Opening the dossier…
Opening the dossier…
Contractor dossier
450 projects on file, including joint ventures this contractor is part of.
Total projects
450
Total budget
₱9.2B
Average progress
96.7%
Completion rate
91.1%
Average risk score
41.5
Medium risk on average, out of 100
Flagged as unusual
15
3.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 431 | ₱8.6B | 41.3 | 15 | 96.5% |
| Region I | 10 | ₱413.8M | 46.2 | 0 | 100.0% |
| Region V | 6 | ₱118.6M | 50.4 | 0 | 100.0% |
| National Capital Region | 3 | ₱34.9M | 38.6 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 184 | ₱4.8B | 46.4 | 1 | 98.6% |
| Buildings and Facilities | 183 | ₱1.8B | 28.9 | 0 | 99.9% |
| Flood Control and Drainage | 32 | ₱878M | 46.8 | 0 | 93.4% |
| Water Provision and Storage | 21 | ₱289.6M | 39.0 | 0 | 100.0% |
| GAA 2025 SSP | 10 | ₱659.1M | 94.5 | 10 | 39.7% |
| GAA 2025 OO-2 | 9 | ₱188M | 88.7 | 0 | 74.2% |
| OTHER | 5 | ₱390.5M | 77.8 | 4 | 76.5% |
| GAA 2025 OO-1 | 4 | ₱228.2M | 93.0 | 0 | 85.4% |
| Bridges | 2 | ₱2.9M | 23.5 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DL0190CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - EVACUATION CENTERS/ QUARANTINE FACILITIES/ PUBLIC HEALTH FACILITIES, CONSTRUCTION OF ALABAT DISTRICT HOSPITAL, ALABAT, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱96M | 90% | High risk96 | Flagged0.005 |
| 25DM0158CONSTRUCTION (COMPLETION) OF MUNICIPAL HALL, PITOGO, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱144M | 55% | High risk96 | Flagged0.024 |
| 25DM0151CONSTRUCTION OF MULTI-PURPOSE BUILDING, BONDOC PENINSULA DISTRICT HOSPITAL, CATANAUAN, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.5M | 25% | High risk96 | Flagged0.024 |
| 25DL0185CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF SANTA MONICA-SAN R | Region IV-A | Quezon 4th DEO | On-Going | ₱93.3M | 39% | High risk96 | Flagged0.018 |
| 25DL0191CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - EVACUATION CENTERS/ QUARANTINE FACILITIES/ PUBLIC HEALTH FACILITIES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, PHASE III, MARIA ELEAZAR DISTRICT H | Region IV-A | Quezon 4th DEO | On-Going | ₱64M | 18% | High risk95 | Flagged0.022 |
| 25DL0122CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF STA. MONICA-SAN RO | Region IV-A | Quezon 4th DEO | On-Going | ₱78.2M | 39% | High risk95 | Flagged0.017 |
| 25DL0083CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY TANAUAN, PLARIDEL, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱48.3M | 28% | High risk95 | Flagged0.014 |
| 25DM0065NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - PADRE BURGOS BY- PASS ROAD, QUEZON, PADRE BURGOS, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱94.6M | 78% | High risk95 | —-0.000 |
| 25DL0188CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION (COMPLETION) OF UNIVERSITY DORMITORY AT SOUTHERN LUZON STATE UNIVERSITY, GUMACA, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱28.7M | 54% | High risk95 | Flagged0.007 |
| 25DM0015ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - GUMACA - PITOGO - MULANAY - SN NARCISO RD - K0292 + 050 - K0292+ 085, K0292 + 500 - K0292 + 545, K0292 + 630 - K0292 + 730 | Region IV-A | Quezon 3rd DEO | On-Going | ₱48.5M | 83% | High risk94 | —-0.009 |
| 25DL0171ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TALOLONG RIVER, LOPEZ, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱93.1M | 47% | High risk94 | —-0.015 |
| 25DM0154CONSTRUCTION OF MULTI-PURPOSE BUILDING (POLYTECHNIC UNIVERSITY OF THE PHILIPPINES) MULANAY, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱9.7M | 37% | High risk94 | Flagged0.012 |
| 25DL0120ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, GUINAYANGAN-TAGKAWAYAN DIVERSION ROAD, TAGKAWAYAN, PACKAGE B, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱46.7M | 81% | High risk93 | —-0.008 |
| 24DL0181(SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF LOPEZ-CALAUAG CIRCUMFERENTIAL ROAD (DOMINLOG-KUMALUDKUD - MANHULUGIN SECTION), CALAUAG, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱93.5M | 91% | High risk90 | Flagged0.048 |
| 24DL0182SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF AGOHO - MARILAG ROAD, CALAUAG, QUEZON (PACKAGE D) | Region IV-A | Quezon 4th DEO | On-Going | ₱93.8M | 68% | High risk90 | Flagged0.055 |
| 25DM0009ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - GUMACA - PITOGO - MULANAY - SN NARCISO RD - K0225+000 - K0226+792, MACALELON, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱38.4M | 100% | High risk90 | —-0.037 |
| 25DL0145ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CAMOHAGUIN RIVER, GUMACA, | Region IV-A | Quezon 4th DEO | On-Going | ₱4.7M | 100% | High risk89 | —-0.035 |
| 25DL0149ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE | Region IV-A | Quezon 4th DEO | On-Going | ₱28.5M | 54% | High risk88 | —-0.024 |
| 25DL0175ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL ALONG BOCBOC CREEK, LOPEZ, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱19M | 54% | High risk88 | —-0.023 |
| 25DL0172ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF PROTECTION STRUCTURE ALONG | Region IV-A | Quezon 4th DEO | On-Going | ₱9.5M | 72% | High risk88 | —-0.026 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24DL0182SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF AGOHO - MARILAG ROAD, CALAUAG, QUEZON (PACKAGE D) | Region IV-A | Quezon 4th DEO | On-Going | ₱93.8M | 68% | High risk90 | Flagged0.055 |
| 24DL0181(SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF LOPEZ-CALAUAG CIRCUMFERENTIAL ROAD (DOMINLOG-KUMALUDKUD - MANHULUGIN SECTION), CALAUAG, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱93.5M | 91% | High risk90 | Flagged0.048 |
| 25DM0151CONSTRUCTION OF MULTI-PURPOSE BUILDING, BONDOC PENINSULA DISTRICT HOSPITAL, CATANAUAN, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.5M | 25% | High risk96 | Flagged0.024 |
| 25DM0158CONSTRUCTION (COMPLETION) OF MUNICIPAL HALL, PITOGO, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱144M | 55% | High risk96 | Flagged0.024 |
| 25DL0103CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY BAGONG PAG-ASA, PEREZ, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱3.4M | 12% | High risk87 | Flagged0.023 |
| 25DM0160CONCRETING OF BRGY. BULO ILAYA TO BRGY. BURGOS TO BRGY. MAIROK ILAYA TO BRGY. MAIROK IBABA FMR, UNISAN, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱24.8M | 56% | High risk64 | Flagged0.022 |
| 25DL0191CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - EVACUATION CENTERS/ QUARANTINE FACILITIES/ PUBLIC HEALTH FACILITIES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, PHASE III, MARIA ELEAZAR DISTRICT H | Region IV-A | Quezon 4th DEO | On-Going | ₱64M | 18% | High risk95 | Flagged0.022 |
| 25DL0185CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF SANTA MONICA-SAN R | Region IV-A | Quezon 4th DEO | On-Going | ₱93.3M | 39% | High risk96 | Flagged0.018 |
| 25DL0122CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF STA. MONICA-SAN RO | Region IV-A | Quezon 4th DEO | On-Going | ₱78.2M | 39% | High risk95 | Flagged0.017 |
| 25DL0083CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY TANAUAN, PLARIDEL, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱48.3M | 28% | High risk95 | Flagged0.014 |
| 24DM0080CONSTRUCTION OF FLOOD CONTROL, BARANGAY 1 AND BARANGAY 5, CATANAUAN, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱101.7M | 65% | High risk79 | Flagged0.012 |
| 25DM0154CONSTRUCTION OF MULTI-PURPOSE BUILDING (POLYTECHNIC UNIVERSITY OF THE PHILIPPINES) MULANAY, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱9.7M | 37% | High risk94 | Flagged0.012 |
| 25DL0188CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION (COMPLETION) OF UNIVERSITY DORMITORY AT SOUTHERN LUZON STATE UNIVERSITY, GUMACA, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱28.7M | 54% | High risk95 | Flagged0.007 |
| 25DL0190CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - EVACUATION CENTERS/ QUARANTINE FACILITIES/ PUBLIC HEALTH FACILITIES, CONSTRUCTION OF ALABAT DISTRICT HOSPITAL, ALABAT, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱96M | 90% | High risk96 | Flagged0.005 |
| 25DL0138CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT), CONSTRUCTION OF ACCESS ROAD TO MAHARLI | Region IV-A | Quezon 4th DEO | On-Going | ₱93.4M | 58% | High risk78 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 101 | 20DL0016D. LOCAL PROGRAM 2. CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS A. MULTIPURPOSE/ FACILITIES 1. CONSTRUCTION OF ATIMONAN NATIONAL GOVERNMENT CENTER, ATIMONAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱28.9M | 100% | Medium risk50 | —-0.097 |
| 102 | 23A00156CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) - POBLACION SUR-SORIOAN-LUCBUBAN-UBBOG-BAYBAYADING ROAD CONNECTING CANDON-SALCED | Region I | Ilocos Sur 2nd DEO | Completed | ₱52.3M | 100% | Medium risk50 | —-0.080 |
| 103 | 23DL0165CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM, MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES 41. CONSTRUCTION OF MULTI-PURPOSE FACILITY (PUBLIC MARKET), GUMACA, QUEZON (PHASE III) | Region IV-A | Quezon 4th DEO | Completed | ₱29.7M | 100% | Medium risk50 | —-0.094 |
| 104 | 23DL0173CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM, BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES 14. CONSTRUCTION OF MULTI-PURPOSE BUILDING (SOUTHERN LUZON STATE UNIVERSITY DORMITORY BUILDING), GUMACA, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱29.7M | 100% | Medium risk50 | —-0.095 |
| 105 | 18FF0091FY-2018 CONST./MAINT. OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEM - CONST/IMPROVEMENT/REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG SIBAGUAN RIVERSECTION 1 : STA.0+000.00 - STA.0+064.79 TO SECTION 5 : STA.0+000.00 - STA.0+010.00 SAGNAY, CAM SUR | Region V | Camarines Sur 4th DEO | Completed | ₱23.1M | 100% | Medium risk49 | —-0.088 |
| 106 | 25DM0075CONSTRUCTION OF RIVER PROTECTION ALONG MAYUBOK RIVER, BARANGAY PINAGBAYANAN, PITOGO, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱48M | 100% | Medium risk49 | —-0.054 |
| 107 | 20A00166CONSTRUCTION OF MISSING LINKS/ NEW ROADS, PANGASINAN - NUEVA VIZCAYA ROAD STA. 214+050 - STA. 214+280, SAN NICOLAS, PANGASINAN | Region I | Region I | Completed | ₱48.3M | 100% | Medium risk49 | —-0.088 |
| 108 | 18DJ0104CONSTRUCTION OF FOUR (4) STOREY TWENTY (20) CLASSROOM ACADEMIC SCHOOL BUILDING AT GULANG-GULANG ELEMENTARY SCHOOL, LUCENA CITY | Region IV-A | Quezon 2nd DEO | Completed | ₱47.5M | 100% | Medium risk49 | —-0.047 |
| 109 | 23DL0039ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS 1. CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BOCBOC CREEK, LOPEZ, QUE | Region IV-A | Quezon 4th DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.081 |
| 110 | 23DL0041ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS 3. CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TALOLONG RIVER, LOPEZ QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.082 |
| 111 | 23DK0105CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM - BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - COMPLETION OF MULTIPURPOSE BUILDING, QUEZON SCIENCE HIGH SCHOOL (QSHS), BARANGAY ISABANG, TAYABAS CITY, QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱14.8M | 100% | Medium risk49 | —-0.105 |
| 112 | 23DL0040ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS 2. CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MALING RIVER, ATIMONAN, | Region IV-A | Quezon 4th DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.079 |
| 113 | 22DL0183CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURE/FACILITIES 1. CONSTRUCTION OF SLOPE PROTECTION ALONG DAANG MAHARLIKA (LZ) - K0155 + 350 - K | Region IV-A | Quezon 4th DEO | Completed | ₱49M | 100% | Medium risk49 | —-0.084 |
| 114 | 21A00250CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS - WATER SUPPLY, CONSTRUCTION OF LEVEL III WATER SUPPLY PROJECT, ARINGAY, LA UNION | Region I | La Union 2nd DEO | Completed | ₱56.7M | 100% | Medium risk49 | —-0.042 |
| 115 | 18DK0089CONSTRUCTION OF MULTI-PURPOSE BUILDING (TRAINING CENTER) BARANGAY CAWAYAN, REAL, QUEZON | Region IV-A | Quezon 1st DEO | Completed | ₱9.9M | 100% | Medium risk49 | —-0.101 |
| 116 | 21DL0117LOCAL PROGRAM, CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, BUILDING AND OTHER STRUCTURES, MULTIPURPOSE / FACILITIES, CONSTRUCTION OF ATIMONAN NATIONAL GOVERNMENT CENTER, ATIMONAN, QUEZON, PHASE | Region IV-A | Quezon 4th DEO | Completed | ₱12M | 100% | Medium risk48 | —-0.102 |
| 117 | 21A00046CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG BAUANG RIVER BASIN, BRGY. SUGUIDAN SUR, NAGUILIAN, LA UNION | Region I | Region I | Completed | ₱48.3M | 100% | Medium risk48 | —-0.069 |
| 118 | 19DL0006CLUSTER VIA. I. OPERATIONS D. LOCAL PROGRAM 3. LOCAL INFRASTRUCTURE PROGRAM A. BUILDINGS AND OTHER STRUCTURES 1. MULTIPURPOSE / FACILITIES 2. CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. JONGO, LOPEZ, QUEZON B. I. OPERATIONS D. LOCAL PROGRAM 3. LO | Region IV-A | Quezon 4th DEO | Completed | ₱8.2M | 100% | Medium risk48 | —-0.102 |
| 119 | 20A00118CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, NAGUILIAN - BAGULIN ROAD LEADING TO TUDDINGAN FALLS AND KEDLAP BURIAL CAVE, NAGUILIAN - BAGULIN, LA UNION | Region I | Region I | Completed | ₱47.3M | 100% | Medium risk48 | —-0.086 |
| 120 | 23DL0186CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM, BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES 39. CONSTRUCTION OF MULTI-PURPOSE BUILDING, CALAUAG INFIRMARY HOSPITAL, CALAUAG, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱19.8M | 100% | Medium risk48 | —-0.100 |
| 121 | 23DL0119LOCAL PROGRAM, NATIONAL BUILDING PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE / FACILITIES 5. CONSTRUCTION OF MULTI-PURPOSE BUILDING (GUMACA PUBLIC MARKET), BRGY. MAUNLAD, GUMACA, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱14.7M | 100% | Medium risk48 | —-0.100 |
| 122 | 20DL0160LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, BUILDINGS AND OTHER STRUCTURES, MULTIPURPOSE / FACILITIES 5. CONSTRUCTION OF MULTI-PURPOSE BUILDING (CONGRESSIONAL LIBRARY), BRGY. TALOLONG, LOPEZ, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱14.6M | 100% | Medium risk47 | —-0.101 |
| 123 | 21DL0017REHAB. OF WATER SUPPLY A. BRGY BULI, CALAUAG B. LUNGIB, CALAUAG C. BINUTAS, CALAUAGD. VILLA SAN ISIDRO, CALAUAG E.TINIGUIBAN, CALAUAG F. BRGY PANSOL, LOPEZ G. VERGAÑA, LOPEZ H. VEGAFLOR, LOPEZ I. VILLA AURORA, LOPEZ J. HIMBUBULO WESTE, GUINAYANGAN K. SA | Region IV-A | Quezon 4th DEO | Completed | ₱6.9M | 100% | Medium risk47 | —-0.068 |
| 124 | 23DL0167CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS, WATER SUPPLY SYSTEM 3. CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY CAGLATE, ALABAT, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱9.6M | 100% | Medium risk47 | —-0.070 |
| 125 | 23DL0169CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE/ RAIN WATER COLLECTORS, WATER SUPPLY SYSTEM 5. CONSTRUCTION OF SOLAR WATER SYSTEM, BARANGAY POBLACION, QUEZON, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱9.6M | 100% | Medium risk47 | —-0.070 |