Contractor dossier
450 projects on file, including joint ventures this contractor is part of.
Total projects
450
Total budget
₱28.3B
Average progress
97.0%
Completion rate
81.1%
Average risk score
51.0
Medium risk on average, out of 100
Flagged as unusual
24
5.3% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 205 | ₱12.5B | 45.2 | 6 | 98.0% |
| Region XI | 163 | ₱11.7B | 55.6 | 14 | 95.7% |
| Region IV-A | 31 | ₱2.1B | 58.0 | 0 | 99.0% |
| National Capital Region | 27 | ₱805.5M | 48.9 | 0 | 100.0% |
| Region I | 11 | ₱569.5M | 67.2 | 3 | 82.9% |
| Region V | 9 | ₱258.8M | 51.5 | 0 | 100.0% |
| Central Office | 2 | ₱259.2M | 71.5 | 0 | 100.0% |
| Region X | 1 | ₱47.5M | 95.4 | 1 | 90.0% |
| Region II | 1 | ₱102.8M | 59.3 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 255 | ₱17.4B | 52.1 | 5 | 98.0% |
| Flood Control and Drainage | 79 | ₱4.7B | 47.9 | 1 | 97.9% |
| Buildings and Facilities | 50 | ₱1.2B | 39.5 | 1 | 99.2% |
| Bridges | 34 | ₱2B | 44.3 | 1 | 94.0% |
| OTHER | 21 | ₱1.7B | 71.2 | 10 | 91.9% |
| GAA 2025 OO-2 | 4 | ₱527.7M | 92.5 | 2 | 70.6% |
| Bridges, Roads | 3 | ₱456.9M | 66.3 | 0 | 100.0% |
| GAA 2025 OO-1 | 2 | ₱191.1M | 94.3 | 2 | 57.4% |
| GAA 2025 SSP | 1 | ₱47.5M | 95.4 | 1 | 90.0% |
| Water Provision and Storage | 1 | ₱49M | 51.6 | 1 | 76.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25KA0087INSTALLATION OF ROAD SAFETY DEVICES ALONG SAYRE HIGHWAY- K1522+000 - K1525+207BRGY. CABANGAHAN - BRGY. BANGCUD, MALAYBALAY CITY, BUKIDNON 2ND LD | Region X | Bukidnon 1st DEO | On-Going | ₱47.5M | 90% | High risk95 | Flagged0.001 |
| 25LD0203PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY- DAVAO- COTABATO ROAD (JCT. DIGOS- COTABATO SECTION)- K1572+000-K1573+032, K1575+322-K1575+565, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱95.5M | 84% | High risk95 | Flagged0.012 |
| 25LG0081CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE- PRES. DIOSDADO P. MACAPAGAL NATL HI-WAY- K1731 + 000 - K1739 +000 | Region XI | Davao Oriental 2nd DEO | On-Going | ₱95.5M | 31% | High risk94 | Flagged0.035 |
| 25LF0102CONSTRUCTION OF FLOOD CONTROL ALONG CATEEL RIVER (TINA SECTION, SAN RAFAEL) CATEEL, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | On-Going | ₱143.2M | 40% | High risk93 | Flagged0.023 |
| 25LI0001CONSTRUCTION OF REVETMENT ALONG AGUSAN RIVER, LOWER MAPAWA BRIDGE UPSTREAM, BARANGAY MAPAWA, MARAGUSAN, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱143.3M | 73% | High risk93 | Flagged0.012 |
| 25CF0002FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG PEÑARANDA RIVER (PHASE 1), BARANGAY PAMBUAN, GAPAN CITY, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | On-Going | ₱96.5M | 75% | High risk92 | —-0.011 |
| 25CE0108CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PAMPANGA RIVER, BARANGAY POBLACION NORTE, MUNICIPALITY OF RIZAL, NUEVA ECIJA | Region III | Nueva Ecija 1st DEO | On-Going | ₱144.7M | 95% | High risk91 | —-0.006 |
| 24AA0491IMPLEMENTATION AND MONITORING OF PAMANA PROJECT - CONSTRUCTION/CONCRETING OF PASUQUIN-TADAO-BANGUI-DADAOR LOCAL ACCESS ROAD IN PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱152.8M | 38% | High risk87 | Flagged0.089 |
| 25CL0048CONSTRUCTION OF SLOPE PROTECTION STRUCTURE ALONG GABOR RIVER (SOUTH SIDE), PHASE 1, SAN FELIPE, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱142.7M | 100% | High risk81 | —-0.013 |
| 24CL0002FLOOD CONTROL WORKS ALONG BANCAL - SAN ISIDRO - MAMBOG RIVER (PHASE I), TOTUN LANUM, BARANGAY MAMBOG, BOTOLAN, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱95.4M | 100% | High risk81 | —-0.045 |
| 25CL0001CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE STRUCTURE (FCDS) ALONG BANCAL-SAN ISIDRO-MAMBOG RIVER, SECTION 1, BOTOLAN, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱95.2M | 89% | High risk81 | —-0.017 |
| 24CL0003FLOOD CONTROL WORKS ALONG BANCAL - SAN ISIDRO - MAMBOG RIVER (PHASE I), TOTUN LANUM, BARANGAY SAN ISIDRO. BOTOLAN, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱96M | 100% | High risk81 | —-0.045 |
| 24LI0126ASSET PRESERVATION - REHABILATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - BENIGNO S. AQUINO JR. NATIONAL HIGHWAY K 1414+267 - K1414+309, K1414+837 - K1414+847, K1417+000 - K1422+204 | Region XI | Davao de Oro 2nd DEO | On-Going | ₱143.3M | 74% | High risk80 | Flagged0.035 |
| 24CL0017CONSTRUCTION OF FLOOD MITIGATION FACILITY OF BALILI-TAMBAK RIVER (PHASE II), PALANGINAN, IBA, ZAMBALES | Region III | Zambales 1st DEO | Completed | ₱96.5M | 100% | High risk80 | —-0.044 |
| 24CF0128SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ELISEO TRINIDAD ANGELES BRIDGE ALONG PAMPANGA RIVER (PHASE III), S | Region III | Nueva Ecija 2nd DEO | On-Going | ₱190.1M | 98% | High risk80 | Flagged0.010 |
| 24L00140PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - DAVAO - COTABATO RD (DAVAO CITY - JCT. DIGOS SECT) - K1526 + 385 - K1527 + 418, DAVAO CITY | Region XI | Region XI | On-Going | ₱95.5M | 99% | High risk80 | Flagged0.013 |
| 24L00141PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - DAVAO - COTABATO RD (DAVAO CITY - JCT. DIGOS SECT) - (S00160MN) K1527 + 418 - K1527 + 813, K1528 + 053 - K1528 + 719, (S00098MN) CHAINAGE 0 - CHAINAGE 95, DAVAO CITY | Region XI | Region XI | On-Going | ₱95.5M | 99% | High risk80 | Flagged0.013 |
| 24L00208PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - DIGOS - MAKAR RD - K1581 + 011 - K1584 + 066, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱95.8M | 98% | High risk80 | Flagged0.014 |
| 24LI0125ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - BENIGNO S. AQUINO JR. NATIONAL HIGHWAY- K1422+204-K1425+000 | Region XI | Davao de Oro 2nd DEO | On-Going | ₱107.4M | 67% | High risk79 | Flagged0.030 |
| 24LI0121PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - MONTEVISTA - COMPOSTELA - MATI BDRY. RD K1428+000 - K1432+070, K1432+215 - K1434+000, K1478+794 - K1479+555, K1479+588 - K1481+062 (SECTION 1) | Region XI | Davao de Oro 2nd DEO | Completed | ₱144.7M | 100% | High risk79 | Flagged0.002 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24AA0491IMPLEMENTATION AND MONITORING OF PAMANA PROJECT - CONSTRUCTION/CONCRETING OF PASUQUIN-TADAO-BANGUI-DADAOR LOCAL ACCESS ROAD IN PASUQUIN, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱152.8M | 38% | High risk87 | Flagged0.089 |
| 24AA0493IMPLEMENTATION AND MONITORING OF PAMANA PROJECT - CONSTRUCTION OF BRIDGE, BRGY. ESTANCIA, PIDDIG, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱39M | 11% | High risk74 | Flagged0.055 |
| 23CL0163CONSTRUCTION OF ACCESS ROAD/DIVERSION ROAD DAANG KALIKASAN TO UACON P1, CANDELARIA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱94.6M | 100% | High risk77 | Flagged0.040 |
| 23CL0164CONSTRUCTION OF ACCESS ROAD/DIVERSION ROAD DAANG KALIKASAN TO UACON P2, CANDELARIA, ZAMBALES | Region III | Zambales 1st DEO | On-Going | ₱94.6M | 100% | High risk76 | Flagged0.037 |
| 25LG0081CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE- PRES. DIOSDADO P. MACAPAGAL NATL HI-WAY- K1731 + 000 - K1739 +000 | Region XI | Davao Oriental 2nd DEO | On-Going | ₱95.5M | 31% | High risk94 | Flagged0.035 |
| 24LI0126ASSET PRESERVATION - REHABILATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - BENIGNO S. AQUINO JR. NATIONAL HIGHWAY K 1414+267 - K1414+309, K1414+837 - K1414+847, K1417+000 - K1422+204 | Region XI | Davao de Oro 2nd DEO | On-Going | ₱143.3M | 74% | High risk80 | Flagged0.035 |
| 24LI0125ASSET PRESERVATION - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - BENIGNO S. AQUINO JR. NATIONAL HIGHWAY- K1422+204-K1425+000 | Region XI | Davao de Oro 2nd DEO | On-Going | ₱107.4M | 67% | High risk79 | Flagged0.030 |
| 23LA0119ASSET PRESERVATION - PREVENTIVE MAINTENANCE- PRIMARY ROADS, DAANG MAHARLIKA (S00126MN), K1431+818.000 - K1433+679.000 | Region XI | Davao de Oro 1st DEO | On-Going | ₱94.7M | 97% | High risk64 | Flagged0.030 |
| 23AA0497CONSTRUCTION OF SEAWALL ALONG PASALENG BAY, BRGY. PASALENG, PAGUDPUD, ILOCOS NORTE | Region I | Ilocos Norte 1st DEO | On-Going | ₱45.7M | 100% | High risk71 | Flagged0.025 |
| 24C00615STATE UNIVERSITIES AND COLLEGES (SUCS)-CONSTRUCTION OF MULTI-PURPOSE BUILDING, PRESIDENT RAMON MAGSAYSAY STATE UNIVERSITY, IBA, ZAMBALES, PROVINCE OF ZAMBALES | Region III | Region III | On-Going | ₱49.3M | 60% | High risk62 | Flagged0.023 |
| 25LF0102CONSTRUCTION OF FLOOD CONTROL ALONG CATEEL RIVER (TINA SECTION, SAN RAFAEL) CATEEL, DAVAO ORIENTAL | Region XI | Davao Oriental 1st DEO | On-Going | ₱143.2M | 40% | High risk93 | Flagged0.023 |
| 24L00231INSTALLATION OF SOLAR LIGHTS ALONG TAGUM-PANABO CIRCUM RD. K1510+000 - K1514+000 | Region XI | Region XI | On-Going | ₱47.8M | 69% | High risk76 | Flagged0.018 |
| 24LC0066TAGUM CITY DIVERSION ROAD K1455+(-573) - K1456+135, K1461+090 - K1461+115, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | On-Going | ₱88.5M | 87% | High risk77 | Flagged0.018 |
| 24L00208PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - DIGOS - MAKAR RD - K1581 + 011 - K1584 + 066, DAVAO DEL SUR | Region XI | Region XI | On-Going | ₱95.8M | 98% | High risk80 | Flagged0.014 |
| 24L00140PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - DAVAO - COTABATO RD (DAVAO CITY - JCT. DIGOS SECT) - K1526 + 385 - K1527 + 418, DAVAO CITY | Region XI | Region XI | On-Going | ₱95.5M | 99% | High risk80 | Flagged0.013 |
| 24L00141PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY - DAVAO - COTABATO RD (DAVAO CITY - JCT. DIGOS SECT) - (S00160MN) K1527 + 418 - K1527 + 813, K1528 + 053 - K1528 + 719, (S00098MN) CHAINAGE 0 - CHAINAGE 95, DAVAO CITY | Region XI | Region XI | On-Going | ₱95.5M | 99% | High risk80 | Flagged0.013 |
| 25LI0001CONSTRUCTION OF REVETMENT ALONG AGUSAN RIVER, LOWER MAPAWA BRIDGE UPSTREAM, BARANGAY MAPAWA, MARAGUSAN, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | On-Going | ₱143.3M | 73% | High risk93 | Flagged0.012 |
| 25LD0203PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY- DAVAO- COTABATO ROAD (JCT. DIGOS- COTABATO SECTION)- K1572+000-K1573+032, K1575+322-K1575+565, DAVAO DEL SUR | Region XI | Davao del Sur DEO | On-Going | ₱95.5M | 84% | High risk95 | Flagged0.012 |
| 24CF0128SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ELISEO TRINIDAD ANGELES BRIDGE ALONG PAMPANGA RIVER (PHASE III), S | Region III | Nueva Ecija 2nd DEO | On-Going | ₱190.1M | 98% | High risk80 | Flagged0.010 |
| 24CD0306ASSET PRESERVATION PROGRAM PREVENTIVE MAINTENANCE PRIMARY ROADS ASHPHALT OVERLAY ALONG GEN. ALEJO SANTOS HIGHWAY K0069+484 K0071+471 NORZAGARAY, BULACAN | Region III | Bulacan 2nd DEO | Completed | ₱93.6M | 100% | High risk70 | Flagged0.005 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 201 | 20OF0236CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. PROJECT 6 (VETERANS MEMORIAL MEDICAL CENTER), QUEZON CITY | National Capital Region | Quezon City 1st DEO | Completed | ₱28.8M | 100% | Medium risk52 | —-0.087 |
| 202 | 23LA0081CONSTRUCTION OF WATER SUPPLY SYSTEM - LEVEL II, PANTUKAN, DAVAO DE ORO | Region XI | Davao de Oro 1st DEO | On-Going | ₱49M | 76% | Medium risk52 | Flagged0.003 |
| 203 | 24C00029ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS, DAANG MAHARLIKA (LZ), PROVINCE OF NUEVA ECIJA | Region III | Region III | Completed | ₱188.6M | 100% | Medium risk52 | —-0.073 |
| 204 | 24L00232INSTALLATION OF SOLAR LIGHTS ALONG TAGUM-PANABO CIRCUM RD. K1514+000 - K1518+000 | Region XI | Region XI | On-Going | ₱47.8M | 91% | Medium risk52 | —-0.050 |
| 205 | 22LC0039CONSTRUCTION OF SAUG RIVER FLOOD CONTROL, ASUNCION, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱86.9M | 100% | Medium risk52 | —-0.061 |
| 206 | 23LH0054PREVENTIVE MAINTENANCE (ASPHALT OVERLAY) ALONG DAVAO-COTABATO OLD RD- K1526+301-K1526+576, K1529+(-721)-K1529+831, TORIL DISTRICT, DAVAO CITY | Region XI | Davao City 2nd DEO | Completed | ₱49M | 100% | Medium risk52 | —-0.089 |
| 207 | 21LC0049DAANG MAHARLIKA (MN) - K1478+392, DAVAO DEL NORTE | Region XI | Davao del Norte DEO | Completed | ₱47.6M | 100% | Medium risk52 | —-0.082 |
| 208 | 24LB0073INSTALLATION OF ROAD SAFETY FACILITIES (SOLAR STREET LIGHTS), SITIO SALUKADANG GOING TO SITIO BANBAN, BARANGAY MAPULA, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.091 |
| 209 | 20O00078RETROFITTING/ STRENGTHENING OF PUBLIC BUILDINGS, NATIONAL CAPITAL REGION - BAGONG BUHAY BUILDING, F. MA. GUERRERO ELEMENTARY SCHOOL, PEDRO GIL, PACO MANILA | National Capital Region | National Capital Region | Completed | ₱34.8M | 100% | Medium risk51 | —-0.095 |
| 210 | 20O00087RETROFITTING/ STRENGTHENING OF PUBLIC BUILDINGS, NATIONAL CAPITAL REGION - BAGONG PAG-ASA BUILDING, F. MA. GUERRERO ELEMENTARY SCHOOL, PEDRO GIL, PACO, MANILA | National Capital Region | National Capital Region | Completed | ₱32.3M | 100% | Medium risk51 | —-0.095 |
| 211 | 18FG0027CONSTRUCTION OF REVETMENT AND CHANNEL IMPROVEMENT, CRISTO REY RIVER, BATO, CAMARINES SUR | Region V | Camarines Sur 5th DEO | Completed | ₱37.2M | 100% | Medium risk51 | —-0.086 |
| 212 | 24LH0080INSTALLATION OF ROAD SAFETY DEVICES ALONG DAVAO-BUKIDNON RD- K1624+724-K1625+321, K1625+773-K1626+231, K1626+750-K1627+168, K1627+558-K1627+781, MARILOG DISTRICT, DAVAO CITY | Region XI | Davao City 2nd DEO | On-Going | ₱47.8M | 98% | Medium risk51 | —-0.053 |
| 213 | 24LB0072INSTALLATION OF ROAD SAFETY FACILITIES (SOLAR STREET LIGHTS), SITIO DAMILAG, BARANGAY MAPULA, DAVAO CITY | Region XI | Davao City DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.091 |
| 214 | 22DO0053ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS - JCT BATASAN - SAN MATEO - RODRIGUEZ BYPASS LINK ROAD, RIZAL | Region IV-A | Rizal 2nd DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.103 |
| 215 | 24CI0057SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG); ACCESS ROADS AND/OR BRIDGE FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES: IMPROVEMENT OF ROAD CONNECTING TO NATIONAL ROADS AT ANGELES CITY, PAMPANGA | Region III | Pampanga 3rd DEO | Completed | ₱96.5M | 100% | Medium risk51 | —-0.090 |
| 216 | 24LA0063INSTALLATION OF ROAD SAFETY FACILITIES ALONG MAINIT PARK RD (S00137MN) K1426 + 227 - K1429 + 350 | Region XI | Davao de Oro 1st DEO | On-Going | ₱47.8M | 89% | Medium risk51 | —-0.043 |
| 217 | 24LA0064INSTALLATION OF ROAD SAFETY FACILITIES ALONG MAINIT PARK RD (S00137MN) K1430 + 392 - K1433 + 360 | Region XI | Davao de Oro 1st DEO | On-Going | ₱47.8M | 98% | Medium risk51 | —-0.046 |
| 218 | 23L00148TAGUM - PANABO CIRCUM. RD. - K1492+313 - K1493+316 | Region XI | Region XI | Completed | ₱48.2M | 100% | Medium risk51 | —-0.089 |
| 219 | 24CI0058SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG); ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATIGIC PUBLIC BUILDINGS/FACILITIES: IMPROVEMENT OF ROAD CONNECTING TO NATIONAL ROADS AT MABALACAT CITY, PAMPANGA | Region III | Pampanga 3rd DEO | Completed | ₱96.5M | 100% | Medium risk51 | —-0.091 |
| 220 | 23LI0084INSTALLATION OF HAZARD MARKERS (CHEVRON) & SAFETY ROLLER BARRIER SYSTEM ALONG MONTEVISTA-COMPOSTELA-MATI BDRY RD-K1453+000+K1493+480 (INTERMITTENT SECTION), MARAGUSAN, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.079 |
| 221 | 19DF0123LOCALPROGRAM -CONSTRUCTION/REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, LOCAL ROADS AND BRIDGES, LOCAL ROADS - ROAD WIDENING/CONCRETING OF TANZA, TRECE MARTIRES CITY ROAD, TANZA, CAVITE | Region IV-A | Cavite 1st DEO | Completed | ₱49M | 100% | Medium risk51 | —-0.103 |
| 222 | 17L00037WIDENING (4 INTO 6 LANES) INCL. REHAB./RECONST./UPGRADING (ASPHALT TO CONCRETE) DAMAGED PAVED NAT'L. | Region XI | Region XI | Completed | ₱175.6M | 100% | Medium risk50 | —-0.025 |
| 223 | 24CK0100ASSET PRESERVATION PROGRAM: PREVENTIVE MAINTENANCE - SECONDARY ROADS - CONCEPCION - CAPAS ROAD - K0113+993 - K0115+783, CONCEPCION, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱96.5M | 100% | Medium risk50 | —-0.091 |
| 224 | 20LC0008SURIGAO-DAVAO COASTAL ROAD K1826+683.72 | Region XI | Davao del Norte DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.085 |
| 225 | 23LI0068INSTALLATION OF HAZARD MARKERS (CHEVRON) & SAFETY ROLLER BARRIER SYSTEM ALONG MONTEVISTA-COMPOSTELA-MATI BDRY RD - K1428+342 - K1453+000 (INTERMITTENT SECTION), COMPOSTELA, DAVAO DE ORO | Region XI | Davao de Oro 2nd DEO | Completed | ₱49M | 100% | Medium risk50 | —-0.078 |