Opening the dossier…
Opening the dossier…
Contractor dossier
183 projects on file, including joint ventures this contractor is part of.
Total projects
183
Total budget
₱7.9B
Average progress
97.9%
Completion rate
95.1%
Average risk score
37.3
Medium risk on average, out of 100
Flagged as unusual
4
2.2% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 182 | ₱7.7B | 37.1 | 4 | 97.9% |
| Region VIII | 1 | ₱193M | 64.6 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 113 | ₱4.5B | 35.6 | 1 | 97.3% |
| Flood Control and Drainage | 50 | ₱2.8B | 40.7 | 2 | 99.7% |
| Buildings and Facilities | 10 | ₱186.1M | 20.5 | 0 | 100.0% |
| Bridges | 4 | ₱48.6M | 34.9 | 0 | 100.0% |
| OTHER | 3 | ₱185.3M | 69.5 | 0 | 100.0% |
| GAA 2025 SSP | 1 | ₱96.5M | 94.8 | 1 | 54.7% |
| GAA 2025 OO-2 | 1 | ₱48.3M | 88.1 | 0 | 89.8% |
| Bridges, Roads | 1 | ₱48M | 33.2 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CJ0233CONSTRUCTION OF CAMILING - BAYAMBANG DIVERSION ROAD (SEGMENT 2), CAMILING, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 55% | High risk95 | Flagged0.024 |
| 25CJ0025CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DUNGUN CREEK, PACKAGE 25, PANIQUI, TARLAC | Region III | Tarlac DEO | On-Going | ₱48.3M | 90% | High risk88 | —-0.020 |
| 24CJ0379REHABILITATION OF SLOPE PROTECTION WITH STEEL SHEET PILE FOUNDATION ALONG TARLAC RIVER CONTROL, RIGHT DIKE, PACKAGE Q, CARANGIAN SECTION, TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱99M | 100% | High risk77 | Flagged0.011 |
| 20CK0070ASSET PRESERVATION PROGRAM: PREVENTIVE MAINTENANCE ALONG CONCEPCION - CAPAS ROAD, CONCEPCION, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱48.7M | 100% | High risk71 | —-0.064 |
| 17CJ0032ASSET PRESERVATION OF NATIONAL ROADS - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/ HIGHWAY DEVELOPMENT MANAGEMENT-4 (HDM-4); TARLAC-GUIMBA RD VIA VICTORIA K0127+(-219) | Region III | Tarlac DEO | Completed | ₱67.5M | 100% | High risk70 | —-0.063 |
| 17CJ0063NETWORK DEVELOPMENT, IMPROVEMENT/ WIDENING OF NATIONAL ROADS, TARLAC - GUIMBA ROAD VIA VICTORIA, KO133+000 - KO136+000; KO144+989.80 - KO146+963.80 | Region III | Tarlac DEO | Completed | ₱80.1M | 100% | High risk70 | —-0.057 |
| 24CJ0376CONSTRUCTION OF SLOPE PROTECTION WITH STEEL SHEET PILE FOUNDATION ALONG TARLAC RIVER CONTROL, LEFT DIKE, PACKAGE F, STA. MARIA - SAN BARTOLOME SECTION, TARLAC | Region III | Tarlac DEO | Completed | ₱99M | 100% | High risk70 | —-0.010 |
| 24CK0175REHABILITATION OF DIKE ALONG LUCUNG RIVER, CUTCUT 1ST SECTION, DOWNSTREAM OF CUTCUT TWIN BRIDGE, CAPAS, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱96.5M | 84% | High risk70 | Flagged0.024 |
| 20CJ0071NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BY-PASS AND DIVERSION ROADS STA. IGNACIA - GUIMBA ROAD VIA GERONA PURA, (GERONA SECTION), TARLAC | Region III | Tarlac DEO | Completed | ₱65.5M | 100% | High risk70 | —-0.035 |
| 23CJ0332CONSTRUCTION OF FLOOD CONTROL STRUCTURES WITH STEEL SHEET PILE FOUNDATION AND ROAD COMPONENT ALONG UNGOT CREEK PACKAGE R, TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱93.6M | 100% | High risk70 | —-0.014 |
| 24CJ0374CONSTRUCTION OF SLOPE PROTECTION STRUCTURES WITH STEEL SHEET PILE FOUNDATION ALONG MORIONES - TARLAC RIVER CONTROL, PACKAGE T, BALANTI SECTION, BALANTI, TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱99M | 100% | High risk70 | —-0.011 |
| 19CJ0122NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BY-PASS AND DIVERSION ROADS GERONA-VICTORIA ROAD VIA ESTIPONA PURA, TARLAC | Region III | Tarlac DEO | Completed | ₱56.2M | 100% | High risk69 | —-0.037 |
| 17CJ0034NETWORK DEVELOPMENT - IMPROVEMENT/WIDENING OF NATIONAL ROADS; VICTORIA - PURA RD, KO153+281 - KO153+611; KO148+675 - KO151+336 & KO151+431-KO152+471 | Region III | Tarlac DEO | Completed | ₱63.6M | 100% | High risk69 | —-0.038 |
| 24CJ0366CONSTRUCTION OF SLOPE PROTECTION WITH STEEL SHEET PILE FOUNDATION ALONG MORIONES RIVER, PACKAGE G, TIBAGAN SECTION , TIBAGAN, TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱96.5M | 100% | High risk69 | —-0.013 |
| 16CK0163ASSETS PRESERV. OF NATL RD., REHAB/RECONST/UPGRADING OF DAMAGED PAVE NATL RD INCL. DRAINAGE BASED ON | Region III | Tarlac 2nd DEO | Completed | ₱35.3M | 100% | High risk66 | —-0.067 |
| 16CK0189ASSETS PRESERV. OF NATL RDS-REHAB/RECONST OF NATL RDS W/ SLIPS, SLOPE COLLAPSE & LAND SLIDE ALONG | Region III | Tarlac 2nd DEO | Completed | ₱32.4M | 100% | High risk66 | —-0.067 |
| 18I00028ROAD WIDENING - PRIMARY ROADS: DAANG MAHARLIKA (SM) (SAN ISIDRO-SAN JUANICO), KO690+000-KO690+565; KO679+(-056)-KO680+133; KO680+163.60-KO680+572; KO680+596-KO680+879; KO680+909-KO682+330; KO682+345-KO684+389; KO684+423-KO685+000, NORTHERN SAMAR 1ST LD | Region VIII | Region VIII | Completed | ₱193M | 100% | High risk65 | —-0.059 |
| 24CJ0392CONSTRUCTION OF SLOPE PROTECTION WITH STEEL SHEET PILE FOUNDATION AND ROAD COMPONENT ALONG CAMILING RIVER LEFT BANK, ANOLING 3RD TO PAO 1ST SECTION, CAMILING, TARLAC (PACKAGE G) | Region III | Tarlac DEO | Completed | ₱29.7M | 100% | High risk64 | —-0.059 |
| 24CJ0393CONSTRUCTION OF SLOPE PROTECTION WITH STEEL SHEET PILE FOUNDATION AND ROAD COMPONENT ALONG CAMILING RIVER LEFT BANK, ANOLING 3RD TO PAO 1ST SECTION, CAMILING, TARLAC (PACKAGE F) | Region III | Tarlac DEO | Completed | ₱29.7M | 100% | High risk64 | —-0.059 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CJ0233CONSTRUCTION OF CAMILING - BAYAMBANG DIVERSION ROAD (SEGMENT 2), CAMILING, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 55% | High risk95 | Flagged0.024 |
| 24CK0175REHABILITATION OF DIKE ALONG LUCUNG RIVER, CUTCUT 1ST SECTION, DOWNSTREAM OF CUTCUT TWIN BRIDGE, CAPAS, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱96.5M | 84% | High risk70 | Flagged0.024 |
| 24CJ0379REHABILITATION OF SLOPE PROTECTION WITH STEEL SHEET PILE FOUNDATION ALONG TARLAC RIVER CONTROL, RIGHT DIKE, PACKAGE Q, CARANGIAN SECTION, TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱99M | 100% | High risk77 | Flagged0.011 |
| 23CK0115CONCRETING OF ROAD AT BRGY. CUT-CUT II - BRGY. ANUPUL (PHASE I), CAPAS AND BAMBAN, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱75.6M | 88% | Medium risk43 | Flagged0.008 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 1 | 25CJ0233CONSTRUCTION OF CAMILING - BAYAMBANG DIVERSION ROAD (SEGMENT 2), CAMILING, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 55% | High risk95 | Flagged0.024 |
| 2 | 25CJ0025CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DUNGUN CREEK, PACKAGE 25, PANIQUI, TARLAC | Region III | Tarlac DEO | On-Going | ₱48.3M | 90% | High risk88 | —-0.020 |
| 3 | 24CJ0379REHABILITATION OF SLOPE PROTECTION WITH STEEL SHEET PILE FOUNDATION ALONG TARLAC RIVER CONTROL, RIGHT DIKE, PACKAGE Q, CARANGIAN SECTION, TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱99M | 100% | High risk77 | Flagged0.011 |
| 4 | 20CK0070ASSET PRESERVATION PROGRAM: PREVENTIVE MAINTENANCE ALONG CONCEPCION - CAPAS ROAD, CONCEPCION, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱48.7M | 100% | High risk71 | —-0.064 |
| 5 | 17CJ0032ASSET PRESERVATION OF NATIONAL ROADS - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/ HIGHWAY DEVELOPMENT MANAGEMENT-4 (HDM-4); TARLAC-GUIMBA RD VIA VICTORIA K0127+(-219) | Region III | Tarlac DEO | Completed | ₱67.5M | 100% | High risk70 | —-0.063 |
| 6 | 17CJ0063NETWORK DEVELOPMENT, IMPROVEMENT/ WIDENING OF NATIONAL ROADS, TARLAC - GUIMBA ROAD VIA VICTORIA, KO133+000 - KO136+000; KO144+989.80 - KO146+963.80 | Region III | Tarlac DEO | Completed | ₱80.1M | 100% | High risk70 | —-0.057 |
| 7 | 24CJ0376CONSTRUCTION OF SLOPE PROTECTION WITH STEEL SHEET PILE FOUNDATION ALONG TARLAC RIVER CONTROL, LEFT DIKE, PACKAGE F, STA. MARIA - SAN BARTOLOME SECTION, TARLAC | Region III | Tarlac DEO | Completed | ₱99M | 100% | High risk70 | —-0.010 |
| 8 | 24CK0175REHABILITATION OF DIKE ALONG LUCUNG RIVER, CUTCUT 1ST SECTION, DOWNSTREAM OF CUTCUT TWIN BRIDGE, CAPAS, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱96.5M | 84% | High risk70 | Flagged0.024 |
| 9 | 20CJ0071NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BY-PASS AND DIVERSION ROADS STA. IGNACIA - GUIMBA ROAD VIA GERONA PURA, (GERONA SECTION), TARLAC | Region III | Tarlac DEO | Completed | ₱65.5M | 100% | High risk70 | —-0.035 |
| 10 | 23CJ0332CONSTRUCTION OF FLOOD CONTROL STRUCTURES WITH STEEL SHEET PILE FOUNDATION AND ROAD COMPONENT ALONG UNGOT CREEK PACKAGE R, TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱93.6M | 100% | High risk70 | —-0.014 |
| 11 | 24CJ0374CONSTRUCTION OF SLOPE PROTECTION STRUCTURES WITH STEEL SHEET PILE FOUNDATION ALONG MORIONES - TARLAC RIVER CONTROL, PACKAGE T, BALANTI SECTION, BALANTI, TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱99M | 100% | High risk70 | —-0.011 |
| 12 | 19CJ0122NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BY-PASS AND DIVERSION ROADS GERONA-VICTORIA ROAD VIA ESTIPONA PURA, TARLAC | Region III | Tarlac DEO | Completed | ₱56.2M | 100% | High risk69 | —-0.037 |
| 13 | 17CJ0034NETWORK DEVELOPMENT - IMPROVEMENT/WIDENING OF NATIONAL ROADS; VICTORIA - PURA RD, KO153+281 - KO153+611; KO148+675 - KO151+336 & KO151+431-KO152+471 | Region III | Tarlac DEO | Completed | ₱63.6M | 100% | High risk69 | —-0.038 |
| 14 | 24CJ0366CONSTRUCTION OF SLOPE PROTECTION WITH STEEL SHEET PILE FOUNDATION ALONG MORIONES RIVER, PACKAGE G, TIBAGAN SECTION , TIBAGAN, TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱96.5M | 100% | High risk69 | —-0.013 |
| 15 | 16CK0163ASSETS PRESERV. OF NATL RD., REHAB/RECONST/UPGRADING OF DAMAGED PAVE NATL RD INCL. DRAINAGE BASED ON | Region III | Tarlac 2nd DEO | Completed | ₱35.3M | 100% | High risk66 | —-0.067 |
| 16 | 16CK0189ASSETS PRESERV. OF NATL RDS-REHAB/RECONST OF NATL RDS W/ SLIPS, SLOPE COLLAPSE & LAND SLIDE ALONG | Region III | Tarlac 2nd DEO | Completed | ₱32.4M | 100% | High risk66 | —-0.067 |
| 17 | 18I00028ROAD WIDENING - PRIMARY ROADS: DAANG MAHARLIKA (SM) (SAN ISIDRO-SAN JUANICO), KO690+000-KO690+565; KO679+(-056)-KO680+133; KO680+163.60-KO680+572; KO680+596-KO680+879; KO680+909-KO682+330; KO682+345-KO684+389; KO684+423-KO685+000, NORTHERN SAMAR 1ST LD | Region VIII | Region VIII | Completed | ₱193M | 100% | High risk65 | —-0.059 |
| 18 | 24CJ0392CONSTRUCTION OF SLOPE PROTECTION WITH STEEL SHEET PILE FOUNDATION AND ROAD COMPONENT ALONG CAMILING RIVER LEFT BANK, ANOLING 3RD TO PAO 1ST SECTION, CAMILING, TARLAC (PACKAGE G) | Region III | Tarlac DEO | Completed | ₱29.7M | 100% | High risk64 | —-0.059 |
| 19 | 24CJ0393CONSTRUCTION OF SLOPE PROTECTION WITH STEEL SHEET PILE FOUNDATION AND ROAD COMPONENT ALONG CAMILING RIVER LEFT BANK, ANOLING 3RD TO PAO 1ST SECTION, CAMILING, TARLAC (PACKAGE F) | Region III | Tarlac DEO | Completed | ₱29.7M | 100% | High risk64 | —-0.059 |
| 20 | 24CJ0171CONSTRUCTION OF PANIQUI DRAINAGE SYSTEM, PANIQUI, TARLAC | Region III | Tarlac DEO | Completed | ₱144.8M | 100% | Medium risk58 | —-0.061 |
| 21 | 23CJ0151FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF SLOPE PROTECTION WITH STEEL SHEET PILE FOUNDATION ALONG MORIONES RIVER, TIBAGAN SECTION PACKAGE F, TIBAGAN, | Region III | Tarlac DEO | Completed | ₱95.5M | 100% | Medium risk58 | —-0.077 |
| 22 | 23CJ0145SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES CONSTRUCTION OF SLOPE PROTECTION STRUCTURE WITH STEEL SHEET PILE FOUNDATION ALONG TARLAC FLOOD CONTROL (LEFT DIKE), STA. | Region III | Tarlac DEO | Completed | ₱95.5M | 100% | Medium risk57 | —-0.076 |
| 23 | 23CJ0149FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF SLOPE PROTECTION STRUCTURE WITH STEEL SHEET PILE FOUNDATION ALONG SAN ISIDRO CREEK (PACKAGE N), TARLAC CITY | Region III | Tarlac DEO | Completed | ₱95.5M | 100% | Medium risk57 | —-0.076 |
| 24 | 23CJ0153FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL STRUCTURE WITH STEEL SHEET PILE FOUNDATION ALONG UNGOT CREEK (PACKAGE Q), TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱95.5M | 100% | Medium risk57 | —-0.078 |
| 25 | 23CJ0136FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS REHABILITATION OF SLOPE PROTECTION STRUCTURE WITH STEEL SHEET PILE FOUNDATION ALONG TARLAC FLOOD CONTROL (RIGHT DIKE), CARA | Region III | Tarlac DEO | Completed | ₱95.7M | 100% | Medium risk57 | —-0.076 |