450 projects on file, including joint ventures this contractor is part of.
Total projects
450
Total budget
₱9.2B
Average progress
96.7%
Completion rate
91.1%
Average risk score
41.5
Medium risk on average, out of 100
Flagged as unusual
15
3.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region IV-A | 431 | ₱8.6B | 41.3 | 15 | 96.5% |
| Region I | 10 | ₱413.8M | 46.2 | 0 | 100.0% |
| Region V | 6 | ₱118.6M | 50.4 | 0 | 100.0% |
| National Capital Region | 3 | ₱34.9M | 38.6 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 184 | ₱4.8B | 46.4 | 1 | 98.6% |
| Buildings and Facilities | 183 | ₱1.8B | 28.9 | 0 | 99.9% |
| Flood Control and Drainage | 32 | ₱878M | 46.8 | 0 | 93.4% |
| Water Provision and Storage | 21 | ₱289.6M | 39.0 | 0 | 100.0% |
| GAA 2025 SSP | 10 | ₱659.1M | 94.5 | 10 | 39.7% |
| GAA 2025 OO-2 | 9 | ₱188M | 88.7 | 0 | 74.2% |
| OTHER | 5 | ₱390.5M | 77.8 | 4 | 76.5% |
| GAA 2025 OO-1 | 4 | ₱228.2M | 93.0 | 0 | 85.4% |
| Bridges | 2 | ₱2.9M | 23.5 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25DL0190CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - EVACUATION CENTERS/ QUARANTINE FACILITIES/ PUBLIC HEALTH FACILITIES, CONSTRUCTION OF ALABAT DISTRICT HOSPITAL, ALABAT, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱96M | 90% | High risk96 | Flagged0.005 |
| 25DM0158CONSTRUCTION (COMPLETION) OF MUNICIPAL HALL, PITOGO, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱144M | 55% | High risk96 | Flagged0.024 |
| 25DM0151CONSTRUCTION OF MULTI-PURPOSE BUILDING, BONDOC PENINSULA DISTRICT HOSPITAL, CATANAUAN, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.5M | 25% | High risk96 | Flagged0.024 |
| 25DL0185CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF SANTA MONICA-SAN R | Region IV-A | Quezon 4th DEO | On-Going | ₱93.3M | 39% | High risk96 | Flagged0.018 |
| 25DL0191CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - EVACUATION CENTERS/ QUARANTINE FACILITIES/ PUBLIC HEALTH FACILITIES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, PHASE III, MARIA ELEAZAR DISTRICT H | Region IV-A | Quezon 4th DEO | On-Going | ₱64M | 18% | High risk95 | Flagged0.022 |
| 25DL0122CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF STA. MONICA-SAN RO | Region IV-A | Quezon 4th DEO | On-Going | ₱78.2M | 39% | High risk95 | Flagged0.017 |
| 25DL0083CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY TANAUAN, PLARIDEL, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱48.3M | 28% | High risk95 | Flagged0.014 |
| 25DM0065NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - PADRE BURGOS BY- PASS ROAD, QUEZON, PADRE BURGOS, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱94.6M | 78% | High risk95 | —-0.000 |
| 25DL0188CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION (COMPLETION) OF UNIVERSITY DORMITORY AT SOUTHERN LUZON STATE UNIVERSITY, GUMACA, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱28.7M | 54% | High risk95 | Flagged0.007 |
| 25DM0015ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - SECONDARY ROADS - GUMACA - PITOGO - MULANAY - SN NARCISO RD - K0292 + 050 - K0292+ 085, K0292 + 500 - K0292 + 545, K0292 + 630 - K0292 + 730 | Region IV-A | Quezon 3rd DEO | On-Going | ₱48.5M | 83% | High risk94 | —-0.009 |
| 25DL0171ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE, TALOLONG RIVER, LOPEZ, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱93.1M | 47% | High risk94 | —-0.015 |
| 25DM0154CONSTRUCTION OF MULTI-PURPOSE BUILDING (POLYTECHNIC UNIVERSITY OF THE PHILIPPINES) MULANAY, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱9.7M | 37% | High risk94 | Flagged0.012 |
| 25DL0120ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, GUINAYANGAN-TAGKAWAYAN DIVERSION ROAD, TAGKAWAYAN, PACKAGE B, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱46.7M | 81% | High risk93 | —-0.008 |
| 24DL0181(SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF LOPEZ-CALAUAG CIRCUMFERENTIAL ROAD (DOMINLOG-KUMALUDKUD - MANHULUGIN SECTION), CALAUAG, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱93.5M | 91% | High risk90 | Flagged0.048 |
| 24DL0182SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF AGOHO - MARILAG ROAD, CALAUAG, QUEZON (PACKAGE D) | Region IV-A | Quezon 4th DEO | On-Going | ₱93.8M | 68% | High risk90 | Flagged0.055 |
| 25DM0009ASSET PRESERVATION PROGRAM - PREVENTIVE MAINTENANCE - SECONDARY ROADS - GUMACA - PITOGO - MULANAY - SN NARCISO RD - K0225+000 - K0226+792, MACALELON, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱38.4M | 100% | High risk90 | —-0.037 |
| 25DL0145ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG CAMOHAGUIN RIVER, GUMACA, | Region IV-A | Quezon 4th DEO | On-Going | ₱4.7M | 100% | High risk89 | —-0.035 |
| 25DL0149ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE | Region IV-A | Quezon 4th DEO | On-Going | ₱28.5M | 54% | High risk88 | —-0.024 |
| 25DL0175ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL ALONG BOCBOC CREEK, LOPEZ, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱19M | 54% | High risk88 | —-0.023 |
| 25DL0172ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF PROTECTION STRUCTURE ALONG | Region IV-A | Quezon 4th DEO | On-Going | ₱9.5M | 72% | High risk88 | —-0.026 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24DL0182SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF AGOHO - MARILAG ROAD, CALAUAG, QUEZON (PACKAGE D) | Region IV-A | Quezon 4th DEO | On-Going | ₱93.8M | 68% | High risk90 | Flagged0.055 |
| 24DL0181(SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF LOPEZ-CALAUAG CIRCUMFERENTIAL ROAD (DOMINLOG-KUMALUDKUD - MANHULUGIN SECTION), CALAUAG, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱93.5M | 91% | High risk90 | Flagged0.048 |
| 25DM0151CONSTRUCTION OF MULTI-PURPOSE BUILDING, BONDOC PENINSULA DISTRICT HOSPITAL, CATANAUAN, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱93.5M | 25% | High risk96 | Flagged0.024 |
| 25DM0158CONSTRUCTION (COMPLETION) OF MUNICIPAL HALL, PITOGO, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱144M | 55% | High risk96 | Flagged0.024 |
| 25DL0103CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY BAGONG PAG-ASA, PEREZ, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱3.4M | 12% | High risk87 | Flagged0.023 |
| 25DM0160CONCRETING OF BRGY. BULO ILAYA TO BRGY. BURGOS TO BRGY. MAIROK ILAYA TO BRGY. MAIROK IBABA FMR, UNISAN, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱24.8M | 56% | High risk64 | Flagged0.022 |
| 25DL0191CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - EVACUATION CENTERS/ QUARANTINE FACILITIES/ PUBLIC HEALTH FACILITIES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, PHASE III, MARIA ELEAZAR DISTRICT H | Region IV-A | Quezon 4th DEO | On-Going | ₱64M | 18% | High risk95 | Flagged0.022 |
| 25DL0185CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF SANTA MONICA-SAN R | Region IV-A | Quezon 4th DEO | On-Going | ₱93.3M | 39% | High risk96 | Flagged0.018 |
| 25DL0122CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF STA. MONICA-SAN RO | Region IV-A | Quezon 4th DEO | On-Going | ₱78.2M | 39% | High risk95 | Flagged0.017 |
| 25DL0083CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY TANAUAN, PLARIDEL, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱48.3M | 28% | High risk95 | Flagged0.014 |
| 24DM0080CONSTRUCTION OF FLOOD CONTROL, BARANGAY 1 AND BARANGAY 5, CATANAUAN, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱101.7M | 65% | High risk79 | Flagged0.012 |
| 25DM0154CONSTRUCTION OF MULTI-PURPOSE BUILDING (POLYTECHNIC UNIVERSITY OF THE PHILIPPINES) MULANAY, QUEZON | Region IV-A | Quezon 3rd DEO | On-Going | ₱9.7M | 37% | High risk94 | Flagged0.012 |
| 25DL0188CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION (COMPLETION) OF UNIVERSITY DORMITORY AT SOUTHERN LUZON STATE UNIVERSITY, GUMACA, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱28.7M | 54% | High risk95 | Flagged0.007 |
| 25DL0190CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), BIP - EVACUATION CENTERS/ QUARANTINE FACILITIES/ PUBLIC HEALTH FACILITIES, CONSTRUCTION OF ALABAT DISTRICT HOSPITAL, ALABAT, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱96M | 90% | High risk96 | Flagged0.005 |
| 25DL0138CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT), CONSTRUCTION OF ACCESS ROAD TO MAHARLI | Region IV-A | Quezon 4th DEO | On-Going | ₱93.4M | 58% | High risk78 | Flagged0.004 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 176 | 21DP0069LOCAL PROGRAM - CONSTRUCTION OF ROAD, BARANGAY LAGUAN TO BARANGAY OPLES, LILIW, LAGUNA | Region IV-A | Laguna 3rd DEO | Completed | ₱19.6M | 100% | Medium risk46 | —-0.110 |
| 177 | 20DL0006B. ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS 1. FLOOD MANAGEMENT PROGRAM A. CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS 9. CONSTRUCTION OF PROTECTION WALL ALONG FRENZA RIVER, BRGY. MANGG | Region IV-A | Quezon 4th DEO | Completed | ₱14.2M | 100% | Medium risk46 | —-0.085 |
| 178 | 21DL0135ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION/ REHABILITATION OF FLOOD CONTROL STRUCTURES, TALOLONG RIVER | Region IV-A | Quezon 4th DEO | Completed | ₱14.3M | 100% | Medium risk46 | —-0.086 |
| 179 | 19DL0054I. OPERATIONS B. ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS 1. FLOOD MANAGEMENT PROGRAM A. CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS 1. CONSTRUCTION OF PROTECTION WORKS (SEAWALL) ALONG | Region IV-A | Quezon 4th DEO | Completed | ₱14.2M | 100% | Medium risk46 | —-0.086 |
| 180 | 19DL0050C. CONVERGENCE AND SPECIAL SUPPORT PROGRAM 1. CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS 16. ACCESS ROAD LEADING TO LIMBON LIMBON FALLS, GUMACA, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.100 |
| 181 | 25DL0170ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALO | Region IV-A | Quezon 4th DEO | On-Going | ₱9.5M | 58% | Medium risk46 | —-0.038 |
| 182 | 20DL0003B. ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS 1. FLOOD MANAGEMENT PROGRAM A. CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS 4. CONSTRUCTION OF FLOOD CONTROL ALONG BOONG RIVER, BRGY. VILLA VI | Region IV-A | Quezon 4th DEO | Completed | ₱9.5M | 100% | Medium risk46 | —-0.085 |
| 183 | 19DL0057I. OPERATIONS B. ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS 1. FLOOD MANAGEMENT PROGRAM A. CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS 4. CONSTRUCTION/ REHABILITATION OF FLOOD CONTROL STR | Region IV-A | Quezon 4th DEO | Completed | ₱9.7M | 100% | Medium risk46 | —-0.087 |
| 184 | 21DL0131ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION/ REHABILITATION OF FLOOD CONTROL STRUCTURE, BRGY. ANGELES, | Region IV-A | Quezon 4th DEO | Completed | ₱9.6M | 100% | Medium risk46 | —-0.087 |
| 185 | 21DL0136ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION/ REHABILITATION OF FLOOD CONTROL STRUCTURES ALONG MALING RI | Region IV-A | Quezon 4th DEO | Completed | ₱7.8M | 100% | Medium risk46 | —-0.087 |
| 186 | 20DL0001B. ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS 1. FLOOD MANAGEMENT PROGRAM A. CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS 1. CONSTRUCTION OF FLOOD CONTROL ALONG BOCBOC CREEK, BRGY. BOCBOC, | Region IV-A | Quezon 4th DEO | Completed | ₱19.6M | 100% | Medium risk46 | —-0.086 |
| 187 | 23DM0067CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG AGDANGAN RIVER, AGDANGAN, QUEZON | Region IV-A | Quezon 3rd DEO | Completed | ₱24.8M | 100% | Medium risk46 | —-0.086 |
| 188 | 20DL0009B. ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS 1. FLOOD MANAGEMENT PROGRAM A. CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS 12. CONSTRUCTION OF FLOOD CONTROL ALONG ILOSONG RIVER, PLARIDEL, Q | Region IV-A | Quezon 4th DEO | Completed | ₱23.6M | 100% | Medium risk46 | —-0.086 |
| 189 | 19DL0045C. CONVERGENCE AND SPECIAL SUPPORT PROGRAM 1. CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS 11. ACCESS ROAD LEADING TO BOSQUE CAVE, GUMACA, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.100 |
| 190 | 20DL0042C. CONVERGENCE AND SPECIAL SUPPORT PROGRAM 3. CONSTRUCTION / IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES, AND ECONOMIC ZONES 10. BARANGAYS PAGSABANGAN-VILLA FUERTE ACCESS ROAD IN SUPPORT OF AGRI-BASED INDUSTRIES, GUMACA, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.102 |
| 191 | 19DL0061I. OPERATIONS B. ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS 1. FLOOD MANAGEMENT PROGRAM A. CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS 8. CONSTRUCTION OF FLOOD CONTROL ALONG CAGLATE RIVER | Region IV-A | Quezon 4th DEO | Completed | ₱19.1M | 100% | Medium risk46 | —-0.087 |
| 192 | 19DL0009C. CONVERGENCE AND SPECIAL SUPPORT PROGRAM 4. CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE IN SUPPORT OF NATIONAL SECURITY 2. ACCESS ROAD LEADING TO MILITARY CAMP (201ST INFANTRY KABALIKAT BRIGADE) BRGY. RIZAL ILAYA, CALAUAG, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱14.5M | 100% | Medium risk46 | —-0.105 |
| 193 | 19DL0043C. CONVERGENCE AND SPECIAL SUPPORT PROGRAM 1. CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS 9. ACCESS ROAD LEADING TO INACLAGAN FALLS, GUMACA, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.101 |
| 194 | 20DL0173LOCAL PROGRAM, CONST. / REPAIR / REHAB. / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, LOCAL ROADS AND BRIDGES, LOCAL ROADS 1. CONSTRUCTION OF SAN RAFAEL-INALIG-MATANAG ROAD, ATIMONAN, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱4.8M | 100% | Medium risk46 | —-0.103 |
| 195 | 21DL0071LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, CONSTRUCTION OF LOCAL ROAD, BARANGAY KATANGTANG-BAGONG SILANG-DANLAGAN CABAYAO, CALAUAG, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱14.5M | 100% | Medium risk46 | —-0.106 |
| 196 | 21DL0111ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/ RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - PRIMARY ROADS, DAANG MAHARLIKA (LZ) - K0189+400 - K0189+480 | Region IV-A | Quezon 4th DEO | Completed | ₱14.6M | 100% | Medium risk46 | —-0.108 |
| 197 | 21DL0067LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, BUILDING AND OTHER STRUCTURES, MULTIPURPOSE / FACILITIES, CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY STA. ROSA, LOPEZ, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱4.9M | 100% | Medium risk46 | —-0.102 |
| 198 | 25DL0159ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF SEAWALL IN BARANGAY VILLA MANZANO NORTE, PEREZ, QUEZON | Region IV-A | Quezon 4th DEO | On-Going | ₱4.7M | 100% | Medium risk46 | —-0.056 |
| 199 | 20A00152CONSTRUCTION/ REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - CONSTRUCTION OF RIVERBANK PROTECTION ALONG AGNO RIVER BASIN AT BRGY. PANACOL, AGUILAR, PANGASINAN | Region I | Region I | Completed | ₱43.4M | 100% | Medium risk46 | —-0.072 |
| 200 | 18DL0158C. CONVERGENCE AND SPECIAL SUPPORT PROGRAM 1. CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS 2. ACCESS ROAD LEADING TO INACLAGAN FALLS, BRGY. INACLAGAN, GUMACA, QUEZON | Region IV-A | Quezon 4th DEO | Completed | ₱14.3M | 100% | Medium risk46 | —-0.106 |