Contractor dossier
366 projects on file, including joint ventures this contractor is part of.
Total projects
366
Total budget
₱18.8B
Average progress
89.5%
Completion rate
75.4%
Average risk score
51.9
Medium risk on average, out of 100
Flagged as unusual
35
9.6% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region VII | 348 | ₱18B | 51.4 | 32 | 90.4% |
| Negros Island Region | 13 | ₱588.2M | 66.7 | 2 | 60.2% |
| Region V | 4 | ₱77.2M | 53.7 | 1 | 100.0% |
| Region IV-B | 1 | ₱48M | 44.1 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 144 | ₱6B | 48.9 | 5 | 89.5% |
| Flood Control and Drainage | 104 | ₱7.6B | 58.0 | 10 | 91.2% |
| Buildings and Facilities | 67 | ₱1.7B | 37.6 | 4 | 94.3% |
| OTHER | 21 | ₱1.6B | 71.4 | 5 | 94.6% |
| Bridges | 19 | ₱1.1B | 52.8 | 5 | 76.3% |
| GAA 2025 SSP | 5 | ₱313.1M | 94.7 | 5 | 66.3% |
| GAA 2025 OO-2 | 3 | ₱376M | 93.3 | 1 | 86.8% |
| Water Provision and Storage | 3 | ₱38.2M | 49.3 | 0 | 7.7% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25HD0037CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST. OF FLOOD CONTROL STRUCTURE, PACKAGE 1, SITIO BOKYOL, POBLACION III | Region VII | Cebu 1st DEO | On-Going | ₱101.3M | 90% | High risk95 | Flagged0.020 |
| 25HN0028SSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BLDGS./ FACILITIES -CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG JAGOBIAO CREEK, BARANGAY CASILI, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱135M | 90% | High risk95 | Flagged0.025 |
| 25HN0179SSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF ROAD WITH DRAINAGE FACILITIES, TIMPOLOK ROAD, BARANGAY GUN-OB AND BARANGAY BABAG (PHASE 3), LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱19.2M | 52% | High risk95 | Flagged0.024 |
| 25HI0104CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF ROAD, BARANGAY POBLACION TO BARANGAY PANSOY, SOGOD, CEBU | Region VII | Cebu 5th DEO | On-Going | ₱38.4M | 53% | High risk95 | Flagged0.022 |
| 25HN0140SSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF ROAD WITH DRAINAGE FACILITIES, TIMPOLOK ROAD, BRGY. GUN-OB AND BRGY. BABAG (PHASE 4), LAPU-LAPU CITY | Region VII | Cebu 6th DEO | On-Going | ₱19.2M | 46% | High risk94 | Flagged0.026 |
| 25HN0101OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONST./ MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CALAWISAN CREEK, BARANGAY CALAWISAN, LAPU-LAPU CITY | Region VII | Cebu 6th DEO | On-Going | ₱96.4M | 86% | High risk93 | —-0.008 |
| 25H00065OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONST./ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONST. OF FLOOD CONTROL STRUCTURE ALONG CALAWISAN CREEK (PACKAGE 2), BRGY. CALAWISAN, LAPU-LAPU CITY | Region VII | Region VII | On-Going | ₱144.6M | 75% | High risk93 | Flagged0.005 |
| 25HN0038OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BUTUANON RIVER, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱135M | 99% | High risk93 | —-0.006 |
| 24HN0227LOCAL PROGRAM: NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES -MULTIPURPOSE/FACILITIES - CONSTRUCTION (COMPLETION) OF CEBU 6TH DISTRICT ENGINEERING OFFICE BUILDING, A.C. CORTES AVENUE, PHASE 4, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱115.7M | 86% | High risk90 | Flagged0.064 |
| 23H00114CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF INFECTIOUS DISEASE CENTER, VICENTE SOTTO, CEBU CITY | Region VII | Region VII | On-Going | ₱115.8M | 41% | High risk89 | Flagged0.085 |
| 23HO0260CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BRGY. PAWA (PACKAGE 1), DUMANJUG, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱71.3M | 0% | High risk82 | Flagged0.076 |
| 23HO0261CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF ROAD DIKE AT BRGY. KANG-ACTOL (DOWNSTREAM), DUMANJUG, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱71.3M | 0% | High risk82 | Flagged0.076 |
| 23HO0276CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BRGY. PAWA (PACKAGE 2), DUMANJUG, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱71.3M | 0% | High risk82 | Flagged0.078 |
| 24H00030CSSP, BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF MANTAYUPAN ROAD (LEADING TO BANGAG LAPOS CAVE), BARILI, CEBU | Region VII | Region VII | On-Going | ₱178.2M | 81% | High risk78 | Flagged0.029 |
| 25HM0055CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT TACULING RIVER II, BARANGAY TACULING, LAREN | Negros Island Region | Siquijor DEO | On-Going | ₱97M | 61% | High risk78 | Flagged0.006 |
| 24HN0127CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONST. OF ROAD LEADING TO RORO PORT PHASE 1, BRGY. POBLACION, CORDOVA, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱144.8M | 100% | High risk76 | Flagged0.018 |
| 18FI0026NETWORK DEVELOPMENT PROGRAM, OFF-CARRIAGEWAY IMPROVEMENT, SECONDARY ROADS, MASBATE-MILAGROS RD, K000 | Region V | Masbate 2nd DEO | Completed | ₱25.4M | 100% | High risk76 | —-0.033 |
| 21HN0102LP: LOCAL INFRASTRUCTURE PROGRAM -LOCAL ROADS AND BRIDGES -LOCAL ROADS -CONSTRUCTION OF SAN MIGUEL - PILIPOG COASTAL ROAD (ROCK CAUSEWAY) LEADING TO HOTELS/RESORTS (PHASE 1), CORDOVA, CEBU | Region VII | Cebu 6th DEO | Completed | ₱99M | 100% | High risk74 | —-0.019 |
| 24HG0119CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF LENGIGON FLOOD CONTROL, LENGIGON, ARGAO CEBU | Region VII | Cebu 2nd DEO | On-Going | ₱96.4M | 88% | High risk74 | Flagged0.033 |
| 24HG0120CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ANAHAW FLOOD CONTROL, ANAHAW, ARGAO, CEBU | Region VII | Cebu 2nd DEO | On-Going | ₱96.4M | 90% | High risk74 | Flagged0.031 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 23H00114CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF INFECTIOUS DISEASE CENTER, VICENTE SOTTO, CEBU CITY | Region VII | Region VII | On-Going | ₱115.8M | 41% | High risk89 | Flagged0.085 |
| 23HO0276CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BRGY. PAWA (PACKAGE 2), DUMANJUG, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱71.3M | 0% | High risk82 | Flagged0.078 |
| 23HO0260CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF REVETMENT WALL AT BRGY. PAWA (PACKAGE 1), DUMANJUG, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱71.3M | 0% | High risk82 | Flagged0.076 |
| 23HO0261CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS, FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF ROAD DIKE AT BRGY. KANG-ACTOL (DOWNSTREAM), DUMANJUG, CEBU | Region VII | Cebu 7th DEO | On-Going | ₱71.3M | 0% | High risk82 | Flagged0.076 |
| 24HN0227LOCAL PROGRAM: NATIONAL BUILDING PROGRAM - BUILDINGS AND OTHER STRUCTURES -MULTIPURPOSE/FACILITIES - CONSTRUCTION (COMPLETION) OF CEBU 6TH DISTRICT ENGINEERING OFFICE BUILDING, A.C. CORTES AVENUE, PHASE 4, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱115.7M | 86% | High risk90 | Flagged0.064 |
| 24H00187CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE FACILITY PHASE 2 AT BARANGAY LOOC, LAPU-LAPU CITY, CEBU | Region VII | Region VII | On-Going | ₱145.5M | 0% | High risk62 | Flagged0.063 |
| 24H00186CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE FACILITY PHASE 1 AT BARANGAY LOOC, LAPU-LAPU CITY, CEBU | Region VII | Region VII | On-Going | ₱145.5M | 0% | High risk62 | Flagged0.063 |
| 24HI0156BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF MUNICIPAL HALL BUILDING OF MUNICIPALITY OF COMPOSTELA, PROVINCE OF CEBU | Region VII | Cebu 5th DEO | On-Going | ₱97M | 12% | High risk61 | Flagged0.054 |
| 23HM0132CAPITAL OUTLAY - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES, CONSTRUCTION OF FLOOD CONTROL STRUCTURE (UPSTREAM) AT BAGACAY, LARENA, SIQUIJOR | Negros Island Region | Siquijor DEO | On-Going | ₱38.5M | 82% | High risk69 | Flagged0.045 |
| 24HE0236CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST OF TINA-AN RIVER CAPACITY ENHANCEMENT STRUCTURE (UPSTREAM - BOTH SIDES), N | Region VII | Cebu 1st DEO | On-Going | ₱96.4M | 81% | High risk73 | Flagged0.033 |
| 24HG0119CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF LENGIGON FLOOD CONTROL, LENGIGON, ARGAO CEBU | Region VII | Cebu 2nd DEO | On-Going | ₱96.4M | 88% | High risk74 | Flagged0.033 |
| 24HG0120CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ANAHAW FLOOD CONTROL, ANAHAW, ARGAO, CEBU | Region VII | Cebu 2nd DEO | On-Going | ₱96.4M | 90% | High risk74 | Flagged0.031 |
| 24H00030CSSP, BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF MANTAYUPAN ROAD (LEADING TO BANGAG LAPOS CAVE), BARILI, CEBU | Region VII | Region VII | On-Going | ₱178.2M | 81% | High risk78 | Flagged0.029 |
| 25HN0140SSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF ROAD WITH DRAINAGE FACILITIES, TIMPOLOK ROAD, BRGY. GUN-OB AND BRGY. BABAG (PHASE 4), LAPU-LAPU CITY | Region VII | Cebu 6th DEO | On-Going | ₱19.2M | 46% | High risk94 | Flagged0.026 |
| 25HN0028SSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BLDGS./ FACILITIES -CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG JAGOBIAO CREEK, BARANGAY CASILI, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱135M | 90% | High risk95 | Flagged0.025 |
| 25HD0191REPAIR/REHABILITATION AND CONSTRUCTION OF FARM-TO-MARKET ROADS - CONCRETING OF BRGY. YLAYA FMR, BRGY. YLAYA, SAN FERNANDO, CEBU | Region VII | Cebu 1st DEO | On-Going | ₱49.7M | 32% | Medium risk53 | Flagged0.025 |
| 25HN0179SSP: SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF ROAD WITH DRAINAGE FACILITIES, TIMPOLOK ROAD, BARANGAY GUN-OB AND BARANGAY BABAG (PHASE 3), LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱19.2M | 52% | High risk95 | Flagged0.024 |
| 25HI0104CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS / FACILITIES - CONSTRUCTION OF ROAD, BARANGAY POBLACION TO BARANGAY PANSOY, SOGOD, CEBU | Region VII | Cebu 5th DEO | On-Going | ₱38.4M | 53% | High risk95 | Flagged0.022 |
| 24H00192CSSP, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF COASTAL ROAD, PHASE 1, BARANGAY IBO, LAPULAPU CITY, CEBU | Region VII | Region VII | On-Going | ₱231.5M | 0% | High risk64 | Flagged0.022 |
| 25HD0037CONVERGENCE AND SPECIAL SUPPORT PROGRAM - SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONST. OF FLOOD CONTROL STRUCTURE, PACKAGE 1, SITIO BOKYOL, POBLACION III | Region VII | Cebu 1st DEO | On-Going | ₱101.3M | 90% | High risk95 | Flagged0.020 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 201 | 23HB0018OO1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - RETROFITTING OF PERMANENT BRIDGES, CUENCO BRIDGE (B00054BH) ALONG TAGBILARAN EAST ROAD (TAGBILARAN-JAGNA) K0207+335.00 | Region VII | Bohol 3rd DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.053 |
| 202 | 23HI0002CONSTRUCTION OF FLOOD MITIGATION STRUCTURE - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PANALIPAN RIVER, CATMON, CEBU | Region VII | Cebu 5th DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.079 |
| 203 | 19HH0219LOCAL PROGRAM: LOCAL INFRASTRUCTURE PROGRAM - BUILDINGS AND OTHER STRUCTURE - MULTI PURPOSE / FACILITIES - REHABILITATION OF MULTI - PURPOSE BUILDING (YOUTH CENTER), BRGY. COGON RAMOS, CEBU CITY | Region VII | Cebu City DEO | Completed | ₱14.7M | 100% | Medium risk49 | —-0.095 |
| 204 | 21HE0175LOCAL PROGRAM - BUILDINGS AND OTHER STRUCTURES - MULTI-PURPOSE/FACILITIES - LOCAL INFRASTRUCTURE PROGRAM - REHABILITATION OF MULTI-PURPOSE BUILDING, BARANGAY CUANOS, MINGLANILLA, CEBU | Region VII | Cebu 1st DEO | Completed | ₱4.9M | 100% | Medium risk48 | —-0.095 |
| 205 | 24HN0087CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING, DPWH CEBU 6TH DEO QA LABORATORY BUILDING, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱9.8M | 100% | Medium risk48 | —-0.051 |
| 206 | 19HF0026REPLACEMENT OF ABACA BRIDGE (B00051CB) ALONG CEBU-TOLEDO WHARF RD. (JCT. NAGA-ULING), K0035+215 (S00231CB), L = 20.00M | Region VII | Cebu 3rd DEO | Completed | ₱25.4M | 100% | Medium risk48 | —-0.059 |
| 207 | 24HN0158CSSP: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING (BARANGAY HALL), BARANGAY OPAO, MANDAUE CITY, CEBU | Region VII | Cebu 6th DEO | On-Going | ₱9.9M | 96% | Medium risk48 | —-0.049 |
| 208 | 23HN0109CSSP: BIP - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING AT MACTAN HIGH SCHOOL IN BARANGAY MACTAN, LAPU-LAPU CITY, CEBU | Region VII | Cebu 6th DEO | Completed | ₱16.8M | 100% | Medium risk48 | —-0.093 |
| 209 | 18HE0003RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, PANGDAN BR. 2 (B00608CB) ALONG NAGA-ULING ROAD, CEBU | Region VII | Cebu 1st DEO | Completed | ₱14M | 100% | Medium risk48 | —-0.059 |
| 210 | 18HE0019RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES, ABUNO BRIDGE (B00516CB) ALONG N. BACALSO AVENUE (CEBU SOUTH ROAD), CEBU | Region VII | Cebu 1st DEO | Completed | ₱19.6M | 100% | Medium risk48 | —-0.060 |
| 211 | 18HG0102ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM, CONSTRUCTION OF NEW PERMANENT BRIDGES, CAWAYAN BRIDGE ALONG NATALIO BACALSO AVENUE (CEBU SOUTH ROAD), K078+592 | Region VII | Cebu 2nd DEO | Completed | ₱7.4M | 100% | Medium risk48 | —-0.058 |
| 212 | 18HE0001REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, MANANGA BR. 3 (B00033CB) ALONG CEBU SOUTH COASTAL ROAD (ASCENDING), CEBU | Region VII | Cebu 1st DEO | Completed | ₱24.5M | 100% | Medium risk48 | —-0.060 |
| 213 | 18HE0054REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES, CARCAR BRIDGE (B00560CB) ALONG N. BACALSO AVENUE (CEBU SOUTH ROAD), CEBU | Region VII | Cebu 1st DEO | Completed | ₱9.3M | 100% | Medium risk48 | —-0.059 |
| 214 | 23HE0076ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS - N BACALSO AVE (CEBU SOUTH RD) - K0052+560 - K0053+100, SIBONGA, CEBU | Region VII | Cebu 1st DEO | Completed | ₱44.2M | 100% | Medium risk47 | —-0.095 |
| 215 | 20HN0103LP: LOCAL INFRASTRUCTURE PROGRAM -LOCAL ROADS AND BRIDGES- LOCAL BRIDGES - CONSTRUCTION OF BRIDGE AT BRGY. POLOG, CONSOLACION, CEBU | Region VII | Cebu 6th DEO | Completed | ₱9.9M | 100% | Medium risk47 | —-0.059 |
| 216 | 20HE0013ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF OCAÑA RIVER FLOOD CONTROL STRUCTURE, CARCAR CITY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱34.3M | 100% | Medium risk47 | —-0.077 |
| 217 | 19HE0003ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF CARCAR RIVER FLOOD CONTROL STRUCTURE, POB. II, CARCAR CITY, | Region VII | Cebu 1st DEO | Completed | ₱39.7M | 100% | Medium risk47 | —-0.078 |
| 218 | 25HD0075ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS - NAGA-ULING RD - K0022+590 - K0022+855, CITY OF NAGA, CEBU | Region VII | Cebu 1st DEO | On-Going | ₱46M | 80% | Medium risk47 | —-0.055 |
| 219 | 18HE0018CONSTRUCTION OF LAMACAN RIVER DOWNSTREAM AND UPSTREAM, SIBONGA, CEBU | Region VII | Cebu 1st DEO | Completed | ₱19.6M | 100% | Medium risk47 | —-0.077 |
| 220 | 21H00083REHABILITATION OF DISASTER-RELATED INFRASTRUCTURE AND OTHER FACILITIES AT BRGY. OBONG, DALAGUETE, CEBU | Region VII | Region VII | Completed | ₱6.4M | 100% | Medium risk47 | —-0.088 |
| 221 | 23HE0109ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHAB./RECONST./UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS - TAPAL (CARCAR) ZARAGOSA-OLANGO-ALOGUINSAN RD - K0088+247-K0089+785, CARCAR CITY, CEB | Region VII | Cebu 1st DEO | Completed | ₱44.1M | 100% | Medium risk47 | —-0.095 |
| 222 | 23HG0020ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - N. BACALSO AVE (CEBU SOUTH RD) - K0057+(-615) - K0057+750 | Region VII | Cebu 2nd DEO | Completed | ₱40.1M | 100% | Medium risk47 | —-0.095 |
| 223 | 23HE0062ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHAB/RECONST/UPGRADING OF DAMAGED PAVED ROADS - PRIMARY ROADS - N BACALSO AVE (CEBU SOUTH RD) - K0041+(-1128) - K0041+(-0028), CARCAR CITY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱34.3M | 100% | Medium risk47 | —-0.096 |
| 224 | 23HE0106ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS - N BACALSO AVE (CEBU SOUTH RD) - K0025+018-K0025+047 (LEFT SIDE), K0028+897-K29+057, K0029+077-K0029+169, K0029+1714-K00 | Region VII | Cebu 1st DEO | Completed | ₱39.2M | 100% | Medium risk47 | —-0.095 |
| 225 | 23HE0132ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS - NAGA-ULING RD - K0022+(-040) - K0022+340, NAGA CITY, CEBU | Region VII | Cebu 1st DEO | Completed | ₱34.9M | 100% | Medium risk47 | —-0.095 |