (ROCK CAUSEWAY) LEADING TO HOTELS/RESORTS (PHASE 1), CORDOVA, CEBU | Region VII | Cebu 6th DEO | Completed | ₱99M | 100% | High risk74 | —-0.019 |
| 24HG0119CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF LENGIGON FLOOD CONTROL, LENGIGON, ARGAO CEBU | Region VII | Cebu 2nd DEO | On-Going | ₱96.4M | 88% | High risk74 | Flagged0.033 |
| 24HG0120CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ANAHAW FLOOD CONTROL, ANAHAW, ARGAO, CEBU | Region VII | Cebu 2nd DEO | On-Going | ₱96.4M | 90% | High risk74 | Flagged0.031 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23H00114CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF INFECTIOUS DISEASE CENTER, VICENTE SOTTO, CEBU CITY | Region VII | Region VII | On-Going | ₱115.8M | 41% | High risk89 | Flagged0.085 |
| 23HO0276CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BRGY. PAWA (PACKAGE 2), DUMANJUG, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱71.3M | 0% | High risk82 | Flagged0.078 |
| 23HO0260CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BRGY. PAWA (PACKAGE 1), DUMANJUG, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱71.3M | 0% | High risk82 | Flagged0.076 |
| 23HO0261CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF ROAD DIKE AT BRGY. KANG-ACTOL (DOWNSTREAM), DUMANJUG, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱71.3M | 0% | High risk82 | Flagged0.076 |
| 24HN0227LOCAL PROGRAM: NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES -MULTIPURPOSE/FACILITIES - CONSTRUCTION (COMPLETION) OF CEBU 6TH DISTRICT ENGINEERING OFFICE BUILDING, A.C. CORTES AVENUE, PHASE 4, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱115.7M | 86% | High risk90 | Flagged0.064 |
| 24H00187CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE FACILITY PHASE 2 AT BARANGAY LOOC, LAPU-LAPU CITY, CEBU | Region VII | Region VII | On-Going | ₱145.5M | 0% | High risk62 | Flagged0.063 |
| 24H00186CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE FACILITY PHASE 1 AT BARANGAY LOOC, LAPU-LAPU CITY, CEBU | Region VII | Region VII | On-Going | ₱145.5M | 0% | High risk62 | Flagged0.063 |
| 24HI0156BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MUNICIPAL HALL BUILDING OF MUNICIPALITY OF COMPOSTELA, PROVINCE OF CEBU | Region VII | Cebu 5th DEO | On-Going | ₱97M | 12% | High risk61 | Flagged0.054 |
| 23HM0132CAPITAL OUTLAY - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE (UPSTREAM) AT BAGACAY, LARENA, SIQUIJOR | Negros Island Region | Siquijor DEO | On-Going | ₱38.5M | 82% | High risk69 | Flagged0.045 |
| 24HE0236CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST OF TINA-AN RIVER CAPACITY ENHANCEMENT STRUCTURE (UPSTREAM - BOTH SIDES), N | Region VII | Cebu 1st DEO | On-Going | ₱96.4M | 81% | High risk73 | Flagged0.033 |
| 24HG0119CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF LENGIGON FLOOD CONTROL, LENGIGON, ARGAO CEBU | Region VII | Cebu 2nd DEO | On-Going | ₱96.4M | 88% | High risk74 | Flagged0.033 |
| 24HG0120CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ANAHAW FLOOD CONTROL, ANAHAW, ARGAO, CEBU | Region VII | Cebu 2nd DEO | On-Going | ₱96.4M | 90% | High risk74 | Flagged0.031 |
| 24H00030CSSP, BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF MANTAYUPAN ROAD (LEADING TO BANGAG LAPOS CAVE), BARILI, CEBU | Region VII | Region VII | On-Going | ₱178.2M | 81% | High risk78 | Flagged0.029 |
| 25HN0140SSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF ROAD WITH DRAINAGE FACILITIES, TIMPOLOK ROAD, BRGY. GUN-OB AND BRGY. BABAG (PHASE 4), LAPU-LAPU CITY | Region VII | Cebu 6th DEO | On-Going | ₱19.2M | 46% | High risk94 | Flagged0.026 |
| 25HN0028SSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BLDGS./ FACILITIES -CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG JAGOBIAO CREEK, BARANGAY CASILI, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱135M | 90% | High risk95 | Flagged0.025 |
| 25HD0191REPAIR/REHABILITATION AND CONSTRUCTION OF FARM-TO-MARKET ROADS - CONCRETING OF BRGY. YLAYA FMR, BRGY. YLAYA, SAN FERNANDO, CEBU | Region VII | Cebu 1st DEO | On-Going | ₱49.7M | 32% | Medium risk53 | Flagged0.025 |
| 25HN0179SSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF ROAD WITH DRAINAGE FACILITIES, TIMPOLOK ROAD, BARANGAY GUN-OB AND BARANGAY BABAG (PHASE 3), LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱19.2M | 52% | High risk95 | Flagged0.024 |
| 25HI0104CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF ROAD, BARANGAY POBLACION TO BARANGAY PANSOY, SOGOD, CEBU | Region VII | Cebu 5th DEO | On-Going | ₱38.4M | 53% | High risk95 | Flagged0.022 |
| 24H00192CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF COASTAL ROAD, PHASE 1, BARANGAY IBO, LAPULAPU CITY, CEBU | Region VII | Region VII | On-Going | ₱231.5M | 0% | High risk64 | Flagged0.022 |
| 25HD0037CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST. OF FLOOD CONTROL STRUCTURE, PACKAGE 1, SITIO BOKYOL, POBLACION III | Region VII | Cebu 1st DEO | On-Going | ₱101.3M | 90% | High risk95 | Flagged0.020 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 301 | 20HE0095LOCAL ROADS AND BRIDGES - LOCAL ROADS - CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONSTRUCTION OF ROAD, BRGY. POBLACION, TALISAY CITY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱8.5M | 100% | Medium risk46 | —-0.098 |
| 302 | 19HE0088CONCRETING OF ROAD WITH DRAINAGE AT JUNCTION NATALIO BACALSO AVENUE ROAD LEADING TO BRGY. POOC, TALISAY CITY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱9.2M | 100% | Medium risk46 | —-0.099 |
| 303 | 22HN0055CSSP : CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - CENTENNIAL AVENUE LEADING TO CORDOVA RORO PORT, CORDOVA, CEBU | Region VII | Cebu 6th DEO | Completed | ₱10M | 100% | Medium risk46 | —-0.097 |
| 304 | 19HE0102CONSTRUCTION OF FOUR (4) STOREY TWELVE (12) CLASSROOMS SCHOOL BUILDING, BACAY ELEMENTARY SCHOOL, MINGLANILLA, CEBU | Region VII | Cebu 1st DEO | Completed | ₱42.3M | 100% | Medium risk46 | —-0.044 |
| 305 | 18HE0095CONSTRUCTION OF FOUR (4) STOREY SIXTEEN (16) CLASSROOM SCHOOL BUILDING AT OCAÑA NATIONAL HIGH SCHOOL, CARCAR CITY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱36.7M | 100% | Medium risk45 | —-0.045 |
| 306 | 18HE0100CONSTRUCTION OF FOUR (4) STOREY SIXTEEN (16) CLASSROOM SCHOOL BUILDING AT LIPATA NATIONAL HIGH SCHOOL, MINGLANILLA, CEBU | Region VII | Cebu 1st DEO | Completed | ₱37.5M | 100% | Medium risk45 | —-0.045 |
| 307 | 22EA0219CONSTRUCTION OF BRIDGE, BARANGAY PUYOG, BOAC, MARINDUQUE | Region IV-B | Marinduque DEO | Completed | ₱48M | 100% | Medium risk44 | —-0.052 |
| 308 | 18HE0145CONSTRUCTION OF THREE-STOREY (9 CLASSROOMS) SCHOOL BUILDING (9.5M X 37.00M) AT TUYAN ELEMENTARY SCHOOL, NAGA CITY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱25.2M | 100% | Medium risk44 | —-0.049 |
| 309 | 18HE0139CONSTRUCTION OF FOUR-STOREY (8 CLASSROOMS) SCHOOL BUILDING (9.5M X 23.00M) AT SAN ROQUE NATIONAL HIGH SCHOOL, TALISAY CITY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱22.9M | 100% | Medium risk44 | —-0.049 |
| 310 | 18HE0097CONSTRUCTION OF FOUR (4) EIGHT (8) CLASSROOM SCHOOL BUILDING AT OCAÑA NATIONAL HIGH SCHOOL, CARCAR CITY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱17.1M | 100% | Medium risk43 | —-0.052 |
| 311 | 18HE0141CONSTRUCTION OF FOUR-STOREY (8 CLASSROOMS) SCHOOL BUILDING (9.5M X 23.00M) AT NAGA CENTRAL ELEMENTARY SCHOOL, NAGA CITY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱17.9M | 100% | Medium risk43 | —-0.051 |
| 312 | 18HE0140CONSTRUCTION OF FOUR-STOREY (8 CLASSROOMS) SCHOOL BUILDING (9.5M X 23.00M) AT LIPATA NATIONAL HIGH SCHOOL, MINGLANILLA, CEBU | Region VII | Cebu 1st DEO | Completed | ₱18.4M | 100% | Medium risk43 | —-0.052 |
| 313 | 18HE0096CONSTRUCTION OF TWO (2) FOUR (4) CLASSROOOM SCHOOL BUILDING AT OCAÑA NATIONAL HIGH SCHOOL, CARCAR CITY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱8.9M | 100% | Medium risk43 | —-0.053 |
| 314 | 18HE0103CONSTRUCTION OF TWO (2) STOREY FOUR (4) CLASSROOM SCHOOL BUILDING AT CARCAR CENTRAL ELEMENTARY SCHOOL, CARCAR CITY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱8.9M | 100% | Medium risk43 | —-0.053 |
| 315 | 19HE0103CONSTRUCTION OF TWO (2) STOREY FOUR (4) CLASSROOMS SCHOOL BUILDING, BALIRONG NATIONAL HIGH SCHOOL, NAGA CITY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱13.3M | 100% | Medium risk42 | —-0.053 |
| 316 | 24HE0185CONCRETING OF BRGY. CAMPO 7 FMR PHASE II, BRGY. CAMPO 7, MINGLANILLA, CEBU | Region VII | Cebu 1st DEO | Completed | ₱9.9M | 100% | Medium risk42 | —-0.045 |
| 317 | 18HE0114CONCRETING OF BRGY. BOLINAWAN FARM TO MARKET ROAD, BRGY. BOLINAWAN, CARCAR CITY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱8M | 100% | Medium risk42 | —-0.041 |
| 318 | 18HE0124CONCRETING OF SITIO CALAVERA, BRGY. PANGDAN - SITIO CADAJO-AN, BRGY. LUTAC FMR, BRGY. PANGDAN AND BRGY. LUTAC, NAGA CITY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱6.8M | 100% | Medium risk42 | —-0.041 |
| 319 | 17HH0084CONSTRUCTION OF FOUR (4) STOREY, EIGHT (8) CLASSROOM SCHOOL BUILDING AT TALAMBAN HIGH SCHOOL, BRGY. TALAMBAN, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱20.1M | 100% | Medium risk42 | —-0.020 |
| 320 | 17HH0075CONSTRUCTION OF FOUR (4) STOREY, EIGHT (8) CLASSROOM SCHOOL BUILDING AT TALAMBAN ELEMENTARY SCHOOL, BRGY. TALAMBAN, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱20.1M | 100% | Medium risk42 | —-0.026 |
| 321 | 19HE0076CONCRETING OF SITIO CARAATAN, BRGY. BUENAVISTA FMR, BRGY. BUENAVISTA, CARCAR CITY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱5M | 100% | Medium risk42 | —-0.039 |
| 322 | 17HH0076CONSTRUCTION OF FOUR(4) STOREY, TWELVE(12) CLASSROOM SCHOOL BUILDING AT LABANGON ELEMENTARY SCHOOL, BRGY. LABANGON, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱30.3M | 100% | Medium risk41 | —-0.023 |
| 323 | 18FI0010LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES; LOCAL ROADS, CONCRETING OF BARANGAY ROAD, BRG | Region V | Masbate 2nd DEO | Completed | ₱4.7M | 100% | Medium risk39 | —-0.099 |
| 324 | 18FI0014LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES; LOCAL ROADS, CONCRETING OF BARANGAY ROAD, BRG | Region V | Masbate 2nd DEO | Completed | ₱4.7M | 100% | Medium risk39 | —-0.098 |
| 325 | 19HG0208CONCRETING OF BRGY. TUBA FMR, BRGY. TUBA, DALAGUETE, CEBU | Region VII | Cebu 2nd DEO | Completed | ₱4.7M | 100% | Medium risk37 | —-0.041 |