Contractor dossier
450 projects on file, including joint ventures this contractor is part of.
Total projects
450
Total budget
₱9.2B
Average progress
96.7%
Completion rate
91.1%
Average risk score
41.5
Medium risk on average, out of 100
Flagged as unusual
15
3.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 431 | ₱8.6B | 41.3 | 15 | 96.5% |
| Region I | 10 | ₱413.8M | 46.2 | 0 | 100.0% |
| Region V | 6 | ₱118.6M | 50.4 | 0 | 100.0% |
| National Capital Region | 3 | ₱34.9M | 38.6 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 184 | ₱4.8B | 46.4 | 1 | 98.6% |
| Buildings and Facilities | 183 | ₱1.8B | 28.9 | 0 | 99.9% |
| Flood Control and Drainage | 32 | ₱878M | 46.8 | 0 | 93.4% |
| Water Provision and Storage | 21 | ₱289.6M | 39.0 | 0 | 100.0% |
| GAA 2025 SSP | 10 | ₱659.1M | 94.5 | 10 | 39.7% |
| GAA 2025 OO-2 | 9 | ₱188M | 88.7 | 0 | 74.2% |
| OTHER | 5 | ₱390.5M | 77.8 | 4 | 76.5% |
| GAA 2025 OO-1 | 4 | ₱228.2M | 93.0 | 0 | 85.4% |
| Bridges | 2 | ₱2.9M | 23.5 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DL0190CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - EVACUATION CENTERS/ QUARANTINE FACILITIES/ PUBLIC HEALTH FACILITIES, CONSTRUCTION OF ALABAT DISTRICT HOSPITAL, ALABAT, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱96M | 90% | High risk96 | Flagged0.005 |
| 25DM0158CONSTRUCTION (COMPLETION) OF MUNICIPAL HALL, PITOGO, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱144M | 55% | High risk96 | Flagged0.024 |
| 25DM0151CONSTRUCTION OF MULTI-PURPOSE BUILDING, BONDOC PENINSULA DISTRICT HOSPITAL, CATANAUAN, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.5M | 25% | High risk96 | Flagged0.024 |
| 25DL0185CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF SANTA MONICA-SAN R | Region IV-A | Quezon 4th DEO | On-Going | ₱93.3M | 39% | High risk96 | Flagged0.018 |
| 25DL0191CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - EVACUATION CENTERS/ QUARANTINE FACILITIES/ PUBLIC HEALTH FACILITIES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, PHASE III, MARIA ELEAZAR DISTRICT H | Region IV-A | Quezon 4th DEO | On-Going | ₱64M | 18% | High risk95 | Flagged0.022 |
| 25DL0122CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF STA. MONICA-SAN RO | Region IV-A | Quezon 4th DEO | On-Going | ₱78.2M | 39% | High risk95 | Flagged0.017 |
| 25DL0083CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY TANAUAN, PLARIDEL, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱48.3M | 28% | High risk95 | Flagged0.014 |
| 25DM0065NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - PADRE BURGOS BY- PASS ROAD, QUEZON, PADRE BURGOS, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱94.6M | 78% | High risk95 | —-0.000 |
| 25DL0188CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION (COMPLETION) OF UNIVERSITY DORMITORY AT SOUTHERN LUZON STATE UNIVERSITY, GUMACA, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱28.7M | 54% | High risk95 | Flagged0.007 |
| 25DM0015ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - GUMACA - PITOGO - MULANAY - SN NARCISO RD - K0292 + 050 - K0292+ 085, K0292 + 500 - K0292 + 545, K0292 + 630 - K0292 + 730 | Region IV-A | Quezon 3rd DEO | On-Going | ₱48.5M | 83% | High risk94 | —-0.009 |
| 25DL0171ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TALOLONG RIVER, LOPEZ, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱93.1M | 47% | High risk94 | —-0.015 |
| 25DM0154CONSTRUCTION OF MULTI-PURPOSE BUILDING (POLYTECHNIC UNIVERSITY OF THE PHILIPPINES) MULANAY, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱9.7M | 37% | High risk94 | Flagged0.012 |
| 25DL0120ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, GUINAYANGAN-TAGKAWAYAN DIVERSION ROAD, TAGKAWAYAN, PACKAGE B, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱46.7M | 81% | High risk93 | —-0.008 |
| 24DL0181(SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF LOPEZ-CALAUAG CIRCUMFERENTIAL ROAD (DOMINLOG-KUMALUDKUD - MANHULUGIN SECTION), CALAUAG, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱93.5M | 91% | High risk90 | Flagged0.048 |
| 24DL0182SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF AGOHO - MARILAG ROAD, CALAUAG, QUEZON (PACKAGE D) | Region IV-A | Quezon 4th DEO | On-Going | ₱93.8M | 68% | High risk90 | Flagged0.055 |
| 25DM0009ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - GUMACA - PITOGO - MULANAY - SN NARCISO RD - K0225+000 - K0226+792, MACALELON, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱38.4M | 100% | High risk90 | —-0.037 |
| 25DL0145ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CAMOHAGUIN RIVER, GUMACA, | Region IV-A | Quezon 4th DEO | On-Going | ₱4.7M | 100% | High risk89 | —-0.035 |
| 25DL0149ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE | Region IV-A | Quezon 4th DEO | On-Going | ₱28.5M | 54% | High risk88 | —-0.024 |
| 25DL0175ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL ALONG BOCBOC CREEK, LOPEZ, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱19M | 54% | High risk88 | —-0.023 |
| 25DL0172ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF PROTECTION STRUCTURE ALONG | Region IV-A | Quezon 4th DEO | On-Going | ₱9.5M | 72% | High risk88 | —-0.026 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24DL0182SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF AGOHO - MARILAG ROAD, CALAUAG, QUEZON (PACKAGE D) | Region IV-A | Quezon 4th DEO | On-Going | ₱93.8M | 68% | High risk90 | Flagged0.055 |
| 24DL0181(SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF LOPEZ-CALAUAG CIRCUMFERENTIAL ROAD (DOMINLOG-KUMALUDKUD - MANHULUGIN SECTION), CALAUAG, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱93.5M | 91% | High risk90 | Flagged0.048 |
| 25DM0151CONSTRUCTION OF MULTI-PURPOSE BUILDING, BONDOC PENINSULA DISTRICT HOSPITAL, CATANAUAN, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.5M | 25% | High risk96 | Flagged0.024 |
| 25DM0158CONSTRUCTION (COMPLETION) OF MUNICIPAL HALL, PITOGO, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱144M | 55% | High risk96 | Flagged0.024 |
| 25DL0103CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY BAGONG PAG-ASA, PEREZ, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱3.4M | 12% | High risk87 | Flagged0.023 |
| 25DM0160CONCRETING OF BRGY. BULO ILAYA TO BRGY. BURGOS TO BRGY. MAIROK ILAYA TO BRGY. MAIROK IBABA FMR, UNISAN, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱24.8M | 56% | High risk64 | Flagged0.022 |
| 25DL0191CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - EVACUATION CENTERS/ QUARANTINE FACILITIES/ PUBLIC HEALTH FACILITIES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, PHASE III, MARIA ELEAZAR DISTRICT H | Region IV-A | Quezon 4th DEO | On-Going | ₱64M | 18% | High risk95 | Flagged0.022 |
| 25DL0185CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF SANTA MONICA-SAN R | Region IV-A | Quezon 4th DEO | On-Going | ₱93.3M | 39% | High risk96 | Flagged0.018 |
| 25DL0122CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF STA. MONICA-SAN RO | Region IV-A | Quezon 4th DEO | On-Going | ₱78.2M | 39% | High risk95 | Flagged0.017 |
| 25DL0083CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY TANAUAN, PLARIDEL, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱48.3M | 28% | High risk95 | Flagged0.014 |
| 24DM0080CONSTRUCTION OF FLOOD CONTROL, BARANGAY 1 AND BARANGAY 5, CATANAUAN, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱101.7M | 65% | High risk79 | Flagged0.012 |
| 25DM0154CONSTRUCTION OF MULTI-PURPOSE BUILDING (POLYTECHNIC UNIVERSITY OF THE PHILIPPINES) MULANAY, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱9.7M | 37% | High risk94 | Flagged0.012 |
| 25DL0188CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION (COMPLETION) OF UNIVERSITY DORMITORY AT SOUTHERN LUZON STATE UNIVERSITY, GUMACA, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱28.7M | 54% | High risk95 | Flagged0.007 |
| 25DL0190CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - EVACUATION CENTERS/ QUARANTINE FACILITIES/ PUBLIC HEALTH FACILITIES, CONSTRUCTION OF ALABAT DISTRICT HOSPITAL, ALABAT, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱96M | 90% | High risk96 | Flagged0.005 |
| 25DL0138CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT), CONSTRUCTION OF ACCESS ROAD TO MAHARLI | Region IV-A | Quezon 4th DEO | On-Going | ₱93.4M | 58% | High risk78 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 276 | 18DL0408CY2018 BASIC EDUCATIONAL FACILITIES FUND, (CONSTRUCTION OF CLASSROOMS) BATCH 3, CONSTRUCTION OF CLASSROOMS 2STY10CL, CESAR C. TAN MEMORIAL NATIONAL HIGH SCHOOL, QUEZON, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱22.1M | 100% | Medium risk43 | —-0.056 |
| 277 | 19DL0201CONCRETING OF BRGY. SAN ANDRES - STA. CATALINA - CAWAYANIN (PHASE II) FMR, BRGY. SAN ANDRES - STA. CATALINA - CAWAYANIN, LOPEZ, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱9.6M | 100% | Medium risk43 | —-0.053 |
| 278 | 20DL0256REPAIR/REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG MSR, JCT LOPEZ-CATANAUAN ROAD - K0230+700 - K0230+900, BOTH LANES | Region IV-A | Quezon 4th DEO | Completed | ₱9.6M | 100% | Medium risk43 | —-0.056 |
| 279 | 20DL0138CY 2020 BASIC EDUCATION FACILITIES FUND, CONSTRUCTION OF CLASSROOMS 2STY8CL GUMACA EAST CENTRAL SCHOOL, GUMACA, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱20.5M | 100% | Medium risk43 | —-0.057 |
| 280 | 18DL0410CY 2018 BASIC EDUCATIONAL FACILITIES FUND, (CONSTRUCTION OF CLASSROOMS) BATCH 3, CONSTRUCTION OF CLASSROOMS 4STY 8CL, GUMACA INTEGRATED SCHOOL, GUMACA, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱19.4M | 100% | Medium risk43 | —-0.057 |
| 281 | 19DL0135CONCRETING OF BRGY. JONGO - SAN ISIDRO - SAN RAFAEL - SAN PEDRO - ILAYANG ILOG A - ILAYANG ILOG B - VILLA NACAOB FMR, BRGY. JONGO - SAN ISIDRO - SAN RAFAEL - SAN PEDRO - ILAYANG ILOG A - ILAYANG ILOG B - VILLA NACAOB, LOPEZ, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱4.8M | 100% | Medium risk42 | —-0.051 |
| 282 | 19DL0200CONCRETING OF BRGY. BINAHIAN - BINAHIAN B - BINAHIAN C (PHASE II) FMR, BRGY. BINAHIAN A-BINAHIAN B-BINAHIAN C, LOPEZ, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱4.8M | 100% | Medium risk42 | —-0.052 |
| 283 | 20DL0232CONCRETING OF BAGONG SILANG FMR, BRGY. BAGONG SILANG, TAGKAWAYAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱11.7M | 100% | Medium risk42 | —-0.054 |
| 284 | 20DL0224CY 2020 BASIC EDUCATION FACILITIES FUND, CONSTRUCTION OF CLASSROOMS 2STY6CL STO. NIÑO ILAYA NHS, LOPEZ, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱17.5M | 100% | Medium risk42 | —-0.057 |
| 285 | 19DL0202CONCRETING OF BRGY. BINAHIAN - BINAHIAN B - BINAHIAN C FMR PHASE II, BRGY. BINAHIAN A-BINAHIAN B-BINAHIAN C, LOPEZ, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱4.9M | 100% | Medium risk42 | —-0.052 |
| 286 | 18DL0283CONSTRUCTION / REPAIR / RENOVATION / UPGRADING / EXPANSION / COMPLETION OF RHU, CALAUAG MAIN RHU, CALAUAG, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱6.4M | 100% | Medium risk42 | —-0.059 |
| 287 | 18DL0414CY 2018 BASIC EDUCATIONAL FACILITIES FUND, (CONSTRUCTION OF CLASSROOMS) BATCH 3, CONSTRUCTION OF CLASSROOMS 2STY 4CL LAGAY ES, CALAUAG, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱10.2M | 100% | Medium risk42 | —-0.060 |
| 288 | 23DL0188CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS UNDER THE DEPED`S CY2023 BASIC EDUCATION FACILITIES FUND (BEFF) - BATCH 1, CONSTRUCTION OF 2STY4CL, PEREZ NATIONAL HIGH SCHOOL, PEREZ, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱13.3M | 100% | Medium risk42 | —-0.059 |
| 289 | 18DL0417CY 2018 BASIC EDUCATIONAL FACILITIES FUND, (CONSTRUCTION OF CLASSROOMS) BATCH 3, CONSTRUCTION OF CLASSROOMS 2STY 4CL VILLA ARCAYA ES, GUMACA, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱10.1M | 100% | Medium risk42 | —-0.060 |
| 290 | 18DL0418CY 2018 BASIC EDUCATION FACILITIES FUND, (CONSTRUCTION OF CLASSROOMS) BATCH 3, CONSTRUCTION OF CLASSROOMS 2STY4CL, BEBITO ES, LOPEZ, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱10.1M | 100% | Medium risk42 | —-0.060 |
| 291 | 17DJ0095CONSTRUCTION OF THREE (3) STOREY SIX (6) CLASSROOMS ACADEMIC SCHOOL BUILDING AT BUKAL SUR NATIONAL HIGH SCHOOL, CANDELARIA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱15.5M | 100% | Medium risk41 | —-0.032 |
| 292 | 17DK0243CONSTRUCTION OF FOUR(4) STOREY-SCIENCE AND INFORMATION COMMUNICATION TECHNOLOGY LABORATORY BUILDING @ TAYABAS CITY DIVISION STAND ALONG, TAYABAS CITY | Region IV-A | Quezon 1st DEO | Completed | ₱35.7M | 100% | Medium risk41 | —-0.026 |
| 293 | 17DJ0093CONSTRUCTION OF THREE (3) STOREY SIX (6) CLASSROOMS ACADEMIC SCHOOL BUILDING AT DR. PANFILO CASTRO NATIONAL HIGH SCHOOL (FORMERLY BUKAL SUR NHS - MANGILAG ANNEX), CANDELARIA, QUEZON | Region IV-A | Quezon 2nd DEO | Completed | ₱15.2M | 100% | Medium risk40 | —-0.032 |
| 294 | 18FE0097CONSTRUCTION OF TWO(2) STOREY FOUR (4) CLASSROOM SCHOOL BUILDING (UNDER DEPED CY 2018 BEFF) GUILLERMO AZANES ELEMENTARY SCHOOL CALABANGA CAMARINES SUR | Region V | Camarines Sur 3rd DEO | Completed | ₱13.7M | 100% | Medium risk40 | —-0.037 |
| 295 | 18DL0127CY 2017 BASIC EDUCATION FACILITIES FUND, CONSTRUCTION OF TVL AND OTHER WORKSHOPS, NABANGKA NHS, 2 UNITS - REGULAR WORKSHOPS, 2 UNITS - SCIENCE LABS, 2 UNITS - ICT LABS, GUINAYANGAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱19.5M | 100% | Medium risk40 | —-0.030 |
| 296 | 17DL0185CY 2017 BASIC EDUCATION FACILITIES FUND, CONSTRUCTION OF 2 UNITS - 1STY 2CL SAN FRANCISCO B (CULONG) ES, LOPEZ, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱5.1M | 100% | Medium risk40 | —-0.031 |
| 297 | 18DL0122CY 2017 BASIC EDUCATION FACILITIES FUND, CONSTRUCTION OF TVL AND OTHER WORKSHOPS, RUFINA P. TRINIDAD MEM. NHS, 1 UNIT - REGULAR WORKSHOPS, 2 UNITS - SCIENCE LABS, 2 UNITS - ICT LABS, CALAUAG, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱16.8M | 100% | Medium risk40 | —-0.031 |
| 298 | 18DL0124CY 2017 BASIC EDUCATION FACILITIES FUND, CONSTRUCTION OF TVL AND OTHER WORKSHOPS, STO. ANGEL NATIONAL HIGH SCHOOL, 1 UNIT - REGULAR WORKSHOPS, 2 UNITS - SCIENCE LABS, 2 UNITS - ICT LABS, CALAUAG, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱16.8M | 100% | Medium risk40 | —-0.031 |
| 299 | 18DL0107CY 2017 BASIC EDUCATION FACILITIES FUND, CONSTRUCTION OF TVL AND OTHER WORKSHOPS, PANIKIHAN NHS, 1 UNIT - UNIQUE WORKSHOPS, 1 UNIT - REGULAR WORKSHOPS, 2 UNITS - SCIENCE LABS, 2 UNITS - ICT LABS, GUMACA, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱19.8M | 100% | Medium risk39 | —-0.030 |
| 300 | 18DL0093CY 2017 BASIC EDUCATION FACILITIES FUND, CONSTRUCTION OF TVL AND OTHER WORKSHOPS, CAMOHAGUIN NATIONAL HIGH SCHOOL, 2 UNITS - REGULAR WORKSHOPS, 2 UNITS - SCIENCE LABS, 2 UNITS - ICT LABS, GUMACA, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱19.5M | 100% | Medium risk39 | —-0.030 |