Contractor dossier
450 projects on file, including joint ventures this contractor is part of.
Total projects
450
Total budget
₱9.2B
Average progress
96.7%
Completion rate
91.1%
Average risk score
41.5
Medium risk on average, out of 100
Flagged as unusual
15
3.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 431 | ₱8.6B | 41.3 | 15 | 96.5% |
| Region I | 10 | ₱413.8M | 46.2 | 0 | 100.0% |
| Region V | 6 | ₱118.6M | 50.4 | 0 | 100.0% |
| National Capital Region | 3 | ₱34.9M | 38.6 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 184 | ₱4.8B | 46.4 | 1 | 98.6% |
| Buildings and Facilities | 183 | ₱1.8B | 28.9 | 0 | 99.9% |
| Flood Control and Drainage | 32 | ₱878M | 46.8 | 0 | 93.4% |
| Water Provision and Storage | 21 | ₱289.6M | 39.0 | 0 | 100.0% |
| GAA 2025 SSP | 10 | ₱659.1M | 94.5 | 10 | 39.7% |
| GAA 2025 OO-2 | 9 | ₱188M | 88.7 | 0 | 74.2% |
| OTHER | 5 | ₱390.5M | 77.8 | 4 | 76.5% |
| GAA 2025 OO-1 | 4 | ₱228.2M | 93.0 | 0 | 85.4% |
| Bridges | 2 | ₱2.9M | 23.5 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DL0190CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - EVACUATION CENTERS/ QUARANTINE FACILITIES/ PUBLIC HEALTH FACILITIES, CONSTRUCTION OF ALABAT DISTRICT HOSPITAL, ALABAT, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱96M | 90% | High risk96 | Flagged0.005 |
| 25DM0158CONSTRUCTION (COMPLETION) OF MUNICIPAL HALL, PITOGO, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱144M | 55% | High risk96 | Flagged0.024 |
| 25DM0151CONSTRUCTION OF MULTI-PURPOSE BUILDING, BONDOC PENINSULA DISTRICT HOSPITAL, CATANAUAN, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.5M | 25% | High risk96 | Flagged0.024 |
| 25DL0185CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF SANTA MONICA-SAN R | Region IV-A | Quezon 4th DEO | On-Going | ₱93.3M | 39% | High risk96 | Flagged0.018 |
| 25DL0191CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - EVACUATION CENTERS/ QUARANTINE FACILITIES/ PUBLIC HEALTH FACILITIES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, PHASE III, MARIA ELEAZAR DISTRICT H | Region IV-A | Quezon 4th DEO | On-Going | ₱64M | 18% | High risk95 | Flagged0.022 |
| 25DL0122CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF STA. MONICA-SAN RO | Region IV-A | Quezon 4th DEO | On-Going | ₱78.2M | 39% | High risk95 | Flagged0.017 |
| 25DL0083CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY TANAUAN, PLARIDEL, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱48.3M | 28% | High risk95 | Flagged0.014 |
| 25DM0065NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - PADRE BURGOS BY- PASS ROAD, QUEZON, PADRE BURGOS, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱94.6M | 78% | High risk95 | —-0.000 |
| 25DL0188CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION (COMPLETION) OF UNIVERSITY DORMITORY AT SOUTHERN LUZON STATE UNIVERSITY, GUMACA, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱28.7M | 54% | High risk95 | Flagged0.007 |
| 25DM0015ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - GUMACA - PITOGO - MULANAY - SN NARCISO RD - K0292 + 050 - K0292+ 085, K0292 + 500 - K0292 + 545, K0292 + 630 - K0292 + 730 | Region IV-A | Quezon 3rd DEO | On-Going | ₱48.5M | 83% | High risk94 | —-0.009 |
| 25DL0171ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TALOLONG RIVER, LOPEZ, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱93.1M | 47% | High risk94 | —-0.015 |
| 25DM0154CONSTRUCTION OF MULTI-PURPOSE BUILDING (POLYTECHNIC UNIVERSITY OF THE PHILIPPINES) MULANAY, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱9.7M | 37% | High risk94 | Flagged0.012 |
| 25DL0120ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, GUINAYANGAN-TAGKAWAYAN DIVERSION ROAD, TAGKAWAYAN, PACKAGE B, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱46.7M | 81% | High risk93 | —-0.008 |
| 24DL0181(SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF LOPEZ-CALAUAG CIRCUMFERENTIAL ROAD (DOMINLOG-KUMALUDKUD - MANHULUGIN SECTION), CALAUAG, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱93.5M | 91% | High risk90 | Flagged0.048 |
| 24DL0182SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF AGOHO - MARILAG ROAD, CALAUAG, QUEZON (PACKAGE D) | Region IV-A | Quezon 4th DEO | On-Going | ₱93.8M | 68% | High risk90 | Flagged0.055 |
| 25DM0009ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - GUMACA - PITOGO - MULANAY - SN NARCISO RD - K0225+000 - K0226+792, MACALELON, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱38.4M | 100% | High risk90 | —-0.037 |
| 25DL0145ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CAMOHAGUIN RIVER, GUMACA, | Region IV-A | Quezon 4th DEO | On-Going | ₱4.7M | 100% | High risk89 | —-0.035 |
| 25DL0149ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE | Region IV-A | Quezon 4th DEO | On-Going | ₱28.5M | 54% | High risk88 | —-0.024 |
| 25DL0175ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL ALONG BOCBOC CREEK, LOPEZ, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱19M | 54% | High risk88 | —-0.023 |
| 25DL0172ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF PROTECTION STRUCTURE ALONG | Region IV-A | Quezon 4th DEO | On-Going | ₱9.5M | 72% | High risk88 | —-0.026 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24DL0182SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF AGOHO - MARILAG ROAD, CALAUAG, QUEZON (PACKAGE D) | Region IV-A | Quezon 4th DEO | On-Going | ₱93.8M | 68% | High risk90 | Flagged0.055 |
| 24DL0181(SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF LOPEZ-CALAUAG CIRCUMFERENTIAL ROAD (DOMINLOG-KUMALUDKUD - MANHULUGIN SECTION), CALAUAG, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱93.5M | 91% | High risk90 | Flagged0.048 |
| 25DM0151CONSTRUCTION OF MULTI-PURPOSE BUILDING, BONDOC PENINSULA DISTRICT HOSPITAL, CATANAUAN, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.5M | 25% | High risk96 | Flagged0.024 |
| 25DM0158CONSTRUCTION (COMPLETION) OF MUNICIPAL HALL, PITOGO, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱144M | 55% | High risk96 | Flagged0.024 |
| 25DL0103CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY BAGONG PAG-ASA, PEREZ, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱3.4M | 12% | High risk87 | Flagged0.023 |
| 25DM0160CONCRETING OF BRGY. BULO ILAYA TO BRGY. BURGOS TO BRGY. MAIROK ILAYA TO BRGY. MAIROK IBABA FMR, UNISAN, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱24.8M | 56% | High risk64 | Flagged0.022 |
| 25DL0191CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - EVACUATION CENTERS/ QUARANTINE FACILITIES/ PUBLIC HEALTH FACILITIES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, PHASE III, MARIA ELEAZAR DISTRICT H | Region IV-A | Quezon 4th DEO | On-Going | ₱64M | 18% | High risk95 | Flagged0.022 |
| 25DL0185CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF SANTA MONICA-SAN R | Region IV-A | Quezon 4th DEO | On-Going | ₱93.3M | 39% | High risk96 | Flagged0.018 |
| 25DL0122CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF STA. MONICA-SAN RO | Region IV-A | Quezon 4th DEO | On-Going | ₱78.2M | 39% | High risk95 | Flagged0.017 |
| 25DL0083CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY TANAUAN, PLARIDEL, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱48.3M | 28% | High risk95 | Flagged0.014 |
| 24DM0080CONSTRUCTION OF FLOOD CONTROL, BARANGAY 1 AND BARANGAY 5, CATANAUAN, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱101.7M | 65% | High risk79 | Flagged0.012 |
| 25DM0154CONSTRUCTION OF MULTI-PURPOSE BUILDING (POLYTECHNIC UNIVERSITY OF THE PHILIPPINES) MULANAY, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱9.7M | 37% | High risk94 | Flagged0.012 |
| 25DL0188CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION (COMPLETION) OF UNIVERSITY DORMITORY AT SOUTHERN LUZON STATE UNIVERSITY, GUMACA, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱28.7M | 54% | High risk95 | Flagged0.007 |
| 25DL0190CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - EVACUATION CENTERS/ QUARANTINE FACILITIES/ PUBLIC HEALTH FACILITIES, CONSTRUCTION OF ALABAT DISTRICT HOSPITAL, ALABAT, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱96M | 90% | High risk96 | Flagged0.005 |
| 25DL0138CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT), CONSTRUCTION OF ACCESS ROAD TO MAHARLI | Region IV-A | Quezon 4th DEO | On-Going | ₱93.4M | 58% | High risk78 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 426 | 17DL0235CY 2017 BASIC EDUCATION FACILITIES FUND, CONSTRUCTION OF CLASSROOMS 1STY 2CL COMETA NHS ANNEX, QUEZON, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱2.6M | 100% | Low risk11 | —-0.031 |
| 427 | 17DL0238CY 2017 BASIC EDUCATION FACILITIES FUND, CONSTRUCTION OF CLASSROOMS 1STY 2CL PABLO D. MANINGAS NATIONAL HIGH SCHOOL, QUEZON, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱2.6M | 100% | Low risk11 | —-0.032 |
| 428 | 17DL0166CY 2017 BASIC EDUCATION FACILITIES FUND, CONSTRUCTION OF CLASSROOMS 1STY 2CL APAD NHS (FORMERLY STO. DOMINGO NHS-APAD EXT. CLASSES, CALAUAG, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱2.6M | 100% | Low risk11 | —-0.029 |
| 429 | 17DL0241CY 2017 BASIC EDUCATION FACILITIES FUND, CONSTRUCTION OF CLASSROOMS 1STY 2CL CABIBIHAN NATIONAL HIGH SCHOOL, TAGKAWAYAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱2.6M | 100% | Low risk11 | —-0.029 |
| 430 | 17DL0202CY 2017 BASIC EDUCATION FACILITIES FUND, CONSTRUCTION OF CLASSROOMS 1STY 2CL CABIBIHAN ES, TAGKAWAYAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱2.6M | 100% | Low risk11 | —-0.029 |
| 431 | 17DL0148CY 2017 BASIC EDUCATION FACILITIES FUND, CONSTRUCTION OF CLASSROOMS 1STY 2CL VILLA PEREZ NATIONAL HIGH SCHOOL, GUMACA, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱2.6M | 100% | Low risk11 | —-0.029 |
| 432 | 17DL0145CY 2017 BASIC EDUCATION FACILITIES FUND, CONSTRUCTION OF CLASSROOMS 1STY 2CL CAMOHAGUIN NATIONAL HIGH SCHOOL, GUMACA, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱2.6M | 100% | Low risk11 | —-0.029 |
| 433 | 17DL0174CY 2017 BASIC EDUCATION FACILITIES FUND, CONSTRUCTION OF CLASSROOMS 1STY 2CL STA. MARIA ES (REPLACEMENT), CALAUAG, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱2.6M | 100% | Low risk11 | —-0.029 |
| 434 | 17DL0173CY 2017 BASIC EDUCATION FACILITIES FUND, CONSTRUCTION OF CLASSROOMS 1STY 2CL STA. CRUZ NATIONAL HIGH SCHOOL, GUINAYANGAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱2.6M | 100% | Low risk11 | —-0.029 |
| 435 | 17DL0153CY 2017 BASIC EDUCATION FACILITIES FUND, CONSTRUCTION OF CLASSROOMS 1STY 2CL MAMBALING ES, CALAUAG, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱2.6M | 100% | Low risk11 | —-0.030 |
| 436 | 17DL0138CY 2017 BASIC EDUCATION FACILITIES FUND, CONSTRUCTION OF CLASSROOMS 1STY 2CL COGORIN IBABA NHS, LOPEZ, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱2.6M | 100% | Low risk11 | —-0.029 |
| 437 | 17DL0193CY 2017 BASIC EDUCATION FACILITIES FUND, CONSTRUCTION OF CLASSROOMS 1STY 2CL LOPEZ WEST ES (REPLACEMENT) LOPEZ, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱2.6M | 100% | Low risk10 | —-0.029 |
| 438 | 17DL0140CY 2017 BASIC EDUCATION FACILITIES FUND, CONSTRUCTION OF CLASSROOMS 1STY 2CL DON MATEO ES, LOPEZ, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱2.6M | 100% | Low risk10 | —-0.029 |
| 439 | 17DL0209CY 2017 BASIC EDUCATION FACILITIES FUND, CONSTRUCTION OF CLASSROOMS 1STY 2CL VILLA AURORA ES, LOPEZ, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱2.6M | 100% | Low risk10 | —-0.030 |
| 440 | 17DL0141CY 2017 BASIC EDUCATION FACILITIES FUND, CONSTRUCTION OF CLASSROOMS 1STY 2CL MAGALLANES NATIONAL HIGH SCHOOL, LOPEZ, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱2.6M | 100% | Low risk10 | —-0.030 |
| 441 | 17DL0175CY 2017 BASIC EDUCATION FACILITIES FUND, CONSTRUCTION OF CLASSROOMS 1STY 2CL STA. ROSA ES, CALAUAG, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱2.6M | 100% | Low risk10 | —-0.032 |
| 442 | 18DL0077CONSTRUCTION OF BARANGAY HEALTH STATION (BHS) WITH BIRTHING, BRGY. BAGONG SILANG, PEREZ, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱1.4M | 100% | Low risk9 | —-0.026 |
| 443 | 18DL0083CONSTRUCTION OF BARANGAY HEALTH STATION (BHS) WITH BIRTHING, BRGY. PAGKAKAISA, PEREZ, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱1.4M | 100% | Low risk9 | —-0.026 |
| 444 | 18DL0087CONSTRUCTION OF BARANGAY HEALTH STATION (BHS) WITH BIRTHING, BRGY. VILLA VICTORIA, ALABAT, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱1.4M | 100% | Low risk9 | —-0.027 |
| 445 | 18DL0086CONSTRUCTION OF BARANGAY HEALTH STATION (BHS) WITH BIRTHING, BRGY. VILLA ESPERANZA, ALABAT, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱1.4M | 100% | Low risk9 | —-0.027 |
| 446 | 17DL0255CY 2016 BASIC EDUCATION FACILITIES FUND (BATCH 13) CONSTRUCTION OF CLASSROOMS 2STY4CL GUMACA NATIONAL HIGH SCHOOL, GUMACA, QUEZON (PHASE-2) | Region IV-A | Quezon 4th DEO | Completed | ₱1.8M | 100% | Low risk9 | —-0.026 |
| 447 | 18DL0068CONSTRUCTION OF BASIC BARANGAY HEALTH STATION (BHS), BRGY. MONTAÑA, QUEZON, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱1.4M | 100% | Low risk9 | —-0.027 |
| 448 | 18DL0066CONSTRUCTION OF BASIC BARANGAY HEALTH STATION (BHS), BRGY. MASCARINA, QUEZON, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱1.4M | 100% | Low risk9 | —-0.027 |
| 449 | 18DL0076CONSTRUCTION OF BASIC BARANGAY HEALTH STATION (BHS), BRGY. VILLA GOMEZ, QUEZON, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱1.4M | 100% | Low risk9 | —-0.027 |
| 450 | 18DL0080CONSTRUCTION OF BARANGAY HEALTH STATION (BHS) WITH BIRTHING, BRGY. GORDON, ALABAT, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱1.4M | 100% | Low risk9 | —-0.027 |