Contractor dossier
183 projects on file, including joint ventures this contractor is part of.
Total projects
183
Total budget
₱7.9B
Average progress
97.9%
Completion rate
95.1%
Average risk score
37.3
Medium risk on average, out of 100
Flagged as unusual
4
2.2% of their projects
Risk mix
Exhibit A
| Region | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Region III | 182 | ₱7.7B | 37.1 | 4 | 97.9% |
| Region VIII | 1 | ₱193M | 64.6 | 0 | 100.0% |
Exhibit B
| Category | Projects | Total budget | Avg risk | Flagged | Avg progress |
|---|---|---|---|---|---|
| Roads | 113 | ₱4.5B | 35.6 | 1 | 97.3% |
| Flood Control and Drainage | 50 | ₱2.8B | 40.7 | 2 | 99.7% |
| Buildings and Facilities | 10 | ₱186.1M | 20.5 | 0 | 100.0% |
| Bridges | 4 | ₱48.6M | 34.9 | 0 | 100.0% |
| OTHER | 3 | ₱185.3M | 69.5 | 0 | 100.0% |
| GAA 2025 SSP | 1 | ₱96.5M | 94.8 | 1 | 54.7% |
| GAA 2025 OO-2 | 1 | ₱48.3M | 88.1 | 0 | 89.8% |
| Bridges, Roads | 1 | ₱48M | 33.2 | 0 | 100.0% |
Exhibit C · High-risk projects
Ranked by risk score, then anomaly score. Showing up to 20.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CJ0233CONSTRUCTION OF CAMILING - BAYAMBANG DIVERSION ROAD (SEGMENT 2), CAMILING, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 55% | High risk95 | Flagged0.024 |
| 25CJ0025CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DUNGUN CREEK, PACKAGE 25, PANIQUI, TARLAC | Region III | Tarlac DEO | On-Going | ₱48.3M | 90% | High risk88 | —-0.020 |
| 24CJ0379REHABILITATION OF SLOPE PROTECTION WITH STEEL SHEET PILE FOUNDATION ALONG TARLAC RIVER CONTROL, RIGHT DIKE, PACKAGE Q, CARANGIAN SECTION, TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱99M | 100% | High risk77 | Flagged0.011 |
| 20CK0070ASSET PRESERVATION PROGRAM: PREVENTIVE MAINTENANCE ALONG CONCEPCION - CAPAS ROAD, CONCEPCION, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱48.7M | 100% | High risk71 | —-0.064 |
| 17CJ0032ASSET PRESERVATION OF NATIONAL ROADS - REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/ HIGHWAY DEVELOPMENT MANAGEMENT-4 (HDM-4); TARLAC-GUIMBA RD VIA VICTORIA K0127+(-219) | Region III | Tarlac DEO | Completed | ₱67.5M | 100% | High risk70 | —-0.063 |
| 17CJ0063NETWORK DEVELOPMENT, IMPROVEMENT/ WIDENING OF NATIONAL ROADS, TARLAC - GUIMBA ROAD VIA VICTORIA, KO133+000 - KO136+000; KO144+989.80 - KO146+963.80 | Region III | Tarlac DEO | Completed | ₱80.1M | 100% | High risk70 | —-0.057 |
| 24CJ0376CONSTRUCTION OF SLOPE PROTECTION WITH STEEL SHEET PILE FOUNDATION ALONG TARLAC RIVER CONTROL, LEFT DIKE, PACKAGE F, STA. MARIA - SAN BARTOLOME SECTION, TARLAC | Region III | Tarlac DEO | Completed | ₱99M | 100% | High risk70 | —-0.010 |
| 24CK0175REHABILITATION OF DIKE ALONG LUCUNG RIVER, CUTCUT 1ST SECTION, DOWNSTREAM OF CUTCUT TWIN BRIDGE, CAPAS, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱96.5M | 84% | High risk70 | Flagged0.024 |
| 20CJ0071NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BY-PASS AND DIVERSION ROADS STA. IGNACIA - GUIMBA ROAD VIA GERONA PURA, (GERONA SECTION), TARLAC | Region III | Tarlac DEO | Completed | ₱65.5M | 100% | High risk70 | —-0.035 |
| 23CJ0332CONSTRUCTION OF FLOOD CONTROL STRUCTURES WITH STEEL SHEET PILE FOUNDATION AND ROAD COMPONENT ALONG UNGOT CREEK PACKAGE R, TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱93.6M | 100% | High risk70 | —-0.014 |
| 24CJ0374CONSTRUCTION OF SLOPE PROTECTION STRUCTURES WITH STEEL SHEET PILE FOUNDATION ALONG MORIONES - TARLAC RIVER CONTROL, PACKAGE T, BALANTI SECTION, BALANTI, TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱99M | 100% | High risk70 | —-0.011 |
| 19CJ0122NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BY-PASS AND DIVERSION ROADS GERONA-VICTORIA ROAD VIA ESTIPONA PURA, TARLAC | Region III | Tarlac DEO | Completed | ₱56.2M | 100% | High risk69 | —-0.037 |
| 17CJ0034NETWORK DEVELOPMENT - IMPROVEMENT/WIDENING OF NATIONAL ROADS; VICTORIA - PURA RD, KO153+281 - KO153+611; KO148+675 - KO151+336 & KO151+431-KO152+471 | Region III | Tarlac DEO | Completed | ₱63.6M | 100% | High risk69 | —-0.038 |
| 24CJ0366CONSTRUCTION OF SLOPE PROTECTION WITH STEEL SHEET PILE FOUNDATION ALONG MORIONES RIVER, PACKAGE G, TIBAGAN SECTION , TIBAGAN, TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱96.5M | 100% | High risk69 | —-0.013 |
| 16CK0163ASSETS PRESERV. OF NATL RD., REHAB/RECONST/UPGRADING OF DAMAGED PAVE NATL RD INCL. DRAINAGE BASED ON | Region III | Tarlac 2nd DEO | Completed | ₱35.3M | 100% | High risk66 | —-0.067 |
| 16CK0189ASSETS PRESERV. OF NATL RDS-REHAB/RECONST OF NATL RDS W/ SLIPS, SLOPE COLLAPSE & LAND SLIDE ALONG | Region III | Tarlac 2nd DEO | Completed | ₱32.4M | 100% | High risk66 | —-0.067 |
| 18I00028ROAD WIDENING - PRIMARY ROADS: DAANG MAHARLIKA (SM) (SAN ISIDRO-SAN JUANICO), KO690+000-KO690+565; KO679+(-056)-KO680+133; KO680+163.60-KO680+572; KO680+596-KO680+879; KO680+909-KO682+330; KO682+345-KO684+389; KO684+423-KO685+000, NORTHERN SAMAR 1ST LD | Region VIII | Region VIII | Completed | ₱193M | 100% | High risk65 | —-0.059 |
| 24CJ0392CONSTRUCTION OF SLOPE PROTECTION WITH STEEL SHEET PILE FOUNDATION AND ROAD COMPONENT ALONG CAMILING RIVER LEFT BANK, ANOLING 3RD TO PAO 1ST SECTION, CAMILING, TARLAC (PACKAGE G) | Region III | Tarlac DEO | Completed | ₱29.7M | 100% | High risk64 | —-0.059 |
| 24CJ0393CONSTRUCTION OF SLOPE PROTECTION WITH STEEL SHEET PILE FOUNDATION AND ROAD COMPONENT ALONG CAMILING RIVER LEFT BANK, ANOLING 3RD TO PAO 1ST SECTION, CAMILING, TARLAC (PACKAGE F) | Region III | Tarlac DEO | Completed | ₱29.7M | 100% | High risk64 | —-0.059 |
Exhibit D · Unusual projects
Ranked by anomaly score. Showing up to 20. Red rings on the map mark flagged projects.
| Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|
| 25CJ0233CONSTRUCTION OF CAMILING - BAYAMBANG DIVERSION ROAD (SEGMENT 2), CAMILING, TARLAC | Region III | Tarlac DEO | On-Going | ₱96.5M | 55% | High risk95 | Flagged0.024 |
| 24CK0175REHABILITATION OF DIKE ALONG LUCUNG RIVER, CUTCUT 1ST SECTION, DOWNSTREAM OF CUTCUT TWIN BRIDGE, CAPAS, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱96.5M | 84% | High risk70 | Flagged0.024 |
| 24CJ0379REHABILITATION OF SLOPE PROTECTION WITH STEEL SHEET PILE FOUNDATION ALONG TARLAC RIVER CONTROL, RIGHT DIKE, PACKAGE Q, CARANGIAN SECTION, TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱99M | 100% | High risk77 | Flagged0.011 |
| 23CK0115CONCRETING OF ROAD AT BRGY. CUT-CUT II - BRGY. ANUPUL (PHASE I), CAPAS AND BAMBAN, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱75.6M | 88% | Medium risk43 | Flagged0.008 |
Exhibit E · Evidence locker
Sorted by risk score.
| # | Contract | Region | Province / DEO | Status | Budget | Progress | Risk | Anomaly |
|---|---|---|---|---|---|---|---|---|
| 51 | 21CK0025NETWORK DEVELOPMENT PROGRAM: ROAD WIDENING ALONG TARLAC - STA. ROSA ROAD, LA PAZ, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱83.3M | 100% | Medium risk38 | —-0.093 |
| 52 | 21CJ0127CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS CONSTRUCTION OF MANILA NORTH ROAD TO SCTEX LUISITA ACCESS ROAD (SAN SEBASTIAN TO BALETE), TARLAC CITY (PHASE 2) | Region III | Tarlac DEO | Completed | ₱70.3M | 100% | Medium risk38 | —-0.095 |
| 53 | 18CJ0114NETWORK DEVELOPMENT PROGRAM ROAD WIDENING PANIQUI-RAMOS RD - K0146+(-236) - K0146+000 (L/S), K0148+996.70 - K0149+160.00 (L/S), K0149+406.50 - K0149+640.00 (L/S), K0150+632 - K0151+546 (L/S), K0146+(-236) - K0148+345.80 (R/S), K0148+994.90 - K0149+348.7 | Region III | Tarlac DEO | Completed | ₱61.5M | 100% | Medium risk38 | —-0.098 |
| 54 | 20CJ0102CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS CONSTRUCTION OF SAN JOSE, TARLAC-PALAUIG, ZAMBALES ROAD INCLUDING DRAINAGE PHASE 12, SAN JOSE TARLAC | Region III | Tarlac DEO | Completed | ₱76.1M | 100% | Medium risk38 | —-0.083 |
| 55 | 23CK0002ASSET PRESERVATION PROGRAM: CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS, CONCEPCION - CAPAS ROAD, CAPAS, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱57.7M | 100% | Medium risk38 | —-0.099 |
| 56 | 20CJ0051ASSET PRESERVATION PROGRAM CONSTRUCTION/ UPGRADING/ REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS PANIQUI-RAMOS RD - K0146 + 000 - K0148 + 346 | Region III | Tarlac DEO | Completed | ₱47.1M | 100% | Medium risk37 | —-0.101 |
| 57 | 22CJ0126SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) CONSTRUCTION OF TARLAC GUIMBA ROAD VIA VICTORIA TO TARLAC - STA. ROSA ROAD (BALIBAGO 2ND - SAN MANUE | Region III | Tarlac DEO | Completed | ₱48M | 100% | Medium risk36 | —-0.100 |
| 58 | 23CJ0048SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES CONSTRUCTION OF SLOPE PROTECTION WITH STEEL SHEET PILE FOUNDATION ALONG BATACAN RIVER, PIT-AO SECTION (PACKAGE C), BARANG | Region III | Tarlac DEO | Completed | ₱70.2M | 100% | Medium risk36 | —-0.081 |
| 59 | 21CJ0067CONSTRUCTION / REPAIR / REHABILITATION / IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS CONSTRUCTION OF BY-PASS AND DIVERSION ROAD, CONSTRUCTION OF MALUID-CRUZ BY-PASS/DIVERSION ROAD (PHASE 2), VICTORIA, TARLAC | Region III | Tarlac DEO | Completed | ₱47.7M | 100% | Medium risk36 | —-0.098 |
| 60 | 22CJ0178SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) CONSTRUCTION OF MANILA NORTH ROAD TO TARLAC - SAN MIGUEL VIA MACABULOS ROAD (TARVET DIVERSION ROAD), | Region III | Tarlac DEO | Completed | ₱48M | 100% | Medium risk36 | —-0.098 |
| 61 | 22CJ0177SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) CONSTRUCTION OF MANILA NORTH ROAD TO SCTEX LUISITA (SCTEX LUISITA ACCESS ROAD), TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱48M | 100% | Medium risk36 | —-0.093 |
| 62 | 22CJ0179SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) INTERJURISDICTIONAL ROADS AND/OR BRIDGES (OR, ROADS THAT TRAVERSE MULTIPLE LGU JURISDICTIONS) CONSTRUCTION OF TARLAC - STA. ROSA ROAD TO SCTEX LUISITA ACCESS ROAD (SAN MANUEL - BANTOG DIVERSION | Region III | Tarlac DEO | Completed | ₱48M | 100% | Medium risk36 | —-0.096 |
| 63 | 25CJ0087ACCESS ROAD LEADING TO DUEG ECOTOURISM NATURE'S PARK, BRGY. MAASIN, SAN CLEMENTE, TARLAC | Region III | Tarlac DEO | On-Going | ₱45M | 59% | Medium risk35 | —-0.055 |
| 64 | 25CK0007ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS ALONG VICTORIA - LA PAZ ROAD, LA PAZ, TARLAC | Region III | Tarlac 2nd DEO | On-Going | ₱48M | 76% | Medium risk35 | —-0.066 |
| 65 | 23CJ0103CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) ACCESS ROAD LEADING TO DUEG ECOTOURISM NATURE'S PARK, BRGY. MAASIN, SAN CLEMENTE, TARLAC | Region III | Tarlac DEO | Completed | ₱38.7M | 100% | Medium risk35 | —-0.097 |
| 66 | 21CK0015REHABILITATION/IMPROVEMENT OF EXISTING DIKE ALONG MARIMLA RIVER, (RIGHT BANK, DOWNSTREAM OF STO. NINO BRIDGE), LOURDES SECTION, BAMBAN, TARLAC | Region III | Tarlac 2nd DEO | Completed | ₱72.3M | 100% | Medium risk35 | —-0.086 |
| 67 | 22CJ0061CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) ACCESS ROAD LEADING TO DUEG ECOTOURISM NATURE'S PARK, BRGY. MAASIN, SAN CLEMENTE, TARLAC | Region III | Tarlac DEO | Completed | ₱38.9M | 100% | Medium risk35 | —-0.095 |
| 68 | 21CJ0139FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION/REHABILITATION/IMPROVEMENT OF FLOOD CONTROL STRUCTURES ALONG MORIONES RIVER (LEFT SIDE), TIBAGAN SECTION, TARLAC CITY, TARLAC | Region III | Tarlac DEO | Completed | ₱70.2M | 100% | Medium risk35 | —-0.085 |
| 69 | 21CJ0032CONVERGENCE AND SPECIAL SUPPORT PROGRAM CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) ACCESS ROAD LEADING TO DUEG ECOTOURISM NATURE'S PARK, BRGY. MAASIN, SAN CLEMENTE, TARLA | Region III | Tarlac DEO | Completed | ₱38.5M | 100% | Medium risk35 | —-0.098 |
| 70 | 21CJ0140FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONSTRUCTION/REHABILITATION/IMPROVEMENT OF FLOOD CONTROL STRUCTURES ALONG MORIONES RIVER (RIGHT SIDE), BALANTI SECTION INCLUDING ROAD COMPONENT, TARLAC | Region III | Tarlac DEO | Completed | ₱70.2M | 100% | Medium risk35 | —-0.086 |
| 71 | 23CJ0027FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF SLOPE PROTECTION WITH STEEL SHEET PILE FOUNDATION ALONG TARLAC RIVER CONTROL LEFT DIKE, SAN JOSE-SAN BART | Region III | Tarlac DEO | Completed | ₱70.2M | 100% | Medium risk35 | —-0.085 |
| 72 | 24CJ0068CONSTRUCTION OF CAPAS-SAN JOSE-MAYANTOC-MALACAMPA ROAD (BALDIOS TO PITOMBAYOG DIVERSION ROAD - PHASE II), TARLAC | Region III | Tarlac DEO | Completed | ₱30M | 100% | Medium risk35 | —-0.100 |
| 73 | 19CJ0052NETWORK DEVELOPMENT PROGRAM CONSTRUCTION OF BY-PASS AND DIVERSION ROADS PANIQUI-CAMILING-WAWA ROAD TO STA. IGNACIA-GUIMBA ROAD VIA GERONA AND PURA, (GERONA SECTION), TARLAC | Region III | Tarlac DEO | Completed | ₱46.6M | 100% | Medium risk35 | —-0.097 |
| 74 | 22CJ0029FLOOD MANAGEMENT PROGRAM CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG CAMILING RIVER, RIGHT BANK, SAWAT SECTION (PACKAGE D), SAWAT, CAMILING, TA | Region III | Tarlac DEO | Completed | ₱48M | 100% | Medium risk34 | —-0.085 |
| 75 | 19CJ0085NETWORK DEVELOPMENT PROGRAM ROAD WIDENING ROMULO H-WAY K0163 + 472 - K0164 + 365 | Region III | Tarlac DEO | Completed | ₱20.1M | 100% | Medium risk34 | —-0.099 |