Contractor dossier
34 projects on file, including joint ventures this contractor is part of.
Total projects
34
Total budget
₱6.1B
Average progress
97.6%
Completion rate
82.4%
Average risk score
58.6
Medium risk on average, out of 100
Flagged as unusual
8
23.5% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region II | 19 | ₱3B | 61.6 | 4 | 97.3% |
| Central Office | 4 | ₱1.3B | 65.3 | 1 | 92.9% |
| Region XII | 4 | ₱483.8M | 33.4 | 1 | 100.0% |
| Region IX | 3 | ₱462.4M | 63.5 | 0 | 100.0% |
| Region XI | 2 | ₱712.9M | 64.8 | 2 | 98.6% |
| Cordillera Administrative Region | 1 | ₱91.1M | 57.9 | 0 | 100.0% |
| Region XIII | 1 | ₱98.9M | 49.2 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Bridges | 16 | ₱3B | 59.4 | 4 | 98.2% |
| Roads | 9 | ₱1.3B | 54.2 | 1 | 99.7% |
| Flood Control and Drainage | 5 | ₱277.4M | 48.2 | 0 | 100.0% |
| OTHER | 2 | ₱607.7M | 78.9 | 1 | 92.2% |
| GAA 2025 OO-1 | 1 | ₱282.8M | 91.8 | 1 | 64.2% |
| Bridges, Roads | 1 | ₱714M | 63.0 | 1 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25B00029OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - CONSTRUCTION OF NEW BRIDGES - CLAVERIA VIADUCT ALONG MAHARLIKA NORTH RD | Region II | Region II | On-Going | ₱282.8M | 64% | High risk92 | Flagged0.041 |
| 20B00028ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT: CONSTRUCTION OF BY-PASS ROAD, PACKAGE 2, ISABELA (GOV. DY BRIDGE) | Region II | Region II | On-Going | ₱579.2M | 84% | High risk83 | Flagged0.062 |
| 16B00060BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP) 1 DESIGN AND BUILD BRIDGES FOR LUZON, DIDUNGO BRIDGE AND APPROACHES PHASE II INCLUDING RIGHT-OF-WAY ACQUISITION ALONG NRJ, VILLA SUR-SAN PEDRO-CABUAN-YSMAEL, DISIMUNGAL, QUIRINO | Region II | Region II | Completed | ₱28.5M | 100% | High risk75 | —-0.021 |
| 17BD0025MF02: CONSTRUCTION OF FLOOD CONTROL SYSTEM, SAN VICENTE, IGUIG, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱68.8M | 100% | High risk71 | —-0.035 |
| 18J00130CONST./REPAIR/REHAB./IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - NATIONAL ROADS AND BRIDGES - NATIONAL ROADS - IMPROVEMENT/REBLOCKING OF BONGAO - NALIL NATIONAL ROAD, BONGAO | Region IX | Region IX | Completed | ₱312.3M | 100% | High risk70 | —-0.039 |
| 16Z00009BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP) I, DESIGN AND BUILD BRIDGES IN LUZON CONTRACT PACKAGE 1B | Central Office | Bridges Management Cluster | Completed | ₱690.4M | 100% | High risk70 | Flagged0.021 |
| 23B00040OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - RETROFITTING/STRENGTHENING: CABAGAN - STA. MARIA BRIDGE (B03236LZ) ALONG CABAGAN -STA. MARIA ROAD | Region II | Region II | Completed | ₱274.8M | 100% | High risk68 | —-0.004 |
| 19B00045LOCAL PROGRAM-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES INCLUDING LOCAL PROJECTS-CONSTRUCTION (COMPLETION) OF CABAGAN-STA. MARIA BRIDGE ALONG CABAGAN-STA. MARIA ROAD, ISABELA 1ST DISTRICT | Region II | Region II | Completed | ₱149.3M | 100% | High risk68 | —-0.015 |
| 17J00074ROAD WIDENING OF LANAO-PAGADIAN-ZAMBOANGA CITY ROAD, ZAMBOANGA SIBUGAY 1ST DEO, K 1733+426.00 - K 1734+474.00, K 1734+474.00 - K 1734+918.00, K 1736+463.00 - K 1737+500.00, K 1747+060.00 - K1748+680.00, K 1750+800.00 - K1751+660.00, NET LENGTH: 4,997.00 L | Region IX | Region IX | Completed | ₱126.2M | 100% | High risk67 | —-0.037 |
| 17B00060ASSET PRESERVATION CONTRACT-PREVENTIVE MAINTENANCE (APC) COMPONENT, JICA LOAN AGREEMENT NO. PH-247 PM 01: CABAGAN-SAN PABLO ROAD SECTION (DAANG MAHARLIKA), K0444+000.00 TO K0460+752.00 W/ EXCEPTIONS, CABAGAN-SAN PABLO, ISABELA | Central Office | Roads Management Cluster I (Bilateral) | Completed | ₱206.6M | 100% | High risk66 | —-0.050 |
| 23B00080OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES, PROVINCES OF CAGAYAN AND ISABELA | Central Office | Bridges Management Cluster | On-Going | ₱415.4M | 72% | High risk66 | —-0.005 |
| 20L00164CONSTRUCTION OF ASPHALT ROAD - DAVAO CITY COASTAL BYPASS ROAD (BAGO APLAYA - TIMES BEACH - ROXAS AVENUE), PACKAGE 27, DAVAO CITY | Region XI | Region XI | On-Going | ₱380.1M | 97% | High risk66 | Flagged0.019 |
| 24B00084ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - CABAGAN-STA. MARIA BRIDGE (B03236LZ) ALONG CABAGAN-STA MARIA RD | Region II | Region II | On-Going | ₱115.8M | 100% | High risk65 | —-0.011 |
| 18L00093WIDENING (2 INTO 4 LANES) OF MANIKI BRIDGE (B00182MN) & APPROACHES ALONG TAGUM-PANABO CIRC. RD INCL | Region XI | Region XI | Completed | ₱332.8M | 100% | High risk64 | Flagged0.012 |
| 20BF0067BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - MALLIG BRIDGE (B01158LZ) ALONG SANTIAGO -TUGUEGARAO ROAD, MALLIG, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱212M | 100% | High risk64 | Flagged0.010 |
| 21BD0111CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - ACCESS ROAD LEADING TO CALLAO CAVES TOURISM ZONE (TAWI-CALLAO ROAD), BRGY. PATAGUELEG, PEÑABLANCA, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱94.6M | 100% | High risk64 | —-0.028 |
| 22B00029OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE - REPLACEMENT OF PERMANENT WEAK BRIDGES - ITAWES BRIDGE (B04245LZ) ALONG CAGAYAN-APAYAO ROAD | Region II | Region II | Completed | ₱115.7M | 100% | High risk63 | —-0.023 |
| 18B00055OO 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEV'T - CONST'N OF MISSING LINKS/NEW ROADS: JCT. DELFIN ALBANO ROAD, INCLUDING BRIDGE (CANSAN-BAGUTARI BRIDGE), ISABELA, ISABELA 1ST DISTRICT | Region II | Region II | Completed | ₱714M | 100% | High risk63 | Flagged0.007 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 20B00028ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT: CONSTRUCTION OF BY-PASS ROAD, PACKAGE 2, ISABELA (GOV. DY BRIDGE) | Region II | Region II | On-Going | ₱579.2M | 84% | High risk83 | Flagged0.062 |
| 25B00029OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - CONSTRUCTION OF NEW BRIDGES - CLAVERIA VIADUCT ALONG MAHARLIKA NORTH RD | Region II | Region II | On-Going | ₱282.8M | 64% | High risk92 | Flagged0.041 |
| 16M00039CONSTRUCTION OF PINGUIAMAN BRIDGE II ALONG DULAWAN-MARBEL ROAD, K1744+200 TO K1745+168, EXCEPTION K1744+400+K1745+500 (BRIDGE), LAMBAYONG, SULTAN KUDARAT | Region XII | Region XII | Completed | ₱362M | 100% | Medium risk51 | Flagged0.026 |
| 16Z00009BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP) I, DESIGN AND BUILD BRIDGES IN LUZON CONTRACT PACKAGE 1B | Central Office | Bridges Management Cluster | Completed | ₱690.4M | 100% | High risk70 | Flagged0.021 |
| 20L00164CONSTRUCTION OF ASPHALT ROAD - DAVAO CITY COASTAL BYPASS ROAD (BAGO APLAYA - TIMES BEACH - ROXAS AVENUE), PACKAGE 27, DAVAO CITY | Region XI | Region XI | On-Going | ₱380.1M | 97% | High risk66 | Flagged0.019 |
| 18L00093WIDENING (2 INTO 4 LANES) OF MANIKI BRIDGE (B00182MN) & APPROACHES ALONG TAGUM-PANABO CIRC. RD INCL | Region XI | Region XI | Completed | ₱332.8M | 100% | High risk64 | Flagged0.012 |
| 20BF0067BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - MALLIG BRIDGE (B01158LZ) ALONG SANTIAGO -TUGUEGARAO ROAD, MALLIG, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱212M | 100% | High risk64 | Flagged0.010 |
| 18B00055OO 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEV'T - CONST'N OF MISSING LINKS/NEW ROADS: JCT. DELFIN ALBANO ROAD, INCLUDING BRIDGE (CANSAN-BAGUTARI BRIDGE), ISABELA, ISABELA 1ST DISTRICT | Region II | Region II | Completed | ₱714M | 100% | High risk63 | Flagged0.007 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25B00029OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - CONSTRUCTION OF NEW BRIDGES - CLAVERIA VIADUCT ALONG MAHARLIKA NORTH RD | Region II | Region II | On-Going | ₱282.8M | 64% | High risk92 | Flagged0.041 |
| 2 | 20B00028ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT: CONSTRUCTION OF BY-PASS ROAD, PACKAGE 2, ISABELA (GOV. DY BRIDGE) | Region II | Region II | On-Going | ₱579.2M | 84% | High risk83 | Flagged0.062 |
| 3 | 16B00060BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP) 1 DESIGN AND BUILD BRIDGES FOR LUZON, DIDUNGO BRIDGE AND APPROACHES PHASE II INCLUDING RIGHT-OF-WAY ACQUISITION ALONG NRJ, VILLA SUR-SAN PEDRO-CABUAN-YSMAEL, DISIMUNGAL, QUIRINO | Region II | Region II | Completed | ₱28.5M | 100% | High risk75 | —-0.021 |
| 4 | 17BD0025MF02: CONSTRUCTION OF FLOOD CONTROL SYSTEM, SAN VICENTE, IGUIG, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱68.8M | 100% | High risk71 | —-0.035 |
| 5 | 18J00130CONST./REPAIR/REHAB./IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS - NATIONAL ROADS AND BRIDGES - NATIONAL ROADS - IMPROVEMENT/REBLOCKING OF BONGAO - NALIL NATIONAL ROAD, BONGAO | Region IX | Region IX | Completed | ₱312.3M | 100% | High risk70 | —-0.039 |
| 6 | 16Z00009BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP) I, DESIGN AND BUILD BRIDGES IN LUZON CONTRACT PACKAGE 1B | Central Office | Bridges Management Cluster | Completed | ₱690.4M | 100% | High risk70 | Flagged0.021 |
| 7 | 23B00040OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - RETROFITTING/STRENGTHENING: CABAGAN - STA. MARIA BRIDGE (B03236LZ) ALONG CABAGAN -STA. MARIA ROAD | Region II | Region II | Completed | ₱274.8M | 100% | High risk68 | —-0.004 |
| 8 | 19B00045LOCAL PROGRAM-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURES INCLUDING LOCAL PROJECTS-CONSTRUCTION (COMPLETION) OF CABAGAN-STA. MARIA BRIDGE ALONG CABAGAN-STA. MARIA ROAD, ISABELA 1ST DISTRICT | Region II | Region II | Completed | ₱149.3M | 100% | High risk68 | —-0.015 |
| 9 | 17J00074ROAD WIDENING OF LANAO-PAGADIAN-ZAMBOANGA CITY ROAD, ZAMBOANGA SIBUGAY 1ST DEO, K 1733+426.00 - K 1734+474.00, K 1734+474.00 - K 1734+918.00, K 1736+463.00 - K 1737+500.00, K 1747+060.00 - K1748+680.00, K 1750+800.00 - K1751+660.00, NET LENGTH: 4,997.00 L | Region IX | Region IX | Completed | ₱126.2M | 100% | High risk67 | —-0.037 |
| 10 | 17B00060ASSET PRESERVATION CONTRACT-PREVENTIVE MAINTENANCE (APC) COMPONENT, JICA LOAN AGREEMENT NO. PH-247 PM 01: CABAGAN-SAN PABLO ROAD SECTION (DAANG MAHARLIKA), K0444+000.00 TO K0460+752.00 W/ EXCEPTIONS, CABAGAN-SAN PABLO, ISABELA | Central Office | Roads Management Cluster I (Bilateral) | Completed | ₱206.6M | 100% | High risk66 | —-0.050 |
| 11 | 23B00080OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES, PROVINCES OF CAGAYAN AND ISABELA | Central Office | Bridges Management Cluster | On-Going | ₱415.4M | 72% | High risk66 | —-0.005 |
| 12 | 20L00164CONSTRUCTION OF ASPHALT ROAD - DAVAO CITY COASTAL BYPASS ROAD (BAGO APLAYA - TIMES BEACH - ROXAS AVENUE), PACKAGE 27, DAVAO CITY | Region XI | Region XI | On-Going | ₱380.1M | 97% | High risk66 | Flagged0.019 |
| 13 | 24B00084ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - RETROFITTING/ STRENGTHENING OF PERMANENT BRIDGES - CABAGAN-STA. MARIA BRIDGE (B03236LZ) ALONG CABAGAN-STA MARIA RD | Region II | Region II | On-Going | ₱115.8M | 100% | High risk65 | —-0.011 |
| 14 | 18L00093WIDENING (2 INTO 4 LANES) OF MANIKI BRIDGE (B00182MN) & APPROACHES ALONG TAGUM-PANABO CIRC. RD INCL | Region XI | Region XI | Completed | ₱332.8M | 100% | High risk64 | Flagged0.012 |
| 15 | 20BF0067BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - MALLIG BRIDGE (B01158LZ) ALONG SANTIAGO -TUGUEGARAO ROAD, MALLIG, ISABELA | Region II | Isabela 2nd DEO | Completed | ₱212M | 100% | High risk64 | Flagged0.010 |
| 16 | 21BD0111CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS - ACCESS ROAD LEADING TO CALLAO CAVES TOURISM ZONE (TAWI-CALLAO ROAD), BRGY. PATAGUELEG, PEÑABLANCA, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱94.6M | 100% | High risk64 | —-0.028 |
| 17 | 22B00029OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE - REPLACEMENT OF PERMANENT WEAK BRIDGES - ITAWES BRIDGE (B04245LZ) ALONG CAGAYAN-APAYAO ROAD | Region II | Region II | Completed | ₱115.7M | 100% | High risk63 | —-0.023 |
| 18 | 18B00055OO 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEV'T - CONST'N OF MISSING LINKS/NEW ROADS: JCT. DELFIN ALBANO ROAD, INCLUDING BRIDGE (CANSAN-BAGUTARI BRIDGE), ISABELA, ISABELA 1ST DISTRICT | Region II | Region II | Completed | ₱714M | 100% | High risk63 | Flagged0.007 |
| 19 | 23BF0022BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP) I CONTRACT PACKAGE 1B-PHASE II, CARAPPIGAN, BAYABO AND OLANGO 2 BRIDGE | Central Office | Bridges Management Cluster | On-Going | ₱11.6M | 100% | Medium risk58 | —-0.016 |
| 20 | 18PL0041ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-VARIOUS NATIONAL ROADS, TABUK CITY, RIZAL, PINUKPUK & TANUDAN, KALINGA | Cordillera Administrative Region | Lower Kalinga DEO | Completed | ₱91.1M | 100% | Medium risk58 | —-0.073 |
| 21 | 20B00033ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: NETWORK DEVELOPMENT: ROAD WIDENING-PRIMARY ROADS-CAGAYAN VALLEY ROAD, BALZAIN-TANZA & CARIG SUR-CARIG NORTE SECTION, TUGUEGARAO CITY, CAGAYAN | Region II | Region II | Completed | ₱82M | 100% | Medium risk54 | —-0.054 |
| 22 | 20J00210CONCRETING OF BARANGAY SANGA SANGA FARM TO MARKET ROAD BARANGAY SANGA SANGA, BONGAO, TAWI -TAWI | Region IX | Region IX | Completed | ₱23.9M | 100% | Medium risk54 | —-0.008 |
| 23 | 16B00058BRIDGE CONSTRUCTION REPLACEMENT PROGRAM (BCRP) 1 DESIGN AND BUILD BRIDGES FOR LUZON, TUNGCAB BRIDGE AND APPROACHES PHASE II INCLUDES RIGHT OF WAY ACQUISITION ALONG CORDON-AURORA BOUNDARY ROAD (ISABELA BOUNDARY-JUNCTION DUMABATO), QUIRINO | Region II | Region II | Completed | ₱20.1M | 100% | Medium risk53 | —-0.028 |
| 24 | 16M00039CONSTRUCTION OF PINGUIAMAN BRIDGE II ALONG DULAWAN-MARBEL ROAD, K1744+200 TO K1745+168, EXCEPTION K1744+400+K1745+500 (BRIDGE), LAMBAYONG, SULTAN KUDARAT | Region XII | Region XII | Completed | ₱362M | 100% | Medium risk51 | Flagged0.026 |
| 25 | 18BD0047CONSTRUCTION/URGENT RIVER BANK PROTECTION WORKS, PHASE I, SAN VICENTE, IGUIG, CAGAYAN | Region II | Cagayan 3rd DEO | Completed | ₱64.4M | 100% | Medium risk51 | —-0.063 |