Contractor dossier
66 projects on file, including joint ventures this contractor is part of.
Total projects
66
Total budget
₱372.3M
Average progress
94.9%
Completion rate
84.8%
Average risk score
31.8
Medium risk on average, out of 100
Flagged as unusual
8
12.1% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Negros Island Region | 65 | ₱357.4M | 31.6 | 7 | 95.5% |
| Region VII | 1 | ₱14.9M | 44.5 | 1 | 61.5% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Buildings and Facilities | 46 | ₱266.1M | 25.4 | 3 | 95.5% |
| Roads | 13 | ₱88.4M | 32.8 | 0 | 90.2% |
| GAA 2025 SSP | 5 | ₱9.8M | 87.1 | 5 | 100.0% |
| Bridges | 1 | ₱4.9M | 46.0 | 0 | 100.0% |
| Water Provision and Storage | 1 | ₱3M | 24.0 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25RG0089BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY LACAON, JIMALALUD, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 1st DEO | On-Going | ₱2M | 100% | High risk88 | Flagged0.003 |
| 25RG0056BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY SAMPINITON, JIMALALUD, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 1st DEO | On-Going | ₱2M | 100% | High risk88 | Flagged0.003 |
| 25HJ0109BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY APANANGON, JIMALALUD, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 1st DEO | On-Going | ₱2M | 100% | High risk87 | Flagged0.004 |
| 25RG0081BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY TAMAO, TAYASAN, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 1st DEO | On-Going | ₱2M | 100% | High risk87 | Flagged0.003 |
| 25HJ0100BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY POBLACION, MANJUYOD, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 1st DEO | On-Going | ₱2M | 100% | High risk86 | Flagged0.005 |
| 25HJ0170CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-IMPROVEMENT OF ELECIA-PITOGO ROAD, LA LIBERTAD | Negros Island Region | Negros Oriental 1st DEO | On-Going | ₱26.8M | 30% | High risk66 | —-0.018 |
| 25HJ0003BASIC- INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES- CONSTRUCTION OF MULTI-PURPOSE BUILDING, GERASIMO SILVA VILLEGAS, SR. NATIONAL HS, BARANGAY HIBAIYO, GUIHULNGAN CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 1st DEO | Completed | ₱4.9M | 100% | High risk65 | —-0.060 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 17RG0086CONSTRUCTION OF ONE(1) STOREY TWO(2) CLASSROOM SENIOR HIGH SCHOOL BUILDING AT OLYMPIA NATIONAL HIGH SCHOOL, BAIS CITY | Negros Island Region | Negros Oriental 2nd DEO | Terminated | ₱2.6M | 0% | Low risk15 | Flagged0.055 |
| 23HK0159CONSTRUCTION OF 2STY - 4CL AT DR. ERNESTO A. UY SR. NHS, MABINAY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱17M | 32% | Medium risk38 | Flagged0.019 |
| 24H00157IMPROVEMENT OF ACADEMIC BUILDING CTHM, MAIN CAMPUS - NEGROS ORIENTAL STATE UNIVERSITY | Region VII | Region VII | On-Going | ₱14.9M | 61% | Medium risk44 | Flagged0.009 |
| 25HJ0100BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY POBLACION, MANJUYOD, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 1st DEO | On-Going | ₱2M | 100% | High risk86 | Flagged0.005 |
| 25HJ0109BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY APANANGON, JIMALALUD, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 1st DEO | On-Going | ₱2M | 100% | High risk87 | Flagged0.004 |
| 25RG0089BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY LACAON, JIMALALUD, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 1st DEO | On-Going | ₱2M | 100% | High risk88 | Flagged0.003 |
| 25RG0056BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY SAMPINITON, JIMALALUD, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 1st DEO | On-Going | ₱2M | 100% | High risk88 | Flagged0.003 |
| 25RG0081BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY TAMAO, TAYASAN, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 1st DEO | On-Going | ₱2M | 100% | High risk87 | Flagged0.003 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25RG0089BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY LACAON, JIMALALUD, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 1st DEO | On-Going | ₱2M | 100% | High risk88 | Flagged0.003 |
| 2 | 25RG0056BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY SAMPINITON, JIMALALUD, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 1st DEO | On-Going | ₱2M | 100% | High risk88 | Flagged0.003 |
| 3 | 25HJ0109BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY APANANGON, JIMALALUD, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 1st DEO | On-Going | ₱2M | 100% | High risk87 | Flagged0.004 |
| 4 | 25RG0081BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY TAMAO, TAYASAN, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 1st DEO | On-Going | ₱2M | 100% | High risk87 | Flagged0.003 |
| 5 | 25HJ0100BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING, BARANGAY POBLACION, MANJUYOD, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 1st DEO | On-Going | ₱2M | 100% | High risk86 | Flagged0.005 |
| 6 | 25HJ0170CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-IMPROVEMENT OF ELECIA-PITOGO ROAD, LA LIBERTAD | Negros Island Region | Negros Oriental 1st DEO | On-Going | ₱26.8M | 30% | High risk66 | —-0.018 |
| 7 | 25HJ0003BASIC- INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICES- CONSTRUCTION OF MULTI-PURPOSE BUILDING, GERASIMO SILVA VILLEGAS, SR. NATIONAL HS, BARANGAY HIBAIYO, GUIHULNGAN CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 1st DEO | Completed | ₱4.9M | 100% | High risk65 | —-0.060 |
| 8 | 22HL0124SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG): ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES - REHABILITATION OF BRIDGE, MILAGROSA, STA. CATALINA, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 3rd DEO | Completed | ₱4.9M | 100% | Medium risk46 | —-0.060 |
| 9 | 24H00157IMPROVEMENT OF ACADEMIC BUILDING CTHM, MAIN CAMPUS - NEGROS ORIENTAL STATE UNIVERSITY | Region VII | Region VII | On-Going | ₱14.9M | 61% | Medium risk44 | Flagged0.009 |
| 10 | 22HK0003BASIC INFRASTRUCTURE PROGRAM: CONSTRUCTION OF ROAD, BARANGAY TUBIGON, SIBULAN, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | Completed | ₱4.9M | 100% | Medium risk44 | —-0.090 |
| 11 | 25HK0032CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS(TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP)-ACCESS ROAD FROM CROSSING TABUAC TO CANTUMBOL DOS FALLS,BAIS CITY,NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱10.3M | 42% | Medium risk44 | —-0.054 |
| 12 | 20HL0102CONSTRUCTION OF MULTI-PURPOSE BUILDING (HEALTH CENTER), BGRY. MALABUGAS, BAYAWAN CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 3rd DEO | Completed | ₱4.9M | 100% | Medium risk44 | —-0.086 |
| 13 | 24HK0111CONCRETING OF BRGY. BAHI-AN FMR, BRGY. BAHI-AN, TANJAY CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | Completed | ₱14.9M | 100% | Medium risk43 | —-0.041 |
| 14 | 23HK0170CONCRETING OF ROAD, SITIO ASIOTES, BRGY. POLO, TANJAY CITY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | Completed | ₱4.8M | 100% | Medium risk40 | —-0.036 |
| 15 | 22HL0129CONCRETING OF FARM-TO-MILL ROAD: BRGY. DATAG TO SITIO CANDUGAY, BRGY. CASALAAN, SIATON, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 3rd DEO | Completed | ₱11.2M | 100% | Medium risk40 | —-0.039 |
| 16 | 18HJ0113CONSTRUCTION OF ONE UNIT TWO STOREY WORKSHOP BUILDING AT GUIHULNGAN NATIONAL HIGH SCHOOL- HILAITAN (9.5MX 23.M), GUIHULNGAN, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 1st DEO | Completed | ₱15.5M | 100% | Medium risk38 | —-0.037 |
| 17 | 23HK0159CONSTRUCTION OF 2STY - 4CL AT DR. ERNESTO A. UY SR. NHS, MABINAY, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 2nd DEO | On-Going | ₱17M | 32% | Medium risk38 | Flagged0.019 |
| 18 | 18HJ0110CONSTRUCTION OF ONE UNIT TWO STOREY WORKSHOP BUILDING AT AYUNGON NHS-CAROL-AN EXTENSION (9.5MX23.0M)AYUNGON, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 1st DEO | Completed | ₱15.3M | 100% | Medium risk37 | —-0.043 |
| 19 | 18HJ0108CONSTRUCTION OF ONE UNIT TWO STOREY FOUR CLASSROOM SCHOOL BUILDING AT BUSILAC EXT. HS (9.5M X 23.00M)LA LIBERTAD, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 1st DEO | Completed | ₱14.9M | 100% | Medium risk36 | —-0.046 |
| 20 | 21HL0129CONSTRUCTION/COMPLETION OF (2 STY 6 CL) @ BALUGO ELEMENTARY SCHOOL, VALENCIA (LUZURRIAGA), NEGROS ORIENTAL | Negros Island Region | Negros Oriental 3rd DEO | Completed | ₱15.7M | 100% | Medium risk36 | —-0.042 |
| 21 | 18HJ0100CONSTRUCTION OF ONE UNIT TWO STOREY WORKSHOP BUILDING AT JIMALALUD NHS-TAMAO EXTENSION (9.5M X 23.00M), JIMALALUD, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 1st DEO | Completed | ₱14.1M | 100% | Medium risk36 | —-0.037 |
| 22 | 18HJ0105CONSTRUCTION OF ONE UNIT TWO STOREY WORKSHOP BUILDING AT PINALUBNGAN NATIONAL HIGH SCHOOL (9.5M X 23.0M) UNIT TWO, TAYASAN, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 1st DEO | Completed | ₱14.2M | 100% | Medium risk36 | —-0.046 |
| 23 | 18HJ0097CONSTRUCTION OF ONE UNIT TWO STOREY WORKSHOP BUILDING AT PINALUBNGAN NATIONAL HIGH SCHOOL (9.5M X 23.00M), TAYASAN, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 1st DEO | Completed | ₱14.2M | 100% | Medium risk36 | —-0.046 |
| 24 | 18HJ0096CONSTRUCTION OF ONE UNIT TWO STOREY WORKSHOP BUILDING AT JIMALALUD NATIONAL HIGH SCHOOL (9.5M X 23.00M), JIMALALUD, NEGROS ORIENTAL | Negros Island Region | Negros Oriental 1st DEO | Completed | ₱11.8M | 100% | Medium risk36 | —-0.038 |
| 25 | 18HK0097CONSTRUCTION OF TWO (2) STOREY SIX (6) CLASSROOM SCHOOL BUILDING AT GRACIANO BANOGON HIGH SCHOOL, NOVALLAS, TANJAY CITY (9.50MX32.00M) | Negros Island Region | Negros Oriental 2nd DEO | Completed | ₱11.7M | 100% | Medium risk35 | —-0.042 |