Opening the dossier…
Opening the dossier…
Contractor dossier
366 projects on file, including joint ventures this contractor is part of.
Total projects
366
Total budget
₱18.8B
Average progress
89.5%
Completion rate
75.4%
Average risk score
51.9
Medium risk on average, out of 100
Flagged as unusual
35
9.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 348 | ₱18B | 51.4 | 32 | 90.4% |
| Negros Island Region | 13 | ₱588.2M | 66.7 | 2 | 60.2% |
| Region V | 4 | ₱77.2M | 53.7 | 1 | 100.0% |
| Region IV-B | 1 | ₱48M | 44.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 144 | ₱6B | 48.9 | 5 | 89.5% |
| Flood Control and Drainage | 104 | ₱7.6B | 58.0 | 10 | 91.2% |
| Buildings and Facilities | 67 | ₱1.7B | 37.6 | 4 | 94.3% |
| OTHER | 21 | ₱1.6B | 71.4 | 5 | 94.6% |
| Bridges | 19 | ₱1.1B | 52.8 | 5 | 76.3% |
| GAA 2025 SSP | 5 | ₱313.1M | 94.7 | 5 | 66.3% |
| GAA 2025 OO-2 | 3 | ₱376M | 93.3 | 1 | 86.8% |
| Water Provision and Storage | 3 | ₱38.2M | 49.3 | 0 | 7.7% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HD0037CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST. OF FLOOD CONTROL STRUCTURE, PACKAGE 1, SITIO BOKYOL, POBLACION III | Region VII | Cebu 1st DEO | On-Going | ₱101.3M | 90% | High risk95 | Flagged0.020 |
| 25HN0028SSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BLDGS./ FACILITIES -CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG JAGOBIAO CREEK, BARANGAY CASILI, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱135M | 90% | High risk95 | Flagged0.025 |
| 25HN0179SSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF ROAD WITH DRAINAGE FACILITIES, TIMPOLOK ROAD, BARANGAY GUN-OB AND BARANGAY BABAG (PHASE 3), LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱19.2M | 52% | High risk95 | Flagged0.024 |
| 25HI0104CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF ROAD, BARANGAY POBLACION TO BARANGAY PANSOY, SOGOD, CEBU | Region VII | Cebu 5th DEO | On-Going | ₱38.4M | 53% | High risk95 | Flagged0.022 |
| 25HN0140SSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF ROAD WITH DRAINAGE FACILITIES, TIMPOLOK ROAD, BRGY. GUN-OB AND BRGY. BABAG (PHASE 4), LAPU-LAPU CITY | Region VII | Cebu 6th DEO | On-Going | ₱19.2M | 46% | High risk94 | Flagged0.026 |
| 25HN0101OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONST./ MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CALAWISAN CREEK, BARANGAY CALAWISAN, LAPU-LAPU CITY | Region VII | Cebu 6th DEO | On-Going | ₱96.4M | 86% | High risk93 | —-0.008 |
| 25H00065OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST./ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONST. OF FLOOD CONTROL STRUCTURE ALONG CALAWISAN CREEK (PACKAGE 2), BRGY. CALAWISAN, LAPU-LAPU CITY | Region VII | Region VII | On-Going | ₱144.6M | 75% | High risk93 | Flagged0.005 |
| 25HN0038OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUTUANON RIVER, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱135M | 99% | High risk93 | —-0.006 |
| 24HN0227LOCAL PROGRAM: NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES -MULTIPURPOSE/FACILITIES - CONSTRUCTION (COMPLETION) OF CEBU 6TH DISTRICT ENGINEERING OFFICE BUILDING, A.C. CORTES AVENUE, PHASE 4, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱115.7M | 86% | High risk90 | Flagged0.064 |
| 23H00114CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF INFECTIOUS DISEASE CENTER, VICENTE SOTTO, CEBU CITY | Region VII | Region VII | On-Going | ₱115.8M | 41% | High risk89 | Flagged0.085 |
| 23HO0260CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BRGY. PAWA (PACKAGE 1), DUMANJUG, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱71.3M | 0% | High risk82 | Flagged0.076 |
| 23HO0261CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF ROAD DIKE AT BRGY. KANG-ACTOL (DOWNSTREAM), DUMANJUG, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱71.3M | 0% | High risk82 | Flagged0.076 |
| 23HO0276CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BRGY. PAWA (PACKAGE 2), DUMANJUG, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱71.3M | 0% | High risk82 | Flagged0.078 |
| 24H00030CSSP, BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF MANTAYUPAN ROAD (LEADING TO BANGAG LAPOS CAVE), BARILI, CEBU | Region VII | Region VII | On-Going | ₱178.2M | 81% | High risk78 | Flagged0.029 |
| 25HM0055CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT TACULING RIVER II, BARANGAY TACULING, LAREN | Negros Island Region | Siquijor DEO | On-Going | ₱97M | 61% | High risk78 | Flagged0.006 |
| 24HN0127CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONST. OF ROAD LEADING TO RORO PORT PHASE 1, BRGY. POBLACION, CORDOVA, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱144.8M | 100% | High risk76 | Flagged0.018 |
| 18FI0026NETWORK DEVELOPMENT PROGRAM, OFF-CARRIAGEWAY IMPROVEMENT, SECONDARY ROADS, MASBATE-MILAGROS RD, K000 | Region V | Masbate 2nd DEO | Completed | ₱25.4M | 100% | High risk76 | —-0.033 |
| 21HN0102LP: LOCAL INFRASTRUCTURE PROGRAM -LOCAL ROADS AND BRIDGES -LOCAL ROADS -CONSTRUCTION OF SAN MIGUEL - PILIPOG COASTAL ROAD (ROCK CAUSEWAY) LEADING TO HOTELS/RESORTS (PHASE 1), CORDOVA, CEBU | Region VII | Cebu 6th DEO | Completed | ₱99M | 100% | High risk74 | —-0.019 |
| 24HG0119CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF LENGIGON FLOOD CONTROL, LENGIGON, ARGAO CEBU | Region VII | Cebu 2nd DEO | On-Going | ₱96.4M | 88% | High risk74 | Flagged0.033 |
| 24HG0120CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ANAHAW FLOOD CONTROL, ANAHAW, ARGAO, CEBU | Region VII | Cebu 2nd DEO | On-Going | ₱96.4M | 90% | High risk74 | Flagged0.031 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23H00114CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF INFECTIOUS DISEASE CENTER, VICENTE SOTTO, CEBU CITY | Region VII | Region VII | On-Going | ₱115.8M | 41% | High risk89 | Flagged0.085 |
| 23HO0276CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BRGY. PAWA (PACKAGE 2), DUMANJUG, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱71.3M | 0% | High risk82 | Flagged0.078 |
| 23HO0260CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BRGY. PAWA (PACKAGE 1), DUMANJUG, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱71.3M | 0% | High risk82 | Flagged0.076 |
| 23HO0261CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF ROAD DIKE AT BRGY. KANG-ACTOL (DOWNSTREAM), DUMANJUG, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱71.3M | 0% | High risk82 | Flagged0.076 |
| 24HN0227LOCAL PROGRAM: NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES -MULTIPURPOSE/FACILITIES - CONSTRUCTION (COMPLETION) OF CEBU 6TH DISTRICT ENGINEERING OFFICE BUILDING, A.C. CORTES AVENUE, PHASE 4, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱115.7M | 86% | High risk90 | Flagged0.064 |
| 24H00187CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE FACILITY PHASE 2 AT BARANGAY LOOC, LAPU-LAPU CITY, CEBU | Region VII | Region VII | On-Going | ₱145.5M | 0% | High risk62 | Flagged0.063 |
| 24H00186CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE FACILITY PHASE 1 AT BARANGAY LOOC, LAPU-LAPU CITY, CEBU | Region VII | Region VII | On-Going | ₱145.5M | 0% | High risk62 | Flagged0.063 |
| 24HI0156BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MUNICIPAL HALL BUILDING OF MUNICIPALITY OF COMPOSTELA, PROVINCE OF CEBU | Region VII | Cebu 5th DEO | On-Going | ₱97M | 12% | High risk61 | Flagged0.054 |
| 23HM0132CAPITAL OUTLAY - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE (UPSTREAM) AT BAGACAY, LARENA, SIQUIJOR | Negros Island Region | Siquijor DEO | On-Going | ₱38.5M | 82% | High risk69 | Flagged0.045 |
| 24HE0236CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST OF TINA-AN RIVER CAPACITY ENHANCEMENT STRUCTURE (UPSTREAM - BOTH SIDES), N | Region VII | Cebu 1st DEO | On-Going | ₱96.4M | 81% | High risk73 | Flagged0.033 |
| 24HG0119CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF LENGIGON FLOOD CONTROL, LENGIGON, ARGAO CEBU | Region VII | Cebu 2nd DEO | On-Going | ₱96.4M | 88% | High risk74 | Flagged0.033 |
| 24HG0120CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ANAHAW FLOOD CONTROL, ANAHAW, ARGAO, CEBU | Region VII | Cebu 2nd DEO | On-Going | ₱96.4M | 90% | High risk74 | Flagged0.031 |
| 24H00030CSSP, BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF MANTAYUPAN ROAD (LEADING TO BANGAG LAPOS CAVE), BARILI, CEBU | Region VII | Region VII | On-Going | ₱178.2M | 81% | High risk78 | Flagged0.029 |
| 25HN0140SSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF ROAD WITH DRAINAGE FACILITIES, TIMPOLOK ROAD, BRGY. GUN-OB AND BRGY. BABAG (PHASE 4), LAPU-LAPU CITY | Region VII | Cebu 6th DEO | On-Going | ₱19.2M | 46% | High risk94 | Flagged0.026 |
| 25HN0028SSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BLDGS./ FACILITIES -CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG JAGOBIAO CREEK, BARANGAY CASILI, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱135M | 90% | High risk95 | Flagged0.025 |
| 25HD0191REPAIR/REHABILITATION AND CONSTRUCTION OF FARM-TO-MARKET ROADS - CONCRETING OF BRGY. YLAYA FMR, BRGY. YLAYA, SAN FERNANDO, CEBU | Region VII | Cebu 1st DEO | On-Going | ₱49.7M | 32% | Medium risk53 | Flagged0.025 |
| 25HN0179SSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF ROAD WITH DRAINAGE FACILITIES, TIMPOLOK ROAD, BARANGAY GUN-OB AND BARANGAY BABAG (PHASE 3), LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱19.2M | 52% | High risk95 | Flagged0.024 |
| 25HI0104CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF ROAD, BARANGAY POBLACION TO BARANGAY PANSOY, SOGOD, CEBU | Region VII | Cebu 5th DEO | On-Going | ₱38.4M | 53% | High risk95 | Flagged0.022 |
| 24H00192CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF COASTAL ROAD, PHASE 1, BARANGAY IBO, LAPULAPU CITY, CEBU | Region VII | Region VII | On-Going | ₱231.5M | 0% | High risk64 | Flagged0.022 |
| 25HD0037CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST. OF FLOOD CONTROL STRUCTURE, PACKAGE 1, SITIO BOKYOL, POBLACION III | Region VII | Cebu 1st DEO | On-Going | ₱101.3M | 90% | High risk95 | Flagged0.020 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 23HE0189ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONST OF NAGA RIVER FLOOD CONTROL STRUCTURE, BRY. LANAS, CITY | Region VII | Cebu 1st DEO | Completed | ₱96.4M | 100% | High risk72 | —-0.011 |
| 27 | 23HN0096CSSP: ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - IMPROVEMENT OF ROAD WITH DRAINAGE FACILITIES AT SO-ONG ROAD IN BARANGAYS BANKAL AND MACTAN, LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱96.5M | 100% | High risk72 | —-0.018 |
| 28 | 25HM0040CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (PHASE 2) AT LIBO, ENRIQUE VILLANUEVA, SIQ | Negros Island Region | Siquijor DEO | On-Going | ₱49.5M | 67% | High risk72 | —-0.002 |
| 29 | 25HM0041CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE (PHASE 2) AT OLAVE, ENRIQUE VILLANUEVA, SI | Negros Island Region | Siquijor DEO | On-Going | ₱49.5M | 64% | High risk72 | —-0.002 |
| 30 | 24HN0118CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF ROAD WITH DRAINAGE FACILITY, ANGASIL, LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱67.4M | 78% | High risk72 | Flagged0.015 |
| 31 | 25H00040CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD LEADING TO BANGAG LAPUS CAVE (PHASE 2), BARILI, CEBU | Region VII | Region VII | On-Going | ₱96.4M | 0% | High risk71 | Flagged0.001 |
| 32 | 25HM0039CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION/ REHABILITATION OF SHORE PROTECTION STRUCTURE AT LOTLOTON, ENRIQUE VILLA | Negros Island Region | Siquijor DEO | On-Going | ₱49.5M | 80% | High risk71 | —-0.009 |
| 33 | 19HN0057OO3: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS- PILIPOG-GABI (ROCK CAUSEWAY) COASTAL ROAD LEADING TO GILUTONGAN MARINE SANCTUARY, NALUSUAN MARINE SANCTUARY, HOTELS & RESORTS, BRGY. PILIPOG, CORDOVA, CEBU | Region VII | Cebu 6th DEO | Completed | ₱90.7M | 100% | High risk70 | —-0.020 |
| 34 | 23HN0097CSSP: ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - IMPROVEMENT OF ROAD WITH DRAINAGE FACILITIES AT TIMPOLOK ROAD IN BARANGAY GUN-OB, LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱62.7M | 100% | High risk70 | —-0.025 |
| 35 | 24HN0120CSSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF ROAD WITH DRAINAGE FACILITIES AT TIMPOLOK ROAD IN BRGY.GUN-OB AND BABAG (PHASE 2), LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱61.7M | 100% | High risk70 | —-0.029 |
| 36 | 23HM0132CAPITAL OUTLAY - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE (UPSTREAM) AT BAGACAY, LARENA, SIQUIJOR | Negros Island Region | Siquijor DEO | On-Going | ₱38.5M | 82% | High risk69 | Flagged0.045 |
| 37 | 24HE0049ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONST OF DRAINAGE AT BYPASS AND DIVERSION ROADS (N BACALSO AVE TO CARCA | Region VII | Cebu 1st DEO | Completed | ₱144.6M | 100% | High risk67 | —-0.055 |
| 38 | 24HE0060ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MGT PROGRAM - CONST/ REHAB OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONST OF FLOOD CONTROL STRUCTURE, PAKIGNE RIVER - BARANGAY TUBOD - | Region VII | Cebu 1st DEO | Completed | ₱144.7M | 100% | High risk67 | —-0.057 |
| 39 | 24HN0008CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BASAK CREEK, BRGY. BASAK, PHASE 4, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱144.6M | 51% | High risk67 | —-0.001 |
| 40 | 24H00013OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROG, CONST/ REHAB OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONST OF FLOOD CONTROL STRUCTURE ALONG MANANGA RIVER (UPSTREAM), TALISAY CITY, CEBU | Region VII | Region VII | On-Going | ₱173.7M | 99% | High risk67 | —-0.013 |
| 41 | 25H00054OO 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG TIPOLO RIVER, PHASE 4, MANDAUE CITY | Region VII | Region VII | On-Going | ₱202.5M | 45% | High risk67 | —-0.002 |
| 42 | 24HN0056CSSP: SIPAG - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG JAGOBIAO CREEK, BARANGAY CASILI, PHASE 2, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱144.8M | 100% | High risk67 | —-0.056 |
| 43 | 25HO0165CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION PROGRAM STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF FLOOD CONTROL WALL AT GINATILAN RICER (UPSTREAM), BARANGAY POBLACION - | Region VII | Cebu 7th DEO | On-Going | ₱141.9M | 51% | High risk67 | Flagged0.005 |
| 44 | 25HM0016OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, SIQUIJOR CIRCUMFERENTIAL RD - K0054+960 - K0056+000 | Negros Island Region | Siquijor DEO | On-Going | ₱36.4M | 58% | High risk66 | —-0.023 |
| 45 | 25HM0018OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, SIQUIJOR CIRCUMFERENTIAL RD - K0060+000 - K0061+000 | Negros Island Region | Siquijor DEO | On-Going | ₱34.5M | 59% | High risk66 | —-0.024 |
| 46 | 25HM0020OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, SIQUIJOR CIRCUMFERENTIAL RD - K0051+731 - K0052+210 | Negros Island Region | Siquijor DEO | On-Going | ₱17M | 0% | High risk66 | —-0.006 |
| 47 | 25HM0017OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, SIQUIJOR CIRCUMFERENTIAL RD - K0059+240 - K0059+691 | Negros Island Region | Siquijor DEO | On-Going | ₱15.6M | 60% | High risk66 | —-0.023 |
| 48 | 22H00041CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG MANANGA RIVER (UPPER SIDE), T | Region VII | Region VII | Completed | ₱135.1M | 100% | High risk66 | —-0.060 |
| 49 | 25HM0034CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ROAD, KIMBA-KINAMA | Negros Island Region | Siquijor DEO | On-Going | ₱44.4M | 0% | High risk66 | —-0.007 |
| 50 | 25HM0015OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS, SIQUIJOR CIRCUMFERENTIAL RD - K0054+480 - K0054+820 | Negros Island Region | Siquijor DEO | On-Going | ₱11.9M | 60% | High risk66 | —-0.023 |