Contractor dossier
450 projects on file, including joint ventures this contractor is part of.
Total projects
450
Total budget
₱9.2B
Average progress
96.7%
Completion rate
91.1%
Average risk score
41.5
Medium risk on average, out of 100
Flagged as unusual
15
3.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 431 | ₱8.6B | 41.3 | 15 | 96.5% |
| Region I | 10 | ₱413.8M | 46.2 | 0 | 100.0% |
| Region V | 6 | ₱118.6M | 50.4 | 0 | 100.0% |
| National Capital Region | 3 | ₱34.9M | 38.6 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 184 | ₱4.8B | 46.4 | 1 | 98.6% |
| Buildings and Facilities | 183 | ₱1.8B | 28.9 | 0 | 99.9% |
| Flood Control and Drainage | 32 | ₱878M | 46.8 | 0 | 93.4% |
| Water Provision and Storage | 21 | ₱289.6M | 39.0 | 0 | 100.0% |
| GAA 2025 SSP | 10 | ₱659.1M | 94.5 | 10 | 39.7% |
| GAA 2025 OO-2 | 9 | ₱188M | 88.7 | 0 | 74.2% |
| OTHER | 5 | ₱390.5M | 77.8 | 4 | 76.5% |
| GAA 2025 OO-1 | 4 | ₱228.2M | 93.0 | 0 | 85.4% |
| Bridges | 2 | ₱2.9M | 23.5 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DL0190CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - EVACUATION CENTERS/ QUARANTINE FACILITIES/ PUBLIC HEALTH FACILITIES, CONSTRUCTION OF ALABAT DISTRICT HOSPITAL, ALABAT, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱96M | 90% | High risk96 | Flagged0.005 |
| 25DM0158CONSTRUCTION (COMPLETION) OF MUNICIPAL HALL, PITOGO, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱144M | 55% | High risk96 | Flagged0.024 |
| 25DM0151CONSTRUCTION OF MULTI-PURPOSE BUILDING, BONDOC PENINSULA DISTRICT HOSPITAL, CATANAUAN, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.5M | 25% | High risk96 | Flagged0.024 |
| 25DL0185CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF SANTA MONICA-SAN R | Region IV-A | Quezon 4th DEO | On-Going | ₱93.3M | 39% | High risk96 | Flagged0.018 |
| 25DL0191CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - EVACUATION CENTERS/ QUARANTINE FACILITIES/ PUBLIC HEALTH FACILITIES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, PHASE III, MARIA ELEAZAR DISTRICT H | Region IV-A | Quezon 4th DEO | On-Going | ₱64M | 18% | High risk95 | Flagged0.022 |
| 25DL0122CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF STA. MONICA-SAN RO | Region IV-A | Quezon 4th DEO | On-Going | ₱78.2M | 39% | High risk95 | Flagged0.017 |
| 25DL0083CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY TANAUAN, PLARIDEL, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱48.3M | 28% | High risk95 | Flagged0.014 |
| 25DM0065NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - PADRE BURGOS BY- PASS ROAD, QUEZON, PADRE BURGOS, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱94.6M | 78% | High risk95 | —-0.000 |
| 25DL0188CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION (COMPLETION) OF UNIVERSITY DORMITORY AT SOUTHERN LUZON STATE UNIVERSITY, GUMACA, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱28.7M | 54% | High risk95 | Flagged0.007 |
| 25DM0015ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - GUMACA - PITOGO - MULANAY - SN NARCISO RD - K0292 + 050 - K0292+ 085, K0292 + 500 - K0292 + 545, K0292 + 630 - K0292 + 730 | Region IV-A | Quezon 3rd DEO | On-Going | ₱48.5M | 83% | High risk94 | —-0.009 |
| 25DL0171ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TALOLONG RIVER, LOPEZ, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱93.1M | 47% | High risk94 | —-0.015 |
| 25DM0154CONSTRUCTION OF MULTI-PURPOSE BUILDING (POLYTECHNIC UNIVERSITY OF THE PHILIPPINES) MULANAY, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱9.7M | 37% | High risk94 | Flagged0.012 |
| 25DL0120ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, GUINAYANGAN-TAGKAWAYAN DIVERSION ROAD, TAGKAWAYAN, PACKAGE B, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱46.7M | 81% | High risk93 | —-0.008 |
| 24DL0181(SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF LOPEZ-CALAUAG CIRCUMFERENTIAL ROAD (DOMINLOG-KUMALUDKUD - MANHULUGIN SECTION), CALAUAG, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱93.5M | 91% | High risk90 | Flagged0.048 |
| 24DL0182SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF AGOHO - MARILAG ROAD, CALAUAG, QUEZON (PACKAGE D) | Region IV-A | Quezon 4th DEO | On-Going | ₱93.8M | 68% | High risk90 | Flagged0.055 |
| 25DM0009ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - GUMACA - PITOGO - MULANAY - SN NARCISO RD - K0225+000 - K0226+792, MACALELON, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱38.4M | 100% | High risk90 | —-0.037 |
| 25DL0145ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CAMOHAGUIN RIVER, GUMACA, | Region IV-A | Quezon 4th DEO | On-Going | ₱4.7M | 100% | High risk89 | —-0.035 |
| 25DL0149ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE | Region IV-A | Quezon 4th DEO | On-Going | ₱28.5M | 54% | High risk88 | —-0.024 |
| 25DL0175ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL ALONG BOCBOC CREEK, LOPEZ, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱19M | 54% | High risk88 | —-0.023 |
| 25DL0172ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF PROTECTION STRUCTURE ALONG | Region IV-A | Quezon 4th DEO | On-Going | ₱9.5M | 72% | High risk88 | —-0.026 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24DL0182SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF AGOHO - MARILAG ROAD, CALAUAG, QUEZON (PACKAGE D) | Region IV-A | Quezon 4th DEO | On-Going | ₱93.8M | 68% | High risk90 | Flagged0.055 |
| 24DL0181(SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF LOPEZ-CALAUAG CIRCUMFERENTIAL ROAD (DOMINLOG-KUMALUDKUD - MANHULUGIN SECTION), CALAUAG, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱93.5M | 91% | High risk90 | Flagged0.048 |
| 25DM0151CONSTRUCTION OF MULTI-PURPOSE BUILDING, BONDOC PENINSULA DISTRICT HOSPITAL, CATANAUAN, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.5M | 25% | High risk96 | Flagged0.024 |
| 25DM0158CONSTRUCTION (COMPLETION) OF MUNICIPAL HALL, PITOGO, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱144M | 55% | High risk96 | Flagged0.024 |
| 25DL0103CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY BAGONG PAG-ASA, PEREZ, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱3.4M | 12% | High risk87 | Flagged0.023 |
| 25DM0160CONCRETING OF BRGY. BULO ILAYA TO BRGY. BURGOS TO BRGY. MAIROK ILAYA TO BRGY. MAIROK IBABA FMR, UNISAN, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱24.8M | 56% | High risk64 | Flagged0.022 |
| 25DL0191CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - EVACUATION CENTERS/ QUARANTINE FACILITIES/ PUBLIC HEALTH FACILITIES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, PHASE III, MARIA ELEAZAR DISTRICT H | Region IV-A | Quezon 4th DEO | On-Going | ₱64M | 18% | High risk95 | Flagged0.022 |
| 25DL0185CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF SANTA MONICA-SAN R | Region IV-A | Quezon 4th DEO | On-Going | ₱93.3M | 39% | High risk96 | Flagged0.018 |
| 25DL0122CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF STA. MONICA-SAN RO | Region IV-A | Quezon 4th DEO | On-Going | ₱78.2M | 39% | High risk95 | Flagged0.017 |
| 25DL0083CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY TANAUAN, PLARIDEL, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱48.3M | 28% | High risk95 | Flagged0.014 |
| 24DM0080CONSTRUCTION OF FLOOD CONTROL, BARANGAY 1 AND BARANGAY 5, CATANAUAN, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱101.7M | 65% | High risk79 | Flagged0.012 |
| 25DM0154CONSTRUCTION OF MULTI-PURPOSE BUILDING (POLYTECHNIC UNIVERSITY OF THE PHILIPPINES) MULANAY, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱9.7M | 37% | High risk94 | Flagged0.012 |
| 25DL0188CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION (COMPLETION) OF UNIVERSITY DORMITORY AT SOUTHERN LUZON STATE UNIVERSITY, GUMACA, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱28.7M | 54% | High risk95 | Flagged0.007 |
| 25DL0190CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - EVACUATION CENTERS/ QUARANTINE FACILITIES/ PUBLIC HEALTH FACILITIES, CONSTRUCTION OF ALABAT DISTRICT HOSPITAL, ALABAT, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱96M | 90% | High risk96 | Flagged0.005 |
| 25DL0138CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT), CONSTRUCTION OF ACCESS ROAD TO MAHARLI | Region IV-A | Quezon 4th DEO | On-Going | ₱93.4M | 58% | High risk78 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 76 | 23DM0042CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CATANAUAN RIVER, STA. 3 + 675 - STA. 4 + 100, RIGHT SIDE, CATANAUAN, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱67.6M | 100% | Medium risk53 | —-0.074 |
| 77 | 20DL0087D. LOCAL PROGRAM 2. CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS A. MULTIPURPOSE/ FACILITIES 2. GUMACA PUBLIC MARKET, GUMACA, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱48.3M | 100% | Medium risk53 | —-0.094 |
| 78 | 21DL0145LOCAL PROGRAM, NATIONAL BUILDING PROGRAM, BUILDING AND OTHER STRUCTURES, MULTIPURPOSE / FACILITIES, CONSTRUCTION OF ACADEMIC BUILDING, SOUTHERN LUZON STATE UNIVERSITY (SLSU), GUMACA, QUEZON, PHASE II | Region IV-A | Quezon 4th DEO | Completed | ₱47.6M | 100% | Medium risk53 | —-0.096 |
| 79 | 23DL0120CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES 1. CONSTRUCTION OF GUMACA PUBLIC MARKET GUMACA, QUEZON, PACKAGE B | Region IV-A | Quezon 4th DEO | Completed | ₱47M | 100% | Medium risk52 | —-0.093 |
| 80 | 25DM0074CONSTRUCTION OF REVETMENT WALL AT BARANGAY POBLACION ALONG MULANAY RIVER, MULANAY, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱48M | 38% | Medium risk52 | —-0.033 |
| 81 | 18DL0024CLUSTER IVA. 2. LOCAL INFRASTRUCTURE PROGRAM A. BUILDINGS AND OTHER STRUCTURES 1. MULTIPURPOSE / FACILITIES 37. REHABILITATION OF MULTIPURPOSE BUILDING, CALANTIPAYAN ELEMENTARY SCHOOL, BRGY. CALANTIPAYAN, LOPEZ, QUEZON - P 979,360.16B. 2. LOCAL INFR | Region IV-A | Quezon 4th DEO | Completed | ₱8.1M | 100% | Medium risk52 | —-0.067 |
| 82 | 21DL0046CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES, ACCESS ROADS TO QUIRINO HIGHWAY IN SUPPORT OF AGRI-BASED INDUSTRIES, CALAUAG, QUEZON, PACKAGE II | Region IV-A | Quezon 4th DEO | Completed | ₱53.1M | 100% | Medium risk52 | —-0.101 |
| 83 | 24DM0072NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - PADRE BURGOS BY-PASS ROAD, PACKAGE 3 | Region IV-A | Quezon 3rd DEO | Completed | ₱53.1M | 100% | Medium risk51 | —-0.102 |
| 84 | 24DM0071NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - AGDANGAN BY-PASS ROAD, AGDANGAN, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱53.1M | 100% | Medium risk51 | —-0.102 |
| 85 | 24DM0150CONSTRUCTION OF MULTI-PURPOSE BUILDING (SAN FRANCISCO MUNICIPAL HOSPITAL), SAN FRANCISCO, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱49.5M | 100% | Medium risk51 | —-0.093 |
| 86 | 21A00249CONSTRUCTION/REHABILITATION/IMPROVEMENT OF FACILITIES FOR PERSONS WITH DISABILITIES (PWD) AND ELDERLIES/SENIOR CITIZENS, INCLUDING GENDER-RESPONSIVE FACILITIES - REGION I | Region I | Region I | Completed | ₱28.9M | 100% | Medium risk51 | —-0.079 |
| 87 | 25DM0152CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, AGDANGAN, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱39.6M | 76% | Medium risk51 | —-0.059 |
| 88 | 22DL0099ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS, PRIMARY ROADS, DAANG MAHARLIKA (LZ) - K0201+655 - K0201+713, K0201+734 - K0202+100, K02 | Region IV-A | Quezon 4th DEO | Completed | ₱41.1M | 100% | Medium risk51 | —-0.099 |
| 89 | 23DL0164CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM, BIP - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES 10. CONSTRUCTION OF LOPEZ-CALAUAG CIRCUMFERENTIAL ROAD, LOPEZ, QUEZO | Region IV-A | Quezon 4th DEO | Completed | ₱49.5M | 100% | Medium risk51 | —-0.101 |
| 90 | 21DL0169CONSTRUCTION OF LOCAL ROADS, MAGSAYSAY - GUIHAY - STA. TERESA - STA. LUCIA ROAD, LOPEZ, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱47.9M | 100% | Medium risk51 | —-0.102 |
| 91 | 21DL0090ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LOPEZ BY-PASS, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱47.4M | 100% | Medium risk51 | —-0.103 |
| 92 | 25DL0142BIP-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF ACCESS ROAD TO MAHARLIKA HIGHWAY IN SUPPORT OF COCONUT PROCESSING AND OTHER AGRI-BASED INDUSTRIES, ATIMONAN, QUEZON (PHASE V) | Region IV-A | Quezon 4th DEO | On-Going | ₱48M | 70% | Medium risk51 | —-0.065 |
| 93 | 23DL0094ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - PRIMARY ROADS 2. DAANG MAHARLIKA (LZ) K0159 + 350.5 K0159 + 397 | Region IV-A | Quezon 4th DEO | Completed | ₱51.1M | 100% | Medium risk51 | —-0.104 |
| 94 | 21DL0019CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE IN SUPPORT OF NATIONAL SECURITY, ACCESS ROAD LEADING TO MILITARY CAMP (201ST INFANTRY KABALIKAT BRIGADE) BRGY. RIZAL ILAYA, CALAUAG, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱47.1M | 100% | Medium risk51 | —-0.103 |
| 95 | 23DL0092ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF MISSING LINKS/ NEW ROADS 4. CALAUAG-GUINAYANGAN-BUENAVISTA-LOPEZ ROAD, QUEZON, PACKAGE B | Region IV-A | Quezon 4th DEO | Completed | ₱47.5M | 100% | Medium risk51 | —-0.102 |
| 96 | 23DM0104CONSTRUCTION OF MULTI-PURPOSE BUILDINGS, AGDANGAN, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱46.1M | 100% | Medium risk51 | —-0.093 |
| 97 | 21DL0082ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, PLARIDEL BY-PASS, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱47.1M | 100% | Medium risk51 | —-0.104 |
| 98 | 20DK0054NETWORK DEVELOPMENT-CONSTRUCTION OF BYPASS AND DIVERSION ROAD, PAGBILAO-TAYABAS-LUCBAN DIVERSION ROAD, QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.105 |
| 99 | 20DL0104A. ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 2. NETWORK DEVELOPMENT PROGRAM C. CONSTRUCTION OF MISSING LINKS/ NEW ROADS 2. CALAUAG-GUINAYANGAN-BUENAVISTA-LOPEZ ROAD, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱46.8M | 100% | Medium risk50 | —-0.102 |
| 100 | 20DL0108A. ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM 2. NETWORK DEVELOPMENT PROGRAM B. CONSTRUCTION OF BY-PASS AND DIVERSION ROADS 6. PLARIDEL BY-PASS ROAD, PACKAGE A, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱46.8M | 100% | Medium risk50 | —-0.103 |