Contractor dossier
202 projects on file, including joint ventures this contractor is part of.
Total projects
202
Total budget
₱9.4B
Average progress
90.8%
Completion rate
85.1%
Average risk score
40.0
Medium risk on average, out of 100
Flagged as unusual
10
5.0% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 166 | ₱6.7B | 36.0 | 7 | 94.8% |
| National Capital Region | 20 | ₱1.5B | 55.4 | 0 | 70.0% |
| Region IV-B | 6 | ₱405.3M | 70.9 | 3 | 78.8% |
| Region I | 5 | ₱238.1M | 52.4 | 0 | 51.6% |
| Region IV-A | 4 | ₱342.1M | 58.7 | 0 | 95.3% |
| Region V | 1 | ₱227.4M | 69.5 | 0 | 94.1% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 66 | ₱2.5B | 35.6 | 2 | 86.2% |
| Roads | 60 | ₱2.7B | 38.7 | 0 | 94.0% |
| Flood Control and Drainage | 51 | ₱3.1B | 40.0 | 1 | 96.8% |
| Bridges | 12 | ₱414.5M | 40.2 | 2 | 82.3% |
| OTHER | 5 | ₱183.5M | 64.7 | 0 | 100.0% |
| GAA 2025 SSP | 4 | ₱283.7M | 94.3 | 4 | 51.8% |
| Water Provision and Storage | 3 | ₱159.4M | 43.3 | 1 | 92.1% |
| Bridges, Roads | 1 | ₱95.2M | 51.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CN0064CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY NORTH POBLACION, DIPACULAO, AURORA | Region III | Aurora DEO | On-Going | ₱97.1M | 34% | High risk96 | Flagged0.024 |
| 25ED0165CONSTRUCTION OF SAN AGUSTIN BRIDGE (PUBLIC MARKET), BARANGAY IBABA EAST,CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱57M | 48% | High risk94 | Flagged0.023 |
| 25ED0166CONSTRUCTION OF BRIDGE, BARANGAY PERSONAS, CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱42.8M | 82% | High risk94 | Flagged0.011 |
| 25ED0110CONSTRUCTION OF ROAD, BARANGAY BULUSAN TO BARANGAY BONDOC, CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱86.8M | 43% | High risk93 | Flagged0.030 |
| 22C00098CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF WATER SUPPLY SYSTEM IN PALAYAN CITY, NUEVA ECIJA, PROVINCE OF NUEVA ECIJA | Region III | Region III | On-Going | ₱145.5M | 76% | High risk79 | Flagged0.023 |
| 24C00180FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF ABITONAN RIVER FLOOD CONTROL STRUCTURE, DIPACULAO, AURORA, PROVINCE OF AURORA | Region III | Region III | Completed | ₱169.8M | 100% | High risk77 | —-0.030 |
| 25C00505CONVERGENCE & SPL. SUPP. PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-ACCESS RDS. &/OR BRS. FR. THE NAT'L. RDS. LEAD. TO MAJ./STRAT. PUBLIC BLDGS./FACILITIES-CONST. OF DONA REMEDIOS TRINIDAD NORZAGARAY SAN JOSE RD. (DRT SECT.), NORZAGARAY, BUL | Region III | Region III | On-Going | ₱95.1M | 0% | High risk75 | Flagged0.019 |
| 24C00644CONVERGENCE & SPL. SUPPORT PROG.-BASIC INFRA PROG.-ACCESS RD. & OR BRS. FR. THE NAT'L. RDS. LEAD. TO MAJ. STRAT. PUBLIC BLDGS./FACILITIES: 1. CONST. OF BRGY. BAYABAS-IPIL RD. 2. CONST. OF BRGY. MUCDOL-SALAY RD. 3. CONST. OF RD. GUPA-DITALE, ALL AT DIPACUL | Region III | Region III | On-Going | ₱146.3M | 20% | High risk74 | —-0.001 |
| 24CC0231CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY STO. NINO, PANDI, BULACAN | Region III | Bulacan 1st DEO | Completed | ₱14.7M | 100% | High risk74 | —-0.074 |
| 18CF0141ASSET PRESERVATION PROGRAM -REHABILITATION/RECONSTRUCTION OF ROAD WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE - SECONDARY ROADS - NUEVA ECIJA - AURORA RD- K0156+100 - K0156+260, K0160+600 -K0161+050 | Region III | Nueva Ecija 2nd DEO | Completed | ₱96.5M | 100% | High risk73 | —-0.056 |
| 21CF0172NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - PRIMARY ROADS - DAANG MAHARLIKA (LZ) - K0094 + 272.10 - K0094 + 842.60, K0094 + 866.60 - K0095 + 400.00 | Region III | Nueva Ecija 2nd DEO | Completed | ₱95.7M | 100% | High risk72 | —-0.029 |
| 22C00045CONVERGENCE & SPECIAL SUPPORT PROGRAM-CONST./IMPR'VT. OF VARIOUS INFRA IN SUPPORT OF NAT'L/ SECURITY-(TATAG NG IMPRASTRAKTURA PARA SA KAPAYAPAAN AT SEGURIDAD PROGRAM-TIKAS), CONST. OF ARMY LEADERSHIP DEV'T. EDCU. CENTER (ALDEC) MPB, TRADOC, PA, CAMP O DON | Region III | Region III | Completed | ₱9.6M | 100% | High risk71 | —-0.068 |
| 25C00480CONVERGENCE & SPL. SUPPORT PROG.-SUSTAINABLE INFRA PROJS. ALLEVIATING GAPS (SIPAG)-INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROAD S THAT TRAVERSE MULTIPLE LGU JURISDICTIONS), CONST. OF BYPASS ROAD (PHASE 10) AT DONA REMEDIOS TRINIDAD TO SAN JOSE DEL MONTE | Region III | Region III | On-Going | ₱71.3M | 1% | High risk70 | Flagged0.014 |
| 24CK0176REHABILITATION OF DIKE ALONG LUCUNG RIVER BARANGAY SANTO NINO SECTION, CONCEPCION, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱96.5M | 86% | High risk70 | Flagged0.023 |
| 21F00089LOCAL PROGRAM: BUILDINGS AND OTHER STRUCTURES-MULTIPURPOSE/FACILITIES-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-CONSTRUCTION OF THE MULTI-PURPOSE BUILDING (NEW PILI PUBLIC MARKET),OLD SAN ROQUE, PILI | Region V | Region V | On-Going | ₱227.4M | 94% | High risk70 | —-0.011 |
| 25CN0160CONTRUCTION OF BAYANIHAN - QUIRINO ROAD, MARIA AURORA, AURORA | Region III | Aurora DEO | On-Going | ₱48M | 1% | High risk69 | —-0.016 |
| 24C00376ASSET PRESERVATION PROGRAM-CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS-PRIMARY ROADS, DAANG MAHARLIKA (LZ), PROVINCE OF NUEVA ECIJA | Region III | Region III | On-Going | ₱40.5M | 57% | High risk69 | —-0.024 |
| 17CF0044ASSET PRESERVATION OF NATIONAL ROADS (ARTERIAL), REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT- 4 (HDM-4) PRIMARY ROADS, JOSE ABAD SANTOS | Region III | Nueva Ecija 2nd DEO | Completed | ₱7.4M | 100% | High risk68 | —-0.070 |
| 25OC0120CONSTRUCTION OF DRAINAGE MAIN ALONG DR. A. SANTOS AVENUE, DISTRICT 1,PARAÑAQUE CITY, METRO MANILA | National Capital Region | Metro Manila 2nd DEO | On-Going | ₱141.9M | 0% | High risk67 | —-0.011 |
| 24OF0160CONSTRUCTION OF MULTI-PURPOSE BUILDING (PHASE 4) MEDICAL CENTER, AT BRGY. TANDANG SORA, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱147.2M | 24% | High risk66 | —-0.012 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 24C00638DOH HEALTH FACILITIES ENHANCEMENT PROGRAM (HFEP)-CONSTRUCTION OF NEW SUPER HEALTH CENTERS/RHU-BRGY. CRISTO REY, CAPAS MEGA RURAL HEALTH UNIT, PROVINCE OF TARLAC | Region III | Region III | On-Going | ₱29.6M | 0% | Medium risk54 | Flagged0.036 |
| 25ED0110CONSTRUCTION OF ROAD, BARANGAY BULUSAN TO BARANGAY BONDOC, CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱86.8M | 43% | High risk93 | Flagged0.030 |
| 25CN0064CONSTRUCTION OF MULTI-PURPOSE BUILDING, BARANGAY NORTH POBLACION, DIPACULAO, AURORA | Region III | Aurora DEO | On-Going | ₱97.1M | 34% | High risk96 | Flagged0.024 |
| 24CK0176REHABILITATION OF DIKE ALONG LUCUNG RIVER BARANGAY SANTO NINO SECTION, CONCEPCION, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱96.5M | 86% | High risk70 | Flagged0.023 |
| 25ED0165CONSTRUCTION OF SAN AGUSTIN BRIDGE (PUBLIC MARKET), BARANGAY IBABA EAST,CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱57M | 48% | High risk94 | Flagged0.023 |
| 22C00098CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES-CONSTRUCTION OF WATER SUPPLY SYSTEM IN PALAYAN CITY, NUEVA ECIJA, PROVINCE OF NUEVA ECIJA | Region III | Region III | On-Going | ₱145.5M | 76% | High risk79 | Flagged0.023 |
| 24C00605STATE UNIVERSITIES AND COLLEGES (SUCS)-ESTABLISHMENTOF COLLEGE BUSINESS CENTER WITH FACILITIES AND EQUIPMENT-SAN LUIS CAMPUS-AURORA STATE COLLEGE OF TECHNOLOGY, SAN LUIS, AURORA, PROVINCE OF AURORA | Region III | Region III | On-Going | ₱39.4M | 56% | Medium risk47 | Flagged0.020 |
| 25C00505CONVERGENCE & SPL. SUPP. PROG.-SUSTAINABLE INFRA. PROJS. ALLEVIATING GAPS (SIPAG)-ACCESS RDS. &/OR BRS. FR. THE NAT'L. RDS. LEAD. TO MAJ./STRAT. PUBLIC BLDGS./FACILITIES-CONST. OF DONA REMEDIOS TRINIDAD NORZAGARAY SAN JOSE RD. (DRT SECT.), NORZAGARAY, BUL | Region III | Region III | On-Going | ₱95.1M | 0% | High risk75 | Flagged0.019 |
| 25C00480CONVERGENCE & SPL. SUPPORT PROG.-SUSTAINABLE INFRA PROJS. ALLEVIATING GAPS (SIPAG)-INTERJURISDICTIONAL ROADS AND/OR BRIDGES (ROAD S THAT TRAVERSE MULTIPLE LGU JURISDICTIONS), CONST. OF BYPASS ROAD (PHASE 10) AT DONA REMEDIOS TRINIDAD TO SAN JOSE DEL MONTE | Region III | Region III | On-Going | ₱71.3M | 1% | High risk70 | Flagged0.014 |
| 25ED0166CONSTRUCTION OF BRIDGE, BARANGAY PERSONAS, CALAPAN CITY, ORIENTAL MINDORO | Region IV-B | Mindoro Oriental DEO | On-Going | ₱42.8M | 82% | High risk94 | Flagged0.011 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 26 | 24DF0209CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION OF MULTI-PURPOSE BUILDING, IMUS, CAVITE (PHASE III) | Region IV-A | Cavite 1st DEO | Completed | ₱98M | 100% | High risk63 | —-0.084 |
| 27 | 21CF0159CONSTRUCTION OF ROAD AT BARANGAY MALLORCA, SAN LEONARDO, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱14.7M | 100% | High risk62 | —-0.039 |
| 28 | 21CF0181CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS - PRIMARY ROADS - JOSE ABAD SANTOS AVE. (JASA) - K0 099 + 886.60 - K0 099 + 948.10, K0 100 + 272.30 - K0 100 + 453.00, K0 100 + 636.60 - K0 100 + 963.40 | Region III | Nueva Ecija 2nd DEO | Completed | ₱16.9M | 100% | High risk62 | —-0.042 |
| 29 | 22D00022CONSTRUCTION OF BYPASS / ALTERNATE / DIVERSION ROAD, DASMARIÑAS - GENERAL TRIAS - TANZA (TANZA SECTION), CAVITE | Region IV-A | Region IV-A | Completed | ₱95.8M | 100% | High risk60 | —-0.087 |
| 30 | 24DN0049ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - IMPROVEMENT OF ROAD AND DRAINAGE SYSTEM, BOTONG FRANCISCO AVENUE, BARANGAY SAN ISIDRO ANGONO, RIZAL (FIRST DISTRICT) | Region IV-A | Rizal 1st DEO | On-Going | ₱99.4M | 81% | High risk60 | —-0.053 |
| 31 | 24A00500BASIC INFRASTRUCTURE PROGRAM (BIP), CONSTRUCTION OF MULTI-PURPOSE BUILDING, DOH REGIONAL OFFICE, SAN FERNANDO CITY, LA UNION | Region I | Region I | On-Going | ₱97M | 25% | Medium risk59 | —-0.006 |
| 32 | 24OF0161CONSTRUCTION OF MULTI-PURPOSE BUILDING PACKAGE 2 (HEALTH FACILITY) AT BRGY. TANDANG SORA, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱63.7M | 0% | Medium risk59 | —-0.020 |
| 33 | 24OF0162CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BRGY. TANDANG SORA (PHASE 2), QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱63.7M | 19% | Medium risk59 | —-0.025 |
| 34 | 23OF0169CONSTRUCTION OF MULTI-PURPOSE BUILDING - HOSPITAL PHASE 2 AT DISTRICT 6, QUEZON CITY | National Capital Region | Quezon City 1st DEO | On-Going | ₱66.4M | 38% | Medium risk59 | —-0.029 |
| 35 | 21O00117CONSTRUCTION OF BUILDING, MUNTINLUPA CITY JAIL, MUNTINLUPA CITY | National Capital Region | National Capital Region | Completed | ₱85.9M | 100% | Medium risk58 | —-0.066 |
| 36 | 24CK0076REHABILITATION OF EXISTING DIKE ALONG LUCUNG RIVER (SANTIAGO SECTION, LEFT BANK), PACKAGE B, CONCEPCION, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱96.4M | 100% | Medium risk57 | —-0.076 |
| 37 | 18OE0272CONSTRUCTION OF FOUR (4) STOREY SIXTEEN (16) CLASSROOM SCHOOL BUILDING AT GEN. GREGORIO DEL PILAR ELEMENTARY SCHOOL (BASED ON 2017 PLAN, REVISED 3-24-17) | National Capital Region | North Manila DEO | Completed | ₱89.4M | 100% | Medium risk57 | —-0.032 |
| 38 | 20C00055LOCAL PROGRAM-CONST./REP./REHAB./IMPR'VT. OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-FLOOD CONTROL & DRAINAGE-FLOOD CONTROL STRUCTURES/FACILITIES-CONST./REHAB./CONST. OF FLOOD CONTROL STRUCTURES ALONG RIO CHICO RIVER, BRGY. MACARSE, ZARAGOSA, N.E. | Region III | Region III | Completed | ₱144.7M | 100% | Medium risk57 | —-0.065 |
| 39 | 24CK0081REHABILITATION OF EXISTING DIKE ALONG RIO CHICO RIVER (CASTILLO SECTION, RIGHT BANK), PHASE 1, CONCEPCION, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱96.5M | 100% | Medium risk56 | —-0.076 |
| 40 | 23C00102FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF BULOS FLOOD CONTROL STRUCTURE, DIPACULAO, AURORA, PROVINCE OF AURORA | Region III | Region III | Completed | ₱193M | 100% | Medium risk56 | —-0.055 |
| 41 | 25C00490CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONST. OF FLOOD CONTROL STRUCTURE OF ABITONAN RIVER, PHASE 4, DIPACULAO, AURORA | Region III | Region III | On-Going | ₱97.5M | 52% | Medium risk56 | —-0.032 |
| 42 | 18CF0222CONSTRUCTION OF SLOPE PROTECTION ALONG PAMPANGA RIVER FLOOD CONTROL, SAPANG BUHO, PALAYAN CITY, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱95.5M | 100% | Medium risk56 | —-0.078 |
| 43 | 23OB0291CONSTRUCTION OF MULTI-PURPOSE BUILDING AT PUROK 10, BARANGAY SOUTH DAANG HARI, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | On-Going | ₱48.3M | 0% | Medium risk56 | —-0.018 |
| 44 | 20CF0059CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG PAMPANGA RIVER, BRGY. MAGPAPALAYOC, SAN LEONARDO, NUEVA ECIJA | Region III | Nueva Ecija 2nd DEO | Completed | ₱95.5M | 100% | Medium risk56 | —-0.077 |
| 45 | 22OB0002CONSTRUCTION OF SAN LUIS BATIS PUMPING STATION, BRGY. BATIS, SAN JUAN CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱89.8M | 100% | Medium risk55 | —-0.079 |
| 46 | 22OB0172CONSTRUCTION OF MULTI-PURPOSE BUILDING WITH SITE DEVELOPMENT AT TCU COMPOUND AT BARANGAY CENTRAL BICUTAN, TAGUIG CITY | National Capital Region | Metro Manila 1st DEO | Completed | ₱47.5M | 100% | Medium risk55 | —-0.096 |
| 47 | 23O00049CONSTRUCTION OF LAGUNA LAKE HIGHWAY EXTENSION, TAGUIG CITY (PHASE 6) (PACKAGE B) (RE-ADVERTISEMENT) | National Capital Region | National Capital Region | Completed | ₱74.3M | 100% | Medium risk55 | —-0.086 |
| 48 | 25C00497NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BYPASS AND DIVERSION ROADS-CONCEPCION-MABALACAT BYPASS ROAD (PACKAGE 1), PROVINCE OF PAMPANGA | Region III | Region III | On-Going | ₱201.4M | 7% | Medium risk55 | —-0.018 |
| 49 | 20E00120PUERTO GALERA BIODIVERSITY AND ENVIRONMENTAL RESEARCH AND OUTREACH CENTER, PUERTO GALERA, ORIENTAL MINDORO | Region IV-B | Region IV-B | Completed | ₱116.8M | 100% | Medium risk54 | —-0.019 |
| 50 | 24C00024NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BYPASS AND DIVERSION ROADS, CONCEPCION-MABALACAT BYPASS ROAD, PROVINCE PAMPANGA | Region III | Region III | On-Going | ₱155.1M | 76% | Medium risk54 | —-0.041 |